Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of a Compliant Tether to Decouple Observation Buoy Motion for Auxiliary Wave Power

With the growth of the Blue Economy, the volume of data collection within the ocean environment has been rapidly increasing. Larger numbers of oceanographic, meteorological, and floating Light Detection And Ranging (LiDAR) buoys have been collecting high fidelity measurements while pushing against power budget limits. Power limitations lead to infrequent transmission of reduced data sets or recording data to local storage that must be physically collected when the buoy is serviced. Triton Systems, Inc. and its partners are developing a retrofittable wave energy converter (WEC) to provide auxiliary power to these observation buoys to increase mission duration and power budget, improve reliability, and reduce the need for service trips. One of the greatest challenges has been developing a method to interface Triton's WEC with these buoys without impacting measurement fidelity. This is especially critical for inertial wave and LiDAR wind measurements collected with sensors that could be adversely affected by additional buoy dynamics introduced by an integrated WEC. To address this, Triton and EOM Offshore developed a compliant tether to pair an observation buoy with a floating WEC while decoupling relative motion. Based on EOM's proven stretch hose technology, this compliant tether transmits power and data between the buoy-WEC system. In conclusion, modeling shows that the system has the potential to minimally adversely affect oceanographic, meteorological, wind resource characterization, and other measurements, with future testing scheduled to validate modeling efforts.

16 TIDAL AND WAVE POWER↗

Electrochemical Impedance Spectroscopy of Alloys in a Simulated Space Shuttle Launch Environment

Type 304L stainless steel (304L SS) tubing is currently used in various supply lines that service the Orbiter at NASA's John F. Kennedy Space Center Launch Pads in Florida (USA). The atmosphere at the Space Shuffle launch site is very corrosive due to a combination of factors, such as the proximity of the Atlantic Ocean and the concentrated hydrochloric acid produced by the fuel combustion reaction in the solid rocket boosters. The acidic chloride environment is aggressive to most metals and causes severe pitting in many of the common stainless steel alloys such as 304L SS. Stainless steel tubing is susceptible to pitting corrosion that can cause cracking and rupture of both high-pressure gas and fluid systems. Outages in the systems where failures occur can impact the normal operation of the shuttle and launch schedules. The use of a more corrosion resistant tubing alloy for launch pad applications would greatly reduce the probability of failure, improve safety, lessen maintenance costs, and reduce downtime. A study which included ten alloys was undertaken to find a more corrosion resistant material to replace the existing 304L SS tubing. The study included atmospheric exposure at NASA's John F. Kennedy Space Center outdoor corrosion test site near the launch pads and electrochemical measurements in the laboratory which included DC techniques and electrochemical impedance spectroscopy (EIS). This paper presents the results from EIS measurements on three of the alloys: AL6XN (UN N08367), 254SMO (UNS S32l54), and 304L SS (UNS S30403). Type 304L SS was included in the study as a control. The alloys were tested in three electrolyte solutions which consisted of neutral 3.55% NaC1, 3.55% NaCl in O.1N HC1, and 3.55% NaCl in 1.ON HC1. The solutions were chosen to simulate environments that were expected to be less, similar, and more aggressive, respectively, than those present at the Space Shuttle launch pads. The results from the EIS measurements were analyzed to evaluate the corrosion susceptibility of the alloys and to predict the long-term corrosion performance of the subject materials. The results from the EIS measurements for the three alloys indicated that the higher-alloyed 254SMO and AL6XN exhibited a significantly improved resistance to corrosion than the 304L SS as the concentration of hydrochloric acid in the 3.55% NaC1 solution was increased. The polarization resistance values obtained from the EIS measurements were consistent with those from linear polarization measurements, and were indicative of the actual long-term corrosion performance of the alloys during a two-year atmospheric exposure study.

Calle, L. M.↗

Transition to Online Cable Insulation Condition Monitoring

Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be de-coupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.

Glass, Samuel W.↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Some Aeronautical Communications Experiments

Classically there has existed an asymmetry between the computing and communicating sides of aerospace systems. Over the past few decades, this asymmetry has shifted to favoring communication link technologies, meaning that advancements in available central processing units (CPUs), storage devices, and internal data buses have stagnated. Indeed, the increased emphasis placed on refining subsystem performance such as with antenna bandwidth in phased arrays, amplifier power efficiency, software defined radio (SDR) flexibility and encoding for data compression and error correction has given rise to successful debuts of multi-gigabit-per-second data return from long space-link distances. These accomplishments are easily quantifiable through link budgets and illustrate what is possible, but also reveal the deficiencies in overall communications capabilities. In particular, the ever-accelerating presence of aerospace vehicles gives rise to newer and larger classes of challenges to address the needs of 21st century systems. Furthermore remote sensing and imaging capabilities have far outpaced our ability to transmit their products to the ground, so we are increasingly dependent on pre-processing and downselection to contend with the communications bottleneck. No longer may we depend upon the constrained logistics in delivering end-to-end data delivery through manual reconfigurations, static event scheduling and execution on a per-vehicle basis, for these methods do not scale and therefore must give way to dynamic, networked approaches with an overall systems view in mind. Emerging mission requirements exhibit a trend toward multiple smaller-scale vehicles working together to perform dissimilar observations. Such operations necessitate sensor fusion across a constellation, and where data processing may be distributed throughout a fairly disconnected network whose topology changes over time in non-deterministic manners. Individual communications link performance is still very relevant to deploying an effective communications system, but now must be embedded within a greater architecture of capability to optimally utilize the bandwidth available from each link to generate an ultimate end-to-end quality of service. The deleterious effects of timing uncertainty across the arrangement presents a challenge to measurement synchronization and delivery, so a successful deployed system needs to be tolerant to the delays inherent in time-of-light between elements and digital processing latencies existing at each node. In this presentation we share the flight test results from a high performance Gbps laser communications terminal evaluated with a suite of store and forward capabilities called High-rate Delay Tolerant Networking (HDTN). The communications payload is operated over Lake Erie across a range of configurations including several convergence layers, and is evaluated to determine recovery time after link disruptions, information loss, efficiency and speed. The effectiveness of utilizing a flying laboratory to increase the Technology Readiness Level (TRL) of an integrated system in relevant environments is discussed, as well as the value of conducting aeronautics experiments to retire risk for technology infusion into space missions. Upcoming flight campaigns will be presented, including opportunities to demonstrate secure command and control, data intensive hyperspectral imaging, quantum link characterization, 4k High Definition (HD) video streaming and internetworked space-ground-aero relay operations. These experiments will pave the way for future missions which will depend upon interoperability across disparate government and privately owned networks, involve contention with uncertain and dynamic timing, and require agility to autonomously configure optimal parameters across networks of ever-increasing size and complexity to ensure data delivery. https://www1.grc.nasa.gov/space/scan/acs/tech-studies/dtn/

Daniel Raible↗

Performance assessment of the TDRSS Onboard Navigation System (TONS) experiment on EP/EUVE

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing an operational Tracking and Data Relay Satellite (TDRS) System (TDRSS) Onboard Navigation System (TONS) to provide onboard knowledge of high-accuracy navigation products autonomously to users of TDRSS and its successor, TDRS-2. A TONS experiment has been implemented on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, to flight qualify the TONS operational system using TDRSS forward-link communications services. This paper assesses the performance of the TONS flight hardware, an ultrastable oscillator (USO) and Doppler extractor (DE) card in one of the TDRSS user transponders, and the protoype flight software, based on the TONS experiment results. An overview of onboard navigation via TDRSS is also presented for both the EP/EUVE experiment and for future users of TONS. USO and DE short-term and long-term stability performance has been excellent. TONS Flight Software analysis indicates that position accuracies of better than 25 meters root-mean-square are achievable with tracking every one to two orbits, for the EP/EUVE 525-kilometer altitudes, 28.5-degree inclination orbit. The success of the TONS experiment demonstrates the flight readiness of TONS, which is scheduled to provide autonomous navigation for the Earth Observing System (EOS)-AM mission.

Gramling, C. J.↗

Free Flyer Total and Spectral Solar Irradiance Sensor (TSIS) and Climate Services Mission

NOAA's planned Total and Spectral Solar Irradiance Sensor (TSIS) mission will fly along with the NOAA user service payloads Advanced Data Collection System (ADCS) and Search and Rescue Satellite Aided Tracking (SARSAT). In ' order to guarantee continuity in the 33-year solar irradiance climate data record, TSIS must be launched in time to overlap with current on-orbit solar irradiance instruments. Currently TSIS is moving towards a launch rcadin~ss date of January 2015. TSIS provides for continuation of the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM) ,currently onboard NASA's Solar Radiation and Climate Experiment (SORCE) platform, launched in January 2003. The difficulty of ensuring continuity has increased due to the launch failure of NASA's Glory mission with its improved TIM. Achieving the needed overlap must now rely on extending SORCE. and maintaining the TSIS schedule. TSIS is one component of a NASA-NOAA joint program (JPSS) planned to transition certain climate observations to operational mode. We summarize issues of continuity, improvements being made to the TIM and 81M sensors, and plans to provide for traceability of total and spectral irradiance measurements to ground-based cryogenic standards.

Cahalan, R.↗

Development of a Q-band Propagation Campaign in the United States

The imminent saturation of commercial Ka-band services has generated increased interest by the SATCOM industry, as well as NASA (via potential commercially provided SATCOM services), to investigate the use of the Q-band (37-42 GHz) for future space-to-earth communications spectrum utilization. It is well understood that the use of higher frequencies (i.e. , Q-band) offers wider bandwidth, higher data rate services, but an understanding of Q-band performance limitations as they pertain to atmospheric propagation, particularly at NASA and commercial sites of interest, is not well characterized. Thus, the first steps towards system performance determination will be the initiation of a propagation campaign to statistically The imminent saturation of commercial Ka-band services has generated increased interest by the SATCOM industry, as well as NASA (via potential commercially provided SATCOM services), to investigate the use of the Q-band (37-42 GHz) for future space-to-earth communications spectrum utilization. It is well understood that the use of higher frequencies (i .e., Q-band) offers wider bandwidth, higher data rate services, but an understanding of Q-band performance limitations as they pertain to atmospheric propagation, particularly at NASA and commercial sites of interest, is not well characterized. Thus, the first steps towards system performance determination will be the initiation of a propagation campaign to statistically quantify long-term degradation parameters due to the atmosphere. As such, NASA Glenn Research Center (GRC), in collaboration with Space Systems/Loral(SS/L), is leading an effort to characterize Q-band link performance at key sites to determine its potential for use in future space communications architectures. The proposed propagation campaign is divided into phases, beginning with passive radiometric observations in the Q-band, and eventually leading to an active beacon experiment. Herein, we describe the schedule, development, and architecture of the first Q-band propagation campaign being conducted in the US and the proposed objectives of the effort.

Nessel, James A.↗

Intersatellite Link (ISL) application to commercial communications satellites. Volume 2: Technical final report

Intersatellite Link (ISL) applications can improve and expand communication satellite services in a number of ways. As the demand for orbital slots within prime regions of the geostationary arc increases, attention is being focused on ISLs as a method to utilize this resource more efficiently and circumvent saturation. Various GEO-to-GEO applications were determined that provide potential benefits over existing communication systems. A set of criteria was developed to assess the potential applications. Intersatellite link models, network system architectures, and payload configurations were developed. For each of the chosen ISL applications, ISL versus non-ISL satellite systems architectures were derived. Both microwave and optical ISL implementation approaches were evaluated for payload sizing and cost analysis. The technological availability for ISL implementations was assessed. Critical subsystems technology areas were identified, and an estamate of the schedule and cost to advance the technology to the requiered state of readiness was made.

Young, S. Lee↗

Geostationary Operational Environmental Statellite(GEOS-N report)

The Advanced Missions Analysis Office (AMAO) of GSFC has completed a study of the Geostationary Operational Environmental Satellites (GOES-N) series. The feasibility, risks, schedules, and associated costs of advanced space and ground system concepts responsive to National Oceanic and Atmospheric Administration (NOAA) requirements were evaluated. The study is the first step in a multi-phased procurement effort that is expected to result in launch ready hardware in the post 2000 time frame. This represents the latest activity of GSFC in translating meteorological requirements of NOAA into viable space systems in geosynchronous earth orbits (GEO). GOES-N represents application of the latest spacecraft, sensor, and instrument technologies to enhance NOAA meteorological capabilities via remote and in-situ sensing from GEO. The GOES-N series, if successfully developed, could become another significant step in NOAA weather forecasting space systems, meeting increasingly complex emerging national needs for that agency's services.

Source record↗

Robotic technologies of the Flight Telerobotic Servicer (FTS) including fault tolerance

The original FTS concept for Space Station Freedom (SSF) was to provide telerobotic assistance to enhance crew activity and safety and to reduce crew EVA (Extra Vehicular Activity) activity. The first flight of the FTS manipulator systems would demonstrate several candidate tasks and would verify manipulator performance parameters. These first flight tasks included unlocking a SSF Truss Joint, mating/demating a fluid coupling, contact following of a contour board, demonstrating peg-in-hole assembly, and grasping and moving a mass. Future tasks foreseen for the FTS system included ORU (Orbit Replaceable Unit) change-out, Hubble Space Telescope Servicing, Gamma Ray Observatory refueling, and several in-situ SSF servicing and maintenance tasks. Operation of the FTS was planned to evolve from teleoperation to fully autonomous execution of many tasks. This wide range of mission tasks combined with the desire to evolve toward fully autonomy forced several requirements which may seen extremely demanding to the telerobotics community. The FTS requirements appear to have been created to accommodate the open-ended evolution plan such that operational evolution would not be impeded by function limitations. A recommendation arising from the FTS program to remedy the possible impacts from such ambitious requirements is to analyze candidate robotic tasks. Based on these task analyses, operational impacts against development impacts were weighed prior to requirements definition. Many of the FTS requirements discussed in the following sections greatly influenced the development cost and schedule of the FTS manipulator. The FTS manipulator has been assembled at Martin Marietta and is currently in testing. Successful component tests indicate a manipulator which achieves unprecedented performance specifications.

Chladek, John T.↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗

Urban Air Mobility: Predictive Modelling on the Behavior of Air-Service Bookings in Metropolitan Areas

The demand for a ride to work without running into the inefficiencies of traffic in a bustling, metropolitan area beckons for a system to tackle on-the ground traffic congestion, thus fueling the need for Urban Air Mobility (UAM). The instant gratification culture, notably its effect on Generation Z, has given way to the nature of impulsive decision making. The 2020 COVID-19 crisis, with its use of tap-to-gratify technology, highlights passengers preferring late booking. This last-minute airport reorganization crisis spearheaded our research goal to create a more user-personalized assessment of cancellation rates. Our research highlights that there will be a market in the 2030s for UAM, short-distance air transportation, and the world must prepare for the challenges that come with this new market. Through a two-part model, we obtained two randomized sets of profiles of user-specific and ridership attributes and their relationship with cancellations. Recommendations for future research include factoring this personalized aspect into cancellation projections to provide reasoned user discounts as well as a remedy for the scheduling chaos that stems from the airport organizational crisis.

Srushti Adesara↗

Towards a Scalable and Adaptive Application Support Platform for Large-Scale Distributed E-Sciences in High-Performance Network Environments

The advent of large-scale collaborative scientific applications has demonstrated the potential for broad scientific communities to pool globally distributed resources to produce unprecedented data acquisition, movement, and analysis. System resources including supercomputers, data repositories, computing facilities, network infrastructures, storage systems, and display devices have been increasingly deployed at national laboratories and academic institutes. These resources are typically shared by large communities of users over Internet or dedicated networks and hence exhibit an inherent dynamic nature in their availability, accessibility, capacity, and stability. Scientific applications using either experimental facilities or computation-based simulations with various physical, chemical, climatic, and biological models feature diverse scientific workflows as simple as linear pipelines or as complex as a directed acyclic graphs, which must be executed and supported over wide-area networks with massively distributed resources. Application users oftentimes need to manually configure their computing tasks over networks in an ad hoc manner, hence significantly limiting the productivity of scientists and constraining the utilization of resources. The success of these large-scale distributed applications requires a highly adaptive and massively scalable workflow platform that provides automated and optimized computing and networking services. This project is to design and develop a generic Scientific Workflow Automation and Management Platform (SWAMP), which contains a web-based user interface specially tailored for a target application, a set of user libraries, and several easy-to-use computing and networking toolkits for application scientists to conveniently assemble, execute, monitor, and control complex computing workflows in heterogeneous high-performance network environments. SWAMP will enable the automation and management of the entire process of scientific workflows with the convenience of a few mouse clicks while hiding the implementation and technical details from end users. Particularly, we will consider two types of applications with distinct performance requirements: data-centric and service-centric applications. For data-centric applications, the main workflow task involves large-volume data generation, catalog, storage, and movement typically from supercomputers or experimental facilities to a team of geographically distributed users; while for service-centric applications, the main focus of workflow is on data archiving, preprocessing, filtering, synthesis, visualization, and other application-specific analysis. We will conduct a comprehensive comparison of existing workflow systems and choose the best suited one with open-source code, a flexible system structure, and a large user base as the starting point for our development. Based on the chosen system, we will develop and integrate new components including a black box design of computing modules, performance monitoring and prediction, and workflow optimization and reconfiguration, which are missing from existing workflow systems. A modular design for separating specification, execution, and monitoring aspects will be adopted to establish a common generic infrastructure suited for a wide spectrum of science applications. We will further design and develop efficient workflow mapping and scheduling algorithms to optimize the workflow performance in terms of minimum end-to-end delay, maximum frame rate, and highest reliability. We will develop and demonstrate the SWAMP system in a local environment, the grid network, and the 100Gpbs Advanced Network Initiative (ANI) testbed. The demonstration will target scientific applications in climate modeling and high energy physics and the functions to be demonstrated include workflow deployment, execution, steering, and reconfiguration. Throughout the project period, we will work closely with the science communities in the fields of climate modeling and high energy physics including Spallation Neutron Source (SNS) and Large Hadron Collider (LHC) projects to mature the system for production use.

97 MATHEMATICS AND COMPUTING↗

The HEPCloud Facility: elastic computing for High Energy Physics – The NOvA Use Case

The need for computing in the HEP community follows cycles of peaks and valleys mainly driven by conference dates, accelerator shutdown, holiday schedules, and other factors. Because of this, the classical method of provisioning these resources at providing facilities has drawbacks such as potential overprovisioning. As the appetite for computing increases, however, so does the need to maximize cost efficiency by developing a model for dynamically provisioning resources only when needed. To address this issue, the HEPCloud project was launched by the Fermilab Scientific Computing Division in June 2015. Its goal is to develop a facility that provides a common interface to a variety of resources, including local clusters, grids, high performance computers, and community and commercial Clouds. Initially targeted experiments include CMS and NOvA, as well as other Fermilab stakeholders. In its first phase, the project has demonstrated the use of the “elastic” provisioning model offered by commercial clouds, such as Amazon Web Services. In this model, resources are rented and provisioned automatically over the Internet upon request. In January 2016, the project demonstrated the ability to increase the total amount of global CMS resources by 58,000 cores from 150,000 cores - a 25 percent increase - in preparation for the Recontres de Moriond. In March 2016, the NOvA experiment has also demonstrated resource burst capabilities with an additional 7,300 cores, achieving a scale almost four times as large as the local allocated resources and utilizing the local AWS s3 storage to optimize data handling operations and costs. NOvA was using the same familiar services used for local computations, such as data handling and job submission, in preparation for the Neutrino 2016 conference. In both cases, the cost was contained by the use of the Amazon Spot Instance Market and the Decision Engine, a HEPCloud component that aims at minimizing cost and job interruption. This paper describes the Fermilab HEPCloud Facility and the challenges overcome for the CMS and NOvA communities.

Fuess, S.↗

Human Factors Research Considerations for Terminal Area Urban Air Mobility Operations

In this presentation, we discuss the human factors research challenges from introducing greater levels of automation in a future air transportation concept called Urban Air Mobility (UAM). UAM is an air transportation concept that aims to provide air transportation services to the daily commuter, as well as emergency response and package delivery. The principal innovation over current day large air transport system is the greater distribution of important safety functions to automated and human agents; these functions include air traffic management, traditionally an air traffic controller responsibility. A central aspect of UAM is the development of an automated air traffic manager, whose primary responsibility is to approve airspace access for vehicle operators. Vehicle operator roles may include onboard and remote pilots, as well as a human manager who will supervise an entire fleet. Alternatively, both fleet manager and vehicle operators can be merged into a single role – a feasible option if UAM aircraft are autonomous. In lieu of tower controllers, vertiport managers, with the assistance of automation, will manage arrival and departure schedules between vertiports, as well as supervise surface operations. Our approach here will be to introduce use cases currently being developed by NASA, and then provide preliminary definitions for each of the roles introduced above and how coordination between them can be configured to support the operations within the use cases described. Subsequently, we review the tools and interfaces being developed to support the various roles. To conclude, we present current human factors work related to defining the roles above and suggest future work to advance the UAM concept.

trial planning↗