Search NASA⌕ Search

SEARCH · Search NASA

Results for “System reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond

If power systems transition to integrate higher amounts of variable renewable energy sources, storage technologies, and distributed energy resources (DERs), new risk management frameworks are necessary to ensure cost-effective and reliable power system operations. Projects funded by the Advanced Research Projects Agency-Energy (ARPA-E) Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program aim to contribute new risk management frameworks by developing methods to quantify and manage risk at grid asset and system levels. The National Renewable Energy Laboratory (NREL) led a PERFORM project in collaboration with the Johns Hopkins University, the Electric Power Research Institute (EPRI), kWh Analytics, Packetized Energy, and Imperial Consultants (ICON). The project addressed two challenges related to risk management in electricity markets: managing net load imbalances and flexibility from DERs. This final technical report presents a list of project accomplishments, activities, and outputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

System Engineers and Decisions: It?s All about Knowledge

In order to guarantee that a system meets adequate levels of reliability and availability, system performances are continuously monitored and analyzed thanks to the technological advancements driving the Industry 4.0 revolution. An Industry 4.0 approach is typically based on advanced statistical, big data mining, machine learning, and internet-of-things methods designed to detect anomalies in the behavior of system, detect the most likely failure modes, and provide indications to system engineers on when maintenance activities should be performed before system performance are deemed unacceptable (which can be generated by diagnostic and prognostic methods). However, these analyses, which are designed to automatize and increase the efficacy of the system maintenance program, require large amount of data which can come in various forms: numeric, textual, images, sounds etc. Such data constitutes the historic knowledge benchmark to track system performances and support system engineer decisions. Here we claim that data is not sufficient to support this kind of analyses when applied to systems characterized by complex architectures and behaviors. Robust system engineer decisions require the ability to understand the system operational context that lies behind the observed data elements. In this respect, system models are in fact necessary to “put data in context” and capture relationships between data elements. Industry 4.0 methods require in fact contextual knowledge as a basis upon which hypotheses can be generated and assumptions tested. In our view, for complex systems, model-based system engineering (MBSE) models can afford this contextual knowledge, as they are typically used to describe systems architecture and dynamic behaviors. System knowledge is here intended as the blending of collected data and system architecture which takes the form of a “knowledge graph”. A knowledge graph is a database which consists of a large set of nodes (in our case an entity can be either a data or an MBSE element) which are linked to each other. The types of nodes and links follow a pre-defined topology, sometimes also refers as an ontology, that is designed to fit the actual decisions that needs to be performed. We show here how a knowledge graph can be defined to support system engineer maintenance decisions and how the same graph can be built based on system MBSE models and pre-processed data from numeric (through anomaly detections and diagnostic methods) and textual elements (through technical language processing TLP).

97 - MATHEMATICS AND COMPUTING↗

Puerto Rico Grid and Recovery Post Hurricane Maria

This presentation discusses the impact of and recovery from Hurricanes Irma and Maria in Puerto Rico. The hurricanes hit two weeks apart in 2017, resulting in damage to all elements (generation, distribution, and transmission) of Puerto Rico's already fragile energy system.

demand response↗

Developing VSC-HVDC Oscillation Damping Control Constraints in Unit Commitment

High-voltage direct current (HVDC) systems within the existing power grids will play a pivotal role in enabling high share of renewable power integration and transportation electrification. There is a need for transmission planning models to accurately capture the impact of VSC-HVDC oscillation damping control on the system planning and model the constraints in the security constrained unit commitment (SCUC) problem. In this paper, the SCUC problem in a hybrid DC-AC grid considering damping on electromechanical inter-area oscillation is studied. An electromechanical oscillation-driven transmission capability constraints are derived from system swing equation and incorporated into the SCUC. Multiple system damping control scenarios are set based on the extracted plausible bounds of damping coefficient and inertia constant to linearize the nonlinear expressions. The SCUC problem with proposed constraints is tested on the Reliability Test System Grid Modernization Lab Consortium (RTS-GMLC) via PLEXOS. The impact of the proposed constraints on regional generation, inertia, power flow, annual system cost, and renewable energy curtailment are fully assessed.

damping control↗

Establishing a process of irradiating small animal brain using a CyberKnife and a microCT scanner

Purpose: Establish and validate a process of accurately irradiating small animals using the CyberKnife G4 System (version 8.5) with treatment plans designed to irradiate a hemisphere of a mouse brain based on microCT scanner images. Methods: These experiments consisted of four parts: (1) building a mouse phantom for intensity modulated radiotherapy (IMRT) quality assurance (QA), (2) proving usability of a microCT for treatment planning, (3) fabricating a small animal positioning system for use with the CyberKnife's image guided radiotherapy (IGRT) system, and (4)in vivo verification of targeting accuracy. A set of solid water mouse phantoms was designed and fabricated, with radiochromic films (RCF) positioned in selected planes to measure delivered doses. After down-sampling for treatment planning compatibility, a CT image set of a phantom was imported into the CyberKnife treatment planning system—MultiPlan (ver. 3.5.2). A 0.5 cm diameter sphere was contoured within the phantom to represent a hemispherical section of a mouse brain. A nude mouse was scanned in an alpha cradle using a microCT scanner (cone-beam, 157 × 149 pixels slices, 0.2 mm longitudinal slice thickness). Based on the results of our positional accuracy study, a planning treatment volume (PTV) was created. A stereotactic body mold of the mouse was “printed” using a 3D printer laying UV curable acrylic plastic. Printer instructions were based on exported contours of the mouse's skin. Positional reproducibility in the mold was checked by measuring ten CT scans. To verify accurate dose delivery in vivo, six mice were irradiated in the mold with a 4 mm target contour and a 2 mm PTV margin to 3 Gy and sacrificed within 20 min to avoid DNA repair. The brain was sliced and stained for analysis. Results: For the IMRT QA using a set of phantoms, the planned dose (6 Gy to the calculation point) was compared to the delivered dose measured via film and analyzed using Gamma analysis (3% and 3 mm). A passing rate of 99% was measured in areas of above 40% of the prescription dose. The final inverse treatment plan was comprised of 43 beams ranging from 5 to 12.5 mm in diameter (2.5 mm size increments are available up to 15 mm in diameter collimation). Using the Xsight Spine Tracking module, the CyberKnife system could not reliably identify and track the tiny mouse spine; however, the CyberKnife system could identify and track the fiducial markers on the 3D mold.In vivo positional accuracy analysis using the 3D mold generated a mean error of 1.41 mm ± 0.73 mm when fiducial markers were used for position tracking. Analysis of the dissected brain confirmed the ability to target the correct brain volume. Conclusions: With the use of a stereotactic body mold with fiducial markers, microCT imaging, and resolution down-sampling, the CyberKnife system can successfully perform small-animal radiotherapy studies.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Systems Development Facility Gasification Test Campaign TC22

In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC22, the first test campaign using a high moisture lignite from Mississippi as the feedstock in the modified Transport Gasifier configuration. TC22 was conducted from March 24 to April 17, 2007. The gasification process was operated for 543 hours, increasing the total gasification operation at the PSDF to over 10,000 hours. The PSDF gasification process was operated in air-blown mode with a total of about 1,080 tons of coal. Coal feeder operation was challenging due to the high as-received moisture content of the lignite, but adjustments to the feeder operating parameters reduced the frequency of coal feeder trips. Gasifier operation was stable, and carbon conversions as high as 98.9 percent were demonstrated. Operation of the PCD and other support equipment such as the recycle gas compressor and ash removal systems operated reliably.

01 COAL, LIGNITE, AND PEAT↗

MBM fuel feeding system design and evaluation for FBG pilot plant

Highlights: Black-Right-Pointing-Pointer A 1-5 g/s fuel feeding system for pilot scale FBG was designed, built and tested. Black-Right-Pointing-Pointer Multiple conveying stages improve pressure balancing, flow control and stability. Black-Right-Pointing-Pointer Secondary conveyor stage reduced output irregularity from 47% to 15%. Black-Right-Pointing-Pointer Pneumatic air sparging effective in dealing with poor flow ability of MBM powder. Black-Right-Pointing-Pointer Pneumatic injection port plugs with char at gasification temperature of 850 Degree-Sign C. - Abstract: A biomass fuel feeding system has been designed, constructed and evaluated for a fluidized bed gasifier (FBG) pilot plant at the University of Saskatchewan (Saskatoon, SK, Canada). The system was designed for meat and bone meal (MBM) to be injected into the gasifier at a mass flow-rate range of 1-5 g/s. The designed system consists of two stages of screw conveyors, including a metering stage which controlled the flow-rate of fuel, a rotary airlock and an injection conveyor stage, which delivered that fuel at a consistent rate to the FBG. The rotary airlock which was placed between these conveyors, proved unable to maintain a pressure seal, thus the entire conveying system was sealed and pressurized. A pneumatic injection nozzle was also fabricated, tested and fitted to the end of the injection conveyor for direct injection and dispersal into the fluidized bed. The 150 mm metering screw conveyor was shown to effectively control the mass output rate of the system, across a fuel output range of 1-25 g/s, while the addition of the 50 mm injection screw conveyor reduced the irregularity (error) of the system output rate from 47% to 15%. Although material plugging was found to be an issue in the inlet hopper to the injection conveyor, the addition of air sparging ports and a system to pulse air into those ports was found to successfully eliminate this issue. The addition of the pneumatic injection nozzle reduced the output irregularity further to 13%, with an air supply of 50 slpm as the minimum air supply to drive this injector. After commissioning of this final system to the FBG reactor, the injection nozzle was found to plug with char however, and was subsequently removed from the system. Final operation of the reactor continues satisfactorily with the two screw conveyors operating at matching pressure with the fluidized bed, with the output rate of the system estimated based on system characteristic equations, and confirmed by static weight measurements made before and after testing. The error rate by this method is reported to be approximately 10%, which is slightly better than the estimated error rate of 15% for the conveyor system. The reliability of this measurement prediction method relies upon the relative consistency of the physical properties of MBM with respect to its bulk density and feeding characteristics.

09 BIOMASS FUELS↗

Developing VSC-HVDC Oscillation Damping Control Constraints in Unit Commitment

High-voltage direct current (HVDC) systems within the existing power grids will play a pivotal role in enabling high share of renewable power integration and transportation electrification. There is a need for transmission planning models to accurately capture the impact of VSC-HVDC oscillation damping control on the system planning and model the constraints in the security constrained unit commitment (SCUC) problem. In this paper, the SCUC problem in a hybrid DC-AC grid considering damping on electromechanical inter-area oscillation is studied. An electromechanical oscillation-driven transmission capability constraints are derived from system swing equation and incorporated into the SCUC. Multiple system damping control scenarios are set based on the extracted plausible bounds of damping coefficient and inertia constant to linearize the nonlinear expressions. The SCUC problem with proposed constraints is tested on the IEEE 73-bus reliability test system (RTS) case via PLEXOS. The impact of the proposed constraints on regional generation, inertia, power flow, annual system cost, and renewable energy curtailment are fully assessed.

damping control↗

Microgrid Design, Development and Demonstration - Final Report for Phase I and Phase II

This document constitutes GE’s final report for the Microgrid Design, Development and Demonstration program for DOE’s Office of Electricity Delivery and Energy Reliability, Award DE-FC02-05CH11349. It contains the final report for Phase I in Appendix I, and the results the work performed in Phase II. The program goal was to develop and demonstrate a Microgrid Energy Management (MEM) framework for a broad set of Microgrid applications that provides unified controls, protection, and energy management. This project contributed to the achievement of the U.S. Department of Energy’s Renewable and Distributed Systems Integration Program goals by developing a fully automated power delivery microgrid network that: - Reduces carbon emissions and emissions of other air pollutants through increased use of optimally dispatched renewable energy, - Increases asset use through integration of distributed systems, - Enhances reliability, security, and resiliency from microgrid applications in critical infrastructure protection, constrained areas of the electric grid, etc. - Improves system efficiency with on-site, distributed generation and improved economic efficiency through demand-side management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Cyber-Resilience Risk Management Architecture for Distributed Wind

Distributed wind is an electric energy resource segment with strong potential to be deployed in many applications, but special consideration of resilience and cybersecurity is needed to address the unique conditions associated with distributed wind. Distributed wind is a strong candidate to help meet renewable energy and carbon-free energy goals. However, care must be taken as more systems are installed to ensure that the systems are reliable, resilient, and secure. The physical and communications requirements for distributed wind mean that there are unique cybersecurity considerations, but there is little to no existing guidance on best practices for cybersecurity risk management for distributed wind systems specifically. This research develops an architecture for the consideration of cyber risks associated with distributed wind systems. The architecture takes into account the configurations, challenges, and standards for distributed wind to create a risk-focused perspective that considers of threats, vulnerabilities, and consequences, with special emphasis on what sets distributed wind systems apart from other distributed energy resources (DER). We discuss common distributed wind architectures and how they are interconnected to larger power systems. Because cybersecurity cannot exist independently, the cyber-resilience architecture must consider the system holistically. Finally, we discuss the implementation of a risk assessment process that uses the cyber-resilience framework to address challenges specific to distributed wind.

17 WIND ENERGY↗

The Smart Grid: An Estimation of the Energy and CO2 Benefits

This report articulates nine mechanisms by which the smart grid can reduce energy use and carbon impacts associated with electricity generation and delivery. The quantitative estimates of potential reductions in electricity sector energy and associated CO2 emissions presented are based on a survey of published results and simple analyses. This report does not attempt to justify the cost effectiveness of the smart grid, which to date has been based primarily upon the twin pillars of cost-effective operation and improved reliability. Rather, it attempts to quantify the additional energy and CO2 emission benefits inherent in the smart grid’s potential contribution to the nation’s goal of mitigating climate change by reducing the carbon footprint of the electric power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Study of the Protection Improvements for a Weak Grid Area With High Inverter-Based Resources (IBRs)

This project designs enhanced protection scheme for the real-world weak grid area with a high penetration of IBRs. As the existing protection schemes are originally designed for traditional synchronous machines, we first evaluate if the protection scheme will continue to operate reliably in systems with high levels of IBRs. Hardware relays are tested using a controller-hardware-in-the-loop setup. PSCAD electromagnetic transient simulation with IBR original equipment manufacturer black-box models is used to perform fault studies and generate COMTRADE data, which are replayed by a real-time digital simulator (RTDS) to feed input to the hardware relays. Three scenarios are analyzed: normal operation, an N-1 contingency, and an IBR-only scenario. The evaluation results reveal the following: 1) the protection scheme remains reliable under normal conditions and N-1 contingencies and 2) in IBR-only scenarios, differential protection (87L) continues to operate reliably, whereas local protection elements, such as distance and directional elements, fail because of the lack of regulated negative sequence current contributed by IBRs. Enhanced protection is designed to address the challenge of lack of negative sequence current from IBRs, including increased restraining factors a2 and k2 to block 32Q or using V instead QV ORDER for ground faults, enhanced mho distance element with voltage and phase angle supervision for L-L faults. The efficacy of enhanced protection logic is validated and proven to work reliably. Additionally, IEEE Std. 2800-2022 negative sequence current compliant GFL and GFM IBRs from another vendor are tested and proven to work reliably without need for enhanced logic. Therefore, this work provides valuable decision-making for utilities facing protection system challenges due to IBRs, either designing enhanced protection scheme or requesting their IBRs being IEEE Std. 2800-2022 compliant to produce regulated negative sequence current for protection relay to make correct decision.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Scaling Criteria for Modeling Condensation in Horizontal Tubes Using Reduced Pressure System and Simulant Fluid

Most of the currently operating nuclear power plants (NPPs), generation-II and III, are equipped with active safety systems, which raises concerns regarding those safety systems' operational reliability and the suitability of the accidents prevention measures. Following the severe accidents at nuclear power plants at Three Mile Island, Chernobyl, and recently in Fukushima some advance Pressurized Water Reactors (PWRs) have adopted passively cooled steam generator natural circulation system to remove the decay heat passively through the steam generator (SG). This is done by condensing steam from the steam generator inside a heat exchanger submerged in a tank of water or an air cooled system. The APR+ (Advanced Power Reactor Plus), which is currently being developed in South Korea, has adopted a Passive Auxiliary Feedwater System (PAFS), which removes the decay heat through the steam generator replacing the conventional active auxiliary feedwater system. The main part of the PAFS, in where the steam condenses, is the Passive Condensation Heat Exchanger (PCHX). The steam condenses under high pressure (7.4 MPa, 290 deg. C) in 8.4 m long horizontal tube, with 3 degrees inclination, with inner diameter of 44.8 mm and wall thickness of 3 mm. The PCHX consists of 4 bundles, each bundle has 60 condensation tubes. The performance of the PCHX performance should be evaluated. Condensation has been extensively studied; however, most previous experimental work was directed to low pressure (i.e., near atmospheric pressure) and small condensation tubes. Moreover, studies on the horizontal type heat exchanger are limited, since previous safety systems and experimentation work were directed to the vertical type heat exchangers. Due to the high construction cost of a full size high pressure condensation experiment, a reduced-size reduced-pressure condensation experiment is suggested to evaluate the heat removal performance of a condensation tube of the PAFS heat exchanger. A scaling methodology to be established to design a reduced-size reduced-pressure condensation experiment. This study attempts to develop a scaling criteria for the PAFS condensation system, and to apply it for modeling a high pressure water system by a low pressure Freon system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗