Search NASA⌕ Search

SEARCH · Search NASA

Results for “Adding Nuclear”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Redox potential control in molten salt systems for corrosion mitigation

In a molten salt nuclear reactor system, the redox potential must be controlled for mitigating corrosion of structural materials. The paper presented a critical review on the available knowledge of redox potential control in molten fluoride salt systems. The major potential contaminants that affect the redox potential and material corrosion are TF, oxides, hydroxides, and various metal fluorides. Redox potential control methodologies include gas sparging, contacting the salt with a reducing metal, and adding soluble salt redox buffers to the salt. Redox potential measurement technologies include electrochemical sensors and optical spectroscopy. This work also analyzed the current technology issues and recommended near future studies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advances in Fuel Rod Modeling in Subchannel Thermal-Hydraulic Codes

Coolant Boiling in Rod Arrays-Two Fluid (COBRA-TF), or CTF, is a nuclear thermal hydraulic subchannel code used throughout academia and industry. It solves discretized forms of nine coupled equations for the mass, momentum, and energy equations for the liquid and vapor fields; the mass and momentum equation for the droplet field; and the energy equation for solid structures. This work focuses on improving the temperature predictions of CTF by adding new fuel thermal conductivity models that account for burnup, gadolinia content in addition to temperature. Prior to this work, CTF used a temperature dependent fuel thermal conductivity model. In reality, the fuel thermal conductivity is affected by fission product buildup and radiation damage under irradiation. This results in fuel thermal conductivity degradation, and correspondingly an increase in fuel centerline temperature. Accounting of the irradiation effects is particularly important for correct prediction of fuel temperature profile for the Doppler feedback calculation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SRNL's Lessons Learned from the University of Nevada Reno{sup TM} Nuclear Packaging Internships - 19464

The U.S. Department of Energy's Packaging Certification Program (DOE PCP) and the University of Nevada, Reno (UNR) Mechanical Engineering Department have developed an accredited, graduate level nuclear packaging certificate. The mission is to ensure that the DOE staff and users of PCP services are knowledgeable and competent in packaging and transportation activities. Since 2008, the Savannah River National Laboratory (SRNL) has been teaching two classes for the DOE PCP Packaging University. This paper introduces a recently added third class, where SRNL provided Site Supervisors, targeted toward engineering interns. As part of ensuring a future workforce, the Packaging Technology and Transportation Engineering Group (PT and TE) at Savannah River National Laboratory (SRNL) normally employs two to three summer interns each year. The internships provide SRNL innovative s performing valuable research and support work related to package certification. It also provides SRNL the opportunity to bring in perspective engineers on 'trial-basis.' The interns benefit by learning valuable career skills and gaining exposure to a broad-based career field in the field of packaging. As part of the job specific training, the summer interns are provided an overview of package design, testing, and certification. This includes package operations, containment vessel leak testing, and SARP preparation. Two years ago, SRNL recognized the efficiency of using the SRNL-taught courses for the summer interns working in SRNL PT and TE. SRNL requested that UNR allow the PT and TE two summer interns, who were rising college juniors, to enroll in the SRNL-taught courses for graduate credit. UNR agreed and allowed the interns to enroll under a special admission status. Since that time, UNR developed a new class within the Graduate Certificate in Nuclear Packaging (GCNP), for the summer intern research work. This new class offers a formalized framework for the summer interns to conduct research, while ensuring that the research is performed in a rigor consistent with an accredited college level setting. Last summer, the SRNL PT and TE had three summer interns - all participating in the new course, UNR ME-699 Nuclear Packaging Summer Internship - with each earning three graduate credits from UNR in mechanical engineering. This paper provides a brief overview of the DOE PCP Packaging University/ UNR GCNP, a discussion of SRNL's use of summer interns as a tool to recruit and train the future workforce, and lessons learned from having last year's three SRNL PPT and TE summer interns enroll in the UNR Packaging Internship Class. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coupling of CTF and TRACE for Modeling of Transients

This report documents the improvements that have been made to the capabilities for coupling CTF to systems codes-specifically, the US Nuclear Regulatory Commission (NRC) TRACE code. An initial systems coupling capability had been set up previously using a nonoverlapping domain approach with the codes exchanging data at the core boundaries. The present work adds a new approach using overlapping domains, in which the system code models the core as well. A new input format has been added to allow the user to specify the physical quantities to be exchanged and their location in the system model, which gives the flexibility of applying one-way or two-way coupling between the codes using the desired data exchanges. In addition to applying thermal-hydraulics (T/H) boundary condition (BC) values obtained from TRACE, a capability was added to allow CTF to apply flow resistance feedback to TRACE to match the CTF core pressure drop. Support was added for executing parallel CTF models within the CTF-systems coupling. The system coupling capability was successfully applied to a parallel MSLB transient, demonstrating that both the one-way and two-way coupling behaved as expected and provided substantial improvements to numerical stability and routine compared to the previous nonoverlapping domain coupling. An initial capability was also developed for performing restart calculations in CTF which will be used in the future for restarting CTF-TRACE simulations at specific points in the transient simulation.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Nd Scattering at Intermediate Energies : An Epoch-making Experimental Study of the Three Nucleon Force

Recent progress in our three nucleon force study with three nucleon scattering at intermediate energies (E/A{approx_equal}100 MeV) is presented, especially focusing on experimental deuteron-proton elastic scattering and breakup reactions at RIKEN. One signature of three nucleon forces is identified in the cross section minimum for deuteron-proton elastic scattering by direct comparison between precision data and state-of-the-art Faddeev calculations based on realistic nucleon-nucleon forces plus 2{pi}-exchange three nucleon forces. However, the polarization observables are not always well described by adding the model three nucleon forces, indicating that components other than a 2{pi}-exchange three nucleon force are required to describe the data.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Preparation and Initial Characterization of Fluidized Bed Steam Reforming Pure-Phase Standards

Hanford is investigating the Fluidized Bed Steam Reforming (FBSR) process for their Low Activity Waste. The FBSR process offers a low-temperature continuous method by which liquid waste can be processed with the addition of clay into a sodium aluminosilicate (NAS) waste form. The NAS waste form is mainly comprised of nepheline (NaAlSiO 4 ), sodalite (Na 8 [AlSiO 4 ] 6 Cl 2 ), and nosean (Na 8 [AlSiO 4 ] 6 SO 4 ). Anions such as perrhenate (ReO 4 - ), pertechnetate (TcO 4 - ), and iodine (I - ) are expected to replace sulfate in the nosean structure and/or chloride in the sodalite mineral structure (atomically bonded inside the aluminosilicate cages that these mineral structures possess). In the FBSR waste form, each of these phases can exist in a variety of solid solutions that differ from the idealized forms observed in single crystals in nature. The lack of understanding of the durability of these stoichiometric or idealized mineral phases complicates the ability to deconvolute the durability of the mixed phase FBSR product since it is a combination of different NAS phases. To better understand the behavior, fabrication and testing of the individual phases of the FBSR product is required. Analytical Development (AD) of the Science and Technology directorate of the Savannah River National Laboratory (SRNL) was requested to prepare the series of phase-pure standards, consisting of nepheline, nosean, and Cl, Re, and I sodalite. Once prepared, X-ray Diffraction (XRD) analyses were used to confirm the products were phase pure. These standards are being used for subsequent characterization studies consisting of the following: single-pass flow-through (SPFT) testing, development of thermodynamic data, and x-ray diffraction (XRD) calibration curves. In addition to the above mentioned phase-pure standards, AD was tasked with fabricating a mixed Tc-Re sodalite.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transient Simulation of the Multi-SERTTA Experiment with MAMMOTH

This work details the MAMMOTH reactor physics simulations of the Static Environment Rodlet Transient Test Apparatus (SERTTA) conducted at Idaho National Laboratory in FY-2017. TREAT static-environment experiment vehicles are being developed to enable transient testing of Pressurized Water Reactor (PWR) type fuel specimens, including fuel concepts with enhanced accident tolerance (Accident Tolerant Fuels, ATF). The MAMMOTH simulations include point reactor kinetics as well as spatial dynamics for a temperature-limited transient. The strongly coupled multi-physics solutions of the neutron flux and temperature fields are second order accurate both in the spatial and temporal domains. MAMMOTH produces pellet stack powers that are within 1.5% of the Monte Carlo reference solutions. Some discrepancies between the MCNP model used in the design of the flux collars and the Serpent/MAMMOTH models lead to higher power and energy deposition values in Multi-SERTTA unit 1. The TREAT core results compare well with the safety case computed with point reactor kinetics in RELAP5-3D. The reactor period is 44 msec, which corresponds to a reactivity insertion of 2.685% delta k/k$. The peak core power in the spatial dynamics simulation is 431 MW, which the point kinetics model over-predicts by 12%. The pulse width at half the maximum power is 0.177 sec. Subtle transient effects are apparent at the beginning insertion in the experimental samples due to the control rod removal. Additional difference due to transient effects are observed in the sample powers and enthalpy. The time dependence of the power coupling factor (PCF) is calculated for the various fuel stacks of the Multi-SERTTA vehicle. Sample temperatures in excess of 3100 K, the melting point UO$_2$, are computed with the adiabatic heat transfer model. The planned shaped-transient might introduce additional effects that cannot be predicted with PRK models. Future modeling will be focused on the shaped-transient by improving the control rod models in MAMMOTH and adding the BISON thermo-elastic models and thermal-fluids heat transfer.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons learned in the hot cell at the transuranic waste processing center - 15336

The hot cell at the Transuranic Waste Processing Center (TWPC) has been in operation for seven years. Its mission is to empty, process, and repackage the contents Remote Handled (RH) concrete waste casks. The sequence of operation for processing the RH casks includes using a remotely operated manipulator (manipulator) to remove the cask contents and deliver them to a work table where operators process the waste into RH-TRU, CH-TRU, LLW drums using Master Slave Manipulators (MSMs). The manipulator is the only piece of equipment that can remove material from the cask and represents a single point failure that can shut down hot cell processing should it fail. During the first six years of operation the project processing goals were constantly in jeopardy due to the high frequency and extent of manipulator failures that forced unplanned down time in the hot cell to facilitate repairs. In 2013 a hot cell maintenance outage was planned and executed to improve the operability and reduce the equipment failure rate. A new remotely operated manipulator, purchased as a spare before the outage, was installed in the hot cell during the outage. Prior to installing the manipulator into the hot cell several major and minor modifications were made to the manipulator to incorporate improvements manipulator reliability and maintainability based upon operating and maintenance lessons learned from the previous years of operation. Additionally a maintenance glovebox was added to the hot cell for servicing the removable manipulator components. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achievements and process improvements in processing transuranic waste at the TRU Waste Processing Center - 15488

Wastren Advantage, Inc., (WAI) is the DOE Prime contractor for the TRU Waste Processing Center (TWPC) located in Oak Ridge, TN. This paper highlights the TWPCs specific achievements and process improvements associated with both Contact (CH) and Remote Handled (RH), Transuranic (TRU) waste receipt processing and repackaging for disposal. The five key improvement areas and achievements include: - The TWPC installed, tested and operated successfully the Drum Venting System (DVS) to vent over-packed CH-TRU waste drums in several configurations including 55-gallon drums over-packed in 79 or 85-gallon drums. - A new Remote Drum Opener (RDO) system was designed, tested and placed in service to vent drums discovered in overpack boxes in the Box Breakdown Area and to vent overpack configurations that could not be handled in the standard DVS (e.g., 110 gallon overpacks and multiple drum configurations). - The Cask Processing Enclosure (CPE) approach to repackaging RH-TRU waste contained in concrete casks was developed and implemented - Hot Cell outage to incorporate planned equipment modifications and improvements to maintain processing rates. - To improve certification and segregation of CH-TRU from drums that meet Low Level Waste criteria for disposal at Nevada the TWPC added additional equipment/facilities for Non-Destructive Assay (NDA) and Real Time Radiography (RTR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguards inventory and process monitoring regulatory comparison

Detecting the theft or diversion of the relatively small amount of fissile material needed to make a nuclear weapon given the normal operating capacity of many of today’s running nuclear production facilities is a difficult task. As throughput increases, the ability of the Material Control and Accountability (MC&A) Program to detect the material loss decreases because the statistical measurement uncertainty also increases. The challenge faced is the ability of current accounting, measurement, and material control programs to detect small yet significant losses under some regulatory approaches can decrease to the point where it is extremely low if not practically non-existent at normal operating capacities. Adding concern to this topic is that there are variations among regulatory bodies as far as what is considered a Significant Quantity (SQ). Some research suggests that thresholds should be lower than those found in any current regulation which if adopted would make meeting detection goals even more difficult. This paper reviews and compares the current regulatory requirements for the MA elements related to physical inventory, uncertainty of the Inventory Difference (ID), and Process Monitoring (PM) in the United States Department of Energy (DOE) and Nuclear Regulatory Commission (NRC), Rosatom of the Russian Federation and the Chinese Atomic Energy Agency (CAEA) of China. The comparison looks at how the regulatory requirements for the implementation of various MA elements perform across a range of operating capacities in example facilities.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Energy Infrastructure Database Description and User’s Manual

In 2014, the Deputy Assistant Secretary for Science and Technology Innovation initiated the Nuclear Energy (NE)–Infrastructure Management Project by tasking the Nuclear Science User Facilities, formerly the Advanced Test Reactor National Scientific User Facility, to create a searchable and interactive database of all pertinent NE-supported and -related infrastructure. This database, known as the Nuclear Energy Infrastructure Database (NEID), is used for analyses to establish needs, redundancies, efficiencies, distributions, etc., to best understand the utility of NE’s infrastructure and inform the content of infrastructure calls. The Nuclear Science User Facilities developed the database by utilizing data and policy direction from a variety of reports from the U.S. Department of Energy, the National Research Council, the International Atomic Energy Agency, and various other federal and civilian resources. The NEID currently contains data on 802 research and development instruments housed in 377 facilities at 84 institutions in the United States and abroad. The effort to maintain and expand the database is ongoing. Detailed information on many facilities must be gathered from associated institutions and added to complete the database. The data must be validated and kept current to capture facility and instrumentation status as well as to cover new acquisitions and retirements. This document provides a short tutorial on the navigation of the NEID web portal at NSUF-Infrastructure.INL.gov.

42 ENGINEERING↗

Mitochondrial respiratory chain protein co-regulation in the human brain

Mitochondrial respiratory chain (RC) function requires the stoichiometric interaction among dozens of proteins but their co-regulation has not been defined in the human brain. Here, using quantitative proteomics across three independent cohorts we systematically characterized the co-regulation patterns of mitochondrial RC proteins in the human dorsolateral prefrontal cortex (DLPFC). Whereas the abundance of RC protein subunits that physically assemble into stable complexes were correlated, indicating their co-regulation, RC assembly factors exhibited modest co-regulation. Within complex I, nuclear DNA-encoded subunits exhibited >2.5-times higher co-regulation than mitochondrial (mt)DNA-encoded subunits. Moreover, mtDNA copy number was unrelated to mtDNA-encoded subunits abundance, suggesting that mtDNA content is not limiting. Alzheimer's disease (AD) brains exhibited reduced abundance of complex I RC subunits, an effect largely driven by a 2–4% overall lower mitochondrial protein content. These findings provide foundational knowledge to identify molecular mechanisms contributing to age- and disease-related erosion of mitochondrial function in the human brain.

59 BASIC BIOLOGICAL SCIENCES↗

A U-bearing composite waste form for electrochemical processing wastes

Metallic/ceramic composite waste forms are being developed to immobilize combined metallic and oxide waste streams generated during electrochemical recycling of used nuclear fuel. Composites were made for corrosion testing by reacting HT9 steel to represent fuel cladding, Zr and Mo to simulate metallic fuel waste, and a mixture of ZrO2, Nd2O3, and UO2 to represent oxide wastes. More than half of the added UO2 was reduced to metal and formed Fe-Zr-U intermetallics and most of the remaining UO2 and all of the Nd2O3 reacted to form zirconates. Fe-Cr-Mo intermetallics were also formed. Microstructure characterization of the intermetallic and ceramic phases that were generated and tests conducted to evaluate their corrosion behaviors indicate composite waste forms can accommodate both metallic and oxidized waste streams in durable host phases. (c) 2018 Elsevier B.V. All rights reserved.

Chen, X. (ORCID:0000000332734431)↗

SU-E-J-142: Prompt Gamma Emission Measurements From a Passively Scattered Proton Beam On Targets Containing 16O, 12C and 14N

Purpose: To measure the prompt gamma emission from the important elements found in tissue ({sup 16}O,{sup 12}C and {sup 14}N) in a clinical passive-scatter treatment environment. Methods: The targets (composed of water, Perspex, graphite and liquid nitrogen) were irradiated with a 200 MeV passive-scatter proton beam and the discrete prompt gamma energy spectra was detected by a high resolution 2′ × 2′ LaBr. detector. In order to reduce the high level of radiation produced by the beam line elements, the detector was surrounded by 10 cm of lead to attenuate the scattered gamma-rays entering the detector with an extra 5 cm thick layer of lead added along the beam direction. A 10 cm thick collimator with a 5 cm × 10 cm rectangular opening was also used. Results: The prompt gamma peaks at 6.13 MeV and 4.44 MeV were clearly identified as a Result of the inelastic nuclear reaction between the protons and the 16O atoms found in the water target. The 6.13 MeV peak was 5% higher than the peak at 4.44 MeV for the water target. The 4.44 MeV peak was the only identified emission in the prompt gamma energy spectra from the graphite target ({sup 12}C). The expected 2.313 MeV peak form the{sup 14}N (liquid nitrogen target) was identified, but the other expected {sup 14}N peaks could not be resolved. Conclusion: Prompt gamma measurements with a passive-scatter proton beam are possible, but the presence of a high amount of background radiation from the patient final collimator presents a challenge at the treatment isocenter. The prominent prompt gamma peaks at 6.13 MeV and 4.44 MeV were identified from the water, Perspex and graphite targets. The prompt gammas from the liquid nitrogen target were difficult to see, but may not be significant in the in-vivo verification process.

60 APPLIED LIFE SCIENCES↗

Silver-iodine secondary waste stabilization: multi-scale evaluation

Iodine-129 is a key risk driver in most low-level waste cementitious waste repositories. The objectives of this study were to determine iodine speciation in cementitious materials with slag (Grout+slag) and without slag (Grout–slag) and its impact on iodine immobilization. Additional studies were conducted to determine if grout was compatibility as a waste form for the most common adsorbent used to remove aqueous and gaseous radioiodine, silver-impregnated granular activated carbon (Ag-GAC). Rankings of iodine species by their tendency to bind to grout were: iodide << organo-iodine ≤ iodate. Similarly, ranking of grout formulations by their tendency to immobilize iodine were: Grout +slag < Grout -slag . Organo-iodine comprised >40% of the leachate solution from grout samples initially hydrated (cured) with iodide. The origin of the organic ligand comprising the organo-iodine was organic carbon in the grout material (~1200 mg/kg). Iodine in the solid phase, as determined by K-edge X-ray Absorption Near-Edge Spectroscopy, and aqueous phases were not in equilibrium and essentially no iodine speciation transformations occurred within the grout after one month of curing, irrespective of which iodine species was initially added to the mix. For the first time, these studies demonstrate that multiple iodine species can co-exist simultaneously in grout porewater, the iodine species initially added to the grout can greatly affect immobilization, and that Ag-GAC can be safely disposed in grout formulation, but not in the presence of slag. These results help explain previous data and reduce uncertainty associated with the disposal of nuclear waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Effects of Different Lattice Codes on Results of Sensitivity and Uncertainty Analysis

According to the UAM ('Uncertainty Analysis in Modeling') benchmark, uncertainties in the LWR system calculations at all stages should be determined and quantified. As the neutronics calculations are prerequisite for the predictions of the reactor system, and the uncertainties introduced by the neutronics calculations would be propagated to the subsequent calculations, hence uncertainty analysis has been firstly focused on the neutronics phase to quantify the uncertainties of the reactor-physics predictions in UAM. For the lattice physics, the objective of uncertainty analysis is focused on uncertainty quantifications of the few-group constants; for the core physics, uncertainties of the core steady-state stand-alone neutronics calculations are focused on. Based on the previous researches, the nuclear-data uncertainty has been treated as one of the most significant source of uncertainty and received the most focus. In the previous works, the domestic code UNICORN has the capability of performing sensitivity analysis and uncertainty analysis using the direct numerical perturbation (DNP) method and statistical sampling (SS) method. In this paper, the capability of the UNICORN code has been improved. The domestic lattice code NECP-CACTI has been added in UNICORN to perform the lattice calculations, with DRAGON5.0 and NECP-CACTI available for lattice calculations. For DRAGON5.0 and NECP-CACTI, all the methods and technologies are shared in UNICORN. Therefore, the effects of different lattice codes on the results of sensitivity and uncertainty analysis have been researched and determined in this paper. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗