Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

A Method for Implementing Force-Limited Vibration Control

NASA/GSFC has implemented force-limited vibration control on a controller which can only accept one profile. The method uses a personal computer based digital signal processing board to convert force and/or moment signals into what appears to he an acceleration signal to the controller. This technique allows test centers with older controllers to use the latest force-limited control techniques for random vibration testing. The paper describes the method, hardware, and test procedures used. An example from a test performed at NASA/GSFC is used as a guide.

Worth, Daniel B.↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool the majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit for the ammonia leak was the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high-definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Darnell Cowan↗

Evaluation of Low Power ARM Processors for Monte Carlo Particle Transport: MCNP6 on the ARM Cortex-A8 - Paper 83

In the push towards exascale computing, the limiting factors are power requirements and heat dissipation. Using current technology, the power required to drive an exascale supercomputer would near 400-MW. Clearly, future computing hardware will have to be more energy efficient in order to achieve exascale performance. Most of the current research in advanced computing architectures is in the use of standard CPUs with accelerators. However, these accelerators are not generally supported by the traditional scientific programming languages (C, C++, and Fortran) and the scientific software must be tailored specifically to take advantage of the accelerators. Large scale scientific software (hundreds-of-thousand to millions of lines of code) can not be easily ported to the computing platform du jour. The widespread use of low power ARM based processors in the mobile computing market offer a low power alternative to accelerators that are also supported by the traditional scientific programming languages and programming paradigms such as MPI and OpenMP. Computing architectures for scientific computing are often assessed using standard benchmarks such as LINPACK benchmark or using suites of mini-applications that are greatly simplified stand-ins for scientific software. Often the real applications that will deployed on the scientific supercomputers are not ported or tested until delivery of the machines. In order to evaluate the use of ARM processors for scientific computing the Monte Carlo particle transport code, MCNP version 6 was compiled on the ARM Cortex-A8 and a set of benchmark problems were used to assess performance in comparison to an Intel Xeon E5-2670 and the low power Intel Atom N270. MCNP is a continuous energy Monte Carlo particle transport code in development at Los Alamos National Laboratory since 1977. MCNP is used to transport neutrons, photon, electrons, and charged particles using continuous energy interaction data. It is commonly used in fields of nuclear power, nuclear medicine, radiation protection, and high-energy physics through-out the world. MCNP version 6 is approximately 450 thousand lines of code, written primary in Fortran90, with some C and C++. MCNP supports distributed multiprocessing using MPI and threading with OpenMP. The ARM Cortex-A8 executes MCNP6 using about twice as much power as the Intel Xeon E5-2670 and about the same amount of power as the Intel Atom N270. However, these results are encouraging for the use of low-power ARM chips in future supercomputers. The ARM Cortex-A8 is a 32-bit CPU and it's NEON general-purpose SIMD (single-instruction multiple data) engine does not support double-precision floating-point arithmetic. More recent ARM processors (ARM Cortex-A53 and Cortex-A57) support 64-bit addressing and have NEON co-processors that support double-precision floating-point arithmetic. ARM claims that the A50 series delivers a performance increase of 15 times the Cortex-A8 performance for similar power usage. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Design of the SRF Driver ERL for the Jefferson Lab UV FEL

We describe the design of the SRF Energy-Recovering Linac (ERL) providing the CW electron drive beam at the Jefferson Lab UV FEL. Based on the same 135 MeV linear accelerator as and sharing portions of the recirculator with the Jefferson Lab 10 kW IR Upgrade FEL, the UV driver ERL uses a novel bypass geometry to provide transverse phase space control, bunch length compression, and nonlinear aberration compensation (including correction of RF curvature effects) without the use of magnetic chicanes or harmonic RF. Stringent phase space requirements at the wiggler, low beam energy, high beam current, and use of a pre-existing facility and legacy hardware subject the design to numerous constraints. These are imposed not only by the need for both transverse and longitudinal phase space management, but also by the potential impact of collective phenomena (space charge, wakefields, beam break-up (BBU), and coherent synchrotron radiation (CSR)), and by interactions between the FEL and the accelerator RF system. This report addresses these issues and presents the accelerator design solution that is now in operation.

43 PARTICLE ACCELERATORS↗

In-hardware demonstration of model-independent adaptive tuning of noisy systems with arbitrary phase drift

In this work, an implementation of a recently developed model-independent adaptive control scheme, for tuning uncertain and time varying systems, is demonstrated on the Los Alamos linear particle accelerator. The main benefits of the algorithm are its simplicity, ability to handle an arbitrary number of components without increased complexity, and the approach is extremely robust to measurement noise, a property which is both analytically proven and demonstrated in the experiments performed. We report on the application of this algorithm for simultaneous tuning of two buncher radio frequency (RF) cavities, in order to maximize beam acceptance into the accelerating electromagnetic field cavities of the machine, with the tuning based only on a noisy measurement of the surviving beam current downstream from the two bunching cavities. The algorithm automatically responds to arbitrary phase shift of the cavity phases, automatically re-tuning the cavity settings and maximizing beam acceptance. Because it is model independent it can be utilized for continuous adaptation to time-variation of a large system, such as due to thermal drift, or damage to components, in which the remaining, functional components would be automatically re-tuned to compensate for the failing ones. We start by discussing the general model-independent adaptive scheme and how it may be digitally applied to a large class of multi-parameter uncertain systems, and then present our experimental results.

42 ENGINEERING↗

Enhanced life ion source for germanium and carbon ion implantation

Germanium and carbon ions represent a significant portion of total ion implantation steps in the process flow. Very often ion source materials that used to produce ions are chemically aggressive, especially at higher temperatures, and result in fast ion source performance degradation and a very limited lifetime [B.S. Freer, et. al., 2002 14th Intl. Conf. on Ion Implantation Technology Proc, IEEE Conf. Proc., p. 420 (2003)]. GeF{sub 4} and CO{sub 2} are commonly used to generate germanium and carbon beams. In the case of GeF{sub 4} controlling the tungsten deposition due to the de-composition of WF{sub 6} (halogen cycle) is critical to ion source life. With CO{sub 2}, the materials oxidation and carbon deposition must be controlled as both will affect cathode thermionic emission and anti-cathode (repeller) efficiencies due to the formation of volatile metal oxides. The improved ion source design Extended Life Source 3 (Eterna ELS3) together with its proprietary co-gas material implementation has demonstrated >300 hours of stable continuous operation when using carbon and germanium ion beams. Optimizing cogas chemistries retard the cathode erosion rate for germanium and carbon minimizes the adverse effects of oxygen when reducing gas is introduced for carbon. The proprietary combination of hardware and co-gas has improved source stability and the results of the hardware and co-gas development are discussed.

36 MATERIALS SCIENCE↗

Modeling a Bulb-Style Kaplan Unit Hydrogovernor and Turbine in Mathworks-Simulink and RTDS-RSCAD

Some run-of-river (ROR) hydropower plants use a horizontal bulb-style Kaplan turbine. This turbine and the corresponding governor are not represented well in standard high-fidelity power-system modeling platforms. This paper presents the characterization, development, and modeling of bulb-style Kaplan turbine and associated hydrogovernor equipment in two platforms: Simulink from the MathWorks, Inc., and RSCAD from RTDS Technologies, Inc. The developed models enable accurate assessment of the response of a bulb-style Kaplan hydropower unit to changes in electrical loading and water conditions. The resulting models enable accurate digital real-time simulation with hardware-in-the-loop testing of this class of turbine, which was not previously possible. This, in turn, improves the ability to innovate these technologies and hybridize them in a lab setting, accelerating the potential for innovation in this type of ROR hydropower plant.

13 HYDRO ENERGY↗

A microgravity isolation mount

The design and preliminary testing of a system for isolating microgravity sensitive payloads from spacecraft vibrational and impulsive disturbances is discussed. The Microgravity Isolation Mount (MGIM) concept consists of a platform which floats almost freely within a limited volume inside the spacecraft, but which is constrained to follow the spacecraft in the long term by means of very weak springs. The springs are realized magnetically and form part of a six degree of freedom active magnetic suspension system. The latter operates without any physical contact between the spacecraft and the platform itself. Power and data transfer is also performed by contactless means. Specifications are given for the expected level of input disturbances and the tolerable level of platform acceleration. The structural configuration of the mount is discussed and the design of the principal elements, i.e., actuators, sensors, control loops and power/data transfer devices are described. Finally, the construction of a hardware model that is being used to verify the predicted performance of the MGIM is described.

Jones, D. I.↗

Adapting the Reconfigurable SpaceCube Processing System for Multiple Mission Applications

This paper will detail the use of SpaceCube in multiple space flight applications including the Hubble Space Telescope Servicing Mission 4 (HST-SM4), an International Space Station (ISS) radiation test bed experiment, and the main avionics subsystem for two separate ISS attached payloads. Each mission has had varying degrees of data processing complexities, performance requirements, and external interfaces. We will show the methodology used to minimize the changes required to the physical hardware, FPGA designs, embedded software interfaces, and testing.This paper will summarize significant results as they apply to each mission application. In the HST-SM4 application we utilized the FPGA resources to accelerate portions of the image processing algorithms more than 25 times faster than a standard space processor in order to meet computational speed requirements. For the ISS radiation on-orbit demonstration, the main goal is to show that we can rely on the commercial FPGAs and processors in a space environment. We describe our FPGA and processor radiation mitigation strategies that have resulted in our eight PowerPCs being available and error free for more than 99.99 of the time over the period of four years. This positive data and proven reliability of the SpaceCube on ISS resulted in the Department of Defense (DoD) selecting SpaceCube, which is replacing an older and slower computer currently used on ISS, as the main avionics for two upcoming ISS experiment campaigns. This paper will show how we quickly reconfigured the SpaceCube system to meet the more stringent reliability requirements

SpaceCube↗

Biology and medical research at the exascale.

Advances in computational hardware and algorithms that have transformed areas of physics and engineering have recently brought similar benefits to biology and biomedical research. Biological sciences are undergoing a revolution. High-performance computing has accelerated the transition from hypothesis-driven to design-driven research at all scales, and computational simulation of biological systems is now driving the direction of biological experimentation and the generation of insights.

99 GENERAL AND MISCELLANEOUS↗

The Role of the CEBAF Element Database in Commissioning the 12GeV Accelerator Upgrade

The CEBAF Element Database (CED) was first developed in 2010 as a resource to support model-driven configuration of the Jefferson Lab Continuous Electron Beam Accelerator (CEBAF). Since that time, its uniquely flexible schema design, robust programming interface, and support for multiple concurrent versions has permitted it to evolve into a more broadly useful operational and control system tool. The CED played a critical role before and during the 2013 startup and commissioning of CEBAF following its 18-month long shutdown and upgrade. Information in the CED about hardware components and their relations to one-another facilitated a thorough Hot Checkout process involving more than 18,000 system checks. New software relies on the CED to generate EDM screens for operators on-demand thereby ensuring that the information on those screens is correct and up-to-date. The CED also continues to fulfill its original mission of supporting model-driven accelerator setup. Using the new ced2elegant and eDT (elegant Download Tool), accelerator physicists have proven able to compute and apply energy-dependant set points with greater efficiency than ever before.

Larrieu, T.↗

Software and Hardware Development for the Mu2e Trigger and Data Acquisition System

The Mu2e experiment at Fermilab will be 10,000 times more sensitive than previous experiments looking for muon-to-electron conversion. This precise and complex experimental apparatus will produce 200 million billion muons per year. The accelerator complex repurposes elements of the infrastructure that produced high energy proton and anti-protons beams for the Tevatron experiments to produce the high-intensity muon beams necessary for Mu2e and the Muon (g-2) experiments.

43 PARTICLE ACCELERATORS↗

Optimization of Diffuser (Pre-Scatterer) Configurations for Slow Extraction Loss Reduction at Electrostatic Septa

Uncontrolled beam loss at the electrostatic septum is a performance limit for several existing or planned high power hadron accelerators delivering slow-extracted spills to fixed targets. A passive diffuser, or pre-scatterer, in a suitable configuration has been shown to reduce such beamloss significantly, with the actual gain factor depending on the parameters and details of the extraction process and hardware. In this paper, the optimization of diffuser configurations is investigated for a range of beam energies and extraction conditions, and the sensitivity to the available parameters explored via simulation results. The advantages and limitations of the diffuser are discussed and conclusions drawn concerning the specific case studies of the 8 GeV Fermilab debuncher ring and 400 GeV CERN SPS.

43 PARTICLE ACCELERATORS↗

Non-invasive Polarimetry and Magnetometry

CRADA Objective: To build a non-invasive polarimeter and receiver and test them on Jlab’s beamline. CRADA Statement of Work: “Electrodynamic has a timeline for the development of hardware due to its SBIR with the DOE. The equipment developed will be made available to the Jefferson Lab as it is constructed. Because this equipment is expected to be used in ongoing accelerator commissioning activities and experiments, there is a high likelihood of its use during the project period. Equipment installed at CEBAF will remain at CEBAF. Equipment installed at test stands can be removed and returned to Electrodynamic if requested. Data sharing from the equipment’s use will provide Electrodynamic with invaluable performance data. The capabilities of the equipment provided will enhance JLAB’s ability to monitor and manipulate its beam.”

47 OTHER INSTRUMENTATION↗

Revolutionizing Neuromorphic Computing for Science (Brochure on the 2024 ASCR Workshop on Neuromorphic Computing for Science)

The ASCR basic research needs for Neuromorphic Computing for Science workshop was held in September 2024. The workshop brochure and report aim to inform and draft a set of grand challenges for advancing the field of neuromorphic computing and developing proof of principle neuromorphic circuits applicable for High Performance Computer (HPC) acceleration for scientific discovery, and brainstorm ideas needed for a successful, robust, and world leading basic research program. The resulting priority research directions are: (1) Neuromorphic computing circuit primitives; (2) Connectivity, communication, and hardware integration; (3) Neuroscience-derived dynamics and algorithms; and (4) Ecosystem for scalable neuromorphic co-design. Breakthroughs in understanding, designing, and prototyping the circuitry and simulation capabilities for a truly neuromorphic computer are essential to enable progress in the field.

97 MATHEMATICS AND COMPUTING↗

Revolutionizing Neuromorphic Computing for Science (Report for the 2024 ASCR Workshop on Neuromorphic Computing for Science)

The ASCR basic research needs for Neuromorphic Computing for Science workshop was held in September 2024. The workshop brochure and report aim to inform and draft a set of grand challenges for advancing the field of neuromorphic computing and developing proof of principle neuromorphic circuits applicable for High Performance Computer (HPC) acceleration for scientific discovery, and brainstorm ideas needed for a successful, robust, and world leading basic research program. The resulting priority research directions are: (1) Neuromorphic computing circuit primitives; (2) Connectivity, communication, and hardware integration; (3) Neuroscience-derived dynamics and algorithms; and (4) Ecosystem for scalable neuromorphic co-design. Breakthroughs in understanding, designing, and prototyping the circuitry and simulation capabilities for a truly neuromorphic computer are essential to enable progress in the field.

97 MATHEMATICS AND COMPUTING↗