Search NASA⌕ Search

SEARCH · Search NASA

Results for “Particle accelerator design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Quick setup of unit test for accelerator controls system

Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

43 PARTICLE ACCELERATORS↗

Rogue Mode Shileding in NSLS-II Multipole Vacuum Chambers

Modes with transverse electric field (TE-modes) in the NSLS-II multipole vacuum chamber can be generated at frequencies above 450MHz due to its geometric dimensions. Since the NSLS-II BPM system monitors signals within 10 MHz band at RF frequency of 500 MHz, frequencies of higher-order modes (HOM) can be generated within the transmission band of the band pass filter. In order to avoid systematic errors in the NSLS-II BPM system, we introduced frequency shift of HOMs by using RF metal shielding located in the antechamber slot. We demonstrated numerical modeling and experimental studies of the spurious TE modes in the NSLS-II vacuum chambers with antechamber slot. Calculated frequencies of TE-modes in considered chambers with and without RF shielding were verified experimentally. Flexible BeCu RF shielding inside each chamber at proper location shifts frequencies of H{sub 10p}-modes above {approx}900MHz, except chambers S6 odd and even. These chambers need special attention because of synchrotron radiation from downstream magnets. S6 odd multipole vacuum chamber needs to be measured and the RF shielding length has to be optimized. RF shielding looks adequate for baseline design. Fifty percent of open space provides adequate pumping speed.

25mm434mhz↗

A Silicon-Tungsten ECal with Integrated Electronics

We summarize recent R&D progress for a silicon-tungsten electromagnetic calorimeter (ECal) with integrated electronics, designed to meet the ILC physics requirements. A basic physics requirement for ILC detectors is that they provide excellent reconstruction of hadronic final states. This allows access to new physics which is complementary to the LHC. One statement for a requirement on jet reconstruction is that intermediate particles which decay into jets, such as W, Z, or top, can be identified and isolated. This places unprecedented requirements on 2-jet or 3-jet mass resolution, typically at the level of 3-5% using the PFA technique, which makes challenging demands on the calorimeters. The electromagnetic energy resolution is not expected to limit jet resolution using a PFA. However, particle separation - photon-photon and charged hadron-photon - is crucial. In addition, if one provides this kind of imaging calorimeter to meet the PFA needs, these same features will also be put to good use for reconstruction of specific tau decay modes (to enable final-state polarization measurement), to 'track' photons (even if originating from a vertex displaced from the interaction point), to track MIPS, and so forth. Figure 1 and Table 1 provide some context for our ECal design within the SiD detector concept, along with some main design parameters. More detail is included in the presentation.

43 PARTICLE ACCELERATORS↗

Tevatron Resistive Wall Current Monitor

Resistive Wall Current Monitors (RWCM) were designed and built for the Fermilab Tevatron (Tev) project. These devices measure longitudinal beam current from 3 KHz to 6 GHz with 1.34 ohm gap impedance. There are two RWCM's installed a few feet apart in the Tevatron, upstream RWCM is used for general purpose use, downstream RWCM is dedicated for longitudinal parameters of coalesced beam bunches and bunch intensities. The design provides a calibration or test port for injecting test signals. Microwave absorber material is used to reduce interference from spurious electromagnetic waves traveling inside the beam pipe. This paper will do an overview how the RWCM was designed and its test results.

43 PARTICLE ACCELERATORS↗

R&D ERL: G5 test and commissioning plan

Gun-to-5-cell cavity (G5) setup (Fig 1-2) can be considered as the first stage of the final BNL ERL design. The goal of the G5 setup is to test critical ERL components with the beam and characterize the beam produced by the gun. Also, this test will be used to assess effectiveness of the zigzag merger, which will be installed later in the ERL setup. The major components under the test will include the SRF gun, the five-cell SRF cavity, vacuum components, parts of the control and diagnostic systems. G5 is designed to measure the following beam parameters: (1) projected bunch emittance (?) and Twiss parameters ({alpha}, {beta}); (2) slice emittance; (3) bunch length; and (4) longitudinal and transverse halo.

43 PARTICLE ACCELERATORS↗

ATF2 High Availability Power Supplies

ATF2 is an accelerator test facility modeled after the final focus beamline envisioned for the ILC. By the end of 2008, KEK plans to commission the ATF2 [1]. SLAC and OCEM collaborated on the design of 38 power systems for beamline magnets. The systems range in output power from 1.5 kW to 6 kW. Since high availability is essential for the success of the ILC, Collaborators employed an N+1 modular approach, allowing for redundancy and the use of a single power module rating. This approach increases the availability of the power systems. Common power modules reduces inventory and eases maintenance. Current stability requirements are as tight as 10 ppm. A novel, SLAC designed 20-bit Ethernet Power Supply Controller provides the required precision current regulation. In this paper, Collaborators present the power system design, the expected reliability, fault immunity features, and the methods for satisfying the control and monitoring challenges. Presented are test results and the status of the power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The European Spallation Source

In 2003 the joint European effort to design a European Spallation Source (ESS) resulted in a set of reports, and in May 2009 Lund was agreed to be the ESS site. The ESS Scandinavia office has since then worked on setting all the necessary legal and organizational matters in place so that the Design Update and construction can be started in January 2011, in collaboration with European partners. The Design Update phase is expected to end in 2012, to be followed by a construction phase, with first neutrons expected in 2018-2019.

43 PARTICLE ACCELERATORS↗

First Measurements and Results With a Stretched Wire Test Setup

The LINAC Coherent Light Source [LCLS] is a free electron laser, designed to produce high brilliant X-ray beams using Self Amplified Spontaneous Emission [SASE]. Due to the physics of SASE, the electron beam has to be held very precisely on the same trajectory as the X-ray light beam generated by the undulator magnets. To optimize the SASE output, trajectory deviations between both beams have to be minimized to a few micrometers along the entire undulator section and held stable over the time period between beam-based-alignment processes. Consequently, extremely high position stability of all magnets in the undulator section is required to operate the LCLS successfully. The knowledge of any magnet movement exceeding few micrometers during periods of several weeks is essential for efficient X-ray generation. A well known principle of monitoring transverse component positions along beam lines is the application of stretched wires, associated with suitable wire position sensors and electronics. The particular challenge at LCLS is the required wire system performance in conjunction with the length of the undulator section and the large number of monitors. Verification of system stability and resolution under real conditions is the primary goal of this test setup. A stretched wire test setup has been implemented to gain experience for the final design of a wire system, which will meet the position monitoring requirements in the LCLS undulator section. The report briefly introduces the system's architecture and describes first measurements and results.

43 PARTICLE ACCELERATORS↗

A 15-T Pulsed Solenoid for a High-Power Target Experiment

The MERIT experiment, which ran at CERN in 2007, is a proof-of-principle test for a target system that converts a 4-MW proton beam into a high-intensity muon beam for either a neutrino factory complex or a muon collider. The target system is based on a free mercury jet that intercepts an intense proton beam inside a 15-T solenoidal magnetic field. Here, we describe the design and performance of the 15-T, liquid-nitrogen-precooled, copper solenoid magnet.

43 PARTICLE ACCELERATORS↗

Towards 20 T Hybrid Accelerator Dipole Magnets

We report the most effective way to achieve very high collision energies in a circular particle accelerator is to maximize the field strength of the main bending dipoles. In dipole magnets using Nb-Ti superconductor the practical field limit is considered to be 8-9 T. When Nb 3 Sn superconductor material is utilized, a field level of 15-16 T can be achieved. To further push the magnetic field beyond the Nb 3 Sn limits, High Temperature Superconductors (HTS) need to be considered in the magnet design. The most promising HTS materials for particle accelerator magnets are Bi2212 and REBCO. However, their outstanding performance comes with a significantly higher cost. Therefore, an economically viable option towards 20 T dipole magnets could consist in an “hybrid” solution, where both HTS and Nb3Sn materials are used. We discuss in this paper preliminary conceptual designs of various 20 T hybrid magnet concepts. After the definition of the overall design criteria, the coil dimensions and parameters are investigated with finite element models based on simple sector coils. Preliminary 2D cross-section computation results are then presented and three main layouts compared: cos-theta, block, and common-coil. Both traditional designs and more advanced stress-management options are considered.

43 PARTICLE ACCELERATORS↗

A Hierarchical Control Architecture for a PEBB-Based ILC Marx Modulator

The idea of building power conversion systems around Power Electronic Building Blocks (PEBBs) was initiated by the U.S. Office of Naval Research in the mid 1990s. A PEBB-based design approach is advantageous in terms of power density, modularity, reliability, and serviceability. It is obvious that this approach has much appeal for pulsed power conversion including the International Linear Collider (ILC) klystron modulator application. A hierarchical control architecture has the inherent capability to support the integration of PEBBs. This has already been successfully demonstrated in a number of industrial applications in the recent past. This paper outlines the underlying concepts of a hierarchical control architecture for a PEBB-based Marx-topology ILC klystron modulator. The control in PEBB-based power conversion systems can be functionally partitioned into (three) hierarchical layers; system layer, application layer, and PEBB layer. This has been adopted here. Based on such a hierarchical partition, the interfaces are clearly identified and defined and, consequently, are easily characterised. A conceptual design of the hardware manager, executing low-level hardware oriented tasks, is detailed. In addition, the idea of prognostics is briefly discussed.

43 PARTICLE ACCELERATORS↗

Application of the Eigen-Emittance Concept to Design Ultra-Bright Electron Beams

Using correlations at the cathode to tailor a beam's eigen-emittances is a recent concept made useful by the symplectic nature of Hamiltonian systems such as beams in accelerators. While introducing correlations does not change the overall 6-dimensional phase space volume, it can change the partitioning of this volume into the longitudinal and two transverse emittances, which become these eigen-emittances if all the initial correlations are unwound and removed. In principle, this technique can be used to generate beams with highly asymmetric emittances, such as those needed for the next generation of very hard X-ray free-electron lasers. This approach is based on linear correlations, and its applicability will be limited by the magnitude of nonlinear effects in photoinjectors which will lead to mixing in phase space that cannot be unwound downstream. Here, we review the eigen-emittance concept and present a linear eigen-emittance design leading to a highly partitioned, and transverse ultra-bright, electron beam. We also present numerical tools to examine the evolution of the eigen-emittances in realistic accelerator structures and results indicating how much partitioning is practical.

Accelerator Design, Technology, and Operations↗

Open-Midplane Dipoles for a Muon Collider

For a muon collider with copious decay particles in the plane of the storage ring, open-midplane dipoles (OMD) may be preferable to tungsten-shielded cosine-theta dipoles of large aperture. The OMD should have its midplane completely free of material, so as to dodge the radiation from decaying muons. Analysis funded by a Phase I SBIR suggests that a field of 10-20 T should be feasible, with homogeneity of 1 x 10{sup -4} and energy deposition low enough for conduction cooling to 4.2 K helium. If funded, a Phase II SBIR would refine the analysis and build and test a proof-of-principle magnet. A Phase I SBIR has advanced the feasibility of open-midplane dipoles for the storage ring of a muon collider. A proposed Phase II SBIR would refine these predictions of stresses, deformations, field quality and energy deposition. Design optimizations would continue, leading to the fabrication and test, for the first time, of a proof-of-principle dipole of truly open-midplane design.

43 PARTICLE ACCELERATORS↗

Evaluation of Heat Dissipation in the BPM Buttons

Growth of circulating current in the storage rings drastically increases heating of the beam position monitor (BPM) buttons due to the induced trapped modes is drastically increasing. Excessive heating can lead to the errors in the measuring of beam position or even catastrophic failures of the pick-up assembly. In this paper we present calculations of heat generated in the button for different geometries and materials. The obtained results are used for the optimization of the NSLS-II BPM buttons design.

43 PARTICLE ACCELERATORS↗

Preparatory procedure and equipment for the European x-ray free electron laser cavity implementation

The European x-ray free electron laser is under construction at Deutsches Elektronen-Synchrotron (DESY). The electron beam energy of up to 17.5 GeV will be achieved by using superconducting accelerator technology. Final prototyping, industrialization, and new infrastructure are the actual challenges with respect to the accelerating cavities. This paper describes the preparation strategy optimized for the cavity preparation procedure in industry. For the industrial fabrication and preparation, several new hardware components have been already developed at DESY. The design and construction of a semiautomated rf-measurement machine for dumbbells and end groups are described. In a collaboration among FNAL, KEK, and DESY, an automatic cavity tuning machine has been designed and four machines are under construction. The functionality of these machines with special attention to safety aspects is described in this paper. A new high pressure rinsing system has been developed and is operational.

43 PARTICLE ACCELERATORS↗

Large-acceptance linac for accelerating l9w-energy muons

We propose a high-gradient linear accelerator for accelerating low-energy muons and pions in a strong solenoidal magnetic field. The acceleration starts immediately after collection of pions from a target by solenoidal magnets and brings muons to a kinetic energy of about 200 MeV over a distance of the order of 10 m. At this energy, both an ionization cooling of the muon beam and its further acceleration in a superconducting linac become feasible. The project presents unique challenges - a very large energy spread in a highly divergent beam, as well as pion and muon decays - requiring large longitudinal and transverse acceptances. One potential solution incorporates a normal-conducting linac consisting of independently fed O-mode RF cavities with wide apertures closed by thin metal windows or grids. The guiding magnetic field is provided by external superconducting solenoids. The cavity choice, overall linac design considerations, and simulation results of muon acceleration are presented. While the primary applications of such a linac are for homeland defense and industry, it can provide muon fluxes high enough to be of interest for physics experiments.

43 PARTICLE ACCELERATORS↗

Investigations on Absorber Materials at Cryogenic Temperatures

In the framework of the 12 GeV upgrade project for the Continuous Electron Beam Accelerator Facility (CEBAF) improvements are being made to refurbish cryomodules housing Thomas Jefferson National Accelerator Facility's (JLab) original 5-cell cavities. Recently we have started to look into a possible simplification of the existing Higher Order Mode (HOM) absorber design combined with the aim to find alternative material candidates. The absorbers are implemented in two HOM-waveguides immersed in the helium bath and operate at 2 K temperature. We have built a cryogenic setup to perform measurements on sample load materials to investigate their lossy characteristics and variations from room temperature down to 2 K. Initial results are presented in this paper.

43 PARTICLE ACCELERATORS↗

Site Studies for the SuperB Collider and Synchrotron Radiation Facility Project

The SuperB complex project aims at the construction of a very high luminosity (10{sup 36} cm{sup -2}s{sup -1}) asymmetric e{sup +}e{sup -} B-factory and a few X-ray synchrotron beam lines (SR). The project has been recently approved by the Italian Government as part of the National Research Plan. The Tor Vergata University location has been chosen and a Consortium among INFN, University of Rome II Tor Vergata and the Research Ministry is being signed, allowing for the constitution of the 'Cabibbo Laboratory', where the SuperB project will be hosted. This paper presents and describes the status of the preliminary design of the site layout, related issues for the chosen site and the preliminary ground motion (GM) measurement results.

43 PARTICLE ACCELERATORS↗