Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

FAST - A Unique Experiment and Simplified Approach to Accelerated Integral Fuel Testing

Idaho National Laboratory has a long and internationally recognized history of performing irradiation testing of advanced fast reactor fuels in the Experimental Breeder Reactor II (EBR-II) and the Advanced Test Reactor (ATR). Since EBR-II’s decommissioning in the early 1990’s, irradiation testing has been exclusively performed in ATR. The testing of fast reactor fuels in ATR is challenging given its thermal neutron spectrum and coolant temperatures far below those prototypic of fast reactors. Adept researchers have overcome these obstacles through the use of Cadmium shrouds which attenuate all thermalized neutrons and an experiment design that fosters fuel and cladding temperatures prototypic of fast neutron reactors. Although this design has successfully demonstrated temperatures and temperature gradients that closely mimic those seen in fast reactors, irradiation performance is highly sensitive to fabrication tolerances and the time requirements necessary for high fuel burnup, where irradiation performance data of fast fuel is lacking, are significant. This work summarizes two novel experiment designs and their associated physics analyses for testing fast reactor fuels in ATR; an accelerated irradiation experiment and a fast spectrum experiment. The accelerated irradiation experiment does not utilize a Cadmium shroud, has been shown to triple the burnup rate, yet yields temperatures and radial power profiles prototypic of fast reactor fuels. The fast spectrum experiment utilizes a booster fuel element that that hardens the incident neutron spectrum and also yields temperatures and radial power profiles prototypic of fast reactor fuels. These experiment designs efficiently reduce irradiation time requirements, are more economical, and significantly increase ATR throughput. Fast reactor experiments that capitalize on these designs expedite irradiation performance data for fast reactor fuels and provide information invaluable to fuel performance modeling and simulation validation over a wide range of parameters.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New understandings of failure modes in SSL luminaires

As SSL products are being rapidly introduced into the market, there is a need to develop standard screening and testing protocols that can be performed quickly and provide data surrounding product lifetime and performance. These protocols, derived from standard industry tests, are known as ALTs (accelerated life tests) and can be performed in a timeframe of weeks to months instead of years. Accelerated testing utilizes a combination of elevated temperature and humidity conditions as well as electrical power cycling to control aging of the luminaires. In this study, we report on the findings of failure modes for two different luminaire products exposed to temperature-humidity ALTs. LEDs are typically considered the determining component for the rate of lumen depreciation. However, this study has shown that each luminaire component can independently or jointly influence system performance and reliability. Material choices, luminaire designs, and driver designs all have significant impacts on the system reliability of a product. From recent data, it is evident that the most common failure modes are not within the LED, but instead occur within resistors, capacitors, and other electrical components of the driver. Insights into failure modes and rates as a result of ALTs are reported with emphasis on component influence on overall system reliability.

Shepherd, Sarah D↗

Effects of temperature and particle size on deposition in land based turbines - article no. 051503

Four series of tests were performed in an accelerated deposition test facility to study the independent effects of particle size, gas temperature, and metal temperature on ash deposits from two candidate power turbine synfuels (coal and petcoke). The facility matches the gas temperature and velocity of modern first stage high pressure turbine vanes while accelerating the deposition process. Particle size was found to have a significant effect on capture efficiency with larger particles causing significant thermal barrier coating (TBC) spallation during a 4 h accelerated test. In the second series of tests, particle deposition rate was found to decrease with decreasing gas temperature. The threshold gas temperature for deposition was approximately 960{sup o}C. In the third and fourth test series, impingement cooling was applied to the back side of the target coupon to simulate internal vane cooling. Capture efficiency was reduced with increasing mass flow of coolant air; however, at low levels of cooling, the deposits attached more tenaciously to the TBC layer. Postexposure analyses of the third test series (scanning electron microscopy and X-ray spectroscopy) show decreasing TBC damage with increased cooling levels.

20 FOSSIL-FUELED POWER PLANTS↗

Reliability Evaluation of Bifacial and Monofacial Glass/Glass Modules with EVA and non-EVA Encapsulants

The market share for bifacial modules is projected to be doubled from 30% to 60% in the next ten years. For the monofacial crystalline silicon glass/backsheet (G/B) modules, extensive reliability data has been available for over 40 years. However, practically little/no long-term field or accelerated reliability test data is available for the new generation glass/glass (G/G) bifacial modules and glass/transparent (G/T) bifacial modules. Therefore, the primary motivation of this project was to identify the reliability strengths and weaknesses of new generation G/G modules compared to G/B modules. In this 3-year project, the goal was to objectively recommend the best construction materials for the new generation G/G (bifacial) modules through a systematic experimental approach with appropriate tasks including: Evaluation of field retrieved old-generation G/G modules; Inspection of new-generation G/G modules installed in the plants; Evaluation of new-generation G/G, G/B and G/T modules using EAST (Extended Accelerated Stress Testing), CAST (Combined Accelerated Stress Testing) and FAST (Field Accelerated Stress Testing); and, dynamic literature search and review. Major accomplishments and outcomes of this project are: Accomplishments: Evaluated more than 60 field retrieved modules and constructed and characterized more than 135 mini-modules with three substrate types (G, B, and T), two encapsulant types (EVA and POE), and two cell types (monofacial and bifacial) as well as evaluated more than 30 commercial G/G and G/B modules; Subjected all the modules to multitude characterization tests and various indoor and outdoor accelerated stress tests including FAST (Field Accelerated Stress Testing), EAST (Extended Accelerated Stress Testing), and CAST (Combined Accelerated Stress Testing) to identify and correlate the failure modes in both field and lab tests. Outcomes: Based on the accelerated test results and handling/mounting experience obtained in this project, the recommended best construction for the glass/glass modules is: “Framed GG modules with cut-cells and POE encapsulant (UVpass front; UVpass back).” However, from a statistical and manufacturing point of view (along with stakeholders surveys), the following cautionary notes are added to the above-mentioned recommendation: (i) Cut cells could introduce a higher level of manufacturing issues, including a higher number of cell interconnects; (ii) POE encapsulant is more expensive than EVA and could present a delamination risk and lower throughput during manufacturing due to lower adhesion strength. Other encapsulants, such as coextruded EPE (EVA/POE/EVA), are also recommended to be investigated. The potential public benefit of the proposed project is to present the strengths and weaknesses of glass/glass modules, so an informed procurement decision can be made.

14 SOLAR ENERGY↗

MODELING AND METHOD FOR OPTICAL PERFORMANCE OF A RECEIVER COATING AND ITS DEGRADATION DUE TO OPERATION

The optical properties of the coating used on a concentrated solar power (CSP)’s receiver directly impact the performance of the power plant. Receiver coatings are designed to absorb as much heat as possible and transfer it to the circulating fluid. Over time, the absorptivity of the receiver coating degrades due to environmental and operational conditions. This project aims to (1) create a test apparatus that allows coatings to undergo accelerated lifetime testing under conditions that mimic what the coating will experience on-tower; and (2) develop a mathematical model that based on the test data predicts absorptivity over time. To create the mathematical model, samples of BrightSource Energy’s Gen1 and Gen2 coatings were tested first looking at individual failure modes (such as high temperature cycling) and then for combined failure modes in the newly developed apparatus. In addition to taking optical measurements, the samples were destroyed to allow for metalogical evaluation to understand what was happening on a microscopic level. Pre-existing models from the literature that describe accelerated testing as well as individual phenomena observed in the coating were then combined to create the model. Additionally, the Gen2 and Gen3 coatings are being testing at the Plataforma Solar de Almería (PSA) facility in Almeria, Spain to confirm that the apparatus test results are similar to those received on-sun. (PSA’s facility closely mimics on-tower conditions). The goal is to enable industry players to test coatings using the new apparatus, gather absorptivity measurements (without needing to destroy samples), and input the information into the model to determine how the coating will perform over time, thus allowing the optical performance of coatings to be compared even before they are used on-tower. The model will be publicly available by the end of the project (currently projected as December 2024).

14 SOLAR ENERGY↗

Test-to-Failure of Crystalline Silicon Modules: Preprint

Accelerated lifetime testing of five crystalline silicon module designs was carried out according to the Terrestrial Photovoltaic Module Accelerated Test-to-Failure Protocol. This protocol compares the reliability of various module constructions on a quantitative basis. The modules under test are subdivided into three accelerated lifetime testing paths: 85..deg..C/85% relative humidity withsystem bias, thermal cycling between 40..deg..C and 85..deg..C, and a path that alternates between damp heat and thermal cycling. The most severe stressor is damp heat with system bias applied to simulate the voltages that modules experience when connected in an array. Positive 600 V applied to the active layer with respect to the grounded module frame accelerates corrosion of the silver gridfingers and degrades the silicon nitride antireflective coating on the cells. Dark I-V curve fitting indicates increased series resistance and saturation current around the maximum power point; however, an improvement in junction recombination characteristics is obtained. Shunt paths and cell-metallization interface failures are seen developing in the silicon cells as determined byelectroluminescence, thermal imaging, and I-V curves in the case of negative 600 V bias applied to the active layer. Ability to withstand electrolytic corrosion, moisture ingress, and ion drift under system voltage bias are differentiated.

14 SOLAR ENERGY↗

Research, design and development activities on high power pulsed rf/microwave systems and test facilities for particle accelerators

Several high power S Band microwave systems in the peak power range from 2 MW to 6.5 MW and mean power upto 25 kW along with associated waveguide components, pulse power technology were developed in house at RRCAT. These systems have been used extensively in the development of particle accelerators in the country. Several test facilities were developed in house and supplied to tube R and D labs for development, conditioning and evaluation of microwave tubes indigenously under collaborative efforts. RRCAT has also taken up establishing high power test facilities for advanced accelerators. For such used design and development of 45 MW peak power S Band test facility as well as energy doubler scheme is underway. A 1.3 MW pulsed test stand at 352.2 MHz was also successfully designed and developed to qualify devices, subsystems and components developed in-house. The present paper will describe the research, design and development efforts towards the high power pulsed RF/Microwave systems, test facilities and components. The results and performance of these developments are reported. (author)

43 PARTICLE ACCELERATORS↗

Fission Accelerated Steady-state Testing (FAST)

In an effort to accelerate the irradiation time for advanced reactor fuels, a revised capsule design has been analyzed and developed for the Advanced Fuels Campaign (AFC). This design incorporates a highly enriched, reduced diameter fuel pin that is doubly encapsulated by two steel capsules. This design alloys accelerated irradiations and reduced sensitivity to fabrication variances and eccentricities. The capsule designs utilize existing experiment baskets from the AFC capsules in the Advanced Test Reactor (ATR) outer A position (FAST-OA) and the ATF-1 capsules in the small I position (FAST-SI).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development and Testing of Advanced Accelerator Structures and Technologies at 11.424 GHz (Final Report)

The areas of activity are grouped by Task. Task 1 involved a study of the key physics issues associated with the use of high gradient dielectric-loaded accelerating (DLA) structures in rf linear accelerators, and was carried out in collaboration with Argonne National Laboratory (ANL) and Euclid Techlabs LLC; Task 2 involved a study of high-gain active microwave pulse compressors, and was carried out in collaboration with Omega-P, Inc. and the Institute of Applied Physics of the Russian Academy of Sciences. The experiments were carried out in the X-band Magnicon Laboratory at the Naval Research Laboratory (NRL). The studies under Task 1 were focused on multipactor and breakdown in externally driven DLA structures at the 200-ns timescale. Suppression of multipactor and breakdown are essential to the practical application of dielectric structures in rf linear accelerators. During the first year of this program, we carried out a study of a doubly tapered clamped quartz traveling-wave (TW) structure that operated at up to 15 MV/m without breakdown by eliminating dielectric joints, thus avoiding the joint breakdown that had characterized many earlier experiments. However, strong multipactor loading was observed in the structure. In the second year, we carried out a successful test of a TW DLA structure with a sputtered copper exterior coating that eliminated the need for a clamped metal enclosure to form the outer metallic boundary, thus simplifying the fabrication of the structure. In the second year, we also carried out the first test of a dielectric-loaded standing-wave (SW) accelerating structure. Multipactor loading limited the achievable accelerating gradient in the structure to 9 MV/m, but the SW structure proved to be a useful configuration for studying multipactor physics. To continue this study, a new standing-wave structure is in preparation that will permit direct measurements of the energy stored in the structure for new studies of multipactor physics. Finally, in the third year of the program, we focused on the suppression of multipactor loading using an applied axial magnetic field, as proposed by Chang et al. [C. Chang et al., J. Appl. Phys. 110, 063304 (2011).]. Chang used an analytic model and PIC simulations to show that an axial magnetic field can reduce the period of the secondary electron trajectories on the dielectric surface, and thus spoil the multipactor resonance condition. The optimum effect occurs when the ratio of the gyrofrequency to the rf frequency is in the range of ~ 0.7 to 1. For an X-band structure, this is equivalent to a solenoidal field of 2.8–4 kG. This approach to multipactor suppression is attractive because it maintains the advantages of a DLA structure and is independent of other accelerator parameters.

43 PARTICLE ACCELERATORS↗

MO-F-16A-01: Implementation of MPPG TPS Verification Tests On Various Accelerators

Purpose: To demonstrate the implementation of the Medical Physics Practice Guideline (MPPG) for dose calculation and beam parameters verification of treatment planning systems (TPS). Methods: We implemented the draft TPS MPPG for three linacs: Varian Trilogy, TomoHDA and Elekta Infinity. Static and modulated test plans were created. The static fields are different than used in commissioning. Data was collected using ion chambers and diodes in a scanning water tank, Delta4 phantom and a custom phantom. MatLab and Microsoft Excel were used to create analysis tools to compare reference DICOM dose with scan data. This custom code allowed for the interpolation, registration and gamma analysis of arbitrary dose profiles. It will be provided as open source code. IMRT fields were validated with Delta4 registration and comparison tools. The time for each task was recorded. Results: The tests confirmed the strengths, and revealed some limitations, of our TPS. The agreement between calculated and measured dose was reported for all beams. For static fields, percent depth dose and profiles were analyzed with criteria in the draft MPPG. The results reveal areas of slight mismatch with the model (MLC leaf penumbra, buildup region.) For TomoTherapy, the IMRT plan 2%/2 mm gamma analysis revealed poorest agreement in the low dose regions. For one static test plan for all 10MV Trilogy photon beams, the plan generation, scan queue creation, data collection, data analysis and report took 2 hours, excluding tank setup. Conclusions: We have demonstrated the implementation feasibility of the TPS MPPG. This exercise generated an open source tool for dose comparisons between scan data and DICOM dose data. An easily reproducible and efficient infrastructure with streamlined data collection was created for repeatable robust testing of the TPS. The tests revealed minor discrepancies in our models and areas for improvement that are being investigated.

07 ISOTOPE AND RADIATION SOURCES↗

Research Opportunities in Reliability of Photovoltaic Modules (Presentation)

The motivation for an increased scope and a more proactive effort in reliability research of photovoltaic modules and systems includes reducing the levelized cost of energy and gaining better confidence in the energy and financial payback for photovoltaic systems. This increased reliability and confidence will lead to greater penetration of photovoltaics in the energy portfolio and greateremployment in photovoltaics and related industries. Present research needs include the fundamental degradation mechanisms of polymers, connectors and other module components, mapping of failure mechanisms observed in the field to those in accelerated lifetime tests, determining the acceleration factors, and improving standards for modules such that tests can appropriately be assigned to evaluatetheir long term durability. Specific mechanisms discussed are corrosion in module components, metastability in thin-film active layers, delamination and loss of elastic properties in module polymeric materials, and inverter failure. Presently, there is hiring of reliability scientists and engineers at many levels of the value chain for photovoltaics.

14 SOLAR ENERGY↗

Plasma Wakefield Acceleration and FACET - Facilities for Accelerator Science and Experimental Test Beams at SLAC

Plasma wakefield acceleration is one of the most promising approaches to advancing accelerator technology. This approach offers a potential 1,000-fold or more increase in acceleration over a given distance, compared to existing accelerators. FACET, enabled by the Recovery Act funds, will study plasma acceleration, using short, intense pulses of electrons and positrons. In this lecture, the physics of plasma acceleration and features of FACET will be presented.

43 PARTICLE ACCELERATORS↗

Module-Level Thermal Interface Material Degradation in HALT

Abstract In this study, thermal interface material (TIM) degradation is driven through highly accelerated life test (HALT) using temperature cycling with a prescribed vibrational acceleration for two commercially available materials having thermal conductivities of 6.0 and 8.5 W/m K. HALT specimens were prepared by applying TIM through a 4-mil stencil over AlSiC baseplates in the shape of those used in Wolfspeed CAS325M12HM2 power electronics modules. Baseplates were mounted onto aluminum carrier blocks with embedded thermocouples to characterize the thermal resistance across the baseplate and TIM layer. Thermal dissipation into the top of the baseplates was provided by a custom heating block, which mimics the size and placement of the die junctions in CAS325 modules, applying power loads of 200, 300, and 400 W. After initial characterization, samples were transferred to the HALT chamber with one set of samples exposed to temperature cycling only (TCO) and the other temperature cycling and vibration (TCV). Both sample sets were cycled between temperature extremes of −40 °C and 180 °C with vibrations applied at a peak acceleration of 3.21 Grms. After hundreds of cycles, samples were reevaluated to assess changes in thermal resistance to provide an accelerated measure of TIM degradation. This allows for reliability prediction of useful lifetime (illustrated in a solar inverter case study herein), as well as to provide a basis for developing an accelerated testing method to related temperature cycling to faster methods of degradation. Such techniques provide a means to develop maintenance schedules for power modules for ensuring sufficient thermal performance over the operating lifetime.

Engineering↗

Highly Accelerated UV Stress Testing for Transparent Flexible Frontsheets

There are many photovoltaic (PV) applications where lighter weight and/or bendable PV power would be beneficial. This includes the curved surfaces of buildings, buildings with weight limitations, boats, automobiles, or other portable applications. In many of these cases, the bending will be only a single occurrence at installation or the amount of bending, even if repeated, is not dramatic. This allows for crystalline silicon modules to be used. For flexible applications, the dominant material for the frontsheet is polyethylene tetrafluoroethylene (PETFE). As a fluoropolymer it resists soiling, is UV stable, and PETFE is a more mechanically durable fluoropolymer. However, in the interests of keeping costs down, less expensive alternative polymers are desirable. In this study, highly accelerated ultraviolet light and heat stresses are applied to candidate materials and the degradation kinetics are determined to provide information to evaluate their suitability for use in a PV application.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.

17 WIND ENERGY↗

Advanced Vehicle Testing and Evaluation Final Technical Report Encompassing Project Activities From October 1, 2011 to April 30, 2018

The Advanced Vehicle Testing and Evaluation (AVTE) project incorporated the conduct of advanced technology vehicle and infrastructure testing in the U.S. Department of Energy (DOE) Advanced Vehicle Testing Activity (AVTA). It was the only activity tasked by DOE to conduct independent field evaluations of vehicle technologies that use advanced technology systems and subsystems in vehicles that reduce petroleum consumption. The results are available through reports published on the AVTA website at http://avt.inl.gov/. The AVTE project provided insight into advanced vehicle technology's long-term performance, durability, maintenance, and lifecycle costs that cannot be found elsewhere. The site is a resource for DOE stakeholders and the public to gain knowledge on advanced technology vehicle progress and innovation. Vehicles tested included light and heavy-duty vehicles with conventional, hybrid, plug-in hybrid, and all-electric propulsion systems. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing. Testing and evaluations were conducted in the following phases: Development and refinement of test procedures, which established testing procedures; Baseline performance testing, which established a performance baseline; Accelerated reliability testing, which determined vehicle reliability; Fleet testing, used to evaluate vehicle economics in fleet operation, and End of test performance evaluation. Test results from all aspects of testing were posted by Idaho National Laboratory (INL) to their website. This final report documents work conducted for the entirety of contract DE-EE0005501 by Intertek Testing Services NA, Inc. (Intertek). The contract was performed from October 1, 2011 through April 30, 2018, and includes 18 amendments to the original award with the most recent Amendment 18 dated March 28, 2018. The final budget for the AVTE project totaled 20,220,873 dollars. As a cooperative agreement, Intertek was obligated to provide cost share of 4,044,175 dollars, leaving 16,176,698 dollars as the Federal share of the agreement. Actual total expenditure for the AVTE project was 20,286,850 dollars. The full 16,176,698 dollars Federal share was expended and 4,110,152 dollars of cost share was provided by Intertek. This resulted in an over-share of 65,977 dollars. There were 106 light-duty on-road vehicles vehicles tested in both fleet and accelerated reliability testing. One additional vehicle was rented to obtain performance testing only. Three heavy-duty truck and trailer combinations were tested as part of the semi-autonomous driving with heavy-duty vehicles in a platoon. Overall project scope and direction was determined between Intertek, DOE, and technical teams from Idaho National Laboratory (INL), Argonne National Laboratory (ANL), and National Renewable Energy Laboratory (NREL). The project was administered by the DOE’s National Energy Technology Laboratory (NETL).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗