At least 829 records · Page 46

FY24 progress report on A709 mechanical properties data development and A709 thermal aging status

The report provides the status of the creep, fatigue, and creep-fatigue testing to date conducted at Idaho National Laboratory to generate the data package. This data package evaluates the material performance from three commercial heats to support the Alloy 709 qualification in American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section III, Division 5. First procured heat was manufactured by G.O. Carlson with heat number 58776. Second and third heats were fabricated by ATI Specialty Rolled Products with heat numbers 529900 and 530843, respectively. A series of creep and cyclic specimens were fabricated from these three heats and tests were performed. A list of finished, ongoing, and planned test are presented for creep, fatigue, and creep-fatigue tests. Cyclic properties of three commercial heats are compared.

36 - MATERIALS SCIENCE↗

Gamma Spectrometry Code Rodeo for Uranium Enrichment—FY 2022 Report

In the first two quarters of FY22, data acquisition continued at ORNL and LLNL using uranium sources of known enrichments. This was an FY21 task which could not be completed in FY21 because of problems encountered with the ORNL M400 CZT in Q4 of FY21, and the subsequent repairs. The detector was received back from H3D in the first of September 2021 , and the measurements resumed . Measurements using the repaired detector were completed in Q1 of FY22. The spectra were distributed by ORNL to the analyzing labs. Analysis results were received in Q2 of FY2022. The results from the various codes were intercompared and an ANOVA analysis was performed. Random and systematic uncertainties were established for each code. The ANOVA results and discussions were included in a revised version of FY21Annual Report issued in March 2022. A paper was presented at the INMM 2022Annual Conference, with the analysis results from the various isotopic codes, and the ANOVA table with random and systematic uncertainties. The Project Work Plan (PWP) for FY22 included a task to perform field testing of the M400 CZT and the analysis codes using UF 6 cylinder measurements at the Framatome Fuel Fabrication Facility in Richland, WA. PNNL was the lead for the field testing task. PNNL drafted a Field Test Plan, and refined it based on comments received from the team. PNNL coordinated with Framatome facility, the logistics of carrying out the field testing . A collimator and shield made out of TFlex (tungsten impregnated polymer) was designed and professionally manufactured. The collimators were used in the field test measurements. The measurements at Framatome were completed on April 21, 2022. A total of 34 Type 30B cylinders were measured using three M400 detectors (PNNL, LLNL, and ORNL detectors). Measurements using M400 were taken at two locations on the side of each cylinder and from the end-on bottom location. Additionally, HPGe measurements were taken at the end-on location to establish ground truth. Cylinder wall thickness measurements were also made at all three locations. To gain a better understanding of the effect of background from surrounding cylinders, the same five cylinders measured individually in low background locations were measured again in the cylinder storage yards. Due to inclement weather, manufacturer delays, shipping delays, and equipment failure, the measurement campaign spanned twice as long compared to the original timeline. Gamma-ray spectra from M400 and HPGe detectors, along with the cylinder data and photographs were organized and shared with the collaborators for further analysis. Spectra were analyzed by the participating laboratories. FY22 PWP also consists of tasks related to plutonium source measurements, adapting the codes to analyze plutonium spectra, and inter-comparison of the results from various codes. Plutonium spectra are being acquired at LANL, ORNL, and LLNL. LANL, SNL and LLNL are in the process of modifying FRAM, GADRAS, and CZTU, respectively. The plutonium related tasks will be completed in Q2 of FY23.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Helicopter precision approach capability using the Global Positioning System

The period between 1 July and 31 December, 1992, was spent developing a research plan as well as a navigation system document and flight test plan to investigate helicopter precision approach capability using the Global Positioning System (GPS). In addition, all hardware and software required for the research was acquired, developed, installed, and verified on both the test aircraft and the ground-based reference station.

Kaufmann, David N.↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Testing↗

EVs@Scale NextGen Profiles: EVSE Characterization 2024

As part of the U.S. Department of Energy's EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High power charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. EVSE characterization was conducted over a wide range of DC output current and DC voltage charging for nominal and off-nominal test conditions. Test plans and procedures were developed and refined to define the test configurations and requirements, measurement parameters, and test procedures used throughout NextGen Profiles testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Full power level development of the Space Shuttle main engine

Development of the Space Shuttle main engine for nominal operation at full power level (109 percent rated power) is continuing in parallel with the successful flight testing of the Space Transportation System. Verification of changes made to the rated power level configuration currently being flown on the Orbiter Columbia is in progress and the certification testing of the full power level configuration has begun. The certification test plan includes the accumulation of 10,000 seconds on each of two engines by early 1983. Certification testing includes the simulation of nominal mission duty cycles as well as the two abort thrust profiles: abort to orbit and return to launch site. Several of the certification tests are conducted at 111 percent power to demonstrate additional safety margins. In addition to the flight test and development program results, future plans for life demonstration and engine uprating will be discussed.

Johnson, J. R.↗

WASTE LOADING ENHANCEMENTS FOR HANFORD LAW GLASSES VLS-10R1790-1 FINAL REPORT REV 0 12/1/2010

About 50 million gallons of high-level mixed waste is currently stored in underground tanks at The United States Department of Energy's (DOE's) Hanford site in the State of Washington. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will provide DOE's Office of River Protection (ORP) with a means of treating this waste by vitrification for subsequent disposal. The tank waste will be separated into low- and high-activity waste fractions, which will then be vitrified respectively into Immobilized Low Activity Waste (ILAW) and Immobilized High Level Waste (IHLW) products. The ILAW product will be disposed in an engineered facility on the Hanford site while the IHLW product will likely be directed to a national deep geological disposal facility for high-level nuclear waste. The ILAW and IHLW products must meet a variety of requirements with respect to protection of the environment before they can be accepted for disposal. The Office of River Protection is currently examining options to optimize the Low Activity Waste (LAW) Facility and LAW glass waste form. One option under evaluation is to enhance the waste processing rate of the vitrification plant currently under construction. It is likely that the capacity of the LAW vitrification plant can be increased incrementally by implementation of a variety of low-risk, high-probability changes, either separately or in combination. These changes include: (1) Operating at the higher processing rates demonstrated at the LAW pilot melter; (2) Increasing the glass pool surface area within the existing external melter envelope; (3) Increasing the glass waste loading; and (4) Operating the melter at a slightly higher temperature. The Vitreous State Laboratory (VSL) of The Catholic University of America (CUA) and Energy Solutions, Inc. have evaluated several of these potential incremental improvements for ORP in support of its evaluation of WTP LAW facility optimization. Some of these incremental improvements have been tested at VSL including increasing the waste loading, increasing the processing temperature, and increasing the fraction of the sulfur in the feed that is partitioned to the off-gas (in the event that a decision is made to break the present WTP recycle loop). These approaches successfully demonstrated increases in glass production rates and significant increases in sulfate incorporation at the nominal melter operating temperature of 1150 C and at slightly higher than nominal glass processing temperatures. Subsequent tests demonstrated further enhancement of glass formulations for all of the LAW waste envelopes, thereby reducing the amount of glass to be produced by the WTP for the same amount of waste processed. The next phase of testing determined the applicability of these improvements over the expected range of sodium and sulfur concentrations for Hanford LAW. This approach was subsequently applied to an even wider range of LAW wastes types, including those with high potassium concentration. The feasibility of formulating higher waste loading glasses using SnO{sub 2} and V{sub 2}O{sub 5} in place of Fe{sub 2}O{sub 3} and TiO{sub 2} as glass former additives was also evaluated. The present report provides data from investigation of the effects of magnesium content (up to {approx}10 wt%) on LAW glass properties and from work to identify improved high waste loading glass formulations that meets all processing and product quality requirements for two waste compositions. The scope of testing is detailed in the Test Plan for this work. A glass composition previously developed and tested at VSL for LAW from tank AN-105 (LAWA187) was varied by substituting Mg for other glass former additives such as Ca, B and Si in an attempt to formulate a glass with improved properties, such as higher waste loading and greater sulfur tolerance. The results were used to reformulate another glass (ORPLG9) developed for LAW from tank AP-101 that contains high concentrations of alkalis (Na and K). Glass formulation goals for this waste were to increase the sulfur tolerance of the glass as well as to decrease refractory corrosion. Each of the two final glass compositions was evaluated to determine the maximum amount of sulfur that can be incorporated into the glass through melter testing. The results from these tests together with earlier work for ORP were evaluated to develop recommendations for the work scope necessary to modify and update the WTP LAW glass formulation correlation algorithm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, Fabrication and Testing of a Superconducting Fault Current Limiter (SFCL)

The purpose of this project was to conduct R&D on specified components and provide technical design support to a SuperPower team developing a high temperature superconducting Fault Current Limiter (SFCL). ORNL teamed with SuperPower, Inc. on a Superconductivity Partnerships with Industry (SPI) proposal for the SFCL that was submitted to DOE and approved in FY 2003. A contract between DOE and SuperPower, Inc. was signed on July 14, 2003 to design, fabricate and test the SFCL. This device employs high temperature superconducting (HTS) elements and SuperPower's proprietary technology. The program goal was to demonstrate a device that will address a broad range of the utility applications and meet utility industry requirements. This DOE-sponsored Superconductivity Partnership with Industry project would positively impact electric power transmission reliability and security by introducing a new element in the grid that can significantly mitigate fault currents and provide lower cost solutions for grid protection. The project will conduct R&D on specified components and provide technical design support to a SuperPower-led team developing a SFCL as detailed in tasks 1-5 below. Note the SuperPower scope over the broad SPI project is much larger than that shown below which indicates only the SuperPower tasks that are complementary to the ORNL tasks. SuperPower is the Project Manager for the SFCL program, and is responsible for completion of the project on schedule and budget. The scope of work for ORNL is to provide R&D support for the SFCL in the following four broad areas: (1) Assist with high voltage subsystem R&D, design, fabrication and testing including characterization of the general dielectric performance of LN2 and component materials; (2) Consult on cryogenic subsystem R&D, design, fabrication and testing; (3) Participate in project conceptual and detailed design reviews; and (4) Guide commercialization by participation on the Technical Advisory Board (TAB). SuperPower's in-kind work for the SFCL will be provided in the following areas: (1) Work with ORNL to develop suitable test platforms for the evaluation of subsystems and components; (2) Provide cryogenic and high voltage subsystem designs for evaluation; (3) Lead the development of the test plans associated with the subsystem and components and participate in test programs at ORNL; and (4) Based on the test results, finalize the subsystem and component designs and incorporate into the respective SFCL prototypes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Vadose Zone Treatability Test of Uranium Reactive Gas Sequestration for the Hanford Central Plateau: Final Report

The uranium reactive gas sequestration (URGS) test described herein was conducted as an element of the Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau. The URGS technology was tested as a potential remedy to decrease the mobility of uranium in the vadose zone as a mechanism to protect groundwater. Information about URGS obtained from this test is intended for use in subsequent feasibility studies for Hanford Central Plateau waste sites with uranium contamination in the deep vadose zone.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Continuation Report: Creep-fatigue Behavior and Damage Accumulation of a Candidate Structural Material for Concentrating Solar Thermal Receiver

At the start of this phase, six alloys were determined to be candidate materials for the concentrating solar power (CSP) thermal receiver: Alloys 617, 625, 740H, 230, 282 and Alloy X. From these, Alloys 740H and 282 were determined to be the most suitable, with both alloys exhibiting similar high temperature strength properties. Alloy 740H was selected due to its ease to work with (simpler heat treatments and welding procedures) and a larger database of existing data. Fatigue testing was started in this phase, with four fatigue tests having been completed, with additional fatigue testing planned, as well as tensile, creep and creep-fatigue tests starting in the next phase. Two fatigue tests performed at 850 °C and were completed in significantly fewer cycles than the two tests performed at 750 °C. Metallography was performed on the fatigued specimens to examine crack path and surrounding microstructure. These preliminary results suggest a significant drop in strength at elevated temperatures above 750 °C, however, more test results will be needed prior to setting design limits. Several potential model high temperature design methods were evaluated that could form the basis of our final recommended creep-fatigue design method for Alloy 740H. To do this we expanded on the receiver finite element model to develop a model representative of a potential Gen 3 design using KCl-MgCl2 salt coolant and operating with a salt inlet temperature of 550°C and salt outlet temperature of 720°C. Using the temperature fields from the model thermohydraulic analysis we determined the design life of the reference receiver assuming it was constructed from 740H seamless tubing and assuming high temperature design properties for 740H from literature data and, where required, naïve extrapolation. As experimental data is generated, these tentative design parameters will be updated to match the actual performance of 740H in elevated temperature service. The results of this design study are a rank ordering of potential design methods for two criteria: ease of use and design margin. The end goal of this project is to develop a creep-fatigue design method with adequate, but not over conservative, design margin that is straightforward to execute. Our receiver model is based on the preliminary design provided to DOE by Solar Reserve. Our analysis indicates a peak metal temperature of around 840° C for this design (comparable to Solar Reserve’s analysis, which shows a peak metal temperature of around 830° C). The Solar Reserve tube thickness is too thin to sustain creep-fatigue loading at this temperature. This means that the current trial design is not well-suited for evaluating different design methodologies, as we predict it will have a very short design life. We suggest that we modify our reference design with input from DOE in order to lower the maximum metal temperature to less than 800° C. We can then repeat these analyses and give a more meaningful comparison of different design methods before making a final selection.

14 SOLAR ENERGY↗

Low Energy Photon Filter Box Optimization Study for the Gamma Irradiation Facility (GIF)

As a follow-up to results presented at the 16th International Symposium on Reactor Dosimetry, a new set of low energy photon filter box designs were evaluated for potential testing at the Gamma Irradiation Facility in Sandia National Laboratories' Technical Area V. The goal of this filter box design study is to produce the highest fidelity gamma ray test environment for electronic parts. Using Monte Carlo coupled photon/electron transport, approximately a dozen different designs were evaluated for the effectiveness in reducing the dose enhancement in a silicon sensor. The completion of this study provides the Radiation Metrology Laboratory staff with a starting point for experimental test plans that could lead to improvement in the gamma ray test environment at the Gamma Irradiation Facility.

61 RADIATION PROTECTION AND DOSIMETRY↗

STEP flight experiments Large Deployable Reflector (LDR) telescope

Flight testing plans for a large deployable infrared reflector telescope to be tested on a space platform are discussed. Subsystem parts, subassemblies, and whole assemblies are discussed. Assurance of operational deployability, rigidization, alignment, and serviceability will be sought.

Runge, F. C.↗

Ground Shake Test of the Boeing Model 360 Helicopter Airframe

Boeing Helicopters, together with other U.S. Helicopter manufacturers, is engaged in a finite element applications program designed to emplace in the U.S. a superior capability to utilize finite element analysis models in support of helicopter airframe structurel design. This program was given the acronym DAMVIBS (Design Analysis Methods for VIBrationS). The test plan is reviewed and results are presented for a shake test of the Boeing Model 360 helicopter. Results of the test will serve as the basis for validation of a finite element vibration model of the helicopter.

Reed, D. A.↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

New Global Ocean Color Sensor: OCI on PACE

- OCI will provide TOA radiances at ~1km spatial resolution, from 340nm (315nm?) to 2260nm, hyperspectral from 340nm to 890nm, 2 day global coverage - OCI will continue and enhance NASA’s earth system data records for ocean color (heritage sensors: SeaWiFS, MODIS, VIIRS) - OCI flight unit is close to being ready for testing (planned for March 2022 to September 2022) - OCI ETU (Engineering Test Unit) completed testing summer 2021, results look promising (see next presentation) - On-orbit calibration will combine successful trending approaches from previous sensors (2 solar diffusers, QVD, lunar gain trending, spectral trending) - New calibration approaches for OCI: large QVD, dim diffuser for linearity trending, lunar hysteresis trending - OCI will be characterized prelaunch with an ambitious goal of 0.5% relative uncertainty; absolute uncertainty will be about 2% (before vicarious calibration); expected on-orbit gain trending accuracy is 0.2% or better - More info on PACE and OCI can be found at https://pace.oceansciences.org/

radiometer↗

Chemical Challenge Tests on ISS Fire Cartridges

Following a confirmed combustion event onboard the International Space Station (ISS), crewmembers will don Emergency Masks, each fitted with 2 ISS fire cartridge filters. As the crewmember breathes through the filters, combustion products in the cabin air are either filtered or catalyzed by the fire cartridge media to minimize crew exposure to harmful levels of contaminants. Rigorous certification, acceptance, and surveillance programs for the fire cartridges ensure that each lot meets stringent performance requirements during the beginning of and throughout the service life of the cartridges. In accordance with the Quality/Acceptance Test Plan, multiple fire cartridges from each lot undergo chemical challenge tests, with each test lasting 2.5 hours and involving one or more chemicals at specified concentrations. These tests are conducted at specific temperatures, humidity levels, and gas flow rates intended to mimic the worst-case conditions for fire cartridge performance. These challenge tests are conducted by the Environmental Chemistry Laboratory at the NASA Lyndon B. Johnson Space Center. The majority of the challenge tests focus on carbon monoxide (CO), but other gases include hydrogen cyanide (HCN), hydrogen chloride (HCl), cyclohexane, acrolein, and acetaldehyde. A fire cartridge is exposed to the test gas in a test chamber at the specified conditions and the outlet is monitored for breakthrough during the 2.5-hour test. This paper will briefly introduce fire cartridges and how they work, then discuss details of the challenge gas delivery and exposure system, breakthrough monitoring methods, and discussion of issues that have arisen during the course of the test program. Although the focus of this paper will be on the conduction of the challenge tests, a general summary of the performance of the fire cartridges will be provided.

Fire Cartridge↗

Chemical Challenge Tests on ISS Fire Cartridges

Following a confirmed combustion event onboard the International Space Station (ISS), crew members will don Emergency Masks, each fitted with 2 ISS fire cartridge filters. As the crew member breathes through the filters, combustion products in the cabin air are either filtered or catalyzed by the fire cartridge media to minimize crew exposure to harmful levels of contaminants. Rigorous certification, acceptance, and surveillance programs for the fire cartridges ensure that each lot meets stringent performance requirements throughout the service life of the cartridges. In accordance with the Quality/Acceptance Test Plan, multiple fire cartridges from each lot undergo chemical challenge tests involving one or more chemicals at specified concentrations. These tests are conducted at specific temperatures, humidity levels, and gas flow rates intended to mimic the worst-case conditions for fire cartridge performance. These challenge tests are conducted by the Environmental Chemistry- Laboratory at the NASA Lyndon B. Johnson Space Center. Many of the challenge tests focus on carbon monoxide (CO), but other gases include hydrogen cyanide (HCN), hydrogen chloride (HCl), cyclohexane, acrolein, ammonia (NH3), and acetaldehyde. A fire cartridge is exposed to the test gas in a chamber at the specified conditions, and the outlet is monitored for breakthrough during the 2.5-hour test. This paper will briefly introduce fire cartridges and how they work and will then discuss details of the challenge gas delivery and exposure system, breakthrough monitoring methods, and discussion of issues that have arisen during the course of the test program. Although the focus of this paper will be on the challenge tests, a general summary of the performance of the fire cartridges will also be provided.

Cristina M. Muko↗