Search NASA⌕ Search

SEARCH · Search NASA

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

International Space Station Bipropellant Plume Contamination Model Update for Short Thruster Pulse Widths

The International Space Station (ISS) Bipropellant Plume Contamination Model has been a vital tool for characterizing the thruster plume-induced contamination environment at the ISS but was not intended to be used for very short thruster pulse widths. This paper presents an updated model that ensures full start-up and shut-down phases are modeled for each thruster firing, when the majority of liquid phase contaminant mass is released. The updated ISS Bipropellant Plume Contamination Model prevents potential under-prediction of thruster plume-induced contamination due to visiting vehicle proximity operations and provides a way to take advantage of thruster start-up and shut-down data performance data gathered during thruster test programs, if available. The International Space Station (ISS) Bipropellant Plume Contamination Model developed by Boeing Space Environments is a semi-empirical model anchored in flight experiment data and has been a vital tool for characterizing the thruster plume-induced contamination environment at the ISS.[1] The current model utilizes flight experiment data from the Plume Impingement Contamination (PIC) and Shuttle Plume Impingement Flight Experiment (SPIFEX) studies, which include Orbiter 3870 N Primary Reaction Control System (PRCS) and Russian 130 N thrusters operating in pulse mode with 80-100 ms.[2] As the next generation of crew and cargo visiting vehicles are developed and arrive at ISS, minimum pulse widths of vehicle thrusters used for ISS proximity operations have decreased significantly below 80 ms. An update to the ISS Bipropellant Contamination Model is needed to prevent potential under-prediction of thruster plume-induced contamination for these very short pulse widths. Contamination due to thruster plumes occurs in the liquid phase (i.e., unburned or partially burned propellant in the plume). Liquid phase releases primarily occur during thruster start-up and shut-down phases, with the steady state phase contributing a small amount to the total contaminant mass released. The current ISS Bipropellant Plume Contamination Model includes functional dependencies on thruster parameters (thrust, mass flow rate, specific impulse (Isp)), distance to receiver surface, and angle off plume centerline. For modeling purposes, contaminant mass released scales linearly with pulse width. This is a conservative approach for pulse widths greater than 80 ms but could under-predict contamination for very short pulse widths (i.e., with little or no steady state phase). This paper presents a model update to add a functional dependency on commanded pulse width to ensure the portion of the pulse spent in start-up and shut-down phases is appropriately modeled, when the majority of liquid phase contaminant mass is released. The updated model prevents potential under-prediction of thruster plume-induced contamination due to visiting vehicle proximity operations while providing a way to take advantage of thruster start-up and shut-down data gathered during test programs, if available. Developing the plume model for a specific thruster using the ISS Bipropellant Plume Contamination Model must be done in consideration of all available thruster performance data. Example thruster data will be used to illustrate this point and options for implementing the model update with existing ISS Bipropellant Plume Contamination Model code will be discussed.

plume contamination↗

CRADA Final Report: CRADA Number NFE-24-10036 with ThermaMatrix, Inc.

ThermaMatrix, Inc provides novel vision inspection solutions for a wide range of manufacturers and industries, providing and implementing the leading technologies for nondestructive inspection (NDI) and material characterization. Many other inspection solutions are either not adequate or are not approachable due to implementation barriers needing expert level operators, excessive inspection time, and high cost. ThermaMatrix’s advanced vision inspection technology addresses all of these limitations. The Lab Embedded Entrepreneurial Program (LEEP) opportunity by the Department of Energy (DOE) allows small-business start-ups to leverage national laboratory capabilities and skilled scientists to rapidly develop their technology that aligns with DOE goals. ThermaMatrix, Inc. was positioned in the Innovation Crossroads program at Oak Ridge National Laboratory to further develop the novel Watson Vision Inspection System to support manufacturing quality control efforts. The research goals were (1) explore fundamental parameters that would improve preexisting capabilities, (2) full-scale industrial setup for demonstration, and (3) capability testing and verification. Manufacturing is demanding more NDI implementation to support their quality control needs, which this technology development would support.

36 MATERIALS SCIENCE↗

X-Ray Imaging and Spectroscopy Mission

The X-Ray Imaging and Spectroscopy Mission (XRISM) is a joint mission between the Japan Aerospace Exploration Agency (JAXA) and the National Aeronautics and Space Administration (NASA) in collaboration with the European Space Agency (ESA). In addition to the three space agencies, universities and research institutes from Japan, North America, and Europe have joined to contribute to developing satellite and onboard instruments, data-processing software, and the scientific observation program. XRISM is the successor to the ASTRO-H (Hitomi) mission, which ended prematurely in 2016. Its primary science goal is to examine astrophysical problems with precise, high-resolution X-ray spectroscopy. XRISM promises to discover new horizons in X-ray astronomy. It carries a 6 × 6 pixelized X-ray microcalorimeter on the focal plane of an X-ray mirror assembly (Resolve) and a co-aligned X-ray CCD camera (Xtend) that covers the same energy band over a large field of view. XRISM utilizes the Hitomi heritage, but all designs were reviewed. The attitude and orbit control system was improved in hardware and software. The spacecraft was launched from the JAXA Tanegashima Space Center on 2023 September 6 (UTC). During the in-orbit commissioning phase, the onboard components were activated. Although the gate valve protecting the Resolve sensor with a thin beryllium X-ray entrance window was not yet opened, scientific observation started in 2024 February with the planned performance verification observation program. The nominal observation program commenced with the following guest observation program beginning in 2024 September.

Astronomy and AstroPhysics↗

Final Technical Report for Automated Manufacturing of Innovative CPV/PV Modules

Cogenra’s Dense Cell Interconnect system was designed to use traditional front-contact cells and string them together into high efficiency and high reliability “supercells”. This novel stringer allows one to take advantage of the ~100 GW/year of existing cell production capacity and create a solar product for the customer that will produce more power and last longer than traditional PV products. The goal for this program was for Cogenra Solar to design and develop a first-of-kind automated solar manufacturing line that produces strings of overlapping cells or “supercells” based on Cogenra’s Dense Cell Interconnect (DCI) technology for their Low Concentration Photovoltaic (LCPV) systems. This will enable the commercialization of DCI technology to improve the efficiency, reliability and economics for their Low Concentration Photovoltaic systems. In this program, Cogenra Solar very successfully designed, developed, built, installed, and started up the ground-breaking manufacturing tools required to assemble supercells. Cogenra then successfully demonstrated operation of the integrated line at high yield and throughput far exceeding expectations. The development of a supercell production line represents a critical step toward a high volume and low cost Low Concentration Photovoltaic Module with Dense Cell Interconnect technology and has enabled the evaluation of the technology for reliability and yield. Unfortunately, performance and cost headwinds on Low Concentration Photovoltaics systems including lack of diffuse capture (10-15% hit) and more expensive tracker requirements resulted in a move away from LCPV technology. Fortunately, the versatility of Dense Cell Interconnect technology allows for application to flat plate module technology as well and Cogenra has worked with the DOE to utilize the learning from this grant to commercialize DCI technology for the solar market through the on-going grant: Catalyzing PV Manufacturing in the US With Cogenra Solar’s Next-Generation Dense Cell Interconnect PV Module Manufacturing Technology. This program is now very successfully building off of this work and commercializing the technology to enable increased solar adoption.

14 SOLAR ENERGY↗

The AMPTE IRM Science Data Center

The creation of artificial ion clouds is a major aspect of the AMPTE program. The IRM Science Data center supports real-time decision for a release with real-time scientific data processing and display including model calculations of ion trajectories. Additionally, survey plots and summary data records are generated in near real time thus allowing to start the data analysis as early as possible. For detailed analyses, interactive programs were developed so that physical parameters of all IRM experiments can be combined to produce common spectra or line plots.

Bauer, O. H.↗

Controlled Islanding Strategy Considering Uncertainty of Renewable Energy Sources Based on Chance-constrained Model

Controlled islanding plays an essential role in preventing the blackout of power systems. Although there are several studies on this topic in the past, not enough attention is paid to the uncertainty brought by renewable energy sources (RESs) that may cause unpredictable unbalanced power and the observability of power systems after islanding that is essential for back-up black-start measures. Therefore, a novel controlled islanding model based on mixed-integer second-order cone and chance-constrained programming (MISOCCP) is proposed to address these issues. First, the uncertainty of RESs is characterized by their possibility distribution models with chance constraints, and the requirements, e. g., system observ-ability, for rapid back-up black-start measures are also considered. Then, a law of large numbers (LLN) based method is employed for converting the chance constraints into deterministic ones and reformulating the non-convex model into convex one. Finally, case studies on the revised IEEE 39-bus and 118-bus power systems as well as the comparisons among different models are given to demonstrate the effectiveness of the proposed model. The results show that the proposed model can result in less unbalanced power and better observability after islanding compared with other models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Human Systems Integration (HSI) Practitioner's Guide

The NASA/SP-2015-3709, Human Systems Integration (HSI) Practitioner's Guide, also known as the "HSIPG," provides a tool for implementing HSI activities within the NASA systems engineering framework. The HSIPG is written to aid the HSI practitioner engaged in a program or project (P/P), and serves as a knowledge base to allow the practitioner to step into an HSI lead or team member role for NASA missions. Additionally, this HSIPG is written to address the role of HSI in the P/P management and systems engineering communities and aid their understanding of the value added by incorporating good HSI practices into their programs and projects. Through helping to build a community of knowledgeable HSI practitioners, this document also hopes to build advocacy across the Agency for establishing strong, consistent HSI policies and practices. Human Systems Integration (HSI) has been successfully adopted (and adapted) by several federal agencies-most notably the U.S. Department of Defense (DoD) and the Nuclear Regulatory Commission (NRC)-as a methodology for reducing system life cycle costs (LCCs). These cost savings manifest themselves due to reductions in required numbers of personnel, the practice of human-centered design, decreased reliance on specialized skills for operations, shortened training time, efficient logistics and maintenance, and fewer safety-related risks and mishaps due to unintended human/system interactions. The HSI process for NASA establishes how cost savings and mission success can be realized through systems engineering. Every program or project has unique attributes. This HSIPG is not intended to provide one-size-fits-all recommendations for HSI implementation. Rather, HSI processes should be tailored to the size, scope, and goals of individual situations. The instructions and processes identified here are best used as a starting point for implementing human-centered system concepts and designs across programs and projects of varying types, including manned and unmanned, human spaceflight, aviation, robotics, and environmental science missions. The practitioner using this guide should have expertise in Systems Engineering or other disciplines involved in producing systems with anticipated human interactions. (See section 1.6 of this guide for further discussion on HSI discipline domains.) The HSIPG provides an "HSI layer" to the NASA Systems Engineering Engine (SEE), detailed in NASA Procedural Requirement (NPR) 7123.1B, NASA Systems Engineering Processes and Requirements, and further explained in NASA/SP-2007-6105, Systems Engineering Handbook (see HSIPG Table 2.2-1, NASA Documents with HSI Content, for specific references and document versions).

Zumbado, Jennifer Rochlis↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

Electronics and Software Engineer for Robotics Project Intern

I was assigned to mentor high school students for the 2017 First Robotics Competition. Using a team based approach, I worked with the students to program the robot and applied my electrical background to build the robot from start to finish. I worked with students who had an interest in electrical engineering to teach them about voltage, current, pulse width modulation, solenoids, electromagnets, relays, DC motors, DC motor controllers, crimping and soldering electrical components, Java programming, and robotic simulation. For the simulation, we worked together to generate graphics files, write simulator description format code, operate Linux, and operate SOLIDWORKS. Upon completion of the FRC season, I transitioned over to providing full time support for the LCS hardware team. During this phase of my internship I helped my co-intern write test steps for two networking hardware DVTs , as well as run cables and update cable running lists.

Teijeiro, Antonio↗

jFuzz: A Concolic Whitebox Fuzzer for Java

We present jFuzz, a automatic testing tool for Java programs. jFuzz is a concolic whitebox fuzzer, built on the NASA Java PathFinder, an explicit-state Java model checker, and a framework for developing reliability and analysis tools for Java. Starting from a seed input, jFuzz automatically and systematically generates inputs that exercise new program paths. jFuzz uses a combination of concrete and symbolic execution, and constraint solving. Time spent on solving constraints can be significant. We implemented several well-known optimizations and name-independent caching, which aggressively normalizes the constraints to reduce the number of calls to the constraint solver. We present preliminary results due to the optimizations, and demonstrate the effectiveness of jFuzz in creating good test inputs. The source code of jFuzz is available as part of the NASA Java PathFinder. jFuzz is intended to be a research testbed for investigating new testing and analysis techniques based on concrete and symbolic execution. The source code of jFuzz is available as part of the NASA Java PathFinder.

Jayaraman, Karthick↗

Development of large rotorcraft transmissions

The U.S. Army Heavy Lift Helicopter (HLH) represents a large rotorcraft which was developed by an American aerospace company. In the early 1970's with the HLH Advanced Technology Components (ATC) program, the development of large rotorcraft transmission and drive systems was started. Failures in the spiral bevel gearing were experienced in tests because the employed method of analysis had not considered the effect of rim bending. Consequently, new gears with strengthened rims were designed and fabricated. For a more accurate prediction of the load capacity of the gears, an extensive Finite Element Method (FEM) system was developed. The U.S. Army's XCH-62 HLH aft rotor transmission was finally successfully tested at full design torque and speed. A description of the test program is provided, and the analytical program is discussed. The analytical phase includes the development of a preprocessing program which aids in the review of calculated FEM stresses.

Samanich, N. E.↗

The Infrastructure Necessary to Support a Sustainable Material Protection, Control and Accounting (MPC&A) Program in Russia

The NNSA Material Protection, Control, and Accounting (MPC&A) program has been engaged for fifteen years in upgrading the security of nuclear materials in Russia. Part of the effort has been to establish the conditions necessary to ensure the long-term sustainability of nuclear security. A sustainable program of nuclear security requires the creation of an indigenous infrastructure, starting with sustained high level government commitment. This includes organizational development, training, maintenance, regulations, inspections, and a strong nuclear security culture. The provision of modern physical protection, control, and accounting equipment to the Russian Federation alone is not sufficient. Comprehensive infrastructure projects support the Russian Federation's ability to maintain the risk reduction achieved through upgrades to the equipment. To illustrate the contributions to security, and challenges of implementation, this paper discusses the history and next steps for an indigenous Tamper Indication Device (TID) program, and a Radiation Portal Monitoring (RPM) program.

Bachner, Katherine M.↗

Space plasma research

Temperature and density analysis in the Automated Analysis Program (for the global empirical model) were modified to use flow velocities produced by the flow velocity analysis. Revisions were started to construct an interactive version of the technique for temperature and density analysis used in the automated analysis program. A sutdy of ion and electron heating at high altitudes in the outer plasmasphere was initiated. Also the analysis of the electron gun experiments on SCATHA were extended to include eclipse operations in order to test a hypothesis that there are interactions between the 50 to 100 eV beam and spacecraft generated photoelectrons. The MASSCOMP software to be used in taking and displaying data in the two-ion plasma experiment was tested and is now working satisfactorily. Papers published during the report period are listed.

Comfort, R. H.↗

The NATA code: Theory and analysis, volume 1

A computer program for calculating quasi-one-dimensional gas flow in axisymmetric and two-dimensional nozzles and rectangular channels is presented. Flow is assumed to start from a state of thermochemical equilibrium at a high temperature in an upstream reservoir. The program provides solutions based on frozen chemistry, chemical equilibrium, and nonequilibrium flow with finite reaction rates. Electronic nonequilibrium effects can be included using a two-temperature model. An approximate laminar boundary layer calculation is given for the shear and heat flux on the nozzle wall. Boundary layer displacement effects on the inviscid flow are considered also. Chemical equilibrium and transport property calculations are provided by subroutines. The code contains precoded thermochemical, chemical kinetic, and transport cross section data for high-temperature air, CO2-N2-Ar mixtures, helium, and argon. It provides calculations of the stagnation conditions on axisymmetric or two-dimensional models, and of the conditions on the flat surface of a blunt wedge. The primary purpose of the code is to describe the flow conditions and test conditions in electric arc heated wind tunnels.

Bade, W. L.↗

User's manual for the TRW gaspipe 2 program: A vapor-gas front analysis program for heat pipes containing non-condensible gas

A digital computer program for design and analysis of heat pipes which contain non-condensible gases, either for temperature control or to aid in start-up from the frozen state, is presented. Some of the calculations which are possible with the program are: (1) wall temperature profile along a gas-loaded heat pipe, (2) amount of gas loading necessary to obtain desired evaporator temperature at a desired heat load, (3) heat load versus evaporator temperature for a fixed amount of gas in the pipe, and (4) heat and mass transfer along the pipe, including the vapor-gas front region.

Edwards, D. K.↗

NextSTEP Appendix A Modular ECLSS Effort Lessons Learned

NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.

NextSTEP↗

NextSTEP Appendix A Modular ECLSS Effort Lessons Learned

NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.

NextSTEP↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗