Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technical Data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Inlet Unstart Propulsion Integration Wind Tunnel Test Program Completed for High-Speed Civil Transport

One of the propulsion system concepts to be considered for the High-Speed Civil Transport (HSCT) is an underwing, dual-propulsion, pod-per-wing installation. Adverse transient phenomena such as engine compressor stall and inlet unstart could severely degrade the performance of one of these propulsion pods. The subsequent loss of thrust and increased drag could cause aircraft stability and control problems that could lead to a catastrophic accident if countermeasures are not in place to anticipate and control these detrimental transient events. Aircraft system engineers must understand what happens during an engine compressor stall and inlet unstart so that they can design effective control systems to avoid and/or alleviate the effects of a propulsion pod engine compressor stall and inlet unstart. The objective of the Inlet Unstart Propulsion Airframe Integration test program was to assess the underwing flow field of a High-Speed Civil Transport propulsion system during an engine compressor stall and subsequent inlet unstart. Experimental research testing was conducted in the 10- by 10-Foot Supersonic Wind Tunnel at the NASA Glenn Research Center at Lewis Field. The representative propulsion pod consisted of a two-dimensional, bifurcated inlet mated to a live turbojet engine. The propulsion pod was mounted below a large flat plate that acted as a wing simulator. Because of the plate s long length (nominally 10-ft wide by 18-ft long), realistic boundary layers could form at the inlet cowl plane. Transient instrumentation was used to document the aerodynamic flow-field conditions during an unstart sequence. Acquiring these data was a significant technical challenge because a typical unstart sequence disrupts the local flow field for about only 50 msec. Flow surface information was acquired via static pressure taps installed in the wing simulator, and intrusive pressure probes were used to acquire flow-field information. These data were extensively analyzed to determine the impact of the unstart transient on the surrounding flow field. This wind tunnel test program was a success, and for the first time, researchers acquired flow-field aerodynamic data during a supersonic propulsion system engine compressor stall and inlet unstart sequence. In addition to obtaining flow-field pressure data, Glenn researchers determined other properties such as the transient flow angle and Mach number. Data are still being reduced, and a comprehensive final report will be released during calendar year 2000.

Porro, A. Robert↗

Reference-free ground truth metric for metal artifact evaluation in CT images

Purpose: In computed tomography (CT), metal objects in the region of interest introduce data inconsistencies during acquisition. Reconstructing these data results in an image with star shaped artifacts induced by the metal inconsistencies. To enhance image quality, the influence of the metal objects can be reduced by different metal artifact reduction (MAR) strategies. For an adequate evaluation of new MAR approaches a ground truth reference data set is needed. In technical evaluations, where phantoms can be measured with and without metal inserts, ground truth data can easily be obtained by a second reference data acquisition. Obviously, this is not possible for clinical data. Here, an alternative evaluation method is presented without the need of an additionally acquired reference data set. Methods: The proposed metric is based on an inherent ground truth for metal artifacts as well as MAR methods comparison, where no reference information in terms of a second acquisition is needed. The method is based on the forward projection of a reconstructed image, which is compared to the actually measured projection data. Results: The new evaluation technique is performed on phantom and on clinical CT data with and without MAR. The metric results are then compared with methods using a reference data set as well as an expert-based classification. It is shown that the new approach is an adequate quantification technique for artifact strength in reconstructed metal or MAR CT images. Conclusions: The presented method works solely on the original projection data itself, which yields some advantages compared to distance measures in image domain using two data sets. Beside this, no parameters have to be manually chosen. The new metric is a useful evaluation alternative when no reference data are available.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

NWTC Helps Chart the World's Wind Resource Potential

Researchers at the National Renewable Energy Laboratory's (NREL's) National Wind Technology Center (NWTC) provide the wind industry, policymakers, and other stakeholders with applied wind resource data, information, maps, and technical assistance. These tools, which emphasize wind resources at ever-increasing heights, help stakeholders evaluate the wind resource and development potential for a specific area.

17 WIND ENERGY↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 9: Viability of Data-Driven Approach for Outage Management (Deliverable D6))

This technical report is provided to US Department of Energy for progress made on the AGGERGATE project led by the Washington State University. This report is specifically related to the deliverable: ’D6: Technical report discussing the viability of the developed data-driven models and co-simulation architecture for models for operation in a real-world operational setting and the results of Tasks 1 to 8, summarizing the project findings and accomplishments to date’.

42 ENGINEERING↗

Data Analytics for Residential PV from Permit to Interconnect (Final Technical Report)

The main objective of this research is to provide novel insights into the effects of permitting, inspection, and interconnection (PII) processes on PV system installations—and in particular, into the relationship between PII processes and adoption timelines. This research can then be used to clarify the potential effect of various process changes on reducing PII timelines, customer cancellation rates, and related costs nationwide. NREL completed this research by assembling a data set of distributed, largely residential rooftop solar systems less than 50 kilowatts in size from participating solar installers. NREL produced five publications describing the effects that PII processes can have on adoption timelines nationwide, in addition to publishing an interactive data viewer with five years of PII cycle time data. This tool can be used by stakeholders to identify potential adoption timelines by local government.

14 SOLAR ENERGY↗

The composing process of technical writers: A preliminary study

The assumption that technical writers compose as do other writers is tested. The literature on the composing process, not limited to the pure or applied sciences, was reviewed, yielding three areas of general agreement. The composing process (1) consists of several stages, (2) is reflexive, and (3) may be mastered by means of strategies. Data on the ways technical writers compose were collected, and findings were related to the three areas of agreement. Questionnaires and interviews surveying 70 writers were used. The disciplines represented by these writers included civil, chemical, agricultural, geological, mechanical, electrical, and petroleum engineering, chemistry, hydrology, geology, and biology. Those providing consulting services, or performing research. No technical editors or professional writers were surveyed, only technicians, engineers, and researchers whose jobs involved composing reports. Three pedagogical implications are included.

Mair, D.↗

XSim: A Radiological Data Simulation Architecture

Report is a Technical Standard report for FEMA NIRT project managed by NA-42 and describes XSim architecture and XML format as a means to minimize the effort required for a field application in producing data.

61 RADIATION PROTECTION AND DOSIMETRY↗

Solar thermal components. A bibliography with abstracts

This bibliographic series cites and abstracts literature and technical papers on components applied to solar thermal energy utilization. The quarterly volumes are divided into ten categories: material properties; flat plat collectors; concentrating collectors; thermal storage; heat pumps; coolers and heat exchangers; solar ponds and distillation; greenhouses; process pleat; and irrigation pumps. Each quarterly volume is compiled from a wide variety of data bases, report literature, technical briefs, journal articles and other traditional and non traditional sources. The Technology Application Center maintains a library containing many of the articles and publications referenced in the series.

Bozman, W. R.↗

High-Rate Ka-Band Modulator for the NISAR Mission

In order to meet ever-increasing data return requirements, more satellites are using the near-Earth Ka-band (25.5 – 27.0 GHz) to achieve higher downlink rates. The paper discusses the Universal Space Transponder - Ka-band Modulator (UST-KaM) developed at the NASA Jet Propulsion Laboratory for the NASA-ISRO SAR (NISAR) mission, which is capable of transmitting up to 1.74 Gbps with 7/8 LDPC encoding. The UST-KaM utilizes OQPSK with both baseband and RF filtering to contain the 1 Gsps transmission spectrum within the 1.5 GHz Ka-band, even with the use of an external, saturated amplifier. Due to the high data rates involved, several technical hurdles were overcome in both the digital and RF designs. The UST-KaM is a software defined radio with two digital circuit board assemblies: a low speed housekeeper board for commanding and telemetry, and a high-rate signal processing board known as the Signal Processing Module (SPM). The SPM receives data from the spacecraft via a SERDES interface at up to 2 Gbps, processes and encodes the data using a Xilinx Virtex-5 FPGA, and produces 1 Gsps OQPSK I and Q waveforms via synchronized, multiplexed DACs. The RF Electronics in the UST-KaM employ a heterodyne architecture in which the I/Q digital waveforms are filtered and then up-converted using a sub-harmonic IQ mixer. The LO of the converter, which is included in the exciter assembly, is at 13.125GHz, and the RF output is a 26.25GHz carrier which is modulated with the OQPSK waveforms. The output of the mixer is then filtered using low loss quartz thinfilm edge coupled Chebyshev filters and amplified through a series of low gain Ka-Band amplifiers. The exciter assembly also has a 2GHz, low-phase-noise, PLL synthesizer to supply the clock to the DACs for the high rate digital waveforms.

Spurgers, Carl↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

systems engineering↗

Scaling up to address data science challenges

Statistics and Data Science provide a variety of perspectives and technical approaches for exploring and understanding Big Data. Partnerships between scientists from different fields such as statistics, machine learning, computer science, and applied mathematics can lead to innovative approaches for addressing problems involving increasingly large amounts of data in a rigorous and effective manner that takes advantage of advances in computing. Here, this article will explore various challenges in Data Science and will highlight statistical approaches that can facilitate analysis of large-scale data including sampling and data reduction methods, techniques for effective analysis and visualization of large-scale simulations, and algorithms and procedures for efficient processing.

97 MATHEMATICS AND COMPUTING↗

Exploring the Use of FHWA Truck Traffic Volume and Weight Data to Support National Truck Freight Mobility Study

The goal of this exploratory study was to investigate alternative data sources and develop methodologies to estimate trends and adjustment factors that could be applied to calibrate statistics generated from the outdated 2002 VIUS. The main focus of this study was on utilizing the FHWA’s traffic data (i.e., VTRIS and TMAS), along with other supplemental freight data (i.e., FAF and CFS), to examine changes in truck volumes and truck weight distributions over time. Ultimately, this effort seeks to develop certain adjustments/factors that could be used to realign perspective VIUS data. Unfortunately, as pointed out previously in this technical memorandum, there are no readily available data sources that could be used to explicitly validate the estimated results from this study. This study compared the estimated distributions from the 2002 VTRIS to the 2002 VIUS data to establish linkages between the two datasets. With distributions and patterns generated based on VTRIS and TMAS data series for additional years, trend factors were then estimated and applied to “update” VIUS-based information. This study resulted in three key highlights: (1) Updated estimates on truck volume and truck VMT can be utilized to better estimate on energy uses by truck. (2) Vehicle class distribution, percent/share of empty trucks, and average truck payload could be updated by utilizing more current annual data series such as VTRIS and TMAS. (3) Additional information could be estimated (e.g., distance distribution by operational type) by integrating other data sources, such as CFS and FAF, instead of relying on the 2002 VIUS data.

33 ADVANCED PROPULSION SYSTEMS↗

SECARB-USA: Data Quality Methodology

SECARB-USA Deliverable 4.2.1 utilizes the outputs from the Needs Assessment (Subtask 2.1) to develop a data quality methodology. Many types of data are needed to evaluate a site for technical and financial viability. Several inventories of data types have been produced (for example NETL, 2010). The objective here is to organize the data types so that the needs met are specified. From this cross index (Table 1 in the Appendix), it will be possible in future tasks to (1) determine, on a site-specific basis, how much of each data type is required at each stage of a project to meet the need, and conversely (2) to further specify and define the data collection methods applied such that the data are tailored to fit that need. Derivative tables can then be developed to semi-quantitively evaluate the extent to which need is critical for early go/no-go decision points, or if it is more important than average, requiring faster or larger capitalization and spend to meet the need. In an additional step, the current availability of data for a site can be semi-quantitively assessed. From the table of data criticality and the table of data availability, site-specific cost for meeting the data needs can be determined, and allow a pre-permit spend estimated for a portfolio of projects.

54 ENVIRONMENTAL SCIENCES↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Data Quality Methodology (4.2.1)

SECARB-USA Deliverable 4.2.1 utilizes the outputs from the Needs Assessment (Subtask 2.1) to develop a data quality methodology. Many types of data are needed to evaluate a site for technical and financial viability. Several inventories of data types have been produced (for example NETL, 2010). The objective here is to organize the data types so that the needs met are specified. From this cross index (Table 1 in the Appendix), it will be possible in future tasks to (1) determine, on a site-specific basis, how much of each data type is required at each stage of a project to meet the need, and conversely (2) to further specify and define the data collection methods applied such that the data are tailored to fit that need. Derivative tables can then be developed to semi-quantitively evaluate the extent to which need is critical for early go/no decision points, or if it is more important than average, requiring faster or larger capitalization and spend to meet the need. In an additional step, the current availability of data for a site can be semi-quantitively assessed. From the table of data criticality and the table of data availability, site-specific cost for meeting the data needs can be determined, and allow a pre-permit spend estimated for a portfolio of projects. All of the data needs to evaluate a site are somewhat interconnected. We used criterion (2) above to determine if the data collection design would have to be modified to meet the need; if this was commonly true a linkage was shown. The application of this cross index to sites in the subsequent tasks will demonstrate that the demand for data types varies site-to-site and project-to-project. Examples of factors to be considered are the complexity of the geology, the injection goals such as rate and duration of the injection, and the types of risk and risk tolerance of key stakeholders. In future tasks the team will compare the demand for data with existing data availability. This will, in turn, determine when data needs to be acquired to support project development. For example, in a project area with complex structure, 3-D seismic data may be needed earlier and more urgently than in an area with simple rock body geometries. In some locations, a 3-D seismic survey has already been collected and can be purchased. In other locations the project developer will need to collect these data. For another example, a project near an urban area or near to a park may generate earlier and more substantive public concern than a site that is developed in mined lands. A calculation using the derivative from table 1 will show the different investment needs. Project cost will vary corresponding to data criticality and data availability.

42 ENGINEERING↗

Selection and Traceability of Parameters To Support Hanford-Specific RESRAD Analyses -- Fiscal Year 2008 Status Report

In fiscal years 2007 and 2008, the Hanford Site Groundwater Remediation Project, formerly managed by Fluor Hanford, Inc., requested the Pacific Northwest National Laboratory (PNNL) to support the development and initial implementation of a strategy to establish and maintain, under configuration control, a set of Hanford-specific flow and transport parameter estimates that can be used to support Hanford Site assessments. This document provides a summary of those efforts, culminating in a set of best-estimate Hanford-specific parameters for use in place of the default parameters used in the RESRAD code. The RESRAD code is a computer model designed to estimate radiation doses and risks from RESidual RADioactive materials. The long-term goals of the PNNL work are to improve the consistency, defensibility, and traceability of parameters and their ranges of variability, and to ensure a sound basis for assigning parameters for flow and transport models in the code. The strategy was to start by identifying the existing parameter data sets most recently used in site assessments, documenting these parameter data sets and the raw data sets on which they were based, and using the existing parameter sets to define best-estimate parameters for use in the RESRAD code. The Hanford-specific assessment parameters compiled for use in RESRAD are traceable back to the professional judgment of the authors of published documents. Within the references, parameters are often not directly traceable back to the raw data and analytical approaches used to derive the assessment parameters. Future activities will work to continuously improve the defensibility and traceability of the parameter data sets and to address limitations and technical issues associated with the existing assessment parameter data sets.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RAID-S Technical Overview: Raid 4 and 5-Compliant Hardware and Software Functionality Improves Data Availability Through Use of XOR-Capable Disks in an Integrated Cached Disk Array

The purpose of this paper is to provide a technical description of redundant array of independent disks - Symmetrix (RAID-S). It is intended to give the reader an understanding of how RAID-S is architected and implemented in the EMC Symmetrix 3000/5000 series integrated cached disk array. Topics include RAID-S taxonomy, configuration considerations, operational characteristics, performance, and implementation guidelines.

Quinn, Brett↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

Ground Data System (GDS)↗

Integration of performance assessments and 3116 basis documents within the Savannah River Site liquid waste facilities - 15375

The end of the Cold War has left a legacy of over 136 million liters (36 million gallons) of radioactive waste in the aging waste tanks at the Department of Energy's Savannah River Site (SRS). A robust program is in place to remove waste from these tanks, treat the waste to separate it into a relatively small volume of high-level waste and a large volume of low-level waste, and to actively dispose of the low-level waste on-site. This process allows the US Department of Energy (DOE) to move forward with closure of the cleaned waste tanks and associated ancillary structures. To support performance-based, risk decision making for closure and disposal activities, three individual performance assessments (PAs) have been developed - salt-stone Disposal Facility, F-Tank Farm and H-Tank Farm. In addition, three Waste Determinations (WDs) have been made by the Secretary of Energy, in consultation with the Nuclear Regulatory Commission (NRC), under the authority of Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA Section 3116). To support these waste determination decisions, individual '3116 Basis Documents' were developed that describe the assumptions and conditions under which the criteria outlined in NDAA Section 3116 are met. The development of each of the PAs represented a long and arduous effort that involved the development of both deterministic and probabilistic conceptual models of the facilities, the development of assumptions and associated ranges, uncertainty and sensitivity analyses, model data collection and analyses, writing of the actual performance assessment, internal and external peer reviews, and ultimately approval by DOE. Similarly, the development of the 3116 Basis Documents represents similar time and financial commitments. At the end of these efforts, after years of preparation and millions of dollars in investment, we have thousands of pages of highly technical text, tables of data and hundreds of graphs and charts all contained in a series of thick binders that fit neatly on the shelf of a bookcase. We were done - right? Actually, we were just getting started. Performance Assessments and 3116 Basis Documents are living documents that shape day-to-day and long-term decision making in the operation of a low-level waste disposal facility (e.g., salt-stone Disposal Facility) or in area closure activities (e.g., F-Tank Farm or H-Tank Farm). Although these documents do not contain specifically described requirements per se, they do utilize specific assumptions that, if changed significantly, could result in no longer being able to demonstrate that there is reasonable assurance that the required performance objectives or the criteria from NDAA Section 3116 can be met. Savannah River Remediation LLC (SRR), the contractor responsible for Liquid Waste operations at SRS, has not only developed the PAs and 3116 Basis Documents to support this work and shepherded these documents through the DOE approval process, but has also developed the processes and procedures to ensure the successful implementation and integration of these documents into day-to-day decision making within the associated facilities. This paper describes these processes, including the Un-reviewed Waste Management Question process and the PA Maintenance process, and provides specific examples of their successful implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗