Search NASA⌕ Search

SEARCH · Search NASA

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Analysis of Phenix end-of-life natural convection test with the MARS-LMR code

The end-of-life test of Phenix reactor performed by the CEA provided an opportunity to have reliable and valuable test data for the validation and verification of a SFR system analysis code. KAERI joined this international program for the analysis of Phenix end-of-life natural circulation test coordinated by the IAEA from 2008. The main objectives of this study were to evaluate the capability of existing SFR system analysis code MARS-LMR and to identify any limitation of the code. The analysis was performed in three stages: pre-test analysis, blind posttest analysis, and final post-test analysis. In the pre-test analysis, the design conditions provided by the CEA were used to obtain a prediction of the test. The blind post-test analysis was based on the test conditions measured during the tests but the test results were not provided from the CEA. The final post-test analysis was performed to predict the test results as accurate as possible by improving the previous modeling of the test. Based on the pre-test analysis and blind test analysis, the modeling for heat structures in the hot pool and cold pool, steel structures in the core, heat loss from roof and vessel, and the flow path at core outlet were reinforced in the final analysis. The results of the final post-test analysis could be characterized into three different phases. In the early phase, the MARS-LMR simulated the heat-up process correctly due to the enhanced heat structure modeling. In the mid phase before the opening of SG casing, the code reproduced the decrease of core outlet temperature successfully. Finally, in the later phase the increase of heat removal by the opening of the SG opening was well predicted with the MARS-LMR code. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Some guidance on preparing validation plans for the DART Full System Models.

Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Multidisciplinary Dynamic Testing Challenges in Validating the NASA Artemis Architecture

NASA is in the midst of bold and exciting next steps in human exploration and spaceflight. The designs of the new Space Launch System (SLS), the Orion spacecraft and the Exploration Ground Systems (EGS) for vehicle processing and launch are essentially complete and there has been significant progress in manufacturing and assembly of specific hardware for the Artemis I and Artemis II missions. Equally as important, the program level and integrated system level testing and analyses are also well underway to support integrated verification, validation, and certificate of flight readiness (CoFR) for the first Artemis mission. Testing and analysis are key to addressing technical challenges that the Artemis missions offer. Building block approaches are required that provide the right balance between component, system, and/or element level testing that satisfies verification and validation objectives and where, uncertainties are quantified and minimized. Artemis I is a system of systems that requires a fusion of test and analysis that adeptly characterizes critical interfaces between major program elements. NASA is implementing new in-situ testing that fuse traditional aerospace structures with civil structures, such as the Integrated Modal Test for the Artemis I vehicle where the Mobile Launcher and Crawler Transporter serve as a support structure whose dynamics couple with that of the Artemis I vehicle. This new paradigm requires a closer inspection of structural behavior of the Crawler Transporter and the Mobile Launcher as they now serve multiple purposes. This requires a paradigm shift to look beyond experimental modal techniques and incorporates operational modal analysis techniques to validate dynamic models from data collected during rollout to the launch pad. A further complicating factor is the Crawler Transporter generated ground forces have numerous harmonics making extracting dynamic responses of the Artemis I, Mobile Launcher, and Crawler Transporter coupled system challenging. This discussion explores all these challenges with and attempts to understand how we best build confidence in systems and system-of-systems performance capabilities and margins and understand uncertainties.

Joel W Sills↗

Shuttle Entry Air Data System

The SEADS system (Shuttle Entry Air Data System) is being developed to provide research quality hypersonic (M greater than 3.5) air data. SEADS will accomplish this through the instrumentation of the orbiter's baseline nose cap. The SEADS development program consists of (1) the design and testing program required to define a reinforced carbon-carbon (RCC) nose cap penetration concept which will not degrade nose cap performance, (2) the definition of analytical techniques and design criteria for array definition and flight data analysis, (3) the verification of these analytical techniques and array criteria through a comprehensive wind-tunnel test program, (4) the demonstration of the system concept through detailed testing, and (5) the analyses and tests required to flight-certify the SEADS system.

Siemers, P. M., III↗

Verification of Electromagnetic Physics Models for Parallel Computing Architectures in the GeantV Project

An intensive R&D and programming effort is required to accomplish new challenges posed by future experimental high-energy particle physics (HEP) programs. The GeantV project aims to narrow the gap between the performance of the existing HEP detector simulation software and the ideal performance achievable, exploiting latest advances in computing technology. The project has developed a particle detector simulation prototype capable of transporting in parallel particles in complex geometries exploiting instruction level microparallelism (SIMD and SIMT), task-level parallelism (multithreading) and high-level parallelism (MPI), leveraging both the multi-core and the many-core opportunities. We present preliminary verification results concerning the electromagnetic (EM) physics models developed for parallel computing architectures within the GeantV project. In order to exploit the potential of vectorization and accelerators and to make the physics model effectively parallelizable, advanced sampling techniques have been implemented and tested. In this paper we introduce a set of automated statistical tests in order to verify the vectorized models by checking their consistency with the corresponding Geant4 models and to validate them against experimental data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A k-NN METHOD TO CLASSIFY RARE ASTRONOMICAL SOURCES: PHOTOMETRIC SEARCH OF BROWN DWARFS WITH SPITZER/IRAC

We present a statistical method for the photometric search of rare astronomical sources based on the weighted k-Nearest Neighbors method. A metric is defined in a multidimensional color-magnitude space based only on the photometric properties of template sources and the photometric uncertainties of both templates and data, without the need to define ad hoc color and magnitude cuts which could bias the search. The metric is defined as a function of two parameters, the number of neighbors k and a threshold distance D {sub th} that can be optimized for maximum selection efficiency and completeness. We apply the method to the search of L and T dwarfs in the Spitzer Extragalactic First Look Survey and the Booetes field of the Spitzer Shallow Survey, as well as to the search of substellar mass companions around nearby stars. With high level of completeness, we confirm the absence of late-T dwarfs detected in at least two bands in the First Look Survey, and only one in the Shallow Survey (previously discovered by Stern et al.). This result is in agreement with the expected statistics for late-T dwarfs. One L/early-T candidate is found in the First Look Survey, and three in the Shallow Surveys, currently undergoing follow-up spectroscopic verification. Finally, we discuss the potential for brown dwarf searches with this method in the Spitzer warm mission Exploration Science programs.

79 ASTRONOMY AND ASTROPHYSICS↗

ASC CSSE Level 2 Milestone #6362: Resilient Asynchronous Many Task Programming Model

This report is an outcome of the ASC CSSE Level 2 Milestone 6362: Analysis of Re- silient Asynchronous Many-Task (AMT) Programming Model. It comprises a summary and in-depth analysis of resilience schemes adapted to the AMT programming model. Herein, performance trade-offs of a resilient-AMT prograrnming model are assessed through two ap- proaches: (1) an analytical model realized by discrete event simulations and (2) empirical evaluation of benchmark programs representing regular and irregular workloads of explicit partial differential equation solvers. As part of this effort, an AMT execution simulator and a prototype resilient-AMT programming framework have been developed. The former permits us to hypothesize the performance behavior of a resilient-AMT model, and has undergone a verification and validation (V&V) process. The latter allows empirical evaluation of the perfor- mance of resilience schemes under emulated program failures and enabled the aforementioned V&V process. The outcome indicates that (1) resilience techniques implemented within an AMT framework allow efficient and scalable recovery under frequent failures, that (2) the abstraction of task and data instances in the AMT programming model enables readily us- able Application Program Interfaces (APIs) for resilience, and that (3) this abstraction enables predicting the performance of resilient-AMT applications with a simple simulation infrastruc- ture. This outcome will provide guidance for the design of the AMT programming model and runtime systems, user-level resilience support, and application development for ASC's next generation platforms (NGPs).

97 MATHEMATICS AND COMPUTING↗

Space station structures and dynamics test program

The design, construction, and operation of a low-Earth orbit space station poses challenges for development and implementation of technology. One specific challenge is the development of a dynamics test program for defining the space station design requirements, and identifying and characterizing phenomena affecting the space station's design and development. The test proposal, as outlined, is a comprehensive structural dynamics program to be launched in support of the space station (SS). Development of a parametric data base and verification of the mathematical models and analytical analysis tools necessary for engineering support of the station's design, construction, and operation provide the impetus for the dynamics test program. The four test phases planned are discussed: testing of SS applicable structural concepts; testing of SS prototypes; testing of actual SS structural hardware; and on-orbit testing of SS construction.

Bugg, Frank M.↗

Applying Human-performance Models to Designing and Evaluating Nuclear Power Plants: Review Guidance and Technical Basis

Human performance models (HPMs) are simulations of human behavior with which we can predict human performance. Designers use them to support their human factors engineering (HFE) programs for a wide range of complex systems, including commercial nuclear power plants. Applicants to U.S. Nuclear Regulatory Commission (NRC) can use HPMs for design certifications, operating licenses, and license amendments. In the context of nuclear-plant safety, it is important to assure that HPMs are verified and validated, and their usage is consistent with their intended purpose. Using HPMs improperly may generate misleading or incorrect information, entailing safety concerns. The objective of this research was to develop guidance to support the NRC staff's reviews of an applicant's use of HPMs in an HFE program. The guidance is divided into three topical areas: (1) HPM Verification, (2) HPM Validation, and (3) User Interface Verification. Following this guidance will help ensure the benefits of HPMs are achieved in a technically sound, defensible manner. During the course of developing this guidance, I identified several issues that could not be addressed; they also are discussed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

International comparison of product certification and verification methods for appliances

Enforcement of appliance standards and consumer trust in appliance labeling are important foundations of growing a more energy efficient economy. Product certification and verification increase compliance rates which in turn increase both energy savings and consumer trust. This paper will serve two purposes: 1) to review international practices for product certification and verification as they relate to the enforcement of standards and labeling programs in the U.S., E.U., Australia, Japan, Canada, and China; and 2) to make recommendations for China to implement improved certification processes related to their mandatory standards and labeling program such as to increase compliance rates and energy savings potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

International Comparison of Product Certification and Verification Methods for Appliances

Enforcement of appliance standards and consumer trust in appliance labeling are important foundations of growing a more energy efficient economy. Product certification and verification increase compliance rates which in turn increase both energy savings and consumer trust. This paper will serve two purposes: 1) to review international practices for product certification and verification as they relate to the enforcement of standards and labeling programs in the U.S., E.U., Australia, Japan, Canada, and China; and 2) to make recommendations for China to implement improved certification processes related to their mandatory standards and labeling program such as to increase compliance rates and energy savings potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants

As part of control room modernization at a nuclear power plant, a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model . These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—meant to catalog final products—rather than formative—meant to guide the overall modernization process. In this report, we highlight two crucial formative subelements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two subelements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomic baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and help ensure that control room modernization represents the successful evolution of the control system.

99 GENERAL AND MISCELLANEOUS↗

Realizing high-accuracy low-cost measurement and verification for deep cost savings (Final Project Report)

The project “Realizing high-accuracy low-cost measurement and verification for deep cost savings”, that began in Fiscal Year (FY) 2017, was funded to conduct the technical analyses, demonstration, market evaluation, and regulatory engagement necessary to realize a cost-effective high-accuracy advanced measurement and verification (M&V) method that could be applied to certain efficiency programs in the Pacific Northwest. Advanced M&V (also known as M&V 2.0), is a method that uses advanced metering infrastructure (AMI) data in combination with analytics to quantify energy efficiency savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Apollo experience report: Thermal protection from engine-plume environments

Portions of the combined Apollo spacecraft (the command and service module and the lunar module) are subjected to the impingement of hot exhaust gases from the various propulsion systems of the modules. The configurations of the vehicles and the sources of impinging engine plumes are described. A typical Apollo mission is outlined. Protection and design-verification methods are discussed. Finally, recommendations are made for future spacecraft programs.

Taylor, J. T.↗

Umbilical Connect Techniques Improvement-Technology Study

The objective of this study was to develop concepts, specifications, designs, techniques, and procedures capable of significantly reducing the time required to connect and verify umbilicals for ground services to the space shuttle. The desired goal was to reduce the current time requirement of several shifts for the Saturn 5/Apollo to an elapsed time of less than one hour to connect and verify all of the space shuttle ground service umbilicals. The study was conducted in four phases: (1) literature and hardware examination, (2) concept development, (3) concept evaluation and tradeoff analysis, and (4) selected concept design. The final product of this study was a detail design of a rise-off disconnect panel prototype test specimen for a LO2/LH2 booster (or an external oxygen/hydrogen tank for an orbiter), a detail design of a swing-arm mounted preflight umbilical carrier prototype test specimen, and a part 1 specification for the umbilical connect and verification design for the vehicles as defined in the space shuttle program.

Valkema, Donald C.↗

Summary report on the Viking 1975 DSN telecommunications compatibility test program

The system design tests and test results that provided the basis for establishment of telecommunications design between the DSN and Viking 1975 were described. The Viking 1975/DSN Telecommunications Compatibility Test Program Consisted of three phases: subsystem design, system design, and system verification tests which were performed at JPL and at the Air Force Eastern Test Range and Kennedy Space Center complexes. Subsystem design tests were performed with the Viking Orbiter (VO) and the Viking Lander (VL) during 1973. System design compatibility tests were performed with the Viking Proof Test Orbiter, Viking Spacecraft Test Lander, and a multiple Viking spacecraft configuration during the summer of 1974. System verification tests were performed with the Viking Orbiter, Viking Lander and Viking spacecraft during the spring and summer of 1975.

A. I. Bryan↗

Voyager flight project: DSN Telecommunications Compatibility Test Program

The Voyager Flight Project - DSN Telecommunications Compatibility Test Program consisted of three phases: Subsystem Design, System Design, and System Verification Tests. Subsystem Design Tests were performed during mid 1976. System Design Tests were performed during late 1976 and early 1977. System Verification Tests were performed during the spring and summer of 1977. This article describes the System Design Tests and test results that provided the basis for establishment of telecommunications design between the DSN and the Voyager Flight Project.

Bryan, A. I.↗

To the first Shuttle launch

The major Shuttle-related testing currently in progress includes: static testing of all major elements, full scale ground vibration testing, main propulsion system testing, software verification and validation, qualification testing of many components and subsystems, and SSME verification testing. This paper reviews the current status of the Shuttle program and gives attention to the transition to operations, near-term traffic plans, user-charge policies, and payload integration. It is concluded that the transition from individual space-research projects to a fully integrated Space Transportation System, providing low-cost routine access to space for many users, involves a complete rethinking of the role NASA and the user will play.

Yardley, J. F.↗