COMPONENT DEGRADATION SUSCEPTIBILITIES AS THE BASES FOR MODELING REACTOR AGING RISK

The extension of nuclear power plant operating licenses beyond 60 years in the United States will be necessary if we are to meet national energy needs while addressing the issues of carbon and climate. Characterizing the operating risks associated with aging reactors is problematic because the principal tool for risk-informed decision-making, Probabilistic Risk Assessment (PRA), is not ideally-suited to addressing aging systems. The components most likely to drive risk in an aging reactor - the passives - receive limited treatment in PRA, and furthermore, standard PRA methods are based on the assumption of stationary failure rates: a condition unlikely to be met in an aging system. A critical barrier to modeling passives aging on the wide scale required for a PRA is that there is seldom sufficient field data to populate parametric failure models, and nor is there the availability of practical physics models to predict out-year component reliability. The methodology described here circumvents some of these data and modeling needs by using materials degradation metrics, integrated with conventional PRA models, to produce risk importance measures for specific aging mechanisms and component types. We suggest that these measures have multiple applications, from the risk-screening of components to the prioritization of materials research.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Impact of Below Detection Limit Samples in (NPP) Decommissioning Residual Risk Assessment - 17033

There are some technical problems with finalizing regulations and standards that address nuclear power plant (NPP) decommissioning site soil analyses for license termination. It is difficult to know how to best include detection limit observations from site soil analysis, because typical soil collection data is reported above, at, and below the detection limit. In addition, multiple detection limits are required to adequately estimate the soil radionuclide concentrations. In the literature, researchers analyzing environmental data refer to below the detection limit observations as 'left-censored data'. Left-censored data are less than the detection limit of the instrument(s) that made the measurements. Conventional approaches to managing left-censored data either ignore or simply replace the detection limits with zero, a fraction of the detection limit, or the detection limit itself. However, these approaches are statistically biased and limited in their usefulness. The Kaplan-Meier method, robust regression on order statistics method, and maximum likelihood estimation method are proposed to estimate the left-censored data more precisely. The proposed methods are applied to data from a Monazite powder manufacturing plant and the Colorado School of Mines Research Institute. Summary statistics such as the sample mean, sample standard deviation, sample percentiles are calculated from each data set and are used in risk and volume estimation calculations. Previous environmental analyses, such as the exposure assessment, recognize the uncertainty issue that is addressed in this research using the Latin hypercube sampling approach. Next, probabilistic distributions of the input parameters are developed for the uncertainty analyses. Finally, a framework methodology depicting the decision-making process in the proposed method is presented. The framework defines the critical steps, the amount of radioactivity, types of distributions, censoring percentage, sample size, and number of detection limits; it also allows the user to select the appropriate approach based on their site-specific data and analyses. The goal of this research is to develop a more precise risk assessment, estimate of the volume of soil removal, examine potential cost savings. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methodolgy For Evaluation Of Technology Impacts In Space Electric Power Systems

The Analysis and Management branch of the Power and Propulsion Office at NASA Glenn Research Center is responsible for performing complex analyses of the space power and In-Space propulsion products developed by GRC. This work quantifies the benefits of the advanced technologies to support on-going advocacy efforts. The Power and Propulsion Office is committed to understanding how the advancement in space technologies could benefit future NASA missions. They support many diverse projects and missions throughout NASA as well as industry and academia. The area of work that we are concentrating on is space technology investment strategies. Our goal is to develop a Monte-Carlo based tool to investigate technology impacts in space electric power systems. The framework is being developed at this stage, which will be used to set up a computer simulation of a space electric power system (EPS). The outcome is expected to be a probabilistic assessment of critical technologies and potential development issues. We are developing methods for integrating existing spreadsheet-based tools into the simulation tool. Also, work is being done on defining interface protocols to enable rapid integration of future tools. Monte Carlo-based simulation programs for statistical modeling of the EPS Model. I decided to learn and evaluate Palisade's @Risk and Risk Optimizer software, and utilize it's capabilities for the Electric Power System (EPS) model. I also looked at similar software packages (JMP, SPSS, Crystal Ball, VenSim, Analytica) available from other suppliers and evaluated them. The second task was to develop the framework for the tool, in which we had to define technology characteristics using weighing factors and probability distributions. Also we had to define the simulation space and add hard and soft constraints to the model. The third task is to incorporate (preliminary) cost factors into the model. A final task is developing a cross-platform solution of this framework.

Holda, Julie↗

User's Guide for RESRAD-OFFSITE

The RESRAD-OFFSITE code can be used to model the radiological dose or risk to an offsite receptor. This User’s Guide for RESRAD-OFFSITE Version 3.1 is an update of the User’s Guide for RESRAD-OFFSITE Version 2 contained in the Appendix A of the User’s Manual for RESRAD-OFFSITE Version 2 (ANL/EVS/TM/07-1, DOE/HS-0005, NUREG/CR-6937). This user’s guide presents the basic information necessary to use Version 3.1 of the code. It also points to the help file and other documents that provide more detailed information about the inputs, the input forms and features/tools in the code; two of the features (overriding the source term and computing area factors) are discussed in the appendices to this guide. Section 2 describes how to download and install the code and then verify the installation of the code. Section 3 shows ways to navigate through the input screens to simulate various exposure scenarios and to view the results in graphics and text reports. Section 4 has screen shots of each input form in the code and provides basic information about each parameter to increase the user’s understanding of the code. Section 5 outlines the contents of all the text reports and the graphical output. It also describes the commands in the two output viewers. Section 6 deals with the probabilistic and sensitivity analysis tools available in the code. Section 7 details the various ways of obtaining help in the code.

61 RADIATION PROTECTION AND DOSIMETRY↗

Assessment of the Area of Review and Leakage Impact for Site 7 using the NRAP-IAM-CCS Tool, Northern Michigan Basin-CarbonSAFE Phase 1 Pre-Feasibility Study

U.S. Environmental Protection Agency’s (EPA’s) Class VI regulations require owners or operators of carbon storage projects to determine an Area of Review (AoR) representative of project risk to underground sources of drinking water (USDWs). The AoR is an estimate of the project footprint and is used to develop monitoring plans to ensure protection of USDWs. In this syudy, the NRAP-IAM-CS software tool was applied to estimate the AoR and the leakage potential of legacy wells located within the AoR to impact groundwater quality at a carbon storage screening site for the NMB-CS, Phase 1 project. The NRAP-IAM-CS is a science-based toolset developed by the U.S. Department of Energy for quantitative risk assessment of geologic sequestration of carbon dioxide (CO 2 ) (Pawar et al., 2016). The toolset adopts a stochastic approach in which predictions include site uncertainties using storage reservoir, leakage scenario, and shallow groundwater impact reduced order models (ROMs). Risk-based analysis done using the NRAP-IAM-CS yielded an AoR that was comparable to estimates defined by the critical pressure needed move fluid from the reservoir to the overlying USDW through an open wellbore. The risk-based AoR was slightly smaller than that based on the critical pressure (234 km 2 compared to 269 km 2 ), because small fluxes did not impact groundwater quality. Leakage from two legacy wells located within the AoR should not impact groundwater quality over the 30-year injection period. Legacy Well 1 penetrates the simulated CO 2 plume and would require a permeability of 5 x 10 -12 m 2 (~5 Darcy) to impact groundwater quality after about 20 years of injection. Legacy Well 2 falls outside of the CO 2 plume footprint, where reservoir pressures are too small to generate large enough leakage flux to change groundwater quality even with well permeabilities as high as 5 x 10 -11 m 2 (~50 Darcy). This work represents one of the first applications of the NRAP toolset for the screening of potential CO 2 storage sites. The toolset provides a risk-based method of evaluating the AoR and the impact of CO 2 or brine leakage through legacy wells. The following recommendations will strengthen the use of probabilistic assessments for site selection and permitting of Class VI CO 2 injection wells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Impact Hazard

The Earth has been subject to hypervelocity impacts from comets and asteroids since its formation, and such impacts have played an important role in the evolution of life on our planet. We now recognize not only the historical role of impacts, but the contemporary hazard posed by such events. In the absence of a complete census of potentially threatening Earth-crossing asteroids or comets (called collectively Near Earth Objects, or NEOs), or even of a comprehensive cur-rent search program to identify NEOs, we can consider the hazard only from a probabilistic perspective. We know the steep power-law relationship between NEO numbers and size, with many more small bodies than large ones. We also know that few objects less than about 50 m in diameter (with kinetic energy near 10 megatons) penetrate the atmosphere and are capable of doing surface damage. But there is a spectrum of possible impact hazards associated with objects from this 10-megaton threshold all the way up to NEOs 5 km or larger in diameter, which are capable of inflicting severe damage on the environment, leading to mass extinction's of species. Detailed analysis has shown that, in general, the larger the object the greater the hazard, even when allowance is made for the infrequency of large impacts. Most of the danger to human life is associated with impacts by objects roughly 2 km or larger (energy greater than 1 million megatons), which can inject sufficient submicrometer dust into the atmosphere to produce a severe short-term global cooling with subsequent loss of crops, leading to starvation. Hazard estimates suggest that the chance of such an event occurring during a human lifetime is about 1:5000, and the global probability of death from such impacts is of the order of 1:20000, values that can be compared with risks associated with other natural hazards such as earthquakes, volcanic eruptions, and severe storms. However, the impact hazard differs from the others in that it can be largely prevented by a comprehensive survey for threatening objects and the application of technological solutions to deflect or destroy objects that are found to have orbits that will lead to collision with the Earth.

Morrison, David↗

Characterizing Epistemic Uncertainty for Launch Vehicle Designs

NASA Probabilistic Risk Assessment (PRA) has the task of estimating the aleatory (randomness) and epistemic (lack of knowledge) uncertainty of launch vehicle loss of mission and crew risk and communicating the results. Launch vehicles are complex engineered systems designed with sophisticated subsystems that are built to work together to accomplish mission success. Some of these systems or subsystems are in the form of heritage equipment, while some have never been previously launched. For these cases, characterizing the epistemic uncertainty is of foremost importance, and it is anticipated that the epistemic uncertainty of a modified launch vehicle design versus a design of well understood heritage equipment would be greater. For reasons that will be discussed, standard uncertainty propagation methods using Monte Carlo simulation produce counter intuitive results and significantly underestimate epistemic uncertainty for launch vehicle models. Furthermore, standard PRA methods such as Uncertainty-Importance analyses used to identify components that are significant contributors to uncertainty are rendered obsolete since sensitivity to uncertainty changes are not reflected in propagation of uncertainty using Monte Carlo methods.This paper provides a basis of the uncertainty underestimation for complex systems and especially, due to nuances of launch vehicle logic, for launch vehicles. It then suggests several alternative methods for estimating uncertainty and provides examples of estimation results. Lastly, the paper shows how to implement an Uncertainty-Importance analysis using one alternative approach, describes the results, and suggests ways to reduce epistemic uncertainty by focusing on additional data or testing of selected components.

Novack, Steven D.↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗

Characterizing Epistemic Uncertainty for Launch Vehicle Designs

NASA Probabilistic Risk Assessment (PRA) has the task of estimating the aleatory (randomness) and epistemic (lack of knowledge) uncertainty of launch vehicle loss of mission and crew risk, and communicating the results. Launch vehicles are complex engineered systems designed with sophisticated subsystems that are built to work together to accomplish mission success. Some of these systems or subsystems are in the form of heritage equipment, while some have never been previously launched. For these cases, characterizing the epistemic uncertainty is of foremost importance, and it is anticipated that the epistemic uncertainty of a modified launch vehicle design versus a design of well understood heritage equipment would be greater. For reasons that will be discussed, standard uncertainty propagation methods using Monte Carlo simulation produce counter intuitive results, and significantly underestimate epistemic uncertainty for launch vehicle models. Furthermore, standard PRA methods, such as Uncertainty-Importance analyses used to identify components that are significant contributors to uncertainty, are rendered obsolete, since sensitivity to uncertainty changes are not reflected in propagation of uncertainty using Monte Carlo methods. This paper provides a basis of the uncertainty underestimation for complex systems and especially, due to nuances of launch vehicle logic, for launch vehicles. It then suggests several alternative methods for estimating uncertainty and provides examples of estimation results. Lastly, the paper describes how to implement an Uncertainty-Importance analysis using one alternative approach, describes the results, and suggests ways to reduce epistemic uncertainty by focusing on additional data or testing of selected components.

Novack, Steven D.↗

Convolution Correction Factor Adjustments on Static PRA Models for Event Assessment

Current probabilistic risk assessment (PRA) models will contain cut sets that have time-constrained basic events such as switched components, recovery of failed components, and failures in time. For these cut sets that have multiple time-constrained events that interact (e.g., offsite power recover at the same time as multiple diesel generators fail to run), there is the possibility that the minimal cut set quantified result is too large. Since current PRA models typically assume that the accident scenario starts at “time zero,” the fails-to-run basic events use this starting time as the basis for their respective reliability models. Over time, the standard practice was to recognize this issue and accept it as part of the conservatism built into the event tree/fault tree PRA models. However, now that these same PRA models are being used in a regulatory forum, this conservatism needs to be addressed. Further, this issue exists not only for the baseline PRA results, but for deficiencies that have been observed or those that have the potential of occurrence, whether the deficiency is complete failure or just a degraded condition. We have found that this conservatism becomes very important when evaluating scenarios such as station blackout sequences and other loss of offsite power sequences. This paper will address the theory and implemented process used by the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) PRA software. Starting with SAPHIRE version 8, the process that was developed is to calculate a “convolution correction factor” based on three distinct calculations. The first calculation is the cut set based frequency calculated via the standard event tree/fault tree PRA model (assuming all run failures start at time equal to zero). The second calculation is to perform the exact time-constrained calculation by integrating the component failure models over the time period of interest (e.g., time to recover, a mission time). For example, this exact calculation for the case of the diesel generators is to convolve their failure models with the offsite power recovery model to obtain the exact frequency. The third calculation is to produce the convolution correction factor by dividing the exact frequency calculation by the standard cut set frequency. This convolution correction factor is then applied to the PRA cut sets in order to remove the time-constrained conservatism. The process used to obtain the convolution correction factor for the baseline PRA is important; however, in this paper we also describe what happens when there is degradation of a component or a potential deficiency. These issues become very important in order to ensure that the convolution correction factor is re-calculated correctly. If the correction factor does not get re-calculated and the same baseline convolution correction factor is used, the final analysis result could be over conservative or under conservative. This paper will discuss how these issues are addressed and provide examples on how SAPHIRE automatically makes the necessary adjustments. MathCad verification results can be computed using the provided equations and input data.

99 GENERAL AND MISCELLANEOUS↗

Assessment of the Geomechanical Risks Associated with CO 2 Injection at the FutureGen 2.0 Site: Application of the State of Stress Assessment Tool (SOSAT)

This report presents the results of the application of the State of Stress Assessment Tool (SOSAT) on the FutureGen 2.0 data set. SOSAT was developed as part of the National Risk Assessment Partnership (NRAP) project and provides a unique integrated framework for estimating the state of stress probability distribution at a given depth in the subsurface and evaluating the risk of induced shear and tensile failure resulting from the injection of carbon dioxide (CO 2 ). The approach implemented by SOSAT is based on two deterministic and widely used methods of determining the state of stress (i.e., stress polygon and one-dimensional tectonic-elastic approach). These methods have been modified using a probabilistic approach to account for uncertainties in the input parameters. The methodology proposed in SOSAT was demonstrated using the data obtained for the FutureGen 2.0 project located in the Illinois Basin. Although the FutureGen 2.0 project was suspended by the U.S. Department of Energy prior to the start of injection operations, the extensive characterization efforts undertaken at the storage site have yielded a considerable amount of valuable data about this part of the sedimentary basin. The FutureGen 2.0 storage site was designed to accommodate the injection of 1.1 million metric tons of CO 2 per year over a 20-year period. The injection of CO 2 and the associated pressure buildup in the reservoir is expected to alter the state of stress over the course of the injection. These changes in the initial stress state may affect fault stability and potentially lead to the unintentional creation of hydraulic fractures, which could pose a leakage risk if not contained within the reservoir. Assessing these risks is critical to making informed decisions about the characterization, management of the injection operation, and monitoring of the storage site. The data required by SOSAT for the geomechanical assessment of the FutureGen 2.0 site were identified, and the methodology proposed in SOSAT was followed to evaluate the probability of reactivating critically oriented faults or potentially creating hydraulic fractures in the reservoir. The results of the geomechanical analysis performed using the SOSAT led to the following conclusions. 1. The probability distribution of the state of stress indicates significant uncertainties in the magnitude of the maximum horizontal stress S Hmax , while the minimum horizontal stress S hmin is well constrained by the stress measurements conducted during the characterization efforts at the storage site. This uncertainty in the magnitude of S Hmax is a common challenge and has significant implications for geomechanical risk at sites like FutureGen 2.0 where a strike-slip tectonic regime exists. 2. The probability that the Mount Simon reservoir was initially critically stressed is relatively high—25%. When the pore pressure increases to the maximum allowable pressure permitted under the Underground Injection Control Class VI regulation of the FutureGen 2.0 project, the risk of shear failure approaches a probability of 43%. These relatively high probabilities reflect the current state of information about the geomechanical conditions in this part of the Illinois Basin. For future operations in this basin this should be a high characterization priority because it could significantly lower the risk of operations. 3. Based on the maximum injection pressure allowed in the UIC Class VI, the risk of unintentional hydraulic fracturing is limited. The risk of shear failure as determined by SOSAT is based on a very conservative approach assuming that critically oriented faults exist in the subsurface. While no faults have been formally identified at the FutureGen 2.0 site, the results obtained with SOSAT using the FutureGen 2.0 data set highlight the importance of integrating uncertainties in critical parameters to quantify geomechanical risks in a defensible way. Should SOSAT have been available at the time the characterization activities were being planned, more characterization efforts would have been implemented to reduce the uncertainties on the magnitude of the maximum horizontal stress, and to dismiss with confidence the potential existence of a critically-oriented fault in the reservoir (e.g., 3D seismic survey).

54 ENVIRONMENTAL SCIENCES↗

Practical Application of PRA as an Integrated Design Tool for Space Systems

This paper presents the application of the first comprehensive Probabilistic Risk Assessment (PRA) during the design phase of a joint NASA/NOAA weather satellite program, Geostationary Operational Environmental Satellite Series R (GOES-R). GOES-R is the next generation weather satellite primarily to help understand the weather and help save human lives. PRA has been used at NASA for Human Space Flight for many years. PRA was initially adopted and implemented in the operational phase of manned space flight programs and more recently for the next generation human space systems. Since its first use at NASA, PRA has become recognized throughout the Agency as a method of assessing complex mission risks as part of an overall approach to assuring safety and mission success throughout project lifecycles. PRA is now included as a requirement during the design phase of both NASA next generation manned space vehicles as well as for high priority robotic missions. The influence of PRA on GOES-R design and operation concepts are discussed in detail. The GOES-R PRA is unique at NASA for its early implementation. It also represents a pioneering effort to integrate risks from both Spacecraft (SC) and Ground Segment (GS) to fully assess the probability of achieving mission objectives. PRA analysts were actively involved in system engineering and design engineering to ensure that a comprehensive set of technical risks were correctly identified and properly understood from a design and operations perspective. The analysis included an assessment of SC hardware and software, SC fault management system, GS hardware and software, common cause failures, human error, natural hazards, solar weather and infrastructure (such as network and telecommunications failures, fire). PRA findings directly resulted in design changes to reduce SC risk from micro-meteoroids. PRA results also led to design changes in several SC subsystems, e.g. propulsion, guidance, navigation and control (GNC), communications, mechanisms, and command and data handling (C&DH). The fault tree approach assisted in the development of the fault management system design. Human error analysis, which examined human response to failure, indicated areas where automation could reduce the overall probability of gaps in operation by half. In addition, the PRA brought to light many potential root causes of system disruptions, including earthquakes, inclement weather, solar storms, blackouts and other extreme conditions not considered in the typical reliability and availability analyses. Ultimately the PRA served to identify potential failures that, when mitigated, resulted in a more robust design, as well as to influence the program's concept of operations. The early and active integration of PRA with system and design engineering provided a well-managed approach for risk assessment that increased reliability and availability, optimized lifecyc1e costs, and unified the SC and GS developments.

Kalia, Prince↗

Sandia National Laboratories performance assessment methodology for long-term environmental programs : the history of nuclear waste management.

Sandia National Laboratories (SNL) is the world leader in the development of the detailed science underpinning the application of a probabilistic risk assessment methodology, referred to in this report as performance assessment (PA), for (1) understanding and forecasting the long-term behavior of a radioactive waste disposal system, (2) estimating the ability of the disposal system and its various components to isolate the waste, (3) developing regulations, (4) implementing programs to estimate the safety that the system can afford to individuals and to the environment, and (5) demonstrating compliance with the attendant regulatory requirements. This report documents the evolution of the SNL PA methodology from inception in the mid-1970s, summarizing major SNL PA applications including: the Subseabed Disposal Project PAs for high-level radioactive waste; the Waste Isolation Pilot Plant PAs for disposal of defense transuranic waste; the Yucca Mountain Project total system PAs for deep geologic disposal of spent nuclear fuel and high-level radioactive waste; PAs for the Greater Confinement Borehole Disposal boreholes at the Nevada National Security Site; and PA evaluations for disposal of high-level wastes and Department of Energy spent nuclear fuels stored at Idaho National Laboratory. In addition, the report summarizes smaller PA programs for long-term cover systems implemented for the Monticello, Utah, mill-tailings repository; a PA for the SNL Mixed Waste Landfill in support of environmental restoration; PA support for radioactive waste management efforts in Egypt, Iraq, and Taiwan; and, most recently, PAs for analysis of alternative high-level radioactive waste disposal strategies including repositories deep borehole disposal and geologic repositories in shale and granite. Finally, this report summarizes the extension of the PA methodology for radioactive waste disposal toward development of an enhanced PA system for carbon sequestration and storage systems. These efforts have produced a generic PA methodology for the evaluation of waste management systems that has gained wide acceptance within the international community. This report documents how this methodology has been used as an effective management tool to evaluate different disposal designs and sites; inform development of regulatory requirements; identify, prioritize, and guide research aimed at reducing uncertainties for objective estimations of risk; and support safety assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

REPRESENTING COMMON-CAUSE FAILURES IN THE SAPHIRE SOFTWARE

Currently, the risk analysis software SAPHIRE has implemented a common-cause failure (CCF) module to represent standard CCF methods such as alpha-factor and multiple Greek letter approaches. However, changes to SAPHIRE are required to support the Nuclear Regulatory Commission’s 2007 “Risk Assessment Standardization Project” CCF analysis guidance for events assessment. This guidance provides an outline of how both the nominal CCF probabilities and conditional (e.g., after a redundant component has failed) CCF probabilities should be calculated. Based upon user-provided input and extending the limitations in the current version of SAPHIRE, the CCF module calculations will be made consistent with the new guidance. The CCF modifications will involve changes to (1) the SAPHIRE graphical user interface directing how end-users and modelers interface with PRA models and (2) algorithmic changes as required. Included in the modifications will be the possibility to treat CCF probability adjustments based upon failure types (e.g., independent versus dependent) and failure modes (e.g., failure-to-run versus failure-to-start). In general, SAPHIRE is being modified to allow the risk analyst to define a CCF object. This object is defined in terms of a basic event. For the CCF object, the analyst would need to specify a minimal set of information, including: - The number of redundant components - The failure criteria (how many component have to fail) - The CCF model type (alpha-factor, MGL, or beta-factor) - The parameters (e.g., the alpha-factors) associated with the model - Staggered or non-staggered testing assumption - Default level of detail (expanded, showing all of the specific failure combinations, or not) This paper will outline both the theory behind the probabilistic calculations and the resulting implementation in the SAPHIRE software.

97 MATHEMATICS AND COMPUTING↗

Smart Sampling and HPC-based Probabilistic Look-ahead Contingency Analysis Implementation and its Evaluation with Real-world Data

This paper describes a probabilistic look-ahead contingency analysis application that incorporates smart sampling and high-performance computing (HPC) techniques. Smart sampling techniques are implemented to effectively represent the structure and statistical characteristics of uncertainty introduced by different sources in the power system. They can significantly reduce the data set size required for multiple look-ahead contingency analyses, and therefore reduce the time required to compute them. High-performance-computing (HPC) techniques are used to further reduce computational time. These two techniques enable a predictive capability that forecasts the impact of various uncertainties on potential transmission limit violations. The developed package has been tested with real world data from the Bonneville Power Administration. Case study results are presented to demonstrate the performance of the applications developed.

high performance computing↗

The Containment Assurance Risk Framework of the Mars Sample Return Program

The Mars Sample Return campaign aims at bringing rock and atmospheric samples from Mars to Earth through a series of robotic missions. These missions would collect the samples being cached and deposited on Martian soil by the Perseverance rover, place them in a container, and launch them into Martian orbit for subsequent capture by an orbiter that would bring them back. Given there exists a non-zero probability that the samples contain biological material, precautions are being taken to design systems that would break the chain of contact between Mars and Earth. These include techniques such as sterilization of Martian particles, redundant containment vessels, and a robust reentry capsule capable of accurate landings without a parachute. Requirements exist that the probability of containment not assured of Martian-contaminated material into Earth’s biosphere be less than one in a million. To demonstrate compliance with this strict requirement, a statistical framework was developed to assess the likelihood of containment loss during each sample return phase and make a statement about the total combined mission probability of containment not assured. The work presented here describes this framework, which considers failure modes or fault conditions that can initiate failure sequences ultimately leading to containment not assured. Reliability estimates are generated from databases, design heritage, component specifications, or expert opinion in the form of probability density functions or point estimates and provided as inputs to the mathematical models that simulate the different failure sequences. The probabilistic outputs are then combined following the logic of several fault trees to compute the ultimate probability of containment not assured. Given the multidisciplinary nature of the problem and the different types of mathematical models used, the statistical tools needed for analysis are required to be computationally efficient. While standard Monte Carlo approaches are used for fast models, a multi-fidelity approach to rare event probabilities is proposed for expensive models. In this paradigm, inexpensive low-fidelity models are developed for computational acceleration purposes while the expensive high-fidelity model is kept in the loop to retain accuracy in the results. This work presents an example of end-to-end application of this framework highlighting the computational benefits of a multi-fidelity approach.

Giuseppe Cataldo↗

Distributed micro-releases of bioterror pathogens : threat characterizations and epidemiology from uncertain patient observables.

Terrorist attacks using an aerosolized pathogen preparation have gained credibility as a national security concern since the anthrax attacks of 2001. The ability to characterize the parameters of such attacks, i.e., to estimate the number of people infected, the time of infection, the average dose received, and the rate of disease spread in contemporary American society (for contagious diseases), is important when planning a medical response. For non-contagious diseases, we address the characterization problem by formulating a Bayesian inverse problem predicated on a short time-series of diagnosed patients exhibiting symptoms. To keep the approach relevant for response planning, we limit ourselves to 3.5 days of data. In computational tests performed for anthrax, we usually find these observation windows sufficient, especially if the outbreak model employed in the inverse problem is accurate. For contagious diseases, we formulated a Bayesian inversion technique to infer both pathogenic transmissibility and the social network from outbreak observations, ensuring that the two determinants of spreading are identified separately. We tested this technique on data collected from a 1967 smallpox epidemic in Abakaliki, Nigeria. We inferred, probabilistically, different transmissibilities in the structured Abakaliki population, the social network, and the chain of transmission. Finally, we developed an individual-based epidemic model to realistically simulate the spread of a rare (or eradicated) disease in a modern society. This model incorporates the mixing patterns observed in an (American) urban setting and accepts, as model input, pathogenic transmissibilities estimated from historical outbreaks that may have occurred in socio-economic environments with little resemblance to contemporary society. Techniques were also developed to simulate disease spread on static and sampled network reductions of the dynamic social networks originally in the individual-based model, yielding faster, though approximate, network-based epidemic models. These reduced-order models are useful in scenario analysis for medical response planning, as well as in computationally intensive inverse problems.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Uncertainty Considerations for Ballistic Limit Equations

The overall risk for any spacecraft system is typically determined using a Probabilistic Risk Assessment (PRA). A PRA attempts to determine the overall risk associated with a particular mission by factoring in all known risks (and their corresponding uncertainties, if known) to the spacecraft during its mission. The threat to mission and human life posed by the mircro-meteoroid & orbital debris (MMOD) environment is one of the risks. NASA uses the BUMPER II program to provide point estimate predictions of MMOD risk for the Space Shuttle and the International Space Station. However, BUMPER II does not provide uncertainty bounds or confidence intervals for its predictions. With so many uncertainties believed to be present in the models used within BUMPER II, providing uncertainty bounds with BUMPER II results would appear to be essential to properly evaluating its predictions of MMOD risk. The uncertainties in BUMPER II come primarily from three areas: damage prediction/ballistic limit equations, environment models, and failure criteria definitions. In order to quantify the overall uncertainty bounds on MMOD risk predictions, the uncertainties in these three areas must be identified. In this paper, possible approaches through which uncertainty bounds can be developed for the various damage prediction and ballistic limit equations encoded within the shuttle and station versions of BUMPER II are presented and discussed. We begin the paper with a review of the current approaches used by NASA to perform a PRA for the Space Shuttle and the International Space Station, followed by a review of the results of a recent sensitivity analysis performed by NASA using the shuttle version of the BUMPER II code. Following a discussion of the various equations that are encoded in BUMPER II, we propose several possible approaches for establishing uncertainty bounds for the equations within BUMPER II. We conclude with an evaluation of these approaches and present a recommendation regarding which of them would be the most appropriate to follow.

Schonberg, W. P.↗