Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Cost and Schedule Analytical Techniques Development

This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

Source record↗

Correlative Analysis of Behavioral and Physiological Concomitants of Labor in Pregnant Rats

During parturition, rats exhibit characteristic behavioral expressions of labor. Lordosis contractions, consisting of an elongation of the dams body, are observed beginning several hours prior to neonate births, whereas vertical contractions, repeated rapid lifts of the abdomen, occur immediately preceding the birth of each neonate. We analyzed underlying changes in intrauterine pressure (IUP) using a telemetric sensor that we modified for use in freely-moving rats. This technique enabled us to correlate behavioral expressions of labor contractions with IUP. A small telemetric blood pressure sensor was fitted within a fluid-filled balloon, similar in size to a full term rat fetus. On Gestational day 19 of the rats' 22-day pregnancy, a unit was surgically implanted within the uterus. The dams were simultaneously videotaped, enabling us to directly correlate IUP signals with behavioral expressions of labor contractions. Earlier phases of labor, consisting predominantly of lordosis contractions were characterized by lower pressures relative to later phases during which higher pressures and vertical contractions were frequently observed.

Baer, L. A.↗

Inhibition of the active lymph pump by flow in rat mesenteric lymphatics and thoracic duct

There are only a few reports of the influence of imposed flow on an active lymph pump under conditions of controlled intraluminal pressure. Thus, the mechanisms are not clearly defined. Rat mesenteric lymphatics and thoracic ducts were isolated, cannulated and pressurized. Input and output pressures were adjusted to impose various flows. Lymphatic systolic and diastolic diameters were measured and used to determine contraction frequency and pump flow indices. Imposed flow inhibited the active lymph pump in both mesenteric lymphatics and in the thoracic duct. The active pump of the thoracic duct appeared more sensitive to flow than did the active pump of the mesenteric lymphatics. Imposed flow reduced the frequency and amplitude of the contractions and accordingly the active pump flow. Flow-induced inhibition of the active lymph pump followed two temporal patterns. The first pattern was a rapidly developing inhibition of contraction frequency. Upon imposition of flow, the contraction frequency immediately fell and then partially recovered over time during continued flow. This effect was dependent on the magnitude of imposed flow, but did not depend on the direction of flow. The effect also depended upon the rate of change in the direction of flow. The second pattern was a slowly developing reduction of the amplitude of the lymphatic contractions, which increased over time during continued flow. The inhibition of contraction amplitude was dependent on the direction of the imposed flow, but independent of the magnitude of flow. Nitric oxide was partly but not completely responsible for the influence of flow on the mesenteric lymph pump. Exposure to NO mimicked the effects of flow, and inhibition of the NO synthase by N (G)-monomethyl-L-arginine attenuated but did not completely abolish the effects of flow.

NASA Discipline Musculoskeletal↗

KSC SBIR/STTR 2004 Program Year Report

The Kennedy Space Center Level III SBIR/STTR management staff is under the Technology Transfer Office within the Spaceport Engineering and Technology Directorate. The SBIR and STTR programs provide an opportunity for small high technology companies and research institutions to participate in Government-sponsored research and development (R&D) programs in key technology areas. The SBIR program was established by Congress in 1982 to provide increased opportunities for small businesses to participate in R&D programs, increase employment, and improve U.S. competitiveness. The program's specific objectives are to stimulate U.S. technological innovation, use small businesses to meet Federal research and development needs, increase private sector commercialization of innovations, and foster and encourage participation by socially disadvantaged businesses. Legislation enacted in December 2000 reauthorized the program and strengthened emphasis on pursuing commercial applications of SBIR projects. An SBIR Phase I contract is the opportunity to establish the feasibility and technical merit of a proposed innovation. Selected competitively, the Phase I contract lasts for 6 months and is funded up to $70,000. SBIR Phase II contracts continue the most promising Phase I projects based on scientific! technical merit, expected value to NASA, company capability, and commercial potential. Phase II contracts are usually for a period of 24 months and may not exceed $600,000. NASA usually selects approximately 40 percent of Phase I projects to continue to the Phase II level. Phase III is the process of furthering the development of a product to make it commercially available. The STTR program awards contracts to small business concerns for cooperative R&D with a nonprofit research institution. Research institutions include nonprofit research organizations, Federal laboratories, or universities. The goal of the program established by Congress is to facilitate the transfer of technology developed by a research institution through the entrepreneurship of a small business. The STIR program is smaller in funding than the SBIR program. While the proposal is submitted by the small business concern, at least 30 percent of the funding and work must originate with the research institution. STTR Phase I projects receive up to $100K for a one-year effort, and a Phase II contract receives up to $600K for two years.

Source record↗

NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project

A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.

Technology Transfer↗

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASA's RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit #2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASAs RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit 2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA GRC

The Thermal Energy Conversion Branch at NASA Glenn Research Center (GRC) is supporting the development of high-efficiency power convertors in support of Radioisotope Power System (RPS) development. Significant progress was made towards such a system that utilized Stirling conversion machines during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was cancelled in 2013 by the Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This new effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton designs. The technology development contracts each consist of up to three phases: Design, Fabricate, and Test. As of May 2018, all contracts have completed the Design Phase, and each underwent a design review with an independent review board. Two of the contracts have been awarded the Phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, NASA GRC is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating 10 convertors from previous development projects. Four of which are flexure-bearing based, and the other six are gas-bearing based. One of the flexure-bearing convertors has accumulated over 110,000 hours of operation, and holds the current maintenance-free heat-engine run-time record. Another flexure-bearing convertor was recently manually shutdown after 105,620 hours of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of runtime on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Amongst the gas-bearing convertors, the longest running unit has accumulated over 70,000 hours of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously, for which the longest runtime has reached 26,000 hours.

Oriti, Salvatore↗

A Novel Mobile Examination and Remediation Facility for On-Site Remediation of Dry Storage Systems - 18389

Most of the spent nuclear fuel (SNF) in dry storage in the United States is safely and securely stored in dual-purpose (i.e., storage and transportation) canisters [1]. However, some of the SNF is stored in storage-only (i.e., non-transportable) packages, or packages that may become nonconforming for continued storage or transportation for a variety of reasons. Currently, the capability to remediate dry storage systems (DSSs) for SNF that are not transportable or that need to be repaired to maintain confinement boundary integrity during storage service does not exist without on-site access to a spent fuel pool. Hence, there is a potential future need for a mobile facility with remediation capabilities that can be used at multiple storage installations. These capabilities would permit needed repairs to an existing DSS to support continued storage or for the dry transfer of fuel to a new conveyance suitable for transport, if necessary. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. A novel design concept for a Mobile Examination and Remediation Facility (MERF) is proposed with functions and capabilities to remediate a DSS. The proposed MERF would be a multi-purpose facility, remotely operated and computer-controlled with semi-automated equipment to allow trained operators to safely perform remediation activities while keeping worker radiation dose as low as reasonably achievable. It would include a shielded rotating platform with support towers and would use commercial off- the-shelf examination and repair equipment. A slip ring arrangement underneath the rotating platform would allow for the power supply without impeding the continuous rotation and would simplify cable management. The support towers would be mounted on the rotating platform, and each tower would have vertical and horizontal positioning capability for axial and radial tool location. The rotating platform would be attached to the main MERF structure. Capabilities would include visual, surface, and volumetric examinations to fully characterize physical conditions on canister surface before and after a repair; repair techniques, e.g., laser beam welding, friction stir welding, or cold spray, to perform needed remediation activities; and associated equipment for surface preparation such as cutting and grinding equipment. The proposed design would be simple, modular, robust, economically viable, and easily transportable and would have a small footprint. The modular design would present several advantages including compatibility with a variety of different DSSs, on-site assembly, and transportability; it also would be built in interchangeable sections to facilitate decontamination. Further, shielding would be supplemented through interface with the existing transfer cask and storage overpack. Robustness and canister stability would be achieved using pneumatic holders and steel support structures designed with vibration absorbers to reduce impacts and/or a 'pendulum' effect during a seismic event. Thus, the proposed MERF would be designed to: (i) minimize handling of an affected DSS to the extent practicable, (ii) provide radiation shielding and minimize dose to operators and the public during remediation activities, and (iii) enable examination, repair, and repackaging. This paper describes the proposed MERF design concept and capabilities, main components, equipment, different modes of operation, and operating procedures. Structural and safety assessments would need to be performed before final design, licensing, and deployment. The MERF is evaluated with respect to regulatory impact (first of a kind, prior experience), operational impact (safety, security, staffing, ongoing operations, constraints), worker dose (low, medium, high), cost (low, medium, high), schedule (duration, time sequence), and technology readiness level. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of the SNF Transportation Infrastructure at Operating Commercial Nuclear Power Plant Sites - 18466

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The DOE Office of Nuclear Energy's (DOE-NE) Office of Integrated Waste Management (IWM) is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. One aspect of an integrated nuclear waste management system architecture is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to interim storage and/or disposal facilities. This paper presents a preliminary evaluation of the SNF transportation infrastructure at existing commercial nuclear power plant sites. Reactor site surveys performed by DOE in the 1990's and early 2000's that described the transportation infrastructure at commercial reactor sites at that time served as the starting point for the evaluation. Geographical information systems (GIS) and available open-source information about the reactor sites were used to identify changes in the transportation infrastructure at operating commercial nuclear power plant sites. The data and schematics contained within the previous surveys were comparatively analyzed alongside the GIS tools Google Earth, Google Maps, and DOE's Stakeholder Tool for Assessing Radioactive Transportation (START) to determine potential transportation modes and to identify improvements to the transportation infrastructure that may be needed at each of the sites. The preliminary results obtained and the insight gained from this effort support both integrated waste management system architecture analyses and future planning efforts. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Execution Strategy Analysis (ESA) Origin Sites Readiness Model - 19073

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The DOE Office of Nuclear Energy (DOE-NE) Office of Spent Fuel and Waste Disposition (SFWD) Integrated Waste Management System (IWMS) program is developing an Execution Strategy Analysis (ESA) Origin Sites Readiness Model using the Goldsim{sup TM} software application to provide information on potential future approaches for removing SNF and HLW from origin sites such as commercial nuclear power plant sites. The purpose of this ESA model is to apply integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. The ESA Origin Sites Readiness Model is a dynamic simulation modeling capability. It is developed for use in the analysis and comparison of potential future implementation strategies associated with an integrated nuclear waste management program. The model is designed to be independent of the destination of the SNF or HLW so the results from the Origin Sites Readiness Model are equally applicable to a wide range of scenarios involving shipments to generic destinations in an integrated waste management system. The model explicitly takes significant assumptions, uncertainties, and risks into account. Currently, the ESA Origin Sites Readiness Model includes 14 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Vermont Yankee, La Crosse, Big Rock Point, Zion, Kewaunee, Fort Calhoun, Trojan, Rancho Seco, Humboldt Bay, San Onofre, and Crystal River) and is designed to be modular so that other sites can be added in the future. The model also includes multiple transportation modes (heavy haul truck, rail, and barge), activities related to the acquisition of transportation assets such as railcars and transportation casks, and site-specific considerations of on-site and near-site transportation infrastructure. The model was developed using the ESA process with Subject Matter Experts (SME); it incorporates uncertainty and risks and provides a structured, systematic methodology for evaluating potential SNF campaign scenarios. The model also complements other system-level logistics tools being developed by SFWD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 19092

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating and testing prototype railcars that will comply with the safety standard S-2043. This standard was developed by the Association of American Railroads (AAR) specifically for railcars used to transport High-Level Radioactive Material (HLRM). AAR defines the term HLRM to include both spent nuclear fuel (SNF) and high-level radioactive waste (HLW). DOE is in the process of developing and testing prototype railcars that will satisfy Standard S-2043. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Spent Nuclear Fuel from Shutdown Nuclear Power Plant Sites - 2018 - 19101

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. The evaluations of the shutdown sites contain four components: - A characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; - A description of the on-site infrastructure at the shutdown sites; - An evaluation of the near-site transportation infrastructure and experience at the shutdown sites - An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF were the DOE GC-859 and RW-859 spent nuclear fuel inventory databases. This inventory has been augmented with data obtained from the shutdown sites for SNF discharges that occurred after June 2013. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included field observations and information collected during visits to the 14 shutdown sites, information provided by managers and staff at the shutdown sites, and Google Earth imagery. Extensive photographs taken during the shutdown site visits have proven to be particularly useful in documenting the current conditions at and near the shutdown sites. Tribal and state representatives, State and Regional Group representatives, and Federal Railroad Administration representatives have participated in 11 of the shutdown site visits. In addition to visiting the shutdown site, site visits often include activities such as meeting with local railroads to discuss the near-site railroad infrastructure and meeting with community engagement panels. Oyster Creek permanently ceased power operations on September 17, 2018 and fuel was removed from the reactor vessel on September 25, 2018. Planning for the Oyster Creek site visit has begun and is conducted in three stages. In the first stage, data and documents that are applicable to Oyster Creek are collected. In the second stage, questions are developed based on the data and documents collected during the first stage. These questions are submitted to the Oyster Creek site approximately one month before the site visit. The third stage involves establishing specific schedules and participants. Participants will likely include tribal and state representatives, the Council of State Governments - Eastern Regional Conference, and the Federal Railroad Administration. State participation will likely include a representative of the State Rail Safety Participation Program, the New Jersey Department of Transportation, and the New Jersey Bureau of Nuclear Engineering. The site visit is tentatively expected to occur in April or May of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Next Generation System Analysis Model: Capabilities for Simulating a Waste Management System - 19131

The U.S. Department of Energy (DOE) Office of Nuclear Energy Office of Spent Fuel and Waste Disposition's Integrated Waste Management System (IWMS) program is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWMS are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The system architecture analyses consider alternative disposition pathways for commercial spent nuclear fuel (SNF) being stored dry in at-reactor Independent Spent Fuel Storage Installations (ISFSIs) or wet in spent-fuel pools. One method for evaluating these alternatives is simulating the movement of SNF throughout the system components. Successfully simulating a system on the scale of a national waste management system requires - accurate baseline information (e.g., historic fuel discharges from reactors and dry storage loadings at reactor sites), - modeling all logistic interactions between components of the proposed system, and - tracking and reporting all relevant details regarding the simulation's execution. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWMS. It is based on the Performance Analysis Tool, a simulation platform that has been used to model logistics for the Department of Defense and the Federal Emergency Management Agency. Using existing, government-owned software allows NGSAM developers to modify the software at the level of source code and to develop flexible usability and modeling solutions for developing and running simulations of the IWMS. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. NGSAM is designed with the flexibility to model and track the behavior of virtually any IWMS architecture assumptions or design considerations. For example, NGSAM can model multiple interim storage facilities or repositories or none at all. Similarly, all assumptions regarding shipment schedules, operating schedules, and reactor operation assumptions can be modeled and adjusted in NGSAM with relative ease. The development of NGSAM was targeted to waste management system analysts as the primary users. With that in mind, analysts from ORNL, Sandia National Laboratories (SNL), and Argonne National Laboratory (ANL) were intimately involved in the development process. That involvement extended beyond merely defining requirements. System analysts have been involved with design decisions and software benchmarking and tests, and they have provided subject-matter expertise where necessary. The result is a high degree of interaction between professional software developers and system analysts, with a multitude of benefits to both groups. This paper explores some of the underlying methodology of the agile software development process used in the creation of NGSAM. It illustrates the capabilities of NGSAM. Some example use cases are discussed as well, with relevant results providing context for how NGSAM is used by system analysts to gain a greater understanding of alternative waste management system architectures. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed-to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

External Engagement During Evaluations of Shutdown Nuclear Power Plant Sites - 19221

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. A key part of the shutdown site evaluations are visits to the sites. These site visits typically take place over 3 days. The first day is spent at the nuclear power plant site. The second day is spent evaluating the near-site transportation infrastructure, including rail infrastructure, potential heavy-haul routes, and potential rail and barge transload locations. The third day is often spent meeting with community engagement or advisory panels. External engagement activities during site visits are conducted in two areas. The first area involves inviting tribal and state representatives, State Regional Group (SRG) representatives, and Federal Railroad Administration (FRA) representatives to participate in the entire site visit. The SRG representatives are from the Southern States Energy Board, the Western Interstate Energy Board, the Council of State Governments - Midwest, or the Council of State Governments - Eastern Regional Conference, according to the location of the nuclear power plant. State representatives typically represent their state department of energy, state department of environmental or natural resources, State Rail Safety Participation Program, state police, state department of transportation, radiation protection organization, or emergency management organization. Tribal representatives explore issues associated with cultural affiliation and tribal involvement with past and present site activities. As the regulator of the U.S. railroads, the FRA representatives bring unique experience to the site visits. They also coordinate meetings with the railroads that serve the shutdown sites. The second area of external engagement activities during site visits involves meeting with local community engagement or advisory panels. Meeting with local community engagement or advisory panels provides an opportunity to inform these panels on DOE activities and the roles and responsibilities of federal agencies during site decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SparseMaps—A systematic infrastructure for reduced-scaling electronic structure methods. III. Linear-scaling multireference domain-based pair natural orbital N-electron valence perturbation theory

Multi-reference (MR) electronic structure methods, such as MR configuration interaction or MR perturbation theory, can provide reliable energies and properties for many molecular phenomena like bond breaking, excited states, transition states or magnetic properties of transition metal complexes and clusters. However, owing to their inherent complexity, most MR methods are still too computationally expensive for large systems. Therefore the development of more computationally attractive MR approaches is necessary to enable routine application for large-scale chemical systems. Among the state-of-the-art MR methods, second-order N-electron valence state perturbation theory (NEVPT2) is an efficient, size-consistent, and intruder-state-free method. However, there are still two important bottlenecks in practical applications of NEVPT2 to large systems: (a) the high computational cost of NEVPT2 for large molecules, even with moderate active spaces and (b) the prohibitive cost for treating large active spaces. In this work, we address problem (a) by developing a linear scaling “partially contracted” NEVPT2 method. This development uses the idea of domain-based local pair natural orbitals (DLPNOs) to form a highly efficient algorithm. As shown previously in the framework of single-reference methods, the DLPNO concept leads to an enormous reduction in computational effort while at the same time providing high accuracy (approaching 99.9% of the correlation energy), robustness, and black-box character. In the DLPNO approach, the virtual space is spanned by pair natural orbitals that are expanded in terms of projected atomic orbitals in large orbital domains, while the inactive space is spanned by localized orbitals. The active orbitals are left untouched. Our implementation features a highly efficient “electron pair prescreening” that skips the negligible inactive pairs. The surviving pairs are treated using the partially contracted NEVPT2 formalism. A detailed comparison between the partial and strong contraction schemes is made, with conclusions that discourage the strong contraction scheme as a basis for local correlation methods due to its non-invariance with respect to rotations in the inactive and external subspaces. A minimal set of conservatively chosen truncation thresholds controls the accuracy of the method. With the default thresholds, about 99.9% of the canonical partially contracted NEVPT2 correlation energy is recovered while the crossover of the computational cost with the already very efficient canonical method occurs reasonably early; in linear chain type compounds at a chain length of around 80 atoms. Calculations are reported for systems with more than 300 atoms and 5400 basis functions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Resistance properties of coal-water slurry flowing through local piping fittings

Local resistance characteristics of coal-water slurry (CWS) flowing through three types of piping components, namely gradual contractions, sudden contractions and 90 horizontal bends, were investigated at a transportation test facility. The results show that CWS exhibits different rheological behaviors, i.e., the shear-thinning, Newtonian, and shear-thicken, at different shear rates. When CWS flows through the gradual contractions, the local pressure loss firstly decreases to a minimum, and then increases as the gradual contraction angle {theta} increases. When the CWS flow through the sudden contractions, with the increase of pipe diameter ratio {beta}, the local pressure loss increases for the two kinds of CWS, SHEN-HUA (S-H) CWS and YAN-ZHOU (Y-Z) CWS whose mass concentration range from 57% to 59% and 59% to 62%, respectively. For 90 horizontal bends, there is an optimal value of the bend diameter ratio (Rc/D) at which the local pressure loss is the least. Furthermore, the local resistance coefficient (K) in the empirical correlations is determined from the experimental data. The correlations show that as Re increases, K of the three fittings declines quickly at first. However, with further increase in Re, K shows different behaviors for the three fittings due to the special rheological property of CWS at higher shear rates. The factors of theta, beta and Rc/D have minor effects on K.

01 COAL, LIGNITE, AND PEAT↗