Making a Splash: Targeting Water Saving Measures for the Highest Impact
Presentation describes how to build an energy-efficient data center on research facility campuses.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Presentation describes how to build an energy-efficient data center on research facility campuses.
Abstract Hydroelectric power is playing a new and often expanded role in the world’s major power grids, offering low carbon generating capacity in industrializing, dam-building economies while providing reserve and flexibility to co-manage fledgling wind and solar resources in high income countries. Driven by river flows, conventional hydropower is exposed to the vagaries of weather and climate, motivating drought and climate change hydropower impact studies at large spatial scales. Here we review methods of climate-driven hydropower simulation at large spatial scales, specifically multi-basin regions to global. We identify four types of approach based on complexity of tools and richness of data applied to the problem. Since the earliest attempts to model climate-driven hydropower at continental scale almost two decades ago, the field has transitioned from one of scientific curiosity to practical application, with studies increasingly motivated by the need to inform power grid expansion planning and operation. As the hydrological and water management models used in large-scale hydropower studies become more sophisticated, new opportunities will emerge to study the impacts of changing hydropower on power system reliability and performance at large power grid scale. To grasp these opportunities, the water resources community must continue to enhance data and models for representing river flows and anthropogenic water use and management at subcontinental to global scales.
Flights often experience large delays when they are routed around weather. Multi-flight common route advisories provide delay recovery by suggesting time-saving re-routes for groups of flights whose current weather-avoidance routes have become outdated because the weather has dissipated and/or moved away. A laboratory evaluation of these advisories was conducted by four subject matter experts having extensive experience in traffic flow management operations. These experts provided a total of 120 data points in the airspace of Houston Center. The multi-flight common route tool provides time-saving route change advisories taking into account flight plans, wind fields, and the spatio-temporal evolution of predicted convective weather. It is not designed to account for complex operational factors such as non-standard sector traversal and interactions with local traffic management initiatives; hence a relatively low percentage (37%) of advisories generated by the tool were rated as acceptable. However, a high percentage (81%) of advisories were rated as acceptable after the subject matter experts used the tool's user interface to make route modifications that accounted for relevant operational factors not considered by the tool. The workload associated with using the tool, as measured by the NASA Task Load Index, was quite low (1.1 on a scale of 0 to 10). The results of this evaluation make a good case for human-automation teaming to design operationally valid weather re-routes for delay recovery.
Flights often experience large delays when they are routed around weather. Multi-flight common route advisories provide delay recovery by suggesting time-saving re-routes for groups of flights whose current weather-avoidance routes have become outdated because the weather has dissipated and/or moved away. A laboratory evaluation of these advisories was conducted by four subject matter experts having extensive experience in traffic flow management operations. These experts provided a total of 120 data points in the airspace of Houston Center. The multi-flight common route tool provides time-saving route change advisories taking into account flight plans, wind fields, and the spatio-temporal evolution of predicted convective weather. It is not designed to account for complex operational factors such as non-standard sector traversal and interactions with local traffic management initiatives; hence a relatively low percentage (37%) of advisories generated by the tool were rated as acceptable. However, a high percentage (81%) of advisories were rated as acceptable after the subject matter experts used the tool's user interface to make route modifications that accounted for relevant operational factors not considered by the tool. The workload associated with using the tool, as measured by the NASA Task Load Index, was quite low (1.1 on a scale of 0 to 10). The results of this evaluation make a good case for human-automation teaming to design operationally valid weather re-routes for delay recovery.
The contemporary distribution planning landscape is comprised of an increasing number of factors that require integration into the engineering of the modern electric grid. Expectations for electric utilities to accommodate heightened awareness of stakeholders' interest in things like decarbonization, resilience and equity are growing. As these interests are formed into objectives, many jurisdictions will experience increasing levels of load modifying technologies like DER, building and industrial electrification and electric vehicles which prove not only to challenge the capabilities of the grid; but the processes by which planning for it is traditionally done. Other related factors that strain the conventional distribution planning mold are the swelling amount and sources of data associated with these technologies and the need it creates for improved capabilities in the processes and tools that manage it. As the complexity of the distribution system expands, so will the distribution system's effects on the transmission and generation systems that it is a part of. Forecasting distribution system load and DER are examples of areas where this complexity will manifest, and harmonizing distribution forecasting with transmission and generation forecasting requires higher amounts of intentionality as these typically separate processes become a solitary one. Of course, core activities do not cease as a utility begins to integrate these other factors, and in this webinar we explore specifics of how distribution planning can be expected to evolve as progress towards Integrated Distribution System Planning is made.
To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.
This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)
Environmental information and data underpin achievement of the U.S. Department of Energy (DOE) Office of Environmental Management (EM) mission at the Hanford Site. The Hanford Environmental Data Management (HEDM) Program is the DOE Richland Operations Office (RL) approach to develop and implement a formal program for managing environmental data and the associated records, materials, and systems at the Hanford Site. The current project, contract, organization, and contractor-specific efforts at managing environmental data sets are insufficient to provide orderly, long-term, site-wide access. A vital element to be created within the HEDM program plan is a catalog of data sources, called the Hanford Environmental Information and Data Index (HEIDI), that will enable long-term access and retrievability for the multiple independent sources of data that might otherwise be difficult to discover. This report compares leading open source and commercial data catalog platforms using criteria to assess the functionality needed to develop the HEIDI catalog of Hanford data sources that connects and exchanges data with established Hanford Local Area Network (HLAN) enterprise information technology systems. Proprietary platforms evaluated included ArcGIS Enterprise Sites, Junar, OpenDataSoft, and Socrata, and non-proprietary platforms included Energy Data eXchange (EDX), Comprehensive Knowledge Archive Network (CKAN), and DKAN (a Drupal-based open data portal based on CKAN). Capabilities supporting data discoverability, retrieval, and archival, as well as metadata standard requirements and integration into the HLAN were rated as either failing to meet requirements (F), meeting requirements (M), or exceeding requirements by delivering additional desired features (E). The lowest rating for any capability area was assigned as the overall rating for the platform. These findings enable DOE-RL and the contractors implementing the HEDM plan to focus on candidate tools likely to meet the requirements for implementing HEIDI. All of the platforms receiving an overall rating of ‘F’ were unable to be deployed on Hanford infrastructure or within dedicated cloud resources. A propriety software-as-a-service (SaaS) model of delivering a data catalog (e.g., found in software such as Junar and OpenDataSoft) favors consistency across customers at the expense of customization and configurable roles that are needed for Hanford work. Hosting data on a shared commercial platform places limits on dataset size (maximum of 240 Mb for OpenDataSoft), a significant limitation for HEIDI implementation. EDX, a government data catalog based on CKAN, received the ‘F’ rating due to an inability to incorporate authentication from HLAN into the system. Among platforms rated ‘M’ or ‘E’, only the Socrata platform had a SaaS delivery model. In contrast to other SaaS platforms, Socrata provided custom roles and gateways that allow local datasets to be incorporated into an online catalog. Socrata also complies with the Federal Risk and Authorization Management Program, a significant benefit for cloud-based management of Hanford data. The other platforms rated ‘M’ or ‘E’, ArcGIS Enterprise Sites, CKAN, and DKAN, provide fully self-hosted options, allowing for greater control and flexibility with the HEIDI catalog. These widely used tools have supportive communities of practice, extensive customization options, and demonstrated deployments that provide evidence that they can meet requirements, often deliver additional desired features, and work well with federal government systems. Completely customized alternatives built on a collection of applications were not evaluated because achieving similar performance to CKAN or DKAN requires substantial resources, especially in the absence of the active communities that have grown to support these tools. ArcGIS Enterprise Sites, Socrata, CKAN, and DKAN were evaluated as strong candidates for successful implementation with HEIDI.
The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 458.1, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies.
CalWave has developed a submerged pressure differential type Wave Energy Converter (WEC) architecture called xWave. The single body device oscillates submerged, is positively buoyant, and taut moored to the sea floor and integrates novel features such as absorber submergence depth control. Since participation in the US Wave Energy Prize, CalWave has evolved the design and successfully concluded a scaled 10-month open ocean pilot. CalWave recently concluded the final design phase of a scaled up WEC version for PacWave and started component order/build of the WEC towards the grid-connected demonstration at PacWave. Documentation and data here includes: a system certification plan, a risk registry in the form of an FMECA (Failure Mode, Effects, and Criticality Analysis) table, an updated LCOE content model, a report on performance metrics, and a risk management plan.
The Nuclear Energy Knowledge and Validation Center (NEKVaC) is a new initiative by the Department of Energy (DOE) and Idaho National Laboratory (INL) to coordinate and focus the resources and expertise that exist with the DOE toward solving issues in modern nuclear code validation and knowledge management. In time, code owners, users, and developers will view the NEKVaC as a partner and essential resource for acquiring the best practices and latest techniques for validating codes, providing guidance in planning and executing experiments, facilitating access to and maximizing the usefulness of existing data, and preserving knowledge for continual use by nuclear professionals and organizations for their own validation needs. The scope of the NEKVaC covers many interrelated activities that will need to be cultivated carefully in the near term and managed properly once the NEKVaC is fully functional. Three areas comprise the principal mission: (1) identify and prioritize projects that extend the field of validation science and its application to modern codes, (2) develop and disseminate best practices and guidelines for high-fidelity multiphysics/multiscale analysis code development and associated experiment design, and (3) define protocols for data acquisition and knowledge preservation and provide a portal for access to databases currently scattered among numerous organizations. These mission areas, while each having a unique focus, are interdependent and complementary. Likewise, all activities supported by the NEKVaC, both near term and long term, must possess elements supporting all three areas. This cross cutting nature is essential to ensuring that activities and supporting personnel do not become “stove piped” (i.e., focused a specific function that the activity itself becomes the objective rather than achieving the larger vision). This report begins with a description of the mission areas; specifically, the role played by each major committee and the types of activities for which they are responsible. It then lists and describes the proposed near term tasks upon which future efforts can build.
Medium- and heavy-duty vehicles (MHDVs) are a major source of greenhouse gases and local criteria air pollutants. Electrifying MHDVs may reduce these harmful emissions, which disproportionately impact disadvantaged communities. Due to their relatively high per-vehicle energy needs, consistent fleet operations, and frequent colocation of multiple vehicles at depots, MHDVs may have more spatially and temporally concentrated charging demands than light-duty passenger electric vehicles. That charging concentration means their electrification may require careful advance planning and coordination to manage potential impacts to the electrical grid via charge management or infrastructure upgrades. However, MHDV duty cycles and parking schedules are highly variable across vocations of operation, and there is a shortage of nationally representative, vocationally diverse public data describing typical MHDV operations. This report summarizes the methodology - designed with national representativeness in mind - used to create a new set of data describing typical daily driving distances, dwell durations, and normalized electric vehicle depot charging load curves for MHDVs. The dataset reflects the subset of MHDV operating patterns that may originate from a consistent depot each day and rely on the same depot for charging. In addition to trucks with depot-centric vocational patterns, the data describes operations of transit buses and school buses, each with a depot-centric focus. The dataset is available to the public and suitable for national analysis. It can inform research, infrastructure planning, and policymaking regarding the electrification of MHDVs.
Highlights: Black-Right-Pointing-Pointer This empirical study explores the relationship between data and resultant waste knowledge. Black-Right-Pointing-Pointer The study shows that 'Experience, Data and Theory' account for 54.1% of the variance in knowledge. Black-Right-Pointing-Pointer A strategic framework for Municipalities emerged from this study. - Abstract: Combining the process of learning and the theory of planned behaviour into a new theoretical framework provides an opportunity to explore the impact of data on waste behaviour, and consequently on waste management, in South Africa. Fitting the data to the theoretical framework shows that there are only three constructs which have a significant effect on behaviour, viz experience, knowledge, and perceived behavioural control (PBC). Knowledge has a significant influence on all three of the antecedents to behavioural intention (attitude, subjective norm and PBC). However, it is PBC, and not intention, that has the greatest influence on waste behaviour. While respondents may have an intention to act, this intention does not always manifest as actual waste behaviour, suggesting limited volitional control. The theoretical framework accounts for 53.7% of the variance in behaviour, suggesting significant external influences on behaviour not accounted for in the framework. While the theoretical model remains the same, respondents in public and private organisations represent two statistically significant sub-groups in the data set. The theoretical framework accounts for 47.8% of the variance in behaviour of respondents in public waste organisations and 57.6% of the variance in behaviour of respondents in private organisations. The results suggest that respondents in public and private waste organisations are subject to different structural forces that shape knowledge, intention, and resultant waste behaviour.
Long term archival and retrieval of engineering data is a key component of product life cycle management. Standards have emerged over time to facilitate archival and retrieval, particularly with respect to CAD data. In this report we assess the state of the art in industry, academia, and government, with respect to archival management and preservation planning. Additionally, we present different scenarios for the integration of the DART Workbench tool with an archival and retrieval system. These scenarios are based on existing CAD/CAE industry standards as well as Semantic Web technologies. The goal is not to design and implement a long-term archival system, but rather, to anticipate potential future systems and consider how the DART Workbench may integrate with them. A secondary goal is to provide some reasoned input for eventual lab-wide implementation of a particular approach, thus steering the design of such a system to some degree.
The Grande Ronde Basin (GRB) in Northeast Oregon is a moderately dry climate receiving between 10 and 20 inches of precipitation per year with surrounding mountains accumulating up to 100 inches. Irrigated agriculture is a major part of the economy with water being diverted or pumped from surface and ground sources from April through October. Several ESA listed species exist in the basin including Chinook, steelhead, and bulltrout. Agriculture and ESA (Endangered Species Act) listed aquatic species combined with a dry climate demonstrate the need for a network of stream gauges. The GRB covers over 5,000 square miles and includes several thousand miles of perennial flowing streams. This project is in place to operate 12 existing stream gauges in combination with USGS (4 gauges) and OWRD (one gauge) who, independent of this project, operate five additional gauges (Grande Ronde at Troy, Imnaha R. at Imnaha, Minam R. at Minam, Lookingglass Creek, and Upper Catherine Cr.) to characterizes flow in both the Grande Ronde and Imnaha subbasins. These gauges are intended to assist in irrigation water management, fisheries management, long term flow and trend analysis, TMDL and SB1010 water quality management plan effectiveness, subbasin plan implementation, and provide essential information regarding cumulative effects response to conservation in the GRB. Headwater characteristics, land management influence, and basin outlet data are all selectively collected in this network of 17 flow gauges. Prior to the 2007 water year there were three separate stream gauging programs with similar objectives, protocol, and funding sources in the GRB. Each of these programs for the past ten years has operated under separate administration consuming more time and administrative money than is necessary to accomplish stated objectives. By combining all programs into one project costs have been reduced, each funding source has one contract instead of three, and the same amount of work has been done accomplishing the same objectives. This objective has been continued and realized in the 2008 water year.
The use of satellite remote sensing for resources management was investigated in Indiana. The technique was applied to strip mining and reclamation, highway planning, and the detection of dolomite reefs. A data base was created and used to produce land characteristics and suitability maps for land use planning. In addition, a three dimensional model was developed which provides a cross-sectional profile of the thermal plumes emitted by point sources of thermal pollution into rivers and lakes; this model may be used for the design and site selection of electric power plants.
A multidisciplinary medical-management team at mission control provided Skylab crew support by monitoring health, retrieving and compiling experimental data, assisting in the development of flight plans, and by contributing to in-flight procedures and checklists. Real time computers assisted the flight crews in performing medical and other experiments.
JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.