Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Large-Area Fast-Timing Systems In STAR

The STAR experiment at RHIC concentrates on the tracking of charged hadrons via ionization, and the detection of electrons and photons via calorimetry, in a wide and azimuthally complete acceptance. STAR's ability to directly identify charged hadrons was initially limited to low momenta. This has been addressed via the construction of a large-area Time-of-Flight (TOF) system based on small Multigap Resistive Plate Chambers (MRPCs). The installation of the STAR TOF system was completed last fall. The full system is ran well in the recent RHIC Run 10. The operation of the system, and its performance for particle identification, during RHIC Runs 9 and 10 will be described. STAR's ability to identify muons is also extremely limited. Another large-area TOF system based on much larger MRPCs is envisioned. This system will be located outside the STAR magnet and is called the Muon Telescope Detector (MTD). Several different prototype MTD systems were operated in Runs 7 through 10, and a patch of near-final MTD detectors is under construction for use in the upcoming Run 11. The performance of the MTD prototype detectors, and the design of the Run 11 installation and the full system, will be described.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Accelerating the Decommissioning of the Sellafield Pile Fuel Storage Pond Using Innovative Remote Tooling Developed with the Supply Chain - 16437

The Pile Fuel Storage Pond (PFSP) at Sellafield and adjoining de-canning building provided the storage, cooling and de-canning facility for used fuel and isotopes from the two Windscale reactors and later some Magnox fuel from the Calder Hall reactors. Operations ceased in the 1970's and the facilities are now undergoing a programme of accelerated decommissioning. The pond is a sub-divided outdoor storage pond containing skips of irradiated fuel and miscellaneous waste items and the building contains a series of sub-ponds, known as bays, connected underwater to the main pond. The radiation environment and access limitations necessitate the use of remote technology for the decommissioning programme. This paper describes the philosophy and approach and the technology and equipment adopted for the removal and export of key plant equipment and waste items from within the PFSP. In order to progress the project cost effectively and speedily, the Sellafield project team looked for partners in the supply chain with the required experience, expertise and facilities to supply and test 'commercial off-the-shelf' (COTS) or modified proprietary equipment. This COTS approach minimised the need for multiple, expensive and lengthy design and manufacturing tasks associated with bespoke equipment. Sellafield partnered with specialist remote handling contractor, James Fisher Nuclear, and the respective project teams worked closely together at every stage of the project from qualifying requirements, identifying potential solutions, through to development, testing, training and final deployment. Optioneering of potential solutions involved early 'proof of principle' trials in JFN rig hall facilities, utilising existing equipment and plant mock-ups, along with other equipment manufactured in-house. Together the project teams selected the best solution to take forward, adopting a practical and trials based approach, which allowed rapid and cost effective modification of the solution throughout the project with minimal impact on the programme. When the final solution was validated, plant operators then gained familiarity and training on the equipment so they could execute the work efficiently on plant and so minimise their dose uptake. The removal of a Large De-canner is described in detail. This was a significant obstruction to the emptying, modification and re-use of the bay and a key milestone in the clean-up of the PFSP. The de-canners are large and heavy pieces of equipment which weigh 6.5 t each and approximately 6.5 m long. Their removal was further complicated by limited equipment and man access, radiological contamination from de-canning fuel, challenging material properties, unknown equipment condition and complex lifting requirements. Sellafield Ltd and JFN project teams worked closely together to rapidly develop, trial and deploy a succession of adapted 'commercial off-the-shelf' (COTS) tools whilst addressing emerging challenges and completing the overall task on time and budget. The Sellafield and JFN project and design teams provided an underwater: wheel stop removal tool; towing trolley; grinder on a carbon fibre pole, chute cutting 600 mm circular saw and hydraulic 6 t winch. The suite of tools will be reused on the remaining de-canners in the PFSP and First Generation Magnox Fuel Storage Pond (FGMSP) giving cost and programme savings. Each of the tools can also be used, and some have already been, for other tasks in the bay retrievals such as the size reduction of support frames, large steel sections and chemical de-canner preparatory works. The 'learning from experience' acquired during the project was shared by the Sellafield project with other decommissioning projects across the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The VELOCE pulsed power generator for isentropic compression experiments

Veloce is a medium-voltage, high-current, compact pulsed power generator developed for isentropic and shock compression experiments. Because of its increased availability and ease of operation, Veloce is well suited for studying isentropic compression experiments (ICE) in much greater detail than previously allowed with larger pulsed power machines such as the Z accelerator. Since the compact pulsed power technology used for dynamic material experiments has not been previously used, it is necessary to examine several key issues to ensure that accurate results are obtained. In the present experiments, issues such as panel and sample preparation, uniformity of loading, and edge effects were extensively examined. In addition, magnetohydrodynamic (MHD) simulations using the ALEGRA code were performed to interpret the experimental results and to design improved sample/panel configurations. Examples of recent ICE studies on aluminum are presented.

42 ENGINEERING↗

U.S.– India Joint Center for Building Energy Research and Development (CBERD) Caring for the Energy Health of Healthcare Facilities

The U.S.-India Joint Center for Building Energy Research & Development (CBERD), created through the Partnership to Accelerate Clean Energy (PACE) agreement between the United States and India, is a research and development (R&D) center with over 30 institutional and industry partners from both nations. This five-year presidential initiative is jointly funded by the U.S. Department of Energy and the Government of India. CBERD aims to build upon a foundation of collaborative knowledge, tools, and technologies, and human capabilities that will increase development of high-performance buildings. To reach this goal, the R&D focuses on energy use reduction throughout the entire life cycle of buildings—i.e., design, construction, and operations. During the operations phase of buildings, even with best-practice energy-efficient design, actual energy use can be much higher than the design intent. Every day, much of the energy consumed by buildings serves no purpose (Roth et al. 2005). Building energy information systems (EIS) are commercially available systems that building owners and facility managers use to assess their building operations, measure, visualize, analyze, and report energy cost and consumption. Energy information systems can enable significant energy savings by tracking energy use, identifying consumption patterns, and benchmarking performance against similar buildings, thereby identifying improvement opportunities. The CBERD team has identified potential energy savings of approximately 2 quads of primary energy in the United States, while industry building energy audits in India have indicated potential energy savings of up to 30 percent in commercial buildings such as offices. Additionally, the CBERD team has identified healthcare facilities (e.g., hospitals, clinics), hotels, and offices as the three of the highest-growth sectors in India that have significant energy consumption, and that would benefit the most from implementation of EIS.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status of the Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

The current baseline of ITER foresees 2 Heating Neutral Beam (HNB's) systems based on negative ion technology, each accelerating to 1 MeV 40 A of D{sup -} and capable of delivering 16.5 MW of D{sup 0} to the ITER plasma, with a 3rd HNB injector foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) accelerating 60 A of H{sup -} to 100 keV will inject {approx_equal}15 A equivalent of H{sup 0} for charge exchange recombination spectroscopy and other diagnostics. Recently the RF driven negative ion source developed by IPP Garching has replaced the filamented ion source as the reference ITER design. The RF source developed at IPP, which is approximately a quarter scale of the source needed for ITER, is expected to have reduced caesium consumption compared to the filamented arc driven ion source. The RF driven source has demonstrated adequate accelerated D{sup -} and H{sup -} current densities as well as long-pulse operation. It is foreseen that the HNB's and the DNB will use the same negative ion source. Experiments with a half ITER-size ion source are on-going at IPP and the operation of a full-scale ion source will be demonstrated, at full power and pulse length, in the dedicated Ion Source Test Bed (ISTF), which will be part of the Neutral Beam Test Facility (NBTF), in Padua, Italy. This facility will carry out the necessary R and D for the HNB's for ITER and demonstrate operation of the full-scale HNB beamline. An overview of the current status of the neutral beam (NB) systems and the chosen configuration will be given and the ongoing integration effort into the ITER plant will be highlighted. It will be demonstrated how installation and maintenance logistics have influenced the design, notably the top access scheme facilitating access for maintenance and installation. The impact of the ITER Design Review and recent design change requests (DCRs) will be briefly discussed, including start-up and commissioning issues. The low current hydrogen phase now envisaged for start-up imposed specific requirements for operating the HNB's at full beam power. It has been decided to address the shinethrough issue by installing wall armour protection, which increases the operational space in all scenarios. Other NB related issues identified by the Design Review process will be discussed and the possible changes to the ITER baseline indicated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Interaction Region Magnets for Future Electron-Ion Collider ¿at Jefferson Lab

The Jefferson Lab Electron Ion Collider (JLEIC) is a pro-posed new machine for nuclear physics research. It uses the existing CEBAF accelerator as a full energy injector to deliver 3 to 12 GeV electrons into a new electron collider ring. An all new ion accelerator and collider complex will deliver up to 200 GeV protons. The machine has luminosity goals of 1034 cm-2 sec-1. The whole detector region including forward detection covers about 80 meters of the JLEIC complex. The interaction region design has recently been optimized to accommodate 200 GeV proton energy using conventional NbTi superconducting magnet technology. This paper will describe the requirements and preliminary designs for both the ion and electron beam magnets in the most complex 34.5 m long interaction region (IR) around the interaction point (IP). The interaction region has over thirty-four superconducting magnets operating at 4.5K; these include dipoles, quadrupoles, skew quadrupoles, solenoids, horizontal and vertical correctors and higher order multipole magnets. The paper will also dis-cuss the electromagnetic interaction between these magnets.

Rajput-Ghoshal, Renuka↗

Analog Signal Multiplexing System for the Iota Proton Injector

The Fermilab Accelerator Science and Technology (FAST) Facility at FNAL is a dedicated research and development center focused on advancing particle accelerator technologies for future applications worldwide. Currently, a key objective of FAST Operations is to commission the 2.5 MeV IOTA Proton Injector (IPI) and enable proton injection into the Integrable Optics Test Accelerator (IOTA) storage ring. The low and medium-energy sections of the IPI include four frame-style dipole trims and two multi-function correctors with independently controlled coils, requiring readout of 32 analog channels for current and voltage monitoring in total. To reduce cost and optimize rack space within the PLC-based control system, a 32-to-4 analog signal multiplexing system was designed and implemented. This system enables real-time readback of excitation parameters from all magnetic correctors. This paper presents the design, construction, implementation, and performance of the multiplexing system.

MacLean, Daniel R. [Fermilab] (ORCID:0000000210103↗

Interaction Region Magnets for Future Electron-Ion Collider at Jefferson Lab

The Jefferson Lab Electron Ion Collider (JLEIC) is a pro-posed new machine for nuclear physics research. It uses the existing CEBAF accelerator as a full energy injector to deliver 3 to 12 GeV electrons into a new electron collider ring. An all new ion accelerator and collider complex will deliver up to 200 GeV protons. The machine has luminosity goals of 1034 cm-2 sec-1. The whole detector region including forward detection covers about 80 meters of the JLEIC complex. The interaction region design has recently been optimized to accommodate 200 GeV proton energy using conventional NbTi superconducting magnet technology. This paper will describe the requirements and preliminary designs for both the ion and electron beam magnets in the most complex 34.5 m long interaction region (IR) around the interaction point (IP). The interaction region has over thirty-four superconducting magnets operating at 4.5K; these include dipoles, quadrupoles, skew quadrupoles, solenoids, horizontal and vertical correctors and higher order multipole magnets. The paper will also dis-cuss the electromagnetic interaction between these magnets.

Rajput-Ghoshal, Renuka↗

Cadmium Telluride Photovoltaics Accelerator Consortium Solicitation: Request for Proposals Information

Cadmium telluride photovoltaics (CdTe PV) is a leading PV technology built on U.S. innovations that currently holds significant market share within domestic utility scale PV systems. In order to keep pace with a highly competitive and innovative global PV module market, CdTe manufacturing needs readily adaptable advances at the cell and module levels that simultaneously enable higher conversion efficiencies and manufacturing cost reductions without risking long-term module durability. In pursuit of this goal, the Department of Energy (DOE) Solar Energy Technologies Office (SETO) has asked the National Renewable Energy Laboratory (NREL) to launch and support a Consortium to accelerate domestic CdTe technology development through a competitive solicitation process. NREL will competitively select a CdTe Consortium with the goals of enhancing U.S. competitiveness and expanding domestic CdTe PV material and module production through 2030. NREL will provide coordination and oversight through development of technical scopes, review of technical proposals, subcontract support, and review of deliverables along with research support to the Consortium. The new Consortium is expected to include major U.S. companies and universities that possess strong technology development, transfer, and validation capabilities. The research and analysis output of the CdTe Consortium will inform purchasing, design, deployment, and operations decisions of companies in the domestic CdTe PV supply chain, leading to increased material and module production in the U.S.

41 EE - Solar Energy Technologies Office (EE-4S)↗

First operation of the charge-breeder electron-cyclotron-resonance ion source at the Texas A and M Cyclotron Institute

The 14.5 GHz electron-cyclotron-resonance ion source (ECRIS) designed and fabricated specifically for charge breeding has been installed at the Texas A and M University Cyclotron Institute for use in the institute's ongoing radioactive-ion-beam upgrade. The initial testing of the source has just begun with magnetic analysis of the ECRIS beam. The source has only been conditioning for a brief time at low microwave power, and it is continuing to improve. After the source has been conditioned and characterized, charge-breeding trials with stable beams from a singly ionizing source will begin.

43 PARTICLE ACCELERATORS↗

Fabrication of Cryogenic Manganite Bolometers to Measure the Total Energy at the LCLS Free Electron X-ray Laser

We are developing cryogenic bolometers to measure the total energy of the Linac Coherent Light Source (LCLS) free electron X-ray laser that is currently being built at the Stanford Linear Accelerator Center. LCLS will produce ultrashort {approx}200 fs X-ray laser pulses with {approx}10{sup 13} photons at 0.8 keV up to {approx}10{sup 12} photons at 8 keV per pulse at a repeat interval as short as 8 ms, and will be accompanied by a halo of spontaneous undulator radiation. Our bolometer consists of a 375 {micro}m thick Si absorber and a Nd{sub 0.67}Sr{sub 0.33}MnO{sub 3} sensor operated at its metal-insulator transition. It will measure the total energy of each pulse with a precision of <1%, and is designed to meet the conflicting requirements of radiation hardness, sensitivity, linearity over a dynamic range of three orders of magnitude, and readout speed compatible with the LCLS pulse rate. Here we discuss bolometer design and fabrication, and the photoresponse of prototype devices to pulsed optical lasers.

42 ENGINEERING↗

Optimization and Diagnostics Code for Technological Processes: Radiochemical Production Simulator

A software-hardware complex with the possibility of simulating the functioning of technological processes with APCS in real and accelerated time is being developed as part of Project Breakthrough in order to determine the optimal operating regimes of the technological processes of the units in a closed nuclear fuel cycle. It makes possible monitoring and control functions and the visualization and archiving of the results of simulation, which makes it possible at the development stages of technologies to evaluate the degree of adherence to the requirements of the technological equipment, regulating organs and final-control mechanisms, measurement apparatus, and monitoring channels, to analyze the control and diagnostics algorithms, blocking and protection, and to make when necessary changes in the design being developed. The developed software-hardware complex is a stimulator that will make it possible not only to investigate process schemes with their corresponding algorithms but also to develop training complexes for the training and certification of service personnel.

42 ENGINEERING↗

Trends in best-in-class energy-efficient technologies for room air conditioners

Improving the efficiency of room air conditioners (RACs) could provide significant energy and associated emissions savings, particularly in emerging economies with hot climates where the cooling demand is expected to increase dramatically. To help accelerate efficiency improvements, this study identifies “best-in-class” high-efficiency RAC components and products. The findings show that manufacturers tend to minimize manufacturing costs by using RAC designs that are readily available or standardized to their production, and they share components across various models. High-efficiency RAC models use advanced compressor technologies optimized at a low frequency, large heat exchangers with thermodynamically effective materials and designs, highly efficient direct current fan motors, advanced metering devices, and smart sensors for temperature and humidity control. Recently RAC manufacturers have been improving seasonal efficiency – better reflecting part-load operation – especially via variable-speed (inverter) drives for compressor motors. Recent highest-efficiency RAC models use low global warming potential (GWP) refrigerants, having transitioned from conventional high-GWP refrigerants, in regions where RACs that use these low-GWP refrigerants are commercially available. Recently demonstrated innovative technologies show trends toward smart hybrid designs, evaporative cooling, and solid-state materials beyond the conventional vapor-compression technology. This information could help policymakers improve their RAC market-transformation programs to align with the most-efficient global technology.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Early detection of critical material degradation by means of electromagnetic multi-parametric NDE

With an increasing number of power plants operated in excess of their original design service life an early recognition of critical material degradation in components will gain importance. Many years of reactor safety research allowed for the identification and development of electromagnetic NDE methods which detect precursors of imminent damage with high sensitivity, at elevated temperatures and in a radiation environment. Regarding low-alloy heat-resistant steel grade WB 36 (1.6368, 15NiCuMoNb5), effects of thermal and thermo-mechanical aging on mechanical-technological properties and several micromagnetic parameters have been thoroughly studied. In particular knowledge regarding the process of copper precipitation and its acceleration under thermo-mechanical load has been enhanced. Whilst the Cu-rich WB 36 steel is an excellent model material to study and understand aging effects related to neutron radiation without the challenge of handling radioactive specimens in a hot cell, actually neutron-irradiated reactor pressure vessel materials were investigated as well. The neutron fluence experienced and the resulting shift of the ductile-brittle transition temperature were determined electromagnetically, and it was shown that weld and base material can be distinguished from the cladded side of the RPV wall. Low-cycle fatigue of the austenitic stainless steel AISI 347 (1.4550, X6CrNiNb18-10) has been characterized with electromagnetic acoustic transducers (EMATs) at temperatures of up to 300 °C. Time-of-flight and amplitude of the transmitted ultrasound signal were evaluated against the number of load cycles applied and observed as an indication of the imminent material failure significantly earlier than monitoring stresses or strains.

36 MATERIALS SCIENCE↗

Intra-Beam Scattering, Impedance, and Instabilities in Ultimate Storage Rings

We have investigated collective effects in an ultimate storage ring, i.e. one with diffraction limited emittances in both planes, using PEP-X as an example. In an ultimate ring intra-beam scattering (IBS) sets the limit of current that can be stored. In PEP-X, a 4.5 GeV ring running round beams at 200 mA in 3300 bunches, IBS doubles the emittances to 11.5 pm at the design current. The Touschek lifetime is 11 hours. Impedance driven collective effects tend not to be important since the beam current is relatively low. We have investigated collective effects in PEP-X, an ultimate storage ring, i.e. one with diffraction limited emittances (at one angstrom wavelength) in both planes. In an ultimate ring intra-beam scattering (IBS) sets the limit of current that can be stored. In PEP-X, IBS doubles the emittances to 11.5 pm at the design current of 200 mA, assuming round beams. The Touschek lifetime is quite large in PEP-X, 11.6 hours, and - near the operating point - increases with decreasing emittance. It is, however, a very sensitive function of momentum acceptance. In an ultimate ring like PEP-X impedance driven collective effects tend not to be important since the beam current is relatively low. Before ultimate PEP-X can be realized, the question of how to run a machine with round beams needs serious study. For example, in this report we assumed that the vertical emittance is coupling dominated. It may turn out that using vertical dispersion is a preferable way to generate round beams. The choice will affect IBS and the Touschek effect.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design of a high-power compact SRF linac for industrial applications of e-beam irradiation

Fermilab has developed a novel concept for an industrial electron linac using Nb3Sn coating technology and conduction cooling. These conduction-cooled linacs can generate electron beam energies up to 10 MeV in continuous-wave operation and reach higher power (>=1 MW) by combing several modules. Compact and light enough to mount on mobile platforms, our machine is anticipated to enable new in-situ environmental remediation applications such as waste-water treatment for urban areas, X-ray medical device sterilization, and innovative pavement applications. We highlight a few aspects of a 1 MW design of such a machine in this paper. A detailed plan is in Dhuley et al. (2022) Phys. Rev. Accel. Beams 25, 041601.

43 PARTICLE ACCELERATORS↗

A simulation environment for ITER PCS development

A simulation environment known as the Plasma Control System Simulation Platform (PCSSP), specifically designed to support development of the ITER Plasma Control System (PCS), is currently under construction by an international team encompassing a cross-section of expertise in simulation and exception handling for plasma control. The proposed design addresses the challenging requirements of supporting the PCS design. This work provides an overview of the PCSSP project and a discussion of some of the major features of its design. Plasma control for the ITER tokamak will be significantly more challenging than for existing fusion devices. An order of magnitude greater performance is needed for some types of control, which together with limited actuator authority, implies that optimized individual controllers and nonlinear saturation logic are required. At the same time, consequences of control failure are significantly more severe, which implies a conflicting requirement for robust control. It also implies a requirement for comprehensive and robust exception handling. Coordinated control of multiple competing objectives with significant interactions, together with many shared uses of actuators to control multiple variables, implies that highly integrated control logic and shared actuator management will be required. It remains a challenge for the integrated technologies to simultaneously address these multiple and often competing requirements to be demonstrated on existing fusion devices and adapted for ITER in time to support its operational schedule. We describe ways in which the PCSSP will help address these challenges to support design of both the ITER PCS itself and the algorithms that will be implemented therein. and at the same time greatly reduce the cost of that development. We summarize the current status of the PCSSP design task, including system requirements and preliminary design documents already delivered as well as features of the ongoing detailed architectural design. The methods being incorporated in the detailed design are based on prior experience with control simulation environments in fusion and on standard practices prevalent in development of control-intensive industrial product designs.

43 PARTICLE ACCELERATORS↗