Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE SIMULATION CHAMBER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Antenna Measurements: Test & Analysis of the Radiated Emissions/Immunity of the NASA/Orion Spacecraft Dart Parachute Simulator & Prototype Capsule - The Crew Exploration Vehicle

For future NASA Manned Space Exploration of the Moon and Mars, a blunt body capsule, called the Orion Crew Exploration Vehicle (CEV), composed of a Crew Module (CM) and a Service Module (SM), with a parachute decent assembly is planned for reentry back to Earth. A Capsule Parachute Assembly System (CPAS) is being developed for preliminary prototype parachute drop tests at the Yuma Proving Ground (YPG) to simulate high-speed reentry to Earth from beyond Low-Earth-Orbit (LEO) and to provide measurements of position, velocity, acceleration, attitude, temperature, pressure, humidity, and parachute loads. The primary and secondary (backup) avionics systems on CPAS also provide mission critical firing events to deploy, reef, and release the parachutes in three stages (extraction, drogues, mains) using mortars and pressure cartridge assemblies. In addition, a Mid-Air Delivery System (MDS) is used to separate the capsule from the sled that is used to eject the capsule from the back of the drop plane. Also, high-speed and high-definition cameras in a Video Camera System (VCS) are used to film the drop plane extraction and parachute landing events. Intentional and unintentional radiation emitted from and received by antennas and electronic devices on/in the CEV capsule, the MDS sled, and the VCS system are being tested for radiated emissions/immunity (susceptibility) ~ (RE/RS). To verify Electromagnetic Compatibility (EMC) of the Orion capsule, Electromagnetic Interference (EMI) measurements are being made inside a semi-anechoic chamber at NASA/JSC on the components of the CPAS system. Measurements are made at 1m from the components-under-test (CUT). In addition, EMI measurements of the integrated CEV system are being made inside a hanger at YPG. These measurements are made in a complete circle, at 30◦ angles or less, around the Orion Capsule, the spacecraft system under-test (SUT). Near-field B-Dot probe measurements on the surface of the Orion capsule are being extrapolated outward to the 1m standard distance for comparison to the MIL-STD radiated emissions limit, and far-field hybrid antenna measurements at 3m are being extrapolated inward to the 1m distance for similar comparisons.

Norgard, John D.↗

My Internship at NASA

My name is Isaac Lopez and I am a junior at the University of Houston majoring in Mechanical Engineering Technology. I will be completing my first tour at the NASA-Johnson Space Center ("JSC") as a Mechanical Engineer within the Human Interfaces Branch. Throughout my tour, I was given the opportunity to work on multiple projects that have expanded my knowledge and interest in acoustics and engineering design. One of the projects I worked on at JSC consisted of doing acoustic simulation of the EVA comm. cap. While working on the comm. cap headset, my main duty consisted of simulating the acoustics of the headset to find a solution to the condensing water that can accumulate and block the acoustic tube, causing attenuation or complete loss of audio in one ear for an astronaut using the EVA. For this project, I had to create a Creo model of the comm. cap so that I would be able to import it into Comsol for acoustic simulation. I also had the opportunity to design a portable and lightweight beam degrader for the EEE Parts and Radiation team. With the help of Creo, I was able to make a CAD design and put together a small working prototype for the radiation team to demonstrate the capabilities that the beam degrader had. In addition to these projects, JSC allowed me to work closely on projects with other interns. I had the opportunity to help another intern with his acoustic diverter, intended to improve the sound quality in Node 1 of the ISS. During this project, I helped with some of the acoustic testing inside the anechoic chamber as well as helping record data during testing at the ISS mock up. During the course of my first tour, I was able to learn and continually improve on my CAD drafting skills. With each project I worked on, I acquired new ways to create and improve various designs with various constraints. Furthermore, I also had the opportunity to work with electrical engineers and learn about the electronic components that would provide control of the beam degrader functions. I was able to take the knowledge, skills and designs I had acquired during my tour at JSC (such as Finite Element Analysis) and apply them to my work on the Comsol Multiphysics software for acoustics simulation. I was also able to use it to do some stress analysis on a proposed design for a proposed Habitat structure. My time at JSC has been invaluable as it helped me grow and more fully-comprehend my major as well as spark an interest in acoustics and how much it relates to mechanical engineering. This internship has taught me that engineering is much more than a profession - it is embedded in our daily lives as a puzzle that requires critical thinking as an everyday challenge that makes life more interesting.

Lopez, Isaac↗

Overview of the MAST Upgrade physics programme: testing novel concepts at low aspect ratio to inform future devices

The research programme performed on the Mega Amp Spherical Tokamak (MAST) Upgrade experiment has made significant advances in developing the physics understanding of low aspect ratio tokamaks in support of the operation of ITER and design of fusion powerplants. High performance plasma scenarios have been developed to facilitate a broad programme of experiments, in which confinement is constrained by the presence of m/n = 2/1 modes that cause substantial losses of fast ions. The onset of these modes coincides with the q = 2 surface residing in a local minimum in the toroidal current density profile. The maximum electron temperature at the pedestal top, T e,ped is limited with gas fuelling to ∼350 eV to maintain regular ELMs; higher T e,ped results in a transition to a non-stationary ELM-free regime. The operational space of spherical tokamaks has been expanded into small and ELM-free regimes. Strong shaping of the last closed flux surface can induce a transition from large to small ELMs, and ELM suppression with resonant magnetic perturbations has been observed for the first time in a low aspect ratio tokamak. Negative triangularity shaping has induced a transition from ELMy H-mode to a high-performance L-mode regime for the first time in a low aspect ratio tokamak. In studies of fast ion confinement, losses of fast particles due to Global Alfvén Eigenmodes have been identified. Interactions between fast ions generated by off-axis neutral beam injection and thermal neutrals can result in significant losses of fast ions. Experiments with on- and off-axis neutral beam injection exhibit a flux pumping mechanism, where the central safety factor is held to ∼1 in the absence of sawteeth. In studies of pedestal physics, it has been found that elevated main chamber neutral pressures result in an increase in the electron density and reduction in the temperature at the pedestal top. Advances in understanding plasma exhaust include the integration of a high-performance plasma core with detached outer divertors in the X-point target configuration. A newly commissioned lower divertor cryopump reduces the lower divertor neutral pressure by up to 50%, with minimal effect on the main chamber or upper divertor. New measurements and SOLPS-ITER simulations emphasise the importance of plasma–neutral interactions on divertor detachment in the conditions accessible in experiments. Real-time control of the ionisation front location in both divertor chambers independently has been demonstrated in double null experiments, enabled by the tightly baffled divertor chambers.

MAST Upgrade↗

Calorimeter Heat Flux Trends in NASA’s Subscale Rotating Detonation Rocket Engine

A calorimeter-style rotating detonation rocket engine (RDRE) outer chamber body was designed, additively manufactured in GRCop-42, and hot-fire tested in test cell 105 at NASA Marshall Space Flight Center (MSFC) in Huntsville, AL in August 2024. Steady-state, spatially resolved heat flux and chamber pressure were measured at 13 and 9 locations from the injector face, respectively, for a variety of test conditions and hardware configurations with gaseous methane and oxygen propellants. The 2-in. diameter highly instrumented design, enabled by metal additive manufacturing (AM), allowed for simultaneous measurement of heat flux and chamber pressure through 44 long duration hot-fire tests without failure. Of the 44 tests, only 3 of the tests featured chamber pressures below 100 psia and are discussed in this work. Heat flux trends for this subscale hardware are explored with respect to local propellant mass flux for several different injectors, chamber lengths, and chamber “subsonic” area ratios (contraction ratios). Results show that for increasing chamber pressure, a reduced amount of energy per kilogram of propellant is transferred to the wall. Switching injectors affects the near-face heat flux and chamber pressure profiles. Chamber length does not noticeably affect the heat flux profile but increases bulk heat load. A subsonic area ratio greater than 1 reduces heat losses to the wall compared to a straight annulus case. Equivalence ratio shift did not significantly affect heat flux. Computational fluid dynamics (CFD) and conjugate heat transfer (CHT) analyses were performed to delineate 3-D heat transfer and coolant mass flow maldistribution effects and create a calorimeter transfer function to transform heat flux data and mitigate the profile distortions. Additional CFD/CHT simulations were performed using experimental data as boundary conditions to assess local nucleate boiling propensity during testing and to assess projected hot wall temperatures for future fatigue assessment. Vapor fractions were observed locally for several cases. It is anticipated that this effort will provide a common framework for coolant system design/analysis in calorimeter systems for rocket-based and air-breathing combustors, ensuring greater repeatability in calorimetry measurements across the research community.

Joseph Hernandez-McCloskey↗

Entry, Descent, and Landing With Propulsive Deceleration: Supersonic Retropropulsion Wind Tunnel Testing

The future exploration of the Solar System will require innovations in transportation and the use of entry, descent, and landing (EDL) systems at many planetary landing sites. The cost of space missions has always been prohibitive, and using the natural planetary and planet s moons atmosphere for entry, descent, and landing can reduce the cost, mass, and complexity of these missions. This paper will describe some of the EDL ideas for planetary entry and survey the overall technologies for EDL that may be attractive for future Solar System missions. Future EDL systems may include an inflatable decelerator for the initial atmospheric entry and an additional supersonic retro-propulsion (SRP) rocket system for the final soft landing. As part of those efforts, NASA began to conduct experiments to gather the experimental data to make informed decisions on the "best" EDL options. A model of a three engine retro-propulsion configuration with a 2.5 in. diameter sphere-cone aeroshell model was tested in the NASA Glenn 1- by 1-Foot Supersonic Wind Tunnel (SWT). The testing was conducted to identify potential blockage issues in the tunnel, and visualize the rocket flow and shock interactions during supersonic and hypersonic entry conditions. Earlier experimental testing of a 70 Viking-like (sphere-cone) aeroshell was conducted as a baseline for testing of a supersonic retro-propulsion system. This baseline testing defined the flow field around the aeroshell and from this comparative baseline data, retro-propulsion options will be assessed. Images and analyses from the SWT testing with 300- and 500-psia rocket engine chamber pressures are presented here. The rocket engine flow was simulated with a non-combusting flow of air.

Palaszewski, Bryan↗

Space Electronic Test Engineering

The Space Power and Propulsion Test Engineering Branch at NASA Glenn Research center has the important duty of controlling electronic test engineering services. These services include test planning and early assessment of Space projects, management and/or technical support required to safely and effectively prepare the article and facility for testing, operation of test facilities, and validation/delivery of data to customer. The Space Electronic Test Engineering Branch is assigned electronic test engineering responsibility for the GRC Space Simulation, Microgravity, Cryogenic, and Combustion Test Facilities. While working with the Space Power and Propulsion Test Engineering Branch I am working on several different assignments. My primary assignment deals with an electrical hardware unit known as Sunny Boy. Sunny Boy is a DC load Bank that is designed for solar arrays in which it is used to convert DC power form the solar arrays into AC power at 60 hertz to pump back into the electricity grid. However, there are some researchers who decided that they would like to use the Sunny Boy unit in a space simulation as a DC load bank for a space shuttle or even the International Space Station hardware. In order to do so I must create a communication link between a computer and the Sunny Boy unit so that I can preset a few of the limits (such power, set & constant voltage levels) that Sunny Boy will need to operate using the applied DC load. Apart from this assignment I am also working on a hi-tech circuit that I need to have built at a researcher s request. This is a high voltage analog to digital circuit that will be used to record data from space ion propulsion rocket booster tests. The problem that makes building this circuit so difficult is that it contains high voltage we must find a way to lower the voltage signal before the data is transferred into the computer to be read. The solution to this problem was to transport the signal using infrared light which will lower the voltage signal down low enough so that it is harmless to a computer. Along with my involvement in the Space Power and Propulsion Test Engineering Branch, I am obligated to assist all other members of the branch in their work. This will help me to strengthen and extend my knowledge of Electrical Engineering.

Chambers, Rodney D.↗

Light and Dark in Liquid Argon Time Projection Chamber Neutrino Detectors

Liquid Argon Time Projection Chamber (LArTPC) neutrino detectors have emerged as a detector technology poised to perform measurements of neutrino interactions with unprecedented precision and as a result answer some of the largest open questions in neutrino physics in the coming decade. This thesis describes methods developed to tackle the computational challenges faced as LArTPC detectors increase in scale and complexity moving towards the multi-kiloton DUNE detectors. These include a new, approximated, model that enables rapid simulation of scintillation light in very large scale detectors, as well as the first demonstration of running the LArSoft software framework on a high performance computer. The high precision of LArTPC detectors designed for next-generation neutrino measurements enables them to also search for Beyond the Standard Model physics produced in high-energy proton--fixed-target collisions in neutrino beams. This thesis presents searches for two dark-sector models performed with the ArgoNeuT experiment: Heavy Neutral Leptons and Heavy QCD Axions. Between them, these models can provide solutions for various unresolved puzzles including neutrino mass generation, the baryon asymmetry of the universe, dark matter and the strong CP problem. In both cases, the dark-sector particles could be produced in the NuMI neutrino beam and can then decay to a pair of oppositely charged muons observable in ArgoNeuT and the downstream MINOS near detector. Both measurements required the development of novel experimental selection techniques and enabled new constraints to be set on the existence of these particles in previously unexplored parameter-space. These searches are both the first of their kind in LArTPC neutrino detectors and pave the way for searches at future neutrino facilities.Date of Award31 Dec 2022Original languageEnglishAwarding InstitutionThe University of ManchesterSupervisorStefan Soldner-Rembold (Supervisor) & Justin Evans (Supervisor)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Development of a CO2 Test Capability in the NASA JSC ARCJet for Mars Reentry Simulation

The Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF) located at NASA Johnson Space Center is used for simulating the extreme environment experienced upon reentry for the development and certification of thermal protection systems (TPS). The facility supports a large variety of programs and was heavily leveraged for the certification and operational support of the TPS for the Orbiter and, more recently, the development of the heat shield for CEV. This paper will provide more detail into the heritage of the facility. Unique attributes of the facility include a modular aerodynamically stabilized arc heater and independently controlled O2 and N2 for the test gases. When combining the O2 and N2 in a 23:77 mass ratio respectively the Earth s atmosphere is accurately simulated and via modification of this ratio the investigation of the effects of atomic oxygen on a material s response is possible. In the summer of 2010 a development effort was started to add CO2 as a third independently controlled test gas such that, when combined with N2, opens up the possibility of accurately simulating a Martian reentry environment. This paper will discuss the test facility, especially the arc heater, in more detail. Initial testing involved relatively low concentrations of CO2 combined with N2 for the primary purpose of gathering data to answer two pressing safety concerns. The first being the rate of production of carbon monoxide (CO) within the ejector vacuum system. The main concern was that CO can be flammable and possibly explosive at high enough concentrations and pressures. The hazard control during the development phase involved the use of injecting N2 inside the test chamber diffuser to dilute and reduce the concentration of any and all CO present. A residual gas analyzer (RGA) was used to determine the relative amount of CO in the exhaust gas and provide a conversion rate of CO2 to CO. This paper will discuss in more detail the results of the RGA data and the calculated conversion rate. The second safety concern addressed is the possible formation of hydrogen cyanide (HCN) and cyanide (CN). HCN would primarily be present in the cooling water while the CN would most probably condense onto the interior surfaces of the test chamber. Water samples and wipes of the test chamber surfaces were analyzed by an industrial hygienist for the presence of HCN and CN. His paper will discuss these results in more detail. Throughout this development effort measurements of the CO2:N2 flowfield were made with heat flux and pressure probes and with laser induced fluorescence (LIF) of the atomic oxygen. This paper will discuss these results

DelPapa, Steven V.↗

EOS-AM1 Nickel Hydrogen Cell Interim Life Test Report

This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-l cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 13000 LEO cycles completed as of September 2, 1996. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 ampercs (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battely, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operating at +3 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements through the first 13,000 cycles, including: end of charge and discharge cell voltages and voltage gradients; end of chalge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all chalge parameters. The accelerated stress test battely has completed over 5900 cycles as of 9/11/96. This paper reports both battery performances as a function of cycle life, with individual cell performance comparisons repolted for selected cycles in both tests.

Bennett, C. W.↗

EOS--AM1 Nickel Hydrogen Cell Interim Life Test Report

This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell. 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three. 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operatina at +30 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements throuch the first 18,202 cycles, including: end of chargee and discharge cell voltages and voltace -radients; end of charge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11,998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery performances as a function of cycle life for both the real time LEO and the accelerated life test regimes.

Bennett, C. W.↗

EOS-AM1 Nickel Hydrogen Cell

This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missile and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of die tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18,202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operating at +30 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge mid discharge cell voltages and voltage gradients; end of charge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11,998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery perfortnances as a funcfion of cycle life for both the real-time LEO and the accelerated life test regimes.

Bennett, Charles W.↗

Performance and Thermal Characterization of the NASA-300MS 20 kW Hall Effect Thruster

NASA's Space Technology Mission Directorate is sponsoring the development of a high fidelity 15 kW-class long-life high performance Hall thruster for candidate NASA technology demonstration missions. An essential element of the development process is demonstration that incorporation of magnetic shielding on a 20 kW-class Hall thruster will yield significant improvements in the throughput capability of the thruster without any significant reduction in thruster performance. As such, NASA Glenn Research Center and the Jet Propulsion Laboratory collaborated on modifying the NASA-300M 20 kW Hall thruster to improve its propellant throughput capability. JPL and NASA Glenn researchers performed plasma numerical simulations with JPL's Hall2De and a commercially available magnetic modeling code that indicated significant enhancement in the throughput capability of the NASA-300M can be attained by modifying the thruster's magnetic circuit. This led to modifying the NASA-300M magnetic topology to a magnetically shielded topology. This paper presents performance evaluation results of the two NASA-300M magnetically shielded thruster configurations, designated 300MS and 300MS-2. The 300MS and 300MS-2 were operated at power levels between 2.5 and 20 kW at discharge voltages between 200 and 700 V. Discharge channel deposition from back-sputtered facility wall flux, and plasma potential and electron temperature measurements made on the inner and outer discharge channel surfaces confirmed that magnetic shielding was achieved. Peak total thrust efficiency of 64% and total specific impulse of 3,050 sec were demonstrated with the 300MS-2 at 20 kW. Thermal characterization results indicate that the boron nitride discharge chamber walls temperatures are approximately 100 C lower for the 300MS when compared to the NASA- 300M at the same thruster operating discharge power.

High power↗

Food Sanitation Device for Use in Microgravity

EDEN is a transportation/orbital habitat that carries large amounts of crew members, food, and supplies from Earth to Mars and back, but can also act as a permanent, simulated-1g-environment space station in Martian orbit. The focus of the project is to create a temporary, but long-term living environment that focuses on human health and food production. The project is composed of four major habitable parts (in addition to other major components). Moving from the center out, the first is a central core that acts as a hub that connects to the structural spokes, the main propulsion rockets and serves as a place for other spacecraft to dock onto, in addition to housing some of the basic station control, navigation and automated computer systems. The second set of parts are the spokes that connect the ring to the central core; these are the primary structural components with elevators in the middle carrying people from the ring to the core. The ‘lower’ portions, near the ring and it’s 1g environment, also act as storage centers. The third part is the 2-story outer ring This project served as an engineering senior design project at Temple University, and as part of NASA’s eXploration and Habitation (X-Hab) 2018 Academic Innovation Challenge. The goal of the project was to design, construct, and test a device which would be used in microgravity to sanitize produce. This is part of a NASA’s effort to grow and sanitize fresh produce on the International Space Station (ISS), in order to provide more nutritious meal options to the astronauts. Our team designed a 3-D printed spherical device with UV-C LEDs lining the interior. The designed device consists of an 8” spherical chamber, 10 UV-C LEDs, and a touchscreen user interface to control the device. Our design meets the project requirements by offering several features: a simple user interface, minimal crew time to operate, no waste produced, and the ability to sanitize multiple types of produce. The main reductions in Salmonella bacteria and Aspergillus Flavus mold were not verified. However, the aerobic plate count requirement was greatly exceeded and validated. Testing of the device resulted in visual results confirming significant decrease in E. coli activity with increased UV-C exposure, as well as quantitative results confirming significant reduction in CFU/g for the aerobic plate count. These reductions achieved from 1.464 x 10 7 to 2 x 10 4 CFU/g (2.86 log reduction) after 5 minutes, were significantly more than the requirements given by NASA ( of the craft, which holds all of the food production along with medical bays, a control center and a few parks. This ring also integrates the rigid keystone modules, which are the interface between the spokes, the expandable-construction portions of the ring and the habitation pods. The keystone modules also incorporate redundant, distributed ECLSS systems, medical storage, airlocks, and other integral station functions. The last parts are the habitation pods; these hold the sleeping quarters along with the bathrooms, showers, kitchen space and lounge areas. These expandable modules latch onto the keystone modules of the ring, which serves as a circulatory link between the different habitation pods.

Damien Gordon↗

EOS-AM1 Nickel Hydrogen Cell Interim Life Test Report

This paper reports the interim results Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64-minute charge (VT at 1,507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5 percent DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60 percent DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.90 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (minus 5 deg) cold plate. The entire assembly is located in a thermal chamber operating at plus 3 deg. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at plus 10 deg. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge and discharge cell voltages and voltage gradients; end of charge and discharge cells pressures; within cell and between cell temperature gradients dischare capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery performances as a function of cycle life for both the real-time LEO and the accelerated life test regimes.

Bennett, Charles W.↗

ELM–Wet: Inclusion of a Wet–Landunit With Sub–Grid Representation of Eco–Hydrological Patches and Hydrological Forcing Improves Methane Emission Estimations in the E3SM Land Model (ELM)

Wetlands are the largest emitters of biogenic methane (CH 4 ) and represent the highest source of uncertainty in global CH 4 budgets. Here, we aim to improve the realism of wetland representation in the U.S. Department of Energy's Exascale Earth System Model land surface model, ELM, thereby reducing uncertainty of CH 4 flux predictions. We develop an updated version, ELM-Wet, where we activate a separate landunit for wetlands that handles multiple wetland-specific eco-hydrological patch functional types. We introduce more realistic hydrological forcing through prescribing site-level constraints on surface water elevation, which allows resolving different sustained inundation depth for different patches, and if data exists, prescribing inundation depth. We modified the calculation of aerenchyma transport diffusivity based on observed conductance per leaf area for different vegetation types. We use Bayesian Optimization to parameterize CO 2 and CH 4 fluxes in the developed wet-landunit. Site-level simulations of a coastal non-tidal freshwater wetland in Louisiana were performed with the updated model. Eddy covariance observations of CO 2 and CH 4 fluxes from 2012 to 2013 were used to train the model and data from 2021 were used for validation. Patch-specific chamber flux observations and observations of CH 4 concentration profiles in the soil porewater from 2021 were used for evaluation of the model performance. Our results show that ELM-Wet reduces the model's CH 4 emission root mean squared error by up to 33% and is able to represent inter-daily CO 2 and CH 4 flux variability across the wetland's eco-hydrological patches, including during periods of extreme dry or wet conditions.

54 ENVIRONMENTAL SCIENCES↗

A pion-argon cross section measurement in the ProtoDUNE-SP experiment with cosmogenic muon

Neutrinos are tiny mysterious fundamental particles with small cross sections. Through neutrino physics, scientists across the world are trying to answer many intriguing questions about nature such as the dominance of matter over antimatter, CP violation in the lepton sector, number of supernovas in the early universe, etc. Detection of neutrinos requires massive particle detectors and intense neutrino beam owing to their small cross section. Deep Underground Neutrino Experiment (DUNE) is a next-generation neutrino experiment that is planned to start taking data beginning in 2026. DUNE will consist of 4 massive detectors, the first of which will be using single-phase liquid argon time projection chamber (LArTPC) technology. The ProtoDUNE-SP experiment is a prototype of the DUNE built at the CERN neutrino platform and uses the same detector technology that will be used in DUNE first module. The ProtoDUNE-SP experiment collected months of test beam and cosmic ray data beginning in September 2018. It was built to provide a testbed for the installation of detector parts for DUNE, showing long-term stability of the detector, understanding detector response for different test beam particles (including protons, pions, electrons, kaons, muons), and measurement of hadron-argon cross sections. When a particle passes through LArTPC electron-ion pairs are produced. To reconstruct the position and energy of a particle passing through the medium knowledge of ionization electron drift velocity is essential. The electron drift velocity is distorted by an excess positive charge built up in the detector, known as space charge. This study discusses a novel technique for measuring the ionization electron drift velocity using cosmic-ray muons. The technique uses tracks that travel the entire drift distance of the TPC for drift velocity determination. Secondly, the study discusses a method for converting the charge deposited into energy. The method is carried out in two step s. In th e first step detector response for energetic cosmic ray muons crossing the entire the TPC is used to make the charge deposition uniform throughout the TPC, and in the second step stopping cosmic-ray muons are used for determining the energy scale. Finally, the study discusses a pion-argon cross section measurement based on reweighting of Monte Carlo simulations using J. Calcutt's Geant4Reweight framework. Neutrinos cannot be directly detected; they are identified based on the interaction products. Pions are a common interaction product in a neutrino interaction. For precise modeling of neutrino event generators, it is essential to understand the pion-argon interaction. Pion-argon cross section measurement serves as an important input for neutrino interaction models. The results of the pion-argon total reaction cross section using the Geant4 reweighting technique are found to be in good agreement with Geant4 predictions. The many studies carried out in the ProtoDUNE-SP experi ment wil l be useful for current and future neutrino experiments using LArTPC technology including ICARUS, MicroBooNE, DUNE

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

NASA LSII Lunar Simulant Project

Introduction: America has entered a new era of exploration. NASA’s Artemis program will lead humanity forward to the Moon and prepare us for the next giant leap, the exploration of Mars [1]. To champion technologies needed to live on and explore the Moon, NASA’s Space Technology Mission Directorate (STMD) established the Lunar Surface Innovation Initiative (LSII)[2].LSII's technology development portfolio includes: Utilizing the Moon’s resources; Establishing sustainable surface power; Building machinery and electronics that work in extreme environments, like super-chilly permanently shadowed craters; Mitigating lunar dust; Carrying out surface excavation, manufacturing and construction duties; and Extreme access which includes navigating and exploring the surface/subsurface. To support the development and testing of these technologies, LSII created the lunar simulant project, to create and/or acquire low-, medium-and high-fidelity lunar simulants to match the needs of STMD projects at all levels of technology readiness levels (TRL), as well as other NASA programs. There is not one bulk lunar simulant that will satisfy the needs of all projects. NASA's Approach to Simulants: Just as LSII's activities are being implemented through a combination of unique NASA work and public-private partnerships, NASA will work with commercial simulant providers to acquire simulants that meet NASA's needs. If warranted, NASA will develop simulants using government agencies, as was done with the NASA/USGS Lunar Highlands Type (NU-LHT)series of lunar simulants [3].NASA is also collaborating with the Johns Hopkins University Applied Physics Laboratory(JHUAPL) Lunar Surface Innovation Consortium (LSIC) in the development and characterization of lunar simulants [4]. Within NASA, a small team (< 10 people) is coordinating simulant activities across the agency, with team members located at several NASA centers. The overall objective of the project is to procure lunar simulants in sufficient amounts for earth-based testing of subsystems and systems in a variety of environments (i.e., laboratory, high-bay, thermal-vacuum chambers), required for Artemis missions to the Moon, as well as other missions carrying NASA lunar payloads, such as the Commercial Lunar Payload Services (CLPS)program [5]. Lunar Highlands Simulant: NASA's Artemis Program is targeting the lunar south pole region for initial human missions and the Artemis Base Camp. Hence, the LSII lunar simulant project is currently focusing on the mineralogy and properties of lunar highlands regolith [6 and 7]. Plagioclase-rich rocks (e.g., anorthosite, norite) are the dominant constituent in highlands simulants, with Shawmere, Stillwater, and White Mountain anorthosites being used in commercially available simulants. However, because these feedstocks are terrestrial in nature, they include hydrated minerals, carbon-bearing minerals, and other chemical signatures that are not present on the Moon, and these minor mineral assemblages need to be taken into account when trying to understand test procedures and results. Glass Component: While much attention has been placed on the rock/mineral component of lunar simulants, glass is just as important when creating simulants. The glass component in lunar regoliths is often greater than 50% by volume [8]. This component includes impact melt glass, dark matrix breccias, and agglutinates. However, this component is difficult, time-consuming and expensive to make. Most lunar simulants, past and current, have relied on basaltic cinder as a feedstock for glass. Getting better glass components at a lower cost, particularly agglutinates and glass with an anorthositic composition is a near-term objective that the NASA simulant project is trying to address . Characterization: It is extremely important for lunar simulants to be characterized by several analytical methods. Gruener et al. [9] and JHUAPL LSIC [10] conducted initial assessments of some of the commercially available simulants in 2019 and early 2020, before the global pandemic. Further analyses are needed to better quantify important parameters such as, modal mineralogy and glass content, particle shape, and particle size distribution. These quantified results can then be used in determining figures of merit (FOM) that show how well simulants compare to lunar regolith [11 and 12].

J E Gruener↗

The effect of repeated altitude exposures on the incidence of decompression sickness

INTRODUCTION: Repeated altitude exposures in a single day occur during special operations parachute training, hypobaric chamber training, unpressurized flight, and extravehicular space activity. Inconsistent and contradictory information exists regarding the risk of decompression sickness (DCS) during such hypobaric exposures. HYPOTHESIS: We hypothesized that four short exposures to altitude with and without ground intervals would result in a lower incidence of DCS than a single exposure of equal duration. METHODS: The 32 subjects were exposed to 3 different hypobaric exposures--condition A: 2 h continuous exposure (control); condition B: four 30-min exposures with descent/ascent but no ground interval between the exposures; condition C: four 30-min exposures with descent/ascent and 60 min of ground interval breathing air between exposures. All exposures were to 25,000 ft with 100% oxygen breathing. Subjects were observed for symptoms of DCS, and precordial monitoring of venous gas emboli (VGE) was accomplished with a SONOS 1000 echo-imaging system. RESULTS: DCS occurred in 19 subjects during A (mean onset 70+/-29 min), 7 subjects in B (60+/-34 min), and 2 subjects in C (40+/-18 min). There was a significant difference in DCS incidence between B and A (p = 0.0015) and C and A (p = 0.0002), but no significant difference between B and C. There were 28 cases of VGE in A (mean onset 30+/-23 min), 21 in B (41+/-35 min), and 21 in C (41+/-32 min) with a significant onset curve difference between B and A and between C and A, but not between B and C. Exposure A resulted in four cases of serious respiratory/neurological symptoms, while B had one and C had none. All symptoms resolved during recompression to ground level. CONCLUSION: Data indicate that repeated simulated altitude exposures to 25,000 ft significantly reduce DCS and VGE incidence compared with a single continuous altitude exposure.

Non-NASA Center↗