Search NASA⌕ Search

SEARCH · Search NASA

Results for “REFUELING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Moving Beyond Traditional Tornado Missile Impact Analysis

On March 11, 2011 a 9.0 magnitude earthquake occurred off the coast of Japan creating a tsunami, which together severely damaged northeastern Japan including the Fukushima Dai-ichi nuclear power plant site. In response to this event, the United States (U.S.) Nuclear Regulatory Commission (NRC) issued Order EA-12-049, 'Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events'. In order to meet the guidance of the NRC Order EA-12- 049, the a central U.S. nuclear generating station (Plant) was required to demonstrate that the currently installed Borated Water Storage Tank (BWST), Refueling Water Tank (RWT), and Qualified Condensate Storage Tank (QCST) could provide the necessary capacity following a Beyond Design Basis External Event (BDBEE). These tanks were not originally designed to meet current site design basis requirements for tornado wind and missile impacts. To save the Plant from having to build costly new storage tanks off site, the existing tanks were credited as robust for tornado missile impact through advanced finite element impact analyses using the ANSYS Autodyn solver and fluid-structure interaction (FSI). This procedure is the first known NRC acceptance of advanced analysis and FSI for to satisfy the FLEX tornado missile impact criteria. Extensive verification and validation (V and V) was performed to verify perforation of steel plates which included FSI. These V and V analyses were confirmed against large databases of experimental and theoretical results to ensure accurate modeling and results. The use of this advanced analytical method benefitted the Plant in several ways. A new storage tank was not required to be built, saving not only initial construction costs but also ongoing maintenance costs and monitoring activities. By determining specific vulnerable components of each tank a set of modifications and protection schemes were developed. These modifications were much quicker to implement saving the Plant on downtime costs. (authors)

42 ENGINEERING↗

Feasibility Studies on a Hexagonal-Lattice Core for a World-Class Cold Neutron Source

Cold neutrons have kinetic energies less than 5 meV and wavelengths greater than 4 Α. They can be transported over tens of meters through super-reflecting neutron guides with minimal losses. Cold neutrons are used to investigate the structure of larger molecular systems such as biological materials, polymers and aggregates, due to their preferential interaction with light elements and general ignorance towards heavy ones. Intense beams of cold neutrons are obtained from slowing down a source of thermal energy neutrons - which may be from either a research reactor or spallation neutron source - through some cryogenic moderator such as liquid hydrogen or deuterium. The present reactor at the NIST Center for Neutron Research (NCNR) - NBSR - is such a cold neutron source (CNS) facility which provides cold neutron beams for over 2,000 scientists performing various experiments annually. Feasibility studies on a replacement reactor for the NBSR are underway at NCNR with the primary purpose of optimized cold neutron production. Low enriched uranium (LEU) fuel is required for the new reactor to conform to nuclear non-proliferation agreements. The low thermal power rate of 20 MW is taken as a priority with a fuel cycle length designated as 30 days. A horizontal split compact core with a large D{sub 2}O reflector tank is currently proposed and studied, with the expectation of achieving much better cold neutron performance than the present NIST reactor (NBSR). A preliminary core design has been completed using MCNP6 modeling and simulation. The physics performance characteristics of the proposed new core indicate that the new design is competitive with the most notable existing advanced cold neutron sources. In previous studies, only rectangular shaped fuel elements were considered because they have similar external dimensions as the NBSR fuel elements. However, from a compact core standpoint, a square lattice is not the most effective geometry for a tight configuration. Moreover, the previous studies also showed that the square lattice of the fuel elements left little room to accommodate vertical insertion blade-type control elements. As a result, all control blades had to reside in the D{sub 2}O reflector, which made the design cumbersome (in that case the control blades must penetrate the reflector tank) and neutronically uneconomical. In this summary, a preliminary feasibility study on a hexagonal core lattice is performed to render an alternative geometry for the new reactor (HEX core) to provide sufficient space for the control elements. The identical LEU fuel (U{sub 3}Si{sub 2}/Al) with U-235 enrichment 19.75% is used in the new design. The maximum thermal power and fuel management scheme remain the same as the previous investigations (three 30-day cycled batches for each batch of three fuel elements). The horizontal split compact core concept is also applied in the hexagonal lattice core design, with the objective of creating maximum thermal flux traps between the split core halves. A detailed description of the model for the hexagonal lattice core is presented in the following section. The HEX core design achieves a number of successes over the previous split-core design. Given that much of the motivation of this work was based on implementation of control blades into a concept which lacked them, it is notable that neutron economy was well-preserved in the process of achieving conservatively effective reactivity control; start-up k{sub eff} was in fact increased by 0.23% and peak thermal flux increased by ∼25%. A useful metric in determining the efficacy of resources towards creating an environment for the production of cold neutrons - dubbed the 'quality factor' (QF) - is the ratio of peak thermal neutron flux in a system to the total thermal power produced. Because HEX core's objectives are very focused in comparison to existing research reactors, it is fitting to pursue a design which out-performs all others in terms of some specific performance metric, namely this QF term. While HFIR remains the greatest cold neutron source in the world, it does so through use of HEU fuel (which will be replaced with LEU in the near future), and suffers a greater level of fast neutron contamination that is expected from the HEX design. The new core design achieves these successes due to the hexagonal lattice fuel arrangement, a 13.5% reduction in cladding mass, and a 13.1% reduction in fuel element volume. In spite of a 5.5% reduction in fuel mass, no compromises in reactor performance were noted. Provided the favorable characteristics shown of the control blade design, refueling intervals longer than the prescribed 30 days may be considered. It can be speculated that with these quantitative benefits, the overall capital and continuous costs of the HEX core design will be less than the previously proposed split-core concept.

07 ISOTOPE AND RADIATION SOURCES↗

Initial Application of the Reactivity Method to Analyze KSU TRIGA Fuel

The Kansas State University (KSU) TRIGA Mk II reactor was refueled over 40 years ago with fuel having stainless steel cladding. Much of that fuel had significant burnup, and little work has been done since then to quantify the core composition. The present work aims to provide data in support of efforts to understand this composition. Currently available data consist of 26 critical configurations, including the location of fuel elements, the position of control rods, and various temperatures that have been documented in operational log books. Additional measurements will be made using nondestructive techniques to quantify the burnup of fuel elements irradiated in the KSU reactor. Gamma spectroscopy is a well-established method for determining the burnup of spent fuel, and plans are in place at KSU to perform such measurements. Another option explored here is use of the reactivity method, which relates reactivity worths to burnup using linear or other correlations. Reactivity measurements of fuel elements with wide ranges of burnup were conducted to help identify the present compositions of those fuel elements and to verify the historical inventories of those fuel elements. Significant biases were observed between measured and modeled reactivities for several elements in the KSU reactor. It is expected future measurement of burnups using gamma spectroscopy will help to reduce these biases and produce a best-estimate model of the core composition. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Conceptual System Design of a Supercritical CO{sub 2} cooled Micro Modular Reactor - 18492

Small modular reactor (SMR) concepts proposed in the past have compact size and a longer life reactor core than the conventional nuclear power plants. However, previous concepts based on the water-cooled technologies with a steam Rankine cycle have shown that the complete modularization is still technically challenging. This study suggests an innovative concept of a reactor directly cooled by supercritical carbon dioxide (S-CO{sub 2}) with S-CO{sub 2} Brayton cycle as a power conversion system, namely KAIST MMR (Micro Modular Reactor). To enhance neutron economy and maximize the fuel volume fraction of the core, a uranium carbide fuel controlled by drum type control rods was used in the fast-spectrum MMR. The core has long life (20 years) without refueling or reshuffling as well as inherent safety features. The reactor can be used as a distributed power source, and replace outdated fossil fuel power plants for small cities. Moreover, we propose a S-CO{sub 2} Brayton cycle as a power conversion system to achieve small, high performance and lightweight module. Thanks to the compact core and power conversion system, the entire system can be contained in a single module. The target of the system is to achieve small and compact system that can be transported via ground transportation of a single module containing the core and the power conversion system altogether. In order to meet this target single module s total weight is minimized in the order of 150 tons. The external size of a module is less than 7 m in length and 4 m in diameter. It produces 12 MWe electricity from 36 MWt reactor core. The S-CO{sub 2} Brayton cycle was optimized, and the cycle components were designed while maximizing the performance and minimizing the weight. A passive decay heat removal system utilizing shell and tube heat exchangers was also developed, and examined its performance with transient analysis code. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The coupled neutronics and thermo-fluid dynamics design characteristics of the XE-100 200 MW{sub TH} reactor - 18552

The Xe-100 is a high temperature helium-cooled, graphite moderated, pebble bed reactor with a 10 times through, multi-pass (MEDUL=MEhrfacDUrchLauf) fueling scheme. The design, characterized as a Generation IV reactor, is based on proven technology that has been demonstrated a number of times both experimentally and as commercial reactors. This proven foundation ensures high levels of design and technical readiness. In the overview provided of the design it is shown how the excess reactivity is limited by continuous refueling, whilst the selected core power density will ensure passive heat removal. In this way the intrinsic safety design features of a typical GEN IV design are guaranteed. It is shown that no upset event will lead to a significant amount of radiological release. The coupled core neutronic and thermo-fluid dynamics design for the Xe-100 is performed with the VSOP-A system of codes. For the equilibrium core, VSOP results demonstrate that the spherical fuel powers (maximum 1.9 kW) and operational temperatures (<900 deg. C) fall well within the envelope of the design criteria. Adequate reactivity control and long-term, cold shutdown are provided by two separate, diversely-actuated systems, while the overall negative reactivity temperature coefficient is illustrated over the total operational range. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Semi-supervised learning approach for crack detection and identification in advanced gas-cooled reactor graphite bricks - 111

One of the life-limiting components of an Advanced Gas cooled Reactor (AGR) is its graphite core. The bricks present in the core undergo radiolytic oxidation throughout their lifetime which causes graphite weight loss and irradiation which can result in some of the bricks developing cracks. Understanding the nature and extent of brick cracking within the core is key to ensuring continued and extended operation of the AGR fleet. A semi-supervised machine learning classification algorithm is proposed as a method for improving the detection of cracked graphite bricks, by combining the labels derived from infrequent, detailed inspections of the core, with unlabeled, more frequent monitoring measurements taken during refueling operations. Semi-supervised machine learning, which is an emerging field in nuclear power condition monitoring, is the combination of ideas from both supervised and unsupervised machine learning whereby the data that is used to train the algorithm is a combination of labeled and unlabeled data. This paper introduces the initial research that has been undertaken in creating a semi-supervised self-training algorithm to detect the presence of graphite brick cracks and then proceeds to show that there is an improvement in the classification of graphite bricks using a semi-supervised machine learning classifier compared to supervised machine learning classifiers. This improved classification performance is encouraging as it does not require time consuming and costly human analysis to obtain extra learning information from available data. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Emerging and existing sensing technologies for small modular reactors and advanced reactors - 191

The development of small modular reactors (SMRs) and Generation-IV advanced reactor designs represents a promising future for nuclear energy. These next-generation reactors can support new applications for nuclear energy like hydrogen production, industrial heat generation, and water desalination in addition to electricity generation. Furthermore, SMRs and advanced reactors enable load-following operations, offer improved passive safety features, support lengthened refueling cycles, and provide spent fuel management capabilities. To date, there are no SMRs operating or under construction in the United States, but commercial operation of the first integral Pressurized Water Reactor (iPWR) SMR is expected by the mid-2020's with Generation-IV advanced reactors to follow a decade or two later. To facilitate the development and deployment of SMRs and advanced reactors, key instrumentation and control (I and C) system challenges must be addressed and existing nuclear grade I and C sensors will need to be adapted or new sensors developed. For example, traditional measurement techniques and maintenance strategies used in the current generation of light water reactors (LWRs) will be challenged by the inherent design characteristics of the iPWR. For Generation-IV reactors, conventional I and C sensors will not withstand prolonged exposure to the harsh environmental conditions of advanced reactors (e.g. elevated temperatures, corrosive coolants, increased radiation). This paper discusses the challenges associated with making primary system process measurements in next-generation reactors and includes a summary of work performed to evaluate existing and emerging sensor technologies for these systems. As importantly, the paper presents the initial test results of a prototype temperature sensor developed by Analysis and Measurement Services Corporation (AMS) for use in SMRs and advanced reactors. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

BWR modernization project: installation of a new digital feedwater control system - 295

A European BWR plant carried out a relevant and pioneering modernization project regarding the Feedwater and Feed Pump Turbine Control System, replacing the legacy analogic control with the new General Electric MarkVIe digital system. This digital instrumentation and control modernization, motivated by obsolescence, had a great impact on the main control room and on the plant operation. Tecnatom collaborated with the nuclear power plant in the project performing the following activities: early installation of the system in the full scope and classroom simulators, Human Factors Engineering (HFE) Verification and Validation (V and V), Simulation Assisted Engineering (SAE), design and implementation of cyber secure communication with the Plant Process Computer (PPC), operating procedures modification and plant operators training. Those activities contributed to the success of the project that was completed during the refueling outage as planned. Scheduling HFE verification before the design freeze allowed the plant to modify the Human Machine Interface (HMI) to comply with the standards and increase safety without overcharging the project. SAE resulted in the reduction of costs and time during the system commissioning through the detection of discrepancies and improvements in the control, covering different plant scenarios. All the activities carried out in the simulators before the implementation of the system in the plant contributed to validate it and to build confidence in the new control among the plant personnel. New digital system communication interfaces with the PPC saved cable laying works and allowed future expansions. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

On-Line Monitoring to Detect Sensor and Process Degradation under Normal Operational Transients - 327

Calibration assessment of nuclear plant sensors and transmitters is currently performed through periodic maintenance actions during plant refueling outages. On-line monitoring (OLM) can be used to reduce the time and cost of this maintenance process by using empirical models to evaluate sensor calibration. The implementation of OLM can also mitigate human error associated with unnecessary maintenance on sensors operating within calibration tolerances. OLM has been studied and validated for plants under steady-state baseload operation, but the extension to load-following operation is not well-documented in the literature. Auto-associative kernel regression (AAKR) provides an error-corrected prediction of process sensor measurements for OLM through a weighted average of historic data. The current study evaluates the performance of AAKR for prediction under normal operational transients (such as expected under load-following operation). Performance of the AAKR model with two anomaly detection routines, error uncertainty limit monitoring (EULM) and sequential probability ratio test (SPRT), was evaluated for normal operation, sensor faults, and process degradation. The data used to develop and evaluate the OLM system were collected from a forced flow loop with temperature and flow sensors. Three models of well-correlated groups of sensors are trained to predict normal system behavior under planned transients. The anomaly detection routines are tested for sensor faults and process faults. The results of this experimental study suggest AAKR and an appropriate anomaly detection routine can be applied for sensor calibration and process fault detection under transient operation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Migration to a fully-integrated control room - 349

The nuclear industry is faced with a pressing need to reduce operating costs in order to remain competitive with other forms of electric generation. While current industry initiatives are focused on incremental gains by streamlining work processes and reducing worker burdens, very few, if any, involve significant reductions in the base workload of a nuclear plant. Migration to a fully-integrated control room affords just such an opportunity. This report describes an NPP digital instrumentation and control (I and C) system design, along with its corresponding human systems interface (HSI) design, which achieves high plant availability, while selectively applying digital equipment redundancy and integrating traditional I and C system partitions, to minimize the digital equipment needed, and thereby minimize initial installation costs and ongoing operations and maintenance (O and M) costs. An additional key component of digital equipment minimization is optimization of the digital interface to conventional plant sensors and controlled plant devices (e.g., pumps, valves), which requires no disturbance to plant cables and results in eliminating thousands of electro-mechanical relay control components. The design is rooted in the highly integrated digital technology applied to the most recent advanced light water reactors under United States (U.S.) Nuclear Regulatory Commission (NRC) design certification review and approval. While this design employs technology from new plants, that technology has been adapted to the modernization of current operating NPPs. Hence, the highly integrated digital I and C and HSI design is referred to as the compact control room digital modernization (CDM). Along with minimal digital equipment, the corresponding HSI design employs compact operator workstations with visual display units (VDU) and soft controls for both the main control room (MCR) and remote shutdown room (RSR), to immediately improve human performance and ultimately facilitate operating staff reduction. Some advanced light water reactors have demonstrated this staff reduction through full scope simulator testing of normal and abnormal plant conditions, with U.S. licensed operating crews from currently-operating U.S. plants. Digital equipment minimization, compact operator workstations, and optimized plant component interfaces that require no disturbance to field cables, also facilitate implementation of the CDM over multiple phases, most of which can be conducted during normal refueling shutdown windows. This phased implementation method includes a novel transition of the I and C, MCR and RSR with an operations centered focus. This paper presents the CDM design, along with qualitative cost/benefit comparisons to currently operating plants with conventional analog I and C and HSI technology; this generation of I and C/HSI is referred to as a conventional control room (CCR). A CCR also includes NPPs that have been upgraded with digital systems, but retain the current partitions between plant I and C systems (i.e., no I and C integration) and retain the current plant system to control board configuration of current NPP control rooms. Even though these comparisons are qualitative, a compelling case is presented for the CDM. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

High Accuracy Signal Validation Framework for Sensor Calibration Assessment in NPPs

Effective and efficient health management of sensing channels and instrumentation supports reliable and accurate process monitoring capacities in any industry. Current practice in the nuclear industry relies on periodic calibration assessment and correction activities. This time based maintenance technique consists of three steps: i) removal of sensor to a test environment, ii) testing and recalibration, and iii) reinstallation of sensor into its working environment. This procedure is highly labor intensive, adds to the outage cost and timeline, and contributes to worker radiation exposure and ALARA requirements. Furthermore, the human element contributes to error factors in all stages of the procedure. The effectiveness of this calibration procedure after sensors are returned to working environmental variables also raises concerns, and the practicability of this periodic approach is uncertain for future reactor designs with longer operating cycles between refueling outages. Studies indicate that periodic calibration assessment find only 10% of sensing instrumentations with calibration issues during a single outage (18- 24 months), meaning at least 90% of sensors are undergoing unnecessary maintenance actions. This provides an opportunity to maintain the current levels of safety and functional integrity with fewer, more targeted maintenance actions and lower economic burden. Performance-based maintenance planning shows much promise over current periodic maintenance approaches. Specifically, online monitoring (OLM) utilizes the continually collected process data to non-intrusively monitor the calibration status of process instrumentation and detect the onset of de-calibration, thereby minimizing the number of recalibration procedures required. Ultimately, this can lead to termination of time based recalibration at NPPs. OLM utilizes the process measurements made for process monitoring and control to evaluate the calibration status of the sensors and instrumentation making the measurements. OLM can detect and differentiate sensor faults and process anomalies, thus providing a valuable tool to suit the industry's and regulatory body's requirements. Though supported by more than a decade of research, OLM for sensor calibration assessment is yet to be implemented in the US fleet due to regulatory requirements and constraints. As shown in Figure 1, OLM utilizes process data to train statistical models that predict normal, error-free process behavior. Measured process values are compared with error-corrected predictions to ascertain the presence of faults. The reliability of OLM is dependent on the quality of its predictions, measured in part by the uncertainty in these predictions. This research develops a framework to accurately quantify the prediction uncertainty based on Bayesian inference techniques to provide the required confidence levels for OLM systems. The expected outcomes include signal validation by high-accuracy, high-confidence uncertainty quantification for variable sensor types and operating ranges. Furthermore, the framework will facilitate fault detection capacities and so-called virtual sensors, a capability to replace faulty sensor measurements with error-corrected values when a sensor fault is detected. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Preliminary Assessment of the Dose near the Shield Plug at Fukushima Daiichi Unit 2 (1F2)

Since the accident at Fukushima Daiichi on March 11, 2011, caused by the Great East Japan earthquake and subsequent tsunami, there have been significant coordinated international efforts to better understand the accident progression, phenomenology and consequences. Of particular note is the Organisation for Economic Cooperation and Development Nuclear Energy Agency's (OECD/NEA) Benchmark Study of the Accident at the Fukushima Daiichi Nuclear Power Plant (BSAF Project). Phase 1 of this ongoing effort focused on modeling the modeling of the three beyond design basis accidents at the site for the first six days of the accident. Phase 2 of the effort is a forensic effort and focuses on extending the accident simulations out to 21 days and assessing the consequences of the accident. This effort aims to inform the government of Japan and The Tokyo Electric Power Company (TEPCO)'s ongoing effort to decommission and decontaminate the site. One of the key questions posed by TEPCO in its efforts to decommission the site is the location of released radionuclides (RNs) that result in anomalously high dose rate measurements on and near the shield plugs of all three units. In this summary, we provide insight into the possible location of the source resulting in this high dose. Previous MELCOR accident progression analyses have predicted leakage of the containment through the drywell head, directly below the shield plug. Using this plausible accident scenario, MELCOR is able to predict the radionuclide source to the region below the shield plug and possible deposition amounts within the gaps of the shield plug. Using this predicted source and the transport and shielding code MCNP6 the dose in and around the shield plug of 1F2 was assessed. Unit 2 was chosen since the refueling bay is still intact and therefore a simpler initial problem compared to Units 1 and 3. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Zero-Discharge Policy and its Implications for Tritium Inventory at Columbia Generating Station

Columbia Generating Station, a boiling water reactor (BWR), has not made a discharge of radioactive liquids to the Columbia River since 1998. A concern raised when this zero-discharge policy was first considered was that radioactive tritium produced during plant operation would be concentrated in reactor plant water due to the reduced rate at which tritiated water is replaced with makeup water. Elevated concentration of tritium in plant systems could result in internal exposure, especially during refueling outages when personnel are working in the vicinity of the reactor cavity. Tritium data before and after implementation of the zero-discharge policy demonstrate that there has been no significant effect on tritium concentration in plant systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benchmark Comparisons of Lattice Physics Calculations for Thorium-Based Fuels in Pressure-Tube Heavy Water Reactors

Thorium is a fertile nuclear fuel resource that is nearly three times as abundant as uranium in the earth's crust and that can be exploited and used to extend uranium resources. The pressure tube heavy water reactor (PTHWR) is an excellent existing technology for utilizing thorium-based fuels, due to its high neutron economy achieved by using heavy water as a moderator and coolant, the ability to perform online refueling, and its flexibility in fuel management. Reactor physics studies are underway at the Canadian Nuclear Laboratories (CNL) to evaluate several types of thorium-based fuels that could be implemented in PT-HWRs in the near-term and intermediate future, building upon past experience. For preliminary, conceptual studies, deterministic lattice physics and core physics codes such as WIMS-AECL and RFSP are used to provide quick and more approximate estimates of performance and safety characteristics. The objective of this study was to perform 2D lattice physics benchmark comparisons between WIMS-AECL and MCNP5 for several types of thorium-based fuel bundle lattices for potential use in PT-HWRs. Benchmark comparisons will help confirm the validity of deterministic calculation results, and provide estimates of the potential magnitude of calculation errors and uncertainties. Areas for potential improvements in the WIMS-AECL calculations may also be identified. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ultra-Long-Life Fast Reactor Cores having Axial Blanket-Driver-Blanket Burnup Strategy with Thorium and PWR Spent Fuels

The sustainable energy over a long-term period can be supplied by ultra-long-life fast reactor cores that are designed by fully utilizing breeding by fast neutrons to be operated over several tens of years without refueling. But the fast reactor cores of this type usually have high positive coolant void reactivity worth resulted from the high TRU (Transuranics) contents in the high burnup, which can degrade the inherent safety through high positive coolant expansion reactivity coefficient. Recently, the authors have designed new small ultra-long-life cores that can be operated over 50{approx}60 EFPYs (Effective Full Power Years) and satisfy the self-controllability conditions under the unprotected accidents. The cores use axial blanket-driver-blanket configuration to achieve ultra-long operational cycle length where the fuel burnup propagates from the outer core to the inner core and from the axially central driver to the outer blanket regions. The objective of this work is to suggest the different design options with thorium addition and TRU and uranium from PWR spent fuels for effectively utilizing the large PWR spent fuel stocks and to analyze the performances of the cores. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensitivity Tests of Aluminum Precipitate Preparation Methods on Head Loss through Debris Beds on a Sump Screen

During a Loss-of-Coolant Accident (LOCA) in Pressurized Water Reactors (PWRs), buffered borated water as a coolant from the Refueling Water Storage Tank (RWST) will be injected into the primary loop to cool down the core depending on the break size. For long-term cooling, the coolant will be collected in the containment sump. Then, the Emergency Core Cooling System (ECCS) will pump the coolant through the sump strainers into the reactor. During this phase, buffered borated water produces chemical precipitate by reacting with the structural materials in the containment. Chemical effects evaluated as part of Generic Safety Issue 191 (GSI-191) resolution studies are broadly defined as any chemically induced phenomenon that affects ECCS performance. Initial chemical effects studies jointly sponsored by the Nuclear Regulatory Commission (NRC) and Industry collaborators led to a Westinghouse Owners Group (WOG) study that provided bases for deterministic quantification of chemical effects. The WCAP-16530-NP developed protocols to produce Aluminum Oxyhydroxide (AlOOH), Calcium Phosphate, and Sodium Aluminum Silicate (SAS). The surrogate generation protocol used the metal salt (aluminum nitrate and calcium acetate) unlike post-LOCA accident scenarios where metals leach into a buffered borated solution. Bahn et al. demonstrated that the WCAP-16530-NP SAS precipitate did not produce as much head loss as the WCAP-16530-NP AlOOH precipitate, thus, the present study focused on the effect of AlOOH precipitate on head loss through a fibrous debris bed. In the past, most of the tests were conducted in high approach velocity conditions, approximately 0.03 m/s. After modifications of sump strainer size in PWRs, the approach velocity to the sump strainer was reduced by an order of magnitude, approximately 0.001 ∼ 0.003 m/s. Howe et al. and Kim et al. conducted several head loss tests at the approach velocity of 0.003 m/s. In the present study, an approach velocity of 0.0006 m/s was selected for an extremely slow power plant condition. A PCI strainer design was used as previous head loss tests and debris bypass tests conducted by Lee et al. Three different chemical precipitate preparation methods were used in this study. The additional head loss of the debris bed caused by those chemical precipitates was investigated. The debris bed was produced with NUKON{sup R} fiberglass thermal insulator and additional particulates including dirt, Tin powder, acrylic powder, and Calcium silicate (CalSil). (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SIT Makeup Effect on the Loss of Residual Heat Removal during Mid-loop Operation

For the loss of cooling during the mid-loop operation, the plant needs to have a sufficient time for operator action without active makeup measures such as a loss of alternating current (AC) power. This concern is raised after the Fukushima accident. Especially, in addition to the loss of residual heat removal (LORHR), if the AC power or active makeup measures are unavailable, the passive makeup using gravity feed or pressurized feed will provide sufficient time before core uncovery. This paper investigates means of the passive makeup measures using safety injection tank (SIT) after the LORHR event to prevent or delay the core uncovery and fuel failure for the typical advanced power reactor 1400 (APR1400). Unfortunately, the refueling water storage tank of APR1400 cannot be used for gravity makeup since it is located on the bottom of the containment with a lower elevation than the reactor vessel. So, the SIT makeup and the effect on the core uncovery are investigated. The results show that gravity makeup of a SIT provides insufficient means but the slightly pressurized SIT is required for sufficient operator action time for the LORHR with the station black out (SBO) during the mid-loop operation for the APR1400. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Major Considerations on the Nuclear Material Accounting of PB-HTR Commercial Plants

The pebble bed high temperature reactor (PB-HTR) is a promising reactor type with inherent safety features in the next generation nuclear systems Based on the experience of studying and operating test PB-HTR (the HTR-10) for decades, China is constructing the first commercial nuclear power plant of modular PB-HTR in the world, i.e. the HTR-PM, which is expected to commission by the end of 2017. Since the PB-HTRs are quite different from the conventional PWRs in many aspects, including the large amount of fuel pebbles, the continuous refueling, the low heavy metal density in fuels, the safeguards of PB-HTR is important to investigate. Unfortunately, the research on this topic is insufficient by far, especially for the upcoming commercial PB-HTR plants. The PB-HTR has excellent features on proliferation resistance The graphite fuel pebbles with diameter of 6 cm are used as fuel elements, embedded with more than ten thousand TRISO coated fuel particles. This kind of fuel design provides more than one order of magnitude lower heavy metal concentration in fuel than other fuels. For the typical uranium loading of 7 grams in the HTR-PM, more than 10,000 fresh fuel pebbles (about 1.2 tons) are required to provide a significant quantity of indirect-use uranium with enrichment less than 20%. Moreover, the reprocessing of TRISO particle fuels is difficult because of the rigid SiC layer in the coating. Also, the possibility of utilizing materials from PB-HTR's spent fuels to product dirty bombs is quite low just due to the same reason as reprocessing. On the other hand, the large amount of fuel pebbles and the continuous on-line fueling introduce new challenges in nuclear safeguards and material accounting of PB-HTRs. This summary discusses the major considerations on the nuclear material accounting of PB-HTRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗