Search NASA⌕ Search

SEARCH · Search NASA

Results for “operating experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Final Focus Test Facility ATF2 Status

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometre level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European and American scientists. In this paper, the present status and performance of the recently deployed ATF2 systems are briefly described, based on the first experience with beam measurements and tuning during winter, spring and early autumn of 2009. The near and longer term plans are outlined as well. The ATF collaboration has completed the construction of ATF2 and has started its commissioning. Important experience operating the new cavity BPM and BSM instrumentation in real conditions has been gained and first beam measurements have been performed in a magnetic configuration with reduced optical demagnification. Both horizontal and vertical emittances were successfully tuned and measured in the extraction line, with values approaching the design values of 2 nm and 12 pm, respectively. First checks of the first order optics along the beam line and at the IP were also done. Hardware developments for the second ATF2 goal are being pursued in parallel with the present commissioning work for the first goal. The collaboration is also preparing several near and long terms plans for ATF2. In the next few years, information very valuable for any future collider with local chromaticity correction and tuning of very low emittance beams can be expected. In the previous experience at the FFTB, the smallest vertical beam sizes which were achieved were about 70 nanometers. The work described here continues to address this largely unexplored regime in a systematic way.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Equipment Operational Requirements

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

42 ENGINEERING↗

Handling and Treatment of Sodium-Potassium Alloy (NaK) after the Loss of Key Personnel – 19002

ABSTRACT In September 2010, during cleanup and removal efforts associated with a glovebox containing a sodium-potassium alloy (NaK) cooling system, a NaK reaction event occurred. Near the end of the evolution, which was at a Materials and Fuels Complex (MFC) research facility at the Idaho National Laboratory, a 2 to 3-ounce sample of NaK was being transferred from a metal can to a polyethylene bottle so it could be sent to the disposal outlet for verification analysis. During the transfer, a reaction of the NaK with ambient air was observed in both the metal can and sample container. The potential for a reaction was identified during the planning of this activity and mitigating steps were included in the procedures. In response, the two containers were flooded with argon, closed, and observed overnight. No additional reaction was noted. The sample container and metal can were packaged into a 10-gallon drum and transferred to a permitted storage location pending disposal. While the other containers generated from the deactivation and decommissioning activity were sent off-site for disposal, the 10-gal drum remained due to concerns by a staff specialist that the material could contain potassium superoxide (KO2) as a result of the reaction event. The intent at that time was to treat the NaK in a Resource Conservation and Recovery Act (RCRA)-permitted treatment facility at MFC, instead of sending it off-site for disposal. The container was labeled, inspected, and managed as a hazardous waste. Due to the complexities associated with safely handling and treating NaK and KO2, the container remained in storage. Treatment and disposal of the NaK and KO2 container was revisited in 2016, when researchers and chemists were consulted regarding the potential for superoxide formation and the best means to safely store and treat the container. The facility came to realize that due to the retirements of key personnel, it needed to provide current employees operational experience with the handling and treatment of NaK. An outside company was identified and contracted to provide training and consulting services. Several Battelle Energy Alliance, Inc. (BEA) personnel then attended an alkali metals safety training class. The training course provided participants with classroom and hands–on instruction associated with: • Hazards associated with handling and using sodium and NaK • Proper personal protection equipment, spill control techniques, and first aid • Common design approaches for buildings, systems, and equipment used to contain sodium and NaK • What to expect in the event of a water reaction and how to respond • How to properly prepare for a fire and contain/extinguish small metal fires • A hands-on demonstration of NaK reaction and controls. Following the training, a procedure was developed to open the container, and inspect and treat the NaK. In June 2017, facility operations personnel successfully completed the inspection and treatment of the NaK drum, eliminating the legacy liability.

99 GENERAL AND MISCELLANEOUS↗

Handling and Treatment of Sodium-Potassium Alloy (NaK) after the Loss of Key Personnel - 19002

In September 2010, during cleanup and removal efforts associated with a glovebox containing a sodium-potassium alloy (NaK) cooling system, a NaK reaction event occurred. Near the end of the evolution, which was at a Materials and Fuels Complex (MFC) research facility at the Idaho National Laboratory, a 2 to 3-ounce sample of NaK was being transferred from a metal can to a polyethylene bottle so it could be sent to the disposal outlet for verification analysis. During the transfer, a reaction of the NaK with ambient air was observed in both the metal can and sample container. The potential for a reaction was identified during the planning of this activity and mitigating steps were included in the procedures. In response, the two containers were flooded with argon, closed, and observed overnight. No additional reaction was noted. The sample container and metal can were packaged into a 10-gallon drum and transferred to a permitted storage location pending disposal. While the other containers generated from the deactivation and decommissioning activity were sent off-site for disposal, the 10-gal drum remained due to concerns by a staff specialist that the material could contain potassium superoxide (KO{sub 2}) as a result of the reaction event. The intent at that time was to treat the NaK in a Resource Conservation and Recovery Act (RCRA)-permitted treatment facility at MFC, instead of sending it off-site for disposal. The container was labeled, inspected, and managed as a hazardous waste. Due to the complexities associated with safely handling and treating NaK and KO{sub 2}, the container remained in storage. Treatment and disposal of the NaK and KO{sub 2} container was revisited in 2016, when researchers and chemists were consulted regarding the potential for superoxide formation and the best means to safely store and treat the container. The facility came to realize that due to the retirements of key personnel, it needed to provide current employees operational experience with the handling and treatment of NaK. An outside company was identified and contracted to provide training and consulting services. Several Battelle Energy Alliance, Inc. (BEA) personnel then attended an alkali metals safety training class. The training course provided participants with classroom and hands-on instruction associated with: - Hazards associated with handling and using sodium and NaK; - Proper personal protection equipment, spill control techniques, and first aid; - Common design approaches for buildings, systems, and equipment used to contain sodium and NaK; - What to expect in the event of a water reaction and how to respond; - How to properly prepare for a fire and contain/extinguish small metal fires; - A hands-on demonstration of NaK reaction and controls. Following the training, a procedure was developed to open the container, and inspect and treat the NaK. In June 2017, facility operations personnel successfully completed the inspection and treatment of the NaK drum, eliminating the legacy liability. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Cross Correlation of the ABS and ACT Maps

One of the most important checks for systematic errors in CMB studies is the cross correlation of maps made by independent experiments. In this paper, we report on the cross correlation between maps from the Atacama B-mode Search (ABS) and Atacama Cosmology Telescope (ACT) experiments in both temperature and polarization. These completely different measurements have a clear correlation with each other and with the Planck satellite in both the EE and TE spectra at l < 400 over the roughly 1100 deg(exp 2) common to all three. The TB, EB, and BB cross spectra are consistent with noise. Exploiting such cross-correlations will be important for future experiments operating in Chile that aim to probe the 30 < l < 8,000 range.

CMBR experiments↗

Majorana Demonstrator Bolted Joint Mechanical and Thermal Analysis

The MAJORANA DEMONSTRATOR is designed to probe for neutrinoless double-beta decay, an extremely rare process with a half-life in the order of 10 26 years. The experiment uses an ultra-low background, high-purity germanium detector array. The germanium crystals are both the source and the detector in this experiment. Operating these crystals as ionizing radiation detectors requires having them under cryogenic conditions (below 90 K). A liquid nitrogen thermosyphon is used to extract the heat from the detectors. The detector channels are arranged in strings and thermally coupled to the thermosyphon through a cold plate. The cold plate is joined to the thermosyphon by a bolted joint. This circular plate is housed inside the cryostat can. This document provides a detailed study of the bolted joint that connects the cold plate and the thermosyphon. An analysis of the mechanical and thermal properties of this bolted joint is presented. The force applied to the joint is derived from the torque applied to each one of the six bolts that form the joint. The thermal conductivity of the joint is measured as a function of applied force. The required heat conductivity for a successful experiment is the combination of the thermal conductivity of the detector string and this joint. The thermal behavior of the joint is experimentally implemented and analyzed in this study.

Aguayo Navarrete, Estanislao↗

Updates to NASA’s Break-in-Prebreathe Rules Due to Type II Decompression Sickness Risk Considerations

INTRODUCTION. Investigation of a central neurological decompression sickness (DCS) case during ground testing at Johnson Space Center identified a break-in-prebreathe (BIP) 13 minutes prior to depressurization as the leading credible cause despite applicable prebreathe payback rules being followed. Applicable NASA rules, for ground and flight, directed 2:1 payback of breaks up to 10 mins in duration, regardless of when a break occurs relative to depress. Full restart of prebreathe is directed following breaks > 10 min. The adequacy of NASA’s BIP rules was evaluated prior to resuming hypobaric ground testing or ISS extravehicular activities. METHODS. The following information sources were reviewed prior to formulating recommendations: i) Type II DCS case report and investigation findings; ii) documented rationale for existing flight rules, iii) consultations with subject matter experts involved in definition of existing flight rules (several of whom had since left NASA), iv) relevant published literature, v) model estimates of tissue on-gassing and off-gassing, and vi) NASA’s operational experience with late breaks in prebreathe. RESULTS. NASA’s nominal prebreathe protocols are validated via extensive ground testing to ensure DCS risk is reduced to within acceptable limits. Conversely, there exists a paucity of data, no validated models, and limited documentation regarding BIP risk for NASA prebreathe protocols. Flight rules implemented for shuttle and later ISS are based primarily on expert opinion and an assumption of symmetric on-gassing and off-gassing, which would make 2:1 payback a conservative mitigation for a BIP. Assumption of exponential gas kinetics makes late breaks higher risk, or require greater payback, than earlier breaks. Two BIPs have occurred using the current ISS prebreathe protocol, each of which was followed by greater than 2:1 payback and at least 59 minutes of 100% O2 pre-depress. No DCS cases have been reported during shuttle or ISS EVA operations. DISCUSSION. Interim changes were implemented to protect against late breaks during ground and flight prebreathes by ensuring negligible difference in conservatively modeled ppN2 pre-depress compared to nominal validated protocols. Additional documentation and literature review as well as chamber test planning are ongoing with the objective of further ground and flight rule updates and validation of a BIP risk model.

Prebreathe↗

Updates to NASA’s Break-in-Prebreathe Rules Due to Type II Decompression Sickness Risk Considerations

INTRODUCTION. Investigation of a central neurological decompression sickness (DCS) case during ground testing at Johnson Space Center identified a break-in-prebreathe (BIP) 13 minutes prior to depressurization as the leading credible cause despite applicable prebreathe payback rules being followed. Applicable NASA rules, for ground and flight, directed 2:1 payback of breaks up to 10 mins in duration, regardless of when a break occurs relative to depress. Full restart of prebreathe is directed following breaks > 10 min. The adequacy of NASA’s BIP rules was evaluated prior to resuming hypobaric ground testing or ISS extravehicular activities. METHODS. The following information sources were reviewed prior to formulating recommendations: i) Type II DCS case report and investigation findings; ii) documented rationale for existing flight rules, iii) consultations with subject matter experts involved in definition of existing flight rules (several of whom had since left NASA), iv) relevant published literature, v) model estimates of tissue on-gassing and off-gassing, and vi) NASA’s operational experience with late breaks in prebreathe. RESULTS. NASA’s nominal prebreathe protocols are validated via extensive ground testing to ensure DCS risk is reduced to within acceptable limits. Conversely, there exists a paucity of data, no validated models, and limited documentation regarding BIP risk for NASA prebreathe protocols. Flight rules implemented for shuttle and later ISS are based primarily on expert opinion and an assumption of symmetric on-gassing and off-gassing, which would make 2:1 payback a conservative mitigation for a BIP. Assumption of exponential gas kinetics makes late breaks higher risk, or require greater payback, than earlier breaks. Two BIPs have occurred using the current ISS prebreathe protocol, each of which was followed by greater than 2:1 payback and at least 59 minutes of 100% O2 pre-depress. No DCS cases have been reported during shuttle or ISS EVA operations. DISCUSSION. Interim changes were implemented to protect against late breaks during ground and flight prebreathes by ensuring negligible difference in conservatively modeled ppN2 pre-depress compared to nominal validated protocols. Additional documentation and literature review as well as chamber test planning are ongoing with the objective of further ground and flight rule updates and validation of a BIP risk model.

Prebreathe↗

Advances in physics understanding of high poloidal beta regime toward steady-state operation of CFETR

Experimental and modeling investigations of the high βp scenarios on the DIII-D and EAST tokamaks show advantages in high energy confinement, avoidance of n = 1 MHD, and core-edge integration with reduced heat flux, making this scenario an attractive option for CFETR steady-state operation. Experiments show that plasmas with high confinement and high density can be achieved with neutral beam injection on DIII-D (β p ~ 2.2, β N ~ 3.5, f BS ~ 50%, f Gw ~ 1.0, H 98y2 ~ 1.5) and pure RF power on EAST (β P ~ 2.0, β N ~ 1.6, f BS ~ 50%, f Gw ~ 0.8, H 98y2 > 1.3). By tailoring the current density profile, a q-profile with local (off-axis) negative shear is achieved that yields improved confinement and MHD stability. Transport analysis and simulation suggest that the combination of high density gradient and high Shafranov shift allows turbulence stabilization and higher confinement. Using on-axis ECH injection, tungsten accumulation is avoided on EAST, and this is reproduced in modeling. Reduced heat flux (by >40%) and maintenance of high core confinement is achieved with active feedback control of the radiated divertor, an important result for long pulse operation in tokamaks. In conclusion, the improved physics understanding and validated modeling tools are used to design a 1GW steady-state scenario for CFETR.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

MSL DSENDS EDL Analysis and Operations

This paper presents the operations experience of the JPL EDL (Entry, Descent, and Landing) trajectory simulation team, focusing on events in the week before landing and EDL itself. A brief description of the EDL trajectory simulation tool used for targeting and simulation verification analysis will be presented, including a high level discussion of the required modeling. Initialization and output interfaces used for landing hazard analysis will also be covered, along with discussion of real-time EDL event detection using radiometric Doppler data.

Entry, descent, and landing (EDL)↗

Results of the Second U.S. Manned Suborbital Space Flight, July 21, 1961

This document presents the results of the second United States manned suborbital space flight. The data and flight description presented form a continuation of the information provided at an open conference held under the auspices of the National Aeronautics and Space Administration, in cooperation with the National Institutes of Health and the National Academy of Sciences, at the U.S. Department of State Auditorium on June 6, 1961. The papers presented herein generally parallel the presentations of the first report and were prepared by the personnel of the NASA Manned Spacecraft Center in collaboration with personnel from other government agencies, participating industry, and universities. The second successful manned suborbital space flight on July 21, 1961, in which Astronaut Virgil I. Grissom was the pilot was another step in the progressive research, development, and training program leading to the study of man's capabilities in a space environment during manned orbital flight. Data and operational experiences gained from this flight were in agreement with and supplemented the knowledge obtained from the first suborbital flight of May 5, 1961, piloted by Astronaut Alan B. Shepard, Jr. The two recent manned suborbital flights, coupled with the unmanned research and development flights, have provided valuable engineering nd scientific data on which the program can progress. The successful active participation of the pilots, in much the same way as in the development and testing of high performance aircraft, has. greatly increased our confidence in giving man a significant role in future space flight activities. It is the purpose of this report to continue the practice of providing data to the scientific community interested in activities of this nature. Brief descriptions are presented of the Project Mercury spacecraft and flight plan. Papers are provided which parallel the presentations of data published for the first suborbital space flight. Additional information is given relating to the operational aspects of the medical support activities for the two manned suborbital space flights.

Source record↗

Advanced Technology for Isolating Payloads in Microgravity

One presumption of scientific microgravity research is that while in space disturbances are minimized and experiments can be conducted in the absence of gravity. The problem with this assumption is that numerous disturbances actually occur in the space environment. Scientists must consider all disturbances when planning microgravity experiments. Although small disturbances, such as a human sneeze, do not cause most researchers on earth much concern, in space, these minuscule disturbances can be detrimental to the success or failure of an experiment. Therefore, a need exists to isolate experiments and provide a quiescent microgravity environment. The objective of microgravity isolation is to quantify all possible disturbances or vibrations and then attenuate the transmission of the disturbance to the experiment. Some well-defined vibration sources are: experiment operations, pumps, fans, antenna movements, ventilation systems and robotic manipulators. In some cases, it is possible to isolate the source using simple vibration dampers, shock absorbers and other isolation devices. The problem with simple isolation systems is that not all vibration frequencies are attenuated, especially frequencies less than 0.1 Hz. Therefore, some disturbances are actually emitted into the environment. Sometimes vibration sources are not well defined, or cannot be controlled. These include thermal "creak," random acoustic vibrations, aerodynamic drag, crew activities, and other similar disturbances. On some "microgravity missions," such as the United States Microgravity Laboratory (USML) and the International Microgravity Laboratory (IML) missions, the goal was to create extended quiescent times and limit crew activity during these times. This might be possible for short periods, but for extended durations it is impossible due to the nature of the space environment. On the International Space Station (ISS), vehicle attitude readjustments are required to keep the vehicle in a minimum torque orientation and other experimental activities will occur continually, both inside and outside the station. Since all vibration sources cannot be controlled, the task of attenuating the disturbances is the only realistic alternative. Several groups have independently developed technology to isolate payloads from the space environment. Since 1970, Honeywell's Satellite Systems Division has designed several payload isolation systems and vibration attenuators. From 1987 to 1992, NASA's Lewis Research Center (LeRC) performed research on isolation technology and developed a 6 degree-of-freedom (DOF) isolator and tested the system during 70 low gravity aircraft flight trajectories. Beginning in early 1995, NASA's Marshall Space Flight Center (MSFC) and McDonnell Douglas Aerospace (MDA) jointly developed the STABLE (Suppression of Transient Accelerations By Levitation Evaluation) isolation system. This 5 month accelerated effort produced the first flight of an active microgravity vibration isolation system on STS-73/USML-02 in late October 1995. The Canadian Space Agency developed the Microgravity Vibration Isolation Mount (MIM) for isolating microgravity payloads and this system began operating on the Russian Mir Space Station in May 1996. The Boeing Defense & Space Group, Missiles & Space Division developed the Active Rack Isolation System (ARIS) for isolating payloads in a standard payload rack. ARIS was tested in September 1996 during the STS-79 mission to Mir. Although these isolation systems differ in their technological approach, the objective is to isolate payloads from disturbances. The following sections describe the technologies behind these systems and the different types of hardware used to perform isolation. The purpose of these descriptions is not to detail the inner workings of the hardware but to give the reader an idea of the technology and uses of the hardware components. Also included in the component descriptions is a paragraph detailing some of the advances in isolation technology for that particular component. The final section presents some concluding thoughts and a summary of anticipated advances in research and development for isolating microgravity experiments.

Alhorn, Dean C.↗

Preliminary waste management plan of European spallation

The European Spallation Source (ESS) is the European common effort in designing and building a next generation large-scale user facility for studies of the structure and dynamics of materials. The proposed schematic layout of the ESS facility is based on a linear driver (linac) directing the proton beam (5 MW of 2.5 GeV) of 2.8 ms long pulses with a 20 Hz on a tungsten target where neutrons are produced via spallation reactions. Further the neutrons will be moderated to thermal and sub-thermal energies in a couple of moderators placed around the target. The moderators feed 22 beamlines guiding the neutrons to the scattering instruments, mainly for neutron scattering research, as has been previously mentioned. The objective of this work is to develop a waste management plan for ESS facility. In this respect two important aspects are analyzed. First the present status of the problem is outlined as follow. Estimate types and quantities of waste that the ESS project will generate at different stages: commission, operation, decommissioning were derived using: i) precise Monte Carlo calculations ii) scaling the activity from the operation experience of the existing spallation source installations for waste such it is difficult to predict level of activation or for components of the facility in stage of the preconceptual model. Associated waste treatment/conditioning options and final disposal route were further analyzed in order to define the waste type and packet descriptions in agreement with Swedish regulations and policy. It was found that the compilation of completely new waste type descriptions for qualification of the ESS waste for disposal will be necessary. Particular attention was devoted to 'problematic waste' as Beryllium reflector, C-14 from graphite used as core zone of the beam-dump and collimators or waste arising from the purification systems of both Helium and water cooling circuits. Management of waste on ESS site: collection/segregation systems, characterization system, storage options, is also described. In the second step, the acquired information is used for planning and implementing actions involving all participants (ESS, treatment facility operator, disposal operator, regulatory body and other authorized authorities). (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Recent Experience with the CMS Data Management System

The CMS[1] experiment manages a large-scale data infrastructure, currently handling over 200 PB of disk and 500 PB of tape storage and transferring more than 1 PB of data per day on average between various WLCG[2] sites. Utilizing Rucio[3] for high-level data management, FTS[4] for data transfers, and a variety of storage and network technologies at the sites, CMS confronts inevitable challenges due to the system’s growing scale and evolving nature. Key challenges include managing transfer and storage failures, optimizing data distribution across different storages based on production and analysis needs, implementing necessary technology upgrades and migrations, and efficiently handling user requests. The data management team has established comprehensive monitoring to supervise this system and has successfully addressed many of these challenges. The team’s efforts aim to ensure data availability and protection, minimize failures and manual interventions, maximize transfer throughput and resource utilization, and provide reliable user support. This paper details the operational experience of CMS with its data management system in recent years, focusing on the encountered challenges, the effective strategies employed to overcome them and the ongoing challenges as we prepare for future demands.

Öztürk, Hasan [CERN]↗

The Challenges of Repository Operation in an Existing Mine - 19339

A generally accepted principle related to long term management of radioactive waste/ spent fuel is the isolation in a geological repository. In Germany, the disposal operation of low-level waste (LLW) and intermediate-level waste (ILW) started in the Asse II mine in 1967 and in the former German Democratic Republic in the Morsleben repository in 1971. After the German reunification, the responsibility for the existing sites changed several times until the Bundesgesellschaft fuer Endlagerung (BGE) became new license holder for both sites in 2017. The BGE is responsible to carry out the operative tasks of searching for a high-level waste (HLW) repository, the planning and construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository. Nevertheless, the challenges of repository operation in an existing mine have not changed in all these years, as the regulatory framework is mainly written for Nuclear Power Plants (NPPs) and is difficult to adapt for a repository mine. In particular, conditions in a mine are substantially different from 'clean' above-ground nuclear installations. Dust due to mining activities, relatively high temperatures, and a corrosive atmosphere in a salt mine might be present. Therefore, the usability of the repository for several decades during the different operational phases, i.e. planning, construction, emplacement, and closure, can only be ensured by continuous maintenance. Furthermore, the atomic law is applicable for above-ground facilities and the mining law for mines of every description. The difficulty of geological repositories is to ensure that both laws are going to be applied above and below ground with no regulatory framework tailored especially for such sites. A special case is the Asse II mine where the mining law was applied from the very beginning, before the atomic law needed to be established later on and now requires the retrieval of the radioactive waste before decommissioning. In this presentation, similarities and differences in the legal framework of the repositories in the responsibility of BGE and some operational experiences throughout the years are described. This applies to the radiation protection regime, the excavation ratio, the host rock stability and the backfilling concepts of the mining areas. Further challenges arise from the demonstration of long term safety according to the state-of-the-art of science and technology for either existing repositories/ mines or those under construction or planned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-A-210-00: AAPM Medical Physics Student Meeting: Medical Billing and Regulations: Everything You Always Wanted To Know, But Were Too Afraid To Ask

The purpose of this student annual meeting is to address topics that are becoming more relevant to medical physicists, but are not frequently addressed, especially for students and trainees just entering the field. The talk is divided into two parts: medical billing and regulations. Hsinshun Wu – Why should we learn radiation oncology billing? Many medical physicists do not like to be involved with medical billing or coding during their career. They believe billing is not their responsibility and sometimes they even refuse to participate in the billing process if given the chance. This presentation will talk about a physicist’s long career and share his own experience that knowing medical billing is not only important and necessary for every young medical physicist, but that good billing knowledge could provide a valuable contribution to his/her medical physics development. Learning Objectives: The audience will learn the basic definition of Current Procedural Terminology (CPT) codes performed in a Radiation Oncology Department. Understand the differences between hospital coding and physician-based or freestanding coding. Apply proper CPT coding for each Radiation Oncology procedure. Each procedure with its specific CPT code will be discussed in detail. The talk will focus on the process of care and use of actual workflow to understand each CPT code. Example coding of a typical Radiation Oncology procedure. Special procedure coding such as brachytherapy, proton therapy, radiosurgery, and SBRT. Maryann Abogunde – Medical physics opportunities at the Nuclear Regulatory Commission (NRC) The NRC’s responsibilities include the regulation of medical uses of byproduct (radioactive) materials and oversight of medical use end-users (licensees) through a combination of regulatory requirements, licensing, safety oversight including inspection and enforcement, operational experience evaluation, and regulatory support activities. This presentation will explore the career options for medical physicists in the NRC, how the NRC interacts with clinical medical physicists, and a physicist’s experience as a regulator. Learning Objectives: Explore non-clinical career pathways for medical physics students and trainees at the Nuclear Regulatory Commission. Overview of NRC medical applications and medical use regulations. Understand the skills needed for physicists as regulators. Abogunde is funded to attend the meeting by her employer, the NRC.

07 ISOTOPE AND RADIATION SOURCES↗

SU-A-210-01: Why Should We Learn Radiation Oncology Billing?

The purpose of this student annual meeting is to address topics that are becoming more relevant to medical physicists, but are not frequently addressed, especially for students and trainees just entering the field. The talk is divided into two parts: medical billing and regulations. Hsinshun Wu – Why should we learn radiation oncology billing? Many medical physicists do not like to be involved with medical billing or coding during their career. They believe billing is not their responsibility and sometimes they even refuse to participate in the billing process if given the chance. This presentation will talk about a physicist’s long career and share his own experience that knowing medical billing is not only important and necessary for every young medical physicist, but that good billing knowledge could provide a valuable contribution to his/her medical physics development. Learning Objectives: The audience will learn the basic definition of Current Procedural Terminology (CPT) codes performed in a Radiation Oncology Department. Understand the differences between hospital coding and physician-based or freestanding coding. Apply proper CPT coding for each Radiation Oncology procedure. Each procedure with its specific CPT code will be discussed in detail. The talk will focus on the process of care and use of actual workflow to understand each CPT code. Example coding of a typical Radiation Oncology procedure. Special procedure coding such as brachytherapy, proton therapy, radiosurgery, and SBRT. Maryann Abogunde – Medical physics opportunities at the Nuclear Regulatory Commission (NRC) The NRC’s responsibilities include the regulation of medical uses of byproduct (radioactive) materials and oversight of medical use end-users (licensees) through a combination of regulatory requirements, licensing, safety oversight including inspection and enforcement, operational experience evaluation, and regulatory support activities. This presentation will explore the career options for medical physicists in the NRC, how the NRC interacts with clinical medical physicists, and a physicist’s experience as a regulator. Learning Objectives: Explore non-clinical career pathways for medical physics students and trainees at the Nuclear Regulatory Commission. Overview of NRC medical applications and medical use regulations. Understand the skills needed for physicists as regulators. Abogunde is funded to attend the meeting by her employer, the NRC.

07 ISOTOPE AND RADIATION SOURCES↗

SU-A-210-02: Medical Physics Opportunities at the NRC

The purpose of this student annual meeting is to address topics that are becoming more relevant to medical physicists, but are not frequently addressed, especially for students and trainees just entering the field. The talk is divided into two parts: medical billing and regulations. Hsinshun Wu – Why should we learn radiation oncology billing? Many medical physicists do not like to be involved with medical billing or coding during their career. They believe billing is not their responsibility and sometimes they even refuse to participate in the billing process if given the chance. This presentation will talk about a physicist’s long career and share his own experience that knowing medical billing is not only important and necessary for every young medical physicist, but that good billing knowledge could provide a valuable contribution to his/her medical physics development. Learning Objectives: The audience will learn the basic definition of Current Procedural Terminology (CPT) codes performed in a Radiation Oncology Department. Understand the differences between hospital coding and physician-based or freestanding coding. Apply proper CPT coding for each Radiation Oncology procedure. Each procedure with its specific CPT code will be discussed in detail. The talk will focus on the process of care and use of actual workflow to understand each CPT code. Example coding of a typical Radiation Oncology procedure. Special procedure coding such as brachytherapy, proton therapy, radiosurgery, and SBRT. Maryann Abogunde – Medical physics opportunities at the Nuclear Regulatory Commission (NRC) The NRC’s responsibilities include the regulation of medical uses of byproduct (radioactive) materials and oversight of medical use end-users (licensees) through a combination of regulatory requirements, licensing, safety oversight including inspection and enforcement, operational experience evaluation, and regulatory support activities. This presentation will explore the career options for medical physicists in the NRC, how the NRC interacts with clinical medical physicists, and a physicist’s experience as a regulator. Learning Objectives: Explore non-clinical career pathways for medical physics students and trainees at the Nuclear Regulatory Commission. Overview of NRC medical applications and medical use regulations. Understand the skills needed for physicists as regulators. Abogunde is funded to attend the meeting by her employer, the NRC.

07 ISOTOPE AND RADIATION SOURCES↗