Keep it short: Exploring the impacts of configuration choices on the recent economics of solar-plus-battery and wind-plus-battery hybrid energy plants

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$10$/MWh across ISOs on average. The highest boost occurs in California ($\$15$/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$12.5$/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$12.5$/MWh coupling penalty is reduced to $\$1.6$/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$2$–$\$13$/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Solar Radiation Research Laboratory (SRRL) Final Report: Fiscal Years 2019-2021

The Solar Radiation Research Laboratory (SRRL) at the National Renewable Energy Laboratory (NREL) is a world-leading solar calibration and measurement facility and maintains and disseminates the World Radiation Reference (essentially the W/m 2 ) for the United States, which is essential for traceable and accurate measurements of solar radiation at all solar generation facilities. SRRL operates two International Organization for Standardization (ISO)/International Electrotechincal Commission (IEC) 17025 calibration facilities that provide unique, high-quality calibrations to NREL and other U.S. Department of Energy laboratories. The Baseline Measurement System at SRRL provides a high-quality record of solar irradiance and surface meteorological conditions. SRRL capabilities are used to develop: improved methods for the calibration of solar radiometers; new standards through the ISO, the IEC, and ASTM International; models; advanced instrumentation and methods for operating solar measurement stations. The SRRL data sets are also critical for the validation of new models and data sets, such as the National Solar Radiation Database (NSRDB).

14 SOLAR ENERGY↗

Core Design of the Holos-Quad Microreactor

The Holos-Quad micro-reactor concept, developed by HolosGen LLC, is equipped with a 22 MWt (Mega-Watt thermal) core and an integral power conversion system converting the core thermal energy into approximately 10 MWe (Mega-Watt electric). This design can be configured to support a wide range of applications. It is a very innovative high-temperature gas-cooled reactor concept using TRI-structural ISOtropic particle fuel (TRISO) distributed in graphite hexagonal blocks, cooled with helium in a direct Brayton cycle independently executed by four Subcritical Power Modules (SPMs) fitted into a hardened 40-foot container whose dimensions are in compliance with ISO shipping containers requirements. In FY2019 HolosGen LLC was awarded by the Department of Energy Advanced Research Project Agency-Energy (DOE ARPA-E) under the MEITNER funding program. As part of the MEITNER award, the Argonne National Laboratory (ANL) contributed expertise through two specialized teams: The “Design Team” and the “Resource Team”. The Design Team was dedicated to validate feasibility of the Holos-Quad core and to optimize its core design through neutronics analyses. The Resource Team was dedicated to feasibility verification via high-fidelity codes of Holos-Quad thermal-hydraulic, heat transfer, shielding, and structural aspects. This report summarizes the activities conducted by ANL Design Team. A rigorous design approach based on multi-criteria optimization and code-to-code comparison involving stochastic and high-fidelity deterministic solutions was developed and employed at several evolutionary stages of the Holos-Quad design. Several generations of the Holos-Quad core were designed within this project before converging to the current full-scale Gen 2+ design that is detailed in this report. Figure EA-1 illustrates a cross-sectional view of Gen 2+ Holos-Quad core configuration, and Figure EA-2 provides a simplified perspective view of 1-of-4 SPMs. The Holos-Quad uses four thermal-hydraulically independent SPMs locked into stationary positions during power operation, surrounded by BeO reflector and structural component fully comprised within the dimensional constraints represented by traditional ISO containers. One of the benefits of this approach is to enable transportation of each SPM promptly after irradiation in shielded containers. The core is designed to operate for approximately 8 full-power years while the reactivity controls and power conversion system enable load-following operations. The reactivity controls are represented by independent, diversified, and redundant reactivity control systems based on control drums and redundant sets of shutdown rods. The high-fidelity simulation tools were used to assess detailed power and flux distributions of the three-dimensional full-core or quarter-core of the Gen 2+ configuration. Single-physics and multi-physics simulations of the neutronics code PROTEUS and the thermal-hydraulic code System Analysis Module (SAM) were performed to analyze the Holos design configurations with detailed high-fidelity solutions. The design work performed confirmed feasibility of the Holos-Quad concept, provided realistic design description for detailed design of the operational system, and identified several core design improvements to be further considered for future reactor development activities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Solar and Load Forecasting Incorporating HD Sky Imaging (Phase III)

Due to rapidly changing sky conditions, the available solar irradiance for energy generation is subject to wide swings in amplitude. As the market penetration of solar energy continues to increase rapidly, these variations in solar power generation are beginning to have an impact on grid stability and increased wear on power switches. Solar power forecasting plays a critical role in operations for Independent System Operators (ISOs) and utilities. Accurate forecasts help maintain grid reliability, optimize generation from renewables, and reduce operating costs. Of particular interest to the ISOs and utilities are sudden changes in solar irradiance, termed “ramp events,” due to the movement of clouds. One significant impact of ramp events on the grid is additional ancillary service requirements necessary to manage such variability. Ramp events can also cause voltage fluctuations in the distribution grids and trigger actions of automated line equipment (e.g., tap changers), leading to additional maintenance costs. In high penetration solar regions, forecasts must be made for both transmission-connected and distribution-connected resources – either behind the meter or in front of it. Particularly for distributed solar energy resources, forecasting can be a challenge due to the lack of visibility of the energy resource. Brookhaven National Laboratory (BNL) has been working towards nowcasting Global Horizontal Irradiance (GHI) using low-cost technologies for several years now. The Solar NowCasting technology being developed by BNL is a 0 – 30 min solar “nowcasting” technology applicable to a scale covering both large generating facilities and residential, distributed solar installations that relies on a network of ground-based high-definition (HD) cameras and surface pyranometers. GHI forecasts are being produced for both regions using 8 ground-based HD cameras and at least 2 surface pyranometers. When stitched together, the camera images can be used to forecast the impact of clouds on available solar irradiance over a domain of ~50 km 2 . Phase I of the project was the engineering scale up conceptual design stage. Phase II was the initial field test and demonstration, in which the technology was scaled up by a factor of 20 times and successfully demonstrated in eastern Long Island. In Phase III, an additional forecasting network was added in upstate NY and both networks are currently being operated until at least a full year of data is gathered by the Albany network to allow for the collection of sufficient data to evaluate performance against the persistence and smart persistence models using the Solar Arbiter.

14 SOLAR ENERGY↗

Assessment of Seasonal Energy Performance for Room Air Conditioners in Multiple Climates

This report provides a general approach for adopting a seasonal energy efficiency metric by examining the climate-specific temperature bin distribution for air conditioner use, the seasonal energy efficiency results according to International Standards Organization (ISO) 16358 by climate region, and the relationships in seasonal energy efficiency across regional metrics. This approach could make the seasonal efficiency metric values comparable with those from other countries with standards consistent with ISO 16358. Policy action and market transformation can be accelerated and effectively harmonized with other regional or international efforts by adopting a seasonal energy efficiency metric. The framework and methodology described in this report have been applied in the following publications: Shaffie et al. 2022, Park et al. 2021, Park et al. 2019, and UNEP 2019a.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

System Study: Isolation Condenser 1998-2020

This report presents an unreliability evaluation of the isolation condenser (ISO) system at four U.S. boiling water reactors. Demand, run hours, and failure data from calendar year 1998 through 2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A simple biofuel surrogate blend for diesel fuel: heptane/iso-butanol mixtures and their droplet burning characteristics

• The burning rates of heptane/iso-butanol mixture droplets varied nonlinearly with composition. • Spherical droplet flames were produced by minimizing convective influences on burning. • Sooting propensities varied with mixture fraction and reduced as heptane was diluted with iso-butanol. • The evolution of droplet diameters was nearly linear throughout burning though the flame standoff ratio was not constant, thus indicating that burning was not quasi-steady. • The relative position of the flame to the droplet generally decreased by diluting heptane with iso-butanol. • A heptane/iso-butanol mixture is a good model surrogate system for a transportation fuel/biofuel blend.

Dalili, Alireza↗

System Study: Isolation Condenser 1998-2022

This report presents an unreliability evaluation of the isolation condenser (ISO) system at three U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

Distributed Wind and Impacts of FERC Order No. 2222 Implementation

In September of 2020, FERC issued Order No. 2222, directing ISOs to adjust their long-standing tariffs and participation models to enable the operation of distributed energy resource (DER) aggregators in wholesale energy markets. The rule sought to bring wholesale markets under its jurisdiction up to speed with existing expansion of DERs across the United States and to capture the potential benefits that these technologies can provide. This report describes the implementation of FERC Order No. 2222 and the compliance plans that have been submitted so far, attempt to understand the potential impact the rule may have on distributed wind, and provide opportunities for future work to analyze and encourage deployment under these policy conditions. There is an information gap for the type of market interactions distributed wind may have or how it could be best deployed in DER aggregations under future market conditions. There is significant potential for profitable deployment of distributed wind in states that are served by ISOs and covered under Order No. 2222. Distributed wind and other DERs provide local energy that does not need to travel those distances and avoids the losses typically associated with long-distance energy transmission. Deployment of distributed wind can benefit communities that exist away from large load centers by providing local, clean, and affordable energy. Aggregating DERs that include distributed wind could provide these benefits across multiple far-ranging communities if they have access to participate in wholesale markets. A new baseline valuation of distributed wind in areas covered by Order No. 2222 is required to accurately gauge where it is profitable and how it can compete or complement existing or future DER deployment, including as part of an aggregate.

17 WIND ENERGY↗

Nuclear Materials Packaging, Transportation, and Systems Analysis Group Software Quality Assurance Plan: ANSYS Mechanical Finite Element Analysis Software Version 2023R1

ANSYS Inc. develops and markets engineering simulation software and services used in the aerospace, automotive, manufacturing, electronics, biomedical, energy, defense, and many other industries. ANSYS is dedicated to engineering simulation and is the world’s leading software provider. ANSYS was founded in 1970 and is headquartered in Canonsburg, Pennsylvania. ANSYS provides an engineering analysis tool combining structural, thermal, computational fluid dynamics, acoustic, and electromagnetic simulation capabilities. ANSYS has two main programs, which use the same solvers: (1) Mechanical APDL (ANSYS Design Parametric Language), a Fortran-based coding platform, and (2) ANSYS Workbench, which uses a graphical user interface to aid in finite element analysis implementation. This plan covers both APDL and Workbench. The ANSYS computer program is a large-scale, multipurpose finite element program that can be used to solve several classes of engineering analyses. The analysis capabilities of ANSYS include the ability to solve static and dynamic structural analyses, steady-state and transient heat transfer problems, mode-frequency and buckling eigenvalue problems, static or time-varying magnetic analyses, and various types of field and coupled-field applications. The program contains many special features that allow nonlinearities or secondary effects such as plasticity, large strain, hyperelasticity, creep, swelling, large deflections, contact, stress stiffening, temperature dependency, material anisotropy, and radiation to be included in the solution. As ANSYS has been developed, other special capabilities such as substructuring, submodeling, random vibration, kinetostatics, kinetodynamics, free convection fluid analysis, acoustics, magnetics, piezoelectrics, coupled-field analysis, and design optimization have been added to the program. These capabilities contribute further to making ANSYS a multipurpose analysis tool for varied engineering disciplines. The ANSYS program has been in commercial use for over 50 years and has been used extensively in the aerospace, automotive, construction, electronic, energy services, manufacturing, nuclear, plastics, oil, and steel industries. Additionally, many consulting firms and hundreds of universities have used ANSYS for analysis, research, and educational purposes. ANSYS is recognized worldwide as one of the most widely used and capable programs of its type. Ansys design analysis software is the first created within a quality system with ISO 9001 certification, the internationally accepted quality standard. Product development, testing, maintenance and support processes also meet the United States Nuclear Regulatory Commission's quality requirements, as they have for nearly four decades. The Quality Assurance Service Agreement is suitable for the customers working in the nuclear industry who need to meet specific federal regulations including 10CRF50 Appendix B and provisions of 10CFR21. ANSYS has retained its original International Organization for Standardization (ISO) 9001 accreditation certificate since1995-05-04, It’s current certificate is valid until 2027-05-29.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Software Quality Assurance Plan ANSYS LSDYNA Version 2023R1

ANSYS Inc. develops and markets engineering simulation software and services used in the aerospace, automotive, manufacturing, electronics, biomedical, energy, defense, and many other industries. ANSYS is dedicated to engineering simulation and is the world’s leading software provider. ANSYS was founded in 1970 and is headquartered in Canonsburg, Pennsylvania. ANSYS provides an engineering analysis tool combining structural, thermal, computational fluid dynamics, acoustic and electromagnetic simulation capabilities. ANSYS LS-DYNA is the most used explicit simulation program capable of simulating the response of materials to short periods of severe loading. Its many elements, contact formulations, material models, and other controls can be used to simulate complex models with control over all the details of the problem. ANSYS LS-DYNA has a vast array of capabilities to simulate extreme deformation problems using its explicit solver. Engineers can tackle simulations involving material failure and look at how the failure progresses through a part or through a system. Models with large amounts of parts or surfaces interacting with each other are also easily handled, and the interactions and load passing between complex behaviors are modeled accurately. Using computers with higher numbers of CPU cores can drastically reduce solution times. In addition, many consulting firms and hundreds of universities use ANSYS for analysis, research, and educational purposes. ANSYS is recognized worldwide as one of the most widely used and capable programs of its type. ANSYS has successfully passed over 100 customer quality system audits against American Society of Mechanical Engineers (ASME) NQA-1 and 10 CFR Part 50, Appendix B, since the company was founded, over 60 of which have been since 1997. ANSYS has successfully passed over 100 International Organization for Standardization (ISO) 9001 assessments. ANSYS design analysis software is the first created within a quality system with ISO 9001 certification, which is the internationally accepted quality standard. Product development, testing, maintenance, and support processes also meet the US Nuclear Regulatory Commission’s (NRC’s) quality requirements, as they have for nearly four decades. ANSYS staff perform more than 60,000 software verification tests before releasing each new product. ASME NQA-1-2012 (Subpart 2.7 is specific to software) is the industry- and NRC-accepted approach (consensus standard) for meeting 10 CFR Part 50, Appendix B, requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗