Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASTE PROCESSING PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Development of a Testbed for Pipeline Flushing - 19409

Pipelines which carry radioactive waste within the DOE complex should be properly flushed, particularly in the cases where stationary or moving beds of solid sediment occur, or lines are prone to hydrogen gas buildup. Present guidelines establish a minimum for the amount of water used for post-transfer flushing operations to achieve satisfactory cleaning of pipelines. However, further studies are needed to limit the amount of water used for flushing operations, thus minimizing the consequent downstream waste. These efforts are significantly helpful to DOE waste remediation sites by preserving tank storage, preventing additional waste processing, and minimizing dilution and changes in waste chemistry. An experimental pipe loop designed for study of non-Newtonian slurry flushing is currently being developed at the Florida International University (FIU). The testbed is designed to investigate parameters that effect the efficiency of flushing operations. The objective is to find flush velocity values/modes which lead to satisfactory cleaning of transport lines with a minimum amount of water usage. The developed methodologies will be streamlined according to the demands from both Hanford and Savannah River sites. A test matrix containing parameters such as pipeline length, flow rate, and simulant composition (solid concentration, rheology, particle size and density) has been developed. In the initial phase of testing, material composition and loop length will be fixed to a mixture of 17 wt% kaolin in water (to attain density, viscosity, and yield stress in the applicable range to operations at Savannah River and Hanford sites) and 165 feet, respectively. This matrix provides a parametric study on the flush velocity. Prescribed velocities in this test matrix comply with the maximum and minimum recommended flush velocity values by the flushing guidelines for Hanford waste (RPP-RPT-59600, Rev. 0, SRNL-STI-2015-00014, TFC-ENG-STD-26, REV C-1). Efforts will focus on creating repeatable sediment beds inside the pipeline in both fully-flooded and gravity-drained systems. Bed characterization (i.e., measurement of sediment height, solids concentration, and rheology) will be conducted to ensure consistency of initial conditions between tests. A combination of Pulse-Echo technique, Coriolis meter, and optical inspections will be used to accomplish initial bed characterization (ensuring consistency between tests), control/monitor density variations (initial bed creation, flush velocity control, and post-flush evaluations), and serve as reference (validation of PulseEcho and pipe surface cleanness evaluation), respectively. This paper will present the details of the development of the test loop and the test matrix. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Comprehensive and Centralized Waste Management System - 19412

Information Systems Laboratories (ISL) has designed a new single, integrated, waste management and control system to administer all aspects of nuclear waste management. The overriding goal of the initiative is to provide federal, state, and local agencies with operational awareness, management, and programmatic support for all functions related to nuclear waste management. Over decades of waste management federal agencies have sponsored or directly paid for the development, operation, and control of multiple systems to track and control its waste - with varied success. Multiple contractors have generated disparate control systems/databases and literally mountains of data. Past approaches have not provided a single, integrated, real time data management system. ISL's analysis of past failed efforts has reveal four common symptoms: - Control/management systems that are not compatible; - Programmatic costs that increase with systems use and re-work; - Systems focused on specific sets of data; - Inaccurate or outdated data sets. An integrated waste management and control system that collects and displays real-time, accurate inventory, waste container certification, transportation certification, emplacement, and shipment related data improve operational awareness and overcomes these limitations. Using its vast knowledge and experience in developing numerous waste tracking and management systems, ISL has leveraged its own in-house knowledge and gathered requests from stakeholders all across the industry to design a system that meets the needs of users at all levels of the nuclear waste management process. Using the highly successful and widely used Waste Data System (WDS) designed for the Waste Isolation Pilot Plant as a core component, ISL has designed a system that greatly expands on the functionality of the WDS to exceed its current focus of management of Transuranic Waste shipments. The new system is designed to provide the ability to track a wide range of waste types from Transuranic, High Level, Low Level, Mixed, and any nuclear related material. The main focus of the system is to provide federal regulators a comprehensive and real-time oversight into the handling of all nuclear waste materials. Oversight activities include, but are not limited to, strategy development, projections, metrics, incentive development, tracking, budget review, government cost estimating, and integrated schedules. The major components of the system are summarized below: - The Centralized Waste Management System (CWMS), which will include assimilating and validating known sources of data into the CWMS. - The programmatic reporting support component, which will handle queries from regulators, track compliance with regulatory requirements, and maintain the dashboard for federal management. - Both the CWMS and the programmatic reporting support component will use a standard set of business rules that govern system operations and allow site and program specific needs and limits for all waste programs and types to be captured and maintained. This presentation will provide details of each component of the system detailing its use, interfaces with other components, and value to stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Basis Development for the Tank Closure Cesium Removal (TCCR) Demonstration - 19596

The Tank Closure Cesium Removal (TCCR) system has been installed at Savannah River Site (SRS) to supplement the existing salt waste treatment facilities. The TCCR system is intended to demonstrate the capability of ion exchange (IX) technology to remove Cs-137 from high level liquid waste. Separation is performed by Crystalline Silicotitanate (CST) IX media. The media is stored in shielded columns within a small enclosure. Following processing in the TCCR system, decontaminated waste can receive further treatment and be dispositioned at other SRS facilities. The Cesium-laden columns will instead be removed from the enclosure and transported to another location on site for interim storage. Developing the safety basis for the TCCR system and integrating it into the documented safety analysis for existing facilities presented a unique challenge. Most notably, utilizing new methodologies to analyze new hazards resulted in unexpectedly high consequences. The TCCR system therefore required more rigorous controls than had initially been anticipated. However, the integrated control set developed for the TCCR system should have little impact on its operating capabilities and will allow it to begin operating in 2019. This may lay the foundations for future utilization of similar systems at SRS and across the Department of Energy complex. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site High Level Radioactive Waste Tank Sample Thermolytic Hydrogen Generation - 20346

To support the revision of flammability calculations and controls for the Savannah River Site (SRS) High-Level Radioactive Waste (HLW) tanks, Savannah River National Laboratory (SRNL) conducted laboratory measurements with the goal of quantifying hydrogen produced in HLW by non-radiolytic chemical reactions (i.e., thermolysis). Testing was performed with HLW tank supernate samples that represented a cross section of types of waste at SRS, including tanks that store typical evaporator concentrate, dissolved salt-cake, dilute recycle stream from the Defense Waste Processing Facility (DWPF), evaporator concentrate of the recycle stream from DWPF, fresh waste from the canyon separations facility, and waste that has been through salt processing cesium removal. Non-radioactive simulant testing included the classes of organic compounds historically introduced into the HLW tanks that were recently shown to be the most active toward the thermolytic generation of hydrogen. The reaction rate equations developed for thermolytic hydrogen generation from each class of organic compound showed direct proportionality to organic compound concentration and hydroxide concentration. Simulant testing identified that highly concentrated waste with high hydroxide concentration had the highest rates of thermolytic hydrogen generation. Using the radioactive tank sample thermolysis measurements at high temperatures and the mechanistic salt dependence of the simulant models, a global model was developed for tank waste thermolytic hydrogen generation as a function of total organic carbon content of SRS HLW. Through the primary functionality of the global model (organic carbon and free hydroxide concentration), the relative reactivity of the organic carbon in the waste was quantified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of high level nuclear waste glass samples following extended melter idling

The Savannah River Site Defense Waste Processing Facility (DWPF) melter was recently idled with glass remaining in the melt pool and riser for approximately three months. This situation presented a unique opportunity to collect and analyze glass samples since outages of this duration are uncommon. The objective of this study was to obtain insight into the potential for crystal formation in the glass resulting from an extended idling period. The results will be used to support development of a crystal-tolerant approach for operation of the high-level waste melter at the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Two glass pour stream samples were collected from DWPF when the melter was restarted after idling for three months. The samples did not contain crystallization that was detectible by X-ray diffraction. Electron microscopy identified occasional spinel and noble metal crystals of no practical significance. Occasional platinum particles were observed by microscopy as an artifact of the sample collection method. Reduction/oxidation measurements showed that the pour stream glasses were fully oxidized, which was expected after the extended idling period. Chemical analysis of the pour stream glasses revealed slight differences in the concentrations of some oxides relative to analyses of the melter feed composition prior to the idling period. While these differences may be within the analytical error of the laboratories, the trends indicate that there may have been some amount of volatility associated with some of the glass components, and that there may have been interaction of the glass with the refractory components of the melter. These changes in composition, although small, can be attributed to the idling of the melter for an extended period. The changes in glass composition resulted in a 70-100 °C increase in the predicted spinel liquidus temperature (TL) for the pour stream glass samples relative to the analysis of the melter feed prior to the outage. This indicates that the potential for spinel crystallization increased as a result of idling for an extended period. However, the predicted TL of the pour stream glasses remained 150-200 °C below the mean melt pool temperature of about 1125 °C during the idling period. Given the change in predicted TL over the three month outage, the results indicate that it is important to have a thorough understanding of spinel crystallization within the melter for WTP to operate with a volume percent crystallization constraint. This knowledge will enable process control routines to be developed that avoid bulk crystallization in the melter and allow for recovery from off-normal events. The current WTP crystal-tolerant glass program will develop an improved understanding of spinel crystallization in the WTP melter to allow for operation at maximum waste loading in glass composition systems limited by predictions of spinel crystallization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Numerical comparison of bubbling in a waste glass melter

Radioactive tank waste is scheduled for vitrification at the Hanford Tank Waste Treatment and Immobilization Plant, also known as the Vit Plant, being constructed at the Hanford Site. Testing of the pilot-scale, joule-heated DuraMelter 1200 at the Vitreous State Laboratory has shown that bubbling increases the melt rate, and as a result, melter throughput. Computational fluid dynamics (CFD) models of this pilot-scale waste glass melter were developed to improve our understanding of the processes that occur within the melter to aid in process optimization and troubleshooting of the Vit Plant melters. Unfortunately, model validation is complicated by the difficulty of obtaining suitable experimental data for operational melters attributed to the large-scale, radioactivity and high temperatures at which these melters are operated. This study focuses on confirming the fidelity of the CFD models to accurately reproduce the bubbling behavior. Because of the paucity of experimental data at the resolution required for CFD validation, a code-to-code comparison was used to evaluate two common approaches for simulating flows of immiscible fluids on numerical grids and resolving multiphase interfaces. Here, the volume of fluid and level set methods are used to track the dynamically evolving interfaces between the molten glass and the air bubbles. To aid in the verification of the results of these codes, a comparison of the bubble behavior, growth, and frequency of bubble generation are presented and a grid convergence study is performed for the two approaches. In addition to comparing the numerical results to available experimental data and observations from pilot-scale testing, the results are evaluated in relation to laboratory experiments with bubbles injected into viscous fluids, empirical correlations obtained from the published literature, and the basic laws of fluid dynamics. Furthermore, the results of this work can assist in validating waste glass melter models and provide a better understanding of the flow patterns within the WTP melters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sources and processing of CELSS wastes

The production rate and solid content of waste streams found in a life support system for a space habitat (in which plants are grown for food) are discussed. Two recycling scenarios, derived from qualitative considerations as opposed to quantitative mass and energy balances, tradeoff studies, etc., are presented; they reflect differing emphases on and responses to the waste stream formation rates and their composition, as well as indicate the required products from waste treatment that are needed in a life support system. The data presented demonstrate the magnitude of the challenge to developing a life support system for a space habitat requiring a high degree of closure.

Wydeven, T.↗

Use of Automation in Low Level Waste Storage and Management - 19227

The Australian Nuclear Science and Technology Organisation (ANSTO) generates Low Level Waste (LLW) and Intermediate Level Waste (ILW) from various site operations such as the operation of a research Reactor and the manufacture of Molybdenum 99. The Low Level Solid Waste (LLSW) generated is stored at ANSTO before and after conditioning. The current process flow involves the storage of LLSW waste before conditioning on racks, handled using forklifts. When the unconditioned waste is ready for conditioning, it is transferred to another facility, where volume reduction and packaging is carried out. Once conditioned, the waste is placed in further storage, pending dispatch to the proposed Australian National Radioactive Waste Management Facility (NRWMF). A new purpose built facility has been constructed, adjacent to the LLSW processing facility, for the storage and management of LLSW in both unconditioned and conditioned forms. This new facility will streamline the waste management process and significantly enhance the safety and efficiency of the process. In line with international best practises, the new facility utilises automation solutions to minimise the build footprint, and minimise the use of forklifts and other mobile plant. Most importantly, it applies the principle of ALARA (As Low as Reasonably Achievable) to minimise operator activities in areas where radioactive material is stored and eliminates double handling of the waste. The automation for unconditioned waste utilises an Automated Storage and Retrieval System (ASRS), a vertical stacker crane within high density racking, to provide easy storage and retrieval for processing and/or routine inspections. This system allows operators to control it from outside of the storage area whilst utilising integrated software that allows for the required tracking of the unconditioned waste. From the ASRS storage area, unconditioned waste will have a smooth transition to the processing facility which is located adjacent to the ASRS system. Once conditioned, the waste is catalogued and returned to a designated storage area within the new facility using an automated building gantry crane with a target delivery system to eliminate the need for operators in the main storage bay. The waste will be held here in preparation for dispatch to the future repository. The utilisation of the ASRS for the purpose of storing LLSW is an innovative use of automation that will eliminate operators from active areas, reduce dose rates received and integrate with the waste tracking software. Furthermore, the system has significant advantages with operational efficiencies increased, reduced double handling of nuclear waste and maximum use of building footprint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of chemistry on Standard High Solids Vessel Design mixing

The plan for resolving technical issues regarding mixing performance within vessels of the Hanford Waste Treatment Plant Pretreatment Facility directs a chemical impact study to be performed. The vessels involved are those that will process higher (e.g., 5 wt % or more) concentrations of solids. The mixing equipment design for these vessels includes both pulse jet mixers (PJM) and air spargers. This study assesses the impact of feed chemistry on the effectiveness of PJM mixing in the Standard High Solids Vessel Design (SHSVD). The overall purpose of this study is to complement the Properties that Matter document in helping to establish an acceptable physical simulant for full-scale testing. The specific objectives for this study are (1) to identify the relevant properties and behavior of the in-process tank waste that control the performance of the system being tested, (2) to assess the solubility limits of key components that are likely to precipitate or crystallize due to PJM and sparger interaction with the waste feeds, (3) to evaluate the impact of waste chemistry on rheology and agglomeration, (4) to assess the impact of temperature on rheology and agglomeration, (5) to assess the impact of organic compounds on PJM mixing, and (6) to provide the technical basis for using a physical-rheological simulant rather than a physical-rheological-chemical simulant for full-scale vessel testing. Among the conclusions reached are the following: The primary impact of precipitation or crystallization of salts due to interactions between PJMs or spargers and waste feeds is to increase the insoluble solids concentration in the slurries, which will increase the slurry yield stress. Slurry yield stress is a function of pH, ionic strength, insoluble solids concentration, and particle size. Ionic strength and chemical composition can affect particle size. Changes in temperature can affect SHSVD mixing through its effect on properties such as viscosity, yield stress, solubility, and vapor pressure, or chemical reactions that occur at high temperatures. Organic compounds will affect SHSVD mixing through their effect on properties such as rheology, particle agglomeration/size, particle density, and particle concentration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of Hanford Tank Waste 241-AP-105 in a Continuous Laboratory-Scale Melter

Low-activity waste (LAW) stored in underground tanks on the Hanford site in Washington State is planned to be filtered for solids removal and processed through ion exchange columns for cesium removal at the Low-Activity Waste Pretreatment System facility. These pretreatment steps will allow the waste to be transferred to the Hanford Tank Waste Treatment and Immobilization Plant LAW facility for immobilization into glass. The liquid waste will be combined with glass-forming chemicals (GFCs) to form a waste feed slurry that can be fed to electric melters for vitrification. The process of continuously converting the aqueous feed slurry into a melt is dynamic and includes multiple reactions, degassing, and dissolution processes that depend on heat from the melt below. In this conversion process, waste components are partitioned into one of two streams: glass and off-gas. Processing information and chemical information associated with these waste product streams has been requested by Washington River Protection Solutions for actual tank waste from tank 241-AP-105 (referred to as AP-105). To acquire this type of information, a small-scale melter system was desired that would not require high volumes of input waste or the large resource commitment of a full-scale melter system, while also providing dynamic information that would be difficult to determine from batch reactions in a crucible system. A continuous laboratory-scale melter (CLSM), has been designed to operate with a continuous feeding process, while periodically pouring glass product and collecting off-gas. The CLSM vessel has been sized to collect the relevant process and chemical information from obtainable volumes of AP-105 waste samples. Two CLSMs were constructed: one in a non-radioactive environment for processing waste simulants and another in a fume hood capable of handling radioactive material for processing actual Hanford tank waste. This dual-system setup allowed for comparison between simulated and real tank waste with essentially identical test equipment. AP-105 waste simulant was first tested in the non-radioactive CLSM to determine the processability and desired operating window for the actual tank waste. Rhenium (Re) was added to the simulant to act as a surrogate for technetium-99 ( 99 Tc), a key waste component found in the actual tank waste. The partitioning of Re into the glass and off-gas products during the continuous feeding of simulant was determined, which allowed the Re retention, the mass flow rate of Re out of the CLSM via the glass product with respect to the mass flow rate of Re into the CLSM via the feed slurry, to be calculated. Key processing results and the average Re retention, from the CLSM test run with AP-105 simulant feed slurry are shown in Table ES.1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Roadmap for Deployment of Modularized Hydrothermal Liquefaction: Understanding the Impacts of Industry Learning, Optimal Plant Scale, and Delivery Costs on Biofuel Pricing

Hydrothermal liquefaction (HTL) is a promising technology for converting abundant organic wastes into fuels. Previous techno-economic analyses (TEAs) of HTL have been used to estimate the minimum fuel selling price (MFSP) of biofuel products, but these analyses often assume a bespoke plant design where each plant operates under unique process conditions and neglect transportation costs. However, transportation costs must be included in realistic TEAs, and further, a mass-produced fixed-scale modular plant design approach may be more effective than case-by-case plant design, provided that there is sufficient market capacity to benefit from modularization. This study estimates fuel price behavior in the presence of transportation costs and benefits stemming from modular plant design. This analysis indicates that a modular process capable of handling 60 dry tons per day (DTPD) is optimal, resulting in a ~25% reduction in MFSP (from $4.70/GGE, fully upgraded) at complete market feedstock utilization compared with case-by-case design. The associated cost reductions are attributable to learning benefits and modularization. Several HTL deployment “roadmaps” are then explored, with each roadmap consisting of different periods of case-by-case design followed by adoption of a modularized approach. A period of nonmodular industry growth up to market saturation of ~7% followed by implementation of modular plant design strikes a balance between the investment risk and learned cost reductions associated with modular plant design. However, if bespoke plants built during this period of nonmodular growth saturate more than 23% of available feedstock, learned cost reductions are significantly diminished. Here, this study points to the potential benefits of modularized and decentralized waste-to-energy processes when the modularization follows an optimal deployment strategy.

09 BIOMASS FUELS↗

Current Status of Decommissioning Plans and Chemical Decontamination of Metal Scraps in Chinshan NPP - 19304

The decommissioning of nuclear facilities has become a significantly attractive and worldwide topic due to the end of lifetime of many nuclear power plants within next coming years. In Taiwan, Chinshan nuclear power plant owned by the Taiwan Power Company will be the first candidate to be decommissioned according to the Nuclear Reactor Facilities Regulation Act. The Chinshan nuclear power plant located in New Taipei City has two units of 636 MWe boiling water reactors (BWRs) for the generation of 9 billion kWh of electricity per year. The date of cessation of operation of Unit No. 1 and Unit No. 2 will be December in 2018 and July in 2019, respectively. Based on the Regulations for the Review and Approval of Applications for a Decommissioning Permit of Nuclear Reactor Facilities, Taiwan Power Company have submitted a decommissioning plan of Chinshan nuclear power plant to the authority, Atomic Energy Council (AEC). After the review process, the decommissioning plan of Chinshan nuclear power plant has been permitted by AEC in 2017. Decontamination is generally utilized during the period of decommissioning of nuclear facility in order to minimize the radiation exposure of personnel and the cost of management of radioactive wastes. The successful decontamination also probably provides the benefits of lowering the level of radioactive wastes, facilitating potential releases, permitting the reuse of metals and facilitating the radiation principle of As Low As Reasonably Achievable (ALARA) management. Decontamination aims at the removal of radioactive materials from the contaminated surfaces by several technologies such as washing, heating, chemical reaction and mechanical process. The selection of proper decontamination technologies are depended on the requirement of the target materials and the purpose of the decontamination. Chemical decontamination has been proven to be an effective in reducing the radioactivity for metallic materials by using chemical reagents in contact with the contaminated surfaces. During the operation of Chinshan nuclear power plant, chemical decontamination was performed for Unit No.1 and No.2 in 2000 to decontaminate the Reactor Recirculation System (RRS) and Reactor Water Clean-up Systems (RWCU) by using LOMI-NP-LOMI process. Based on the previous experience of chemical decontamination, the dismantled metallic piping is provided as sample by Chinshan nuclear power plant for the evaluation of the feasibility of chemical decontamination. The provided metallic sample is composed of carbon steel with dose rate around 0.2 mSv/hr. In this report, a multistep decontamination process using strongly oxidizing solution and organic acid solution is performed to remove the contaminated oxide layer from the metal surface, and the resulting contact dose rate and decontamination factor (DF) are also shown to discuss the performance in relation to the process control factors. In this paper, the recent progress in decommissioning programs and preliminary results of the decontamination experiment are described to provide usable information regarding the future decommissioning for Chinshan nuclear power plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Central Plateau Cleanup at DOE's Hanford Site - 12504

The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all other unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring wells. As a companion to the Hanford Site Cleanup Completion Framework document, DOE issued its draft Central Plateau Cleanup Completion Strategy in September 2009 to provide an outline of DOE's vision for completion of cleanup activities across the Central Plateau. As major elements of the Hanford cleanup along the Columbia River Corridor near completion, DOE believed it appropriate to articulate the agency vision for the remainder of the cleanup mission. The Central Plateau Cleanup Completion Strategy and the Hanford Site Cleanup Completion Framework were provided to the regulatory community, the Tribal Nations, political leaders, the public, and Hanford stakeholders to promote dialogue on Hanford's future. The Central Plateau Cleanup Completion Strategy describes DOE's vision for completion of Central Plateau cleanup and outlines the decisions needed to achieve the vision. The Central Plateau strategy involves steps to: (1) contain and remediate contaminated groundwater, (2) implement a geographic cleanup approach that guides remedy selection from a plateau-wide perspective, (3) evaluate and deploy viable treatment methods for deep vadose contamination to provide long-term protection of the groundwater, and (4) conduct essential waste management operations in coordination with cleanup actions. The strategy will also help optimize Central Plateau readiness to use funding when it is available upon completion of River Corridor cleanup projects. One aspect of the Central Plateau strategy is to put in place the process to identify the final footprint for permanent waste management and containment of residual contamination within the 20-square-mile Industrial-Exclusive Area. The final footprint identified for permanent waste management and containment of residual contamination should be as small as practical and remain under federal ownership and control for as long as a potential hazard exists. Outside the final footprint, the remainder of the Central Plateau will be available for other uses consistent with the Hanford Comprehensive Land-Use Plan (DOE 1999), while maintained under federal ownership and control. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synroc Waste Treatment Facility for Fission-based Molybdenum-99 Production - 19335

ANSTO is building a nuclear waste treatment plant that represents a significant step change in the treatment of intermediate-level waste (ILW) from Molybdenum-99 nuclear medicine production. This industrial scale facility shall deploy ANSTO Synroc technologies; a wasteform tailored for immobilizing fission products, an integrated process line for converting liquid waste into free-flowing powder, automated canister filling and sealing, and a hot isostatic pressing (HIP) system designed for remote operation. The HIP represents the last processing step to consolidate the wasteform into a final durable solid compact with the required performance characteristics. This paper shall outline the various phases of development in realising the final plant design as well as timelines to progress through cold- and hot-commissioning. Further, plans for storage and final disposal of the HIPed canister product will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proven Technologies for the Solidification of Complex Liquid Radioactive Waste (LRW): Global Case Studies of Applications and Disposal Options - 20424

Legacy radioactive waste streams from the Cold War still exist and newly generated waste streams from nuclear power plants and research institutes go untreated and expose environmental hazards at many nuclear sites. The nature of the waste is diverse, depending upon the source or the process from which it originated. The most problematic waste streams include complex liquids such as organic (tri-butyl-phosphate TBP) solutions contaminated with Pu and U isotopes, mixed sludge types, high acid radioactive waste, H-3 contaminated organic and aqueous streams, etc. Technological, environmental and economic challenges exist for the treatment and disposal of such waste streams. A proven technology that has been applied to LRW on a global basis provides one option as a low-cost solution to legacy streams and small volume, highly complex LRW frequently found during decommissioning at nuclear power plants and weapons sites. The engineered polymer technology from Nochar, USA, is capable of solidifying standard and highly complex LLW and ILW waste streams for interim or final storage, or for incineration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WTP Modifications to Support DFLAW: LAW, BOF, Lab - 16219

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind nuclear waste treatment facility being designed and constructed for the U.S. Department of Energy by Bechtel National, Inc. and principal subcontractor URS to process and vitrify radioactive waste stored in underground tanks at the Hanford Site. The Tank Operations Contractor, Washington River Protection Solutions, has responsibility to retrieve, stage, pretreat, and deliver the tank waste feed to WTP. To treat tank waste as soon as practicable, a scenario is being considered to deliver pretreated feed straight to WTP's Low-Activity Waste (LAW) Vitrification Facility. This scenario is called the Direct Feed LAW (DFLAW) program. Balance of Facility utility and system facilities are designed for full WTP operation. Thirteen of these are needed to support reduced throughput during DFLAW operation, of which eight require moderate to extensive changes. Extensive changes include permanent plant modifications that allow DFLAW to operate if the Pretreatment (PT) Facility is unavailable. Under full WTP operation, effluents from the LAW Facility will be returned to the PT Facility for further processing and/or transfer to the Liquid Effluent Retention Facility/Effluent Treatment Facility. The PT Facility also handles all flush water from the tank farm transfers. To address these requirements, a Value Improvement Project was performed. The recommended approach is to provide a 'split stream' Effluent Management Facility (EMF) with an evaporator to support DFLAW. The required modifications for DFLAW facilities are discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗