SEARCH · Search NASA
Results for “accelerator test facility”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
A Multi-TeV Linear Collider Based on CLIC Technology : CLIC Conceptual Design Report
This report describes the accelerator studies for a future multi-TeV e + e - collider based on the Compact Linear Collider (CLIC) technology. The CLIC concept as described in the report is based on high gradient normal-conducting accelerating structures where the RF power for the acceleration of the colliding beams is extracted from a high-current Drive Beam that runs parallel with the main linac. The focus of CLIC R&D over the last years has been on addressing a set of key feasibility issues that are essential for proving the fundamental validity of the CLIC concept. The status of these feasibility studies are described and summarized. The report also includes a technical description of the accelerator components and R&D to develop the most important parts and methods, as well as a description of the civil engineering and technical services associated with the installation. Several larger system tests have been performed to validate the two-beam scheme, and of particular importance are the results from the CLIC test facility at CERN (CTF3). Both the machine and detector/physics studies for CLIC have primarily focused on the 3 TeV implementation of CLIC as a benchmark for the CLIC feasibility. This report also includes specific studies for an initial 500 GeV machine, and some discussion of possible intermediate energy stages. The performance and operation issues related to operation at reduced energy compared to the nominal, and considerations of a staged construction program are included in the final part of the report. The CLIC accelerator study is organized as an international collaboration with 43 partners in 22 countries. An associated report describes the physics potential and experiments at CLIC and a shorter report in preparation will focus on the CLIC implementation strategy, together with a plan for the CLIC R&D studies 2012–2016. Critical and important implementation issues such as cost, power and schedule will be addressed there.
Effect of Water Chemistry on Crack Growth Rates in Neutron Irradiated X-750 and XM-19
The Advanced Test Reactor (ATR) National Science User Facility (NSUF) was used to study the effect of neutron damage on crack growth rates (CGR) under simulated boiling water reactor (BWR) water chemistry conditions using a fast neutron spectrum to accelerate the damage process. Nickel based Alloy X-750 and XM-19 were irradiated in the ATR center flux trap (CFT), with this experiment marking the first civilian project to utilize this position within the reactor. 0.4T-CT specimens were used to study crack growth rates for two sample fluences (~1.9 x 1020 n/cm2 and ~9.5 x 1020 n/cm2, E > 1MeV) in both normal water chemistry (NWC) at 2.5 ppm O2 and hydrogen water chemistry (HWC) at ~80 ppb H2. A decrease in CGR was observed with HWC for both alloys with the average ratio (CGR in NWC/CGR in HWC) being a factor of 281 for the XM-19 samples and a factor of 27.8 for the X-750 samples. Observed CGRs in this study showed little difference compared to non-irradiated samples (the non-irradiated XM-19 was 20% cold worked), suggesting limited sensitivity of these susceptible alloys to irradiation effects. The CGR response to varying environmental electrochemical potential (ECP) and water purity will be presented.
Simulation and measurement of the dynamic strain response in a prototypical spallation target
The Second Target Station (STS) at the Spallation Neutron Source (SNS) will address emerging scientific challenges by providing a source of intense cold neutrons to instruments optimized for this source. The STS target will use rotating tungsten blocks and will receive 1.3 GeV proton beam pulses from the SNS accelerator at a repetition rate of 15 Hz. The facility life is planned for 40 years, and each target assembly life is expected to be approximately 10 years. An accurate strain prediction is then critical for fatigue life assessment of STS target blocks because they will be subject to approximately 10 8 beam pulses per lifetime. As an R&D activity, the Los Alamos Neutron Science Center (LANSCE) Weapons Neutron Research (WNR) Target 2 (Blue Room) facility was used to test the strain response of prototypical target blocks to the thermal shock of a proton pulse. The blue room was well suited for a pulsed proton beam impact test of subscale STS target blocks; the 800 MeV proton energy is approximately 60 % of the 1.3 GeV proton energy expected from the SNS accelerator to the STS. The LANSCE Proton Storage Ring (PSR) and SNS are both short-pulse proton beam sources with nominal pulse widths of 250 ns and 661 ns, respectively, so the energy deposition in the target occurs in <1 μs pulse duration. Strain measurements on the outer surface of three target blocks (bare tungsten, tantalum-clad tungsten, niobium-clad tungsten) were recorded for comparison against neutronics and structural simulations. In conclusion, this experiment and the supporting simulations satisfied the following primary research goals for the STS target.
High-power liquid-lithium jet target for neutron production
A compact liquid-lithium target (LiLiT) was built and tested with a high-power electron gun at the Soreq Nuclear Research Center. The lithium target, to be bombarded by the high-intensity proton beam of the Soreq Applied Research Accelerator Facility (SARAF), will constitute an intense source of neutrons produced by the {sup 7}Li(p,n){sup 7}Be reaction for nuclear astrophysics research and as a pilot setup for accelerator-based Boron Neutron Capture Therapy. The liquid-lithium jet target acts both as neutron-producing target and beam dump by removing the beam thermal power (>5 kW, >1 MW/cm{sup 3}) with fast transport. The target was designed based on a thermal model, accompanied by a detailed calculation of the {sup 7}Li(p,n) neutron yield, energy distribution, and angular distribution. Liquid lithium is circulated through the target loop at ∼200 °C and generates a stable 1.5 mm-thick film flowing at a velocity up to 7 m/s onto a concave supporting wall. Electron beam irradiation demonstrated that the liquid-lithium target can dissipate electron power areal densities of >4 kW/cm{sup 2} and volume power density of ∼2 MW/cm{sup 3} at a lithium flow of ∼4 m/s while maintaining stable temperature and vacuum conditions. The LiLiT setup is presently in online commissioning stage for high-intensity proton beam irradiation (1.91–2.5 MeV, 1–2 mA) at SARAF.
PHENIX Muon Piston Calorimeter (MPC) APD and Prototype MPC Extension (MPC-EX) Tests
This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of Muon Piston Calorimeter Extension (MPC-EX) Collaboration who have committed to participate in beam tests to be carried out during the 2013- 2014 Fermilab Test Beam Facility program.
Field Emission Analysis in SRF Cavities for PIP-II Using GEANT4
Field emission (FE) remains a key limitation to achieving optimal performance and reliability in superconducting radiofrequency (SRF) cavities used in accelerator cryomodules. Addressing this challenge requires a detailed understanding of the generation and transport of FE-induced radiation; however, the absence of standardized measurement protocols complicates comparisons across different testing stages and facilities. This work presents initial steps toward a quantitative, systematic framework for analyzing FE-induced radiation using Geant4 simulations. We model four cavity types to be deployed in Fermilab’s Proton Improvement Plan-II (PIP-II) linac - HB650, LB650, SSR2, and SSR1 - to investigate radiation signatures and their dependence on emission conditions. By integrating simulation results with radiation diagnostics, our goal is to identify probable emission sites, enhance diagnostic accuracy, and optimize detector placement. Ultimately, this approach seeks to inform cavity preparation, assembly, and testing procedures, enabling the delivery of FE-free SRF cryomodules for PIP-II.
Field Emission Analysis in SRF Cavities for PIP-II Using GEANT4
Field emission (FE) remains a key limitation to achieving optimal performance and reliability in superconducting radiofrequency (SRF) cavities used in accelerator cryomodules. Addressing this challenge requires a detailed understanding of the generation and transport of FE-induced radiation; however, the absence of standardized measurement protocols complicates comparisons across different testing stages and facilities. This work presents initial steps toward a quantitative, systematic framework for analyzing FE-induced radiation using Geant4 simulations. We model four cavity types to be deployed in Fermilab’s Proton Improvement Plan-II (PIP-II) linac - HB650, LB650, SSR2, and SSR1 - to investigate radiation signatures and their dependence on emission conditions. By integrating simulation results with radiation diagnostics, our goal is to identify probable emission sites, enhance diagnostic accuracy, and optimize detector placement. Ultimately, this approach seeks to inform cavity preparation, assembly, and testing procedures, enabling the delivery of FE-free SRF cryomodules for PIP-II.
Status of Safeguards and Separations Model Development at Plant and Molecular Levels
A primary goal of the Safeguards and Separations IPSC effort is the development of process modeling tools that allow dynamic simulations of separations plant operations under various configurations and conditions, and integration of relevant safeguards analyses. A requirement of the effort is to develop codes on modern, expandable architectures, with flexibility to explore and evaluate a wide range of process options. During FY09, efforts at ORNL have been focused on two priority tasks toward achieving the IPSC goal: (1) a top-down exploration of architecture - Subtask 1: Explore framework for code development and integration for plant-level simulation; and (2) a bottom-up fundamental modeling effort - Subtask 2: Development of molecular-level agent design code. Subtask 1 is important because definition and development of architecture is a key issue for the overall effort, as selection of an overall approach and code/data requirements is a necessary first step in the organization, design and development of separations and safeguards codes that will be incorporated. The agent design effort of Subtask 2 is a molecular-level modeling effort that has a direct impact on a near-term issue of the Separations and Waste Forms Campaign. A current focus of experimental efforts is the development of robust agents and processes for separation of Am/Cm. Development of enhanced agent-design codes will greatly accelerate discovery and experimental testing.
Clearing a Path to Commercialization of Marine Renewable Energy Technologies Through Public–Private Collaboration
Governments are increasingly turning toward public–private partnerships to bring industry support to improving public assets or services. Here, we describe a unique public–private collaboration where a government entity has developed mechanisms to support public and private sector advancement and commercialization of monitoring technologies for marine renewable energy. These support mechanisms include access to a range of skilled personnel and test facilities that promote rapid innovation, prove reliability, and inspire creativity in technology development as innovations move from concept to practice. The ability to iteratively test hardware and software components, sensors, and systems can accelerate adoption of new methods and instrumentation designs. As a case study, we present the development of passive acoustic monitoring technologies customized for operation in energetic waves and currents. We discuss the value of testing different systems together, under the same conditions, as well as the progression through different test locations. The outcome is multiple, complementary monitoring technologies that are well suited to addressing an area of high environmental uncertainty and reducing barriers to responsible deployment of low-carbon energy conversion systems, creating solutions for the future.
Large-Scale Production of Carbon Nanotubes Using the Jefferson Lab Free Electron Laser
We report on our interdisciplinary program to use the Free Electron Laser (FEL) at the Thomas Jefferson National Accelerator Facility (J-Lab) for high-volume pulsed laser vaporization synthesis of carbon nanotubes. Based in part on the funding of from this project, a novel nanotube production system was designed, tested, and patented. Using this new system nanotube production rates over 100 times faster than conventional laser systems were achieved. Analysis of the material produced shows that it is of as high a quality as the standard laser-based materials.
In-Situ Testing Methods for Mixed-Mode Harsh Environments
Future NASA missions are driving a need for instrumentation and space electronics that will operate at extreme temperatures, with low mass and extended deployments. This need results in devices that will experience dose damage at both low and high temperatures that will suppress annealing and induce accelerated wear out issues. Therefore, the ability to perform radiation tests on devices at temperature is critical. This paper analyses the methods and process to enable these test as developed at the JPL Dynamitron Facility. Since electronics are the radiation source for this facility, the steps to ensure parity with cobalt-60 testing are discussed. Also discussed are the implications for system level testing and mixed radiation mode testing for highly integrated and scaled devices.
First Results from Two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule
Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Lab coating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quarter cryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for both cavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc = 7.9 MV/m and the other - 13.3 MV/m at 4 K.
SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING
The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.
JEMMRLA - Electron Model of a Muon RLA with Multi-pass Arcs
We propose a demonstration experiment for a new concept of a 'dogbone' RLA with multi-pass return arcs -- JEMMRLA (Jlab Electron Model of Muon RLA). Such an RLA with linear-field multi-pass arcs was introduced for rapid acceleration of muons for the next generation of Muon Facilities. It allows for efficient use of expensive RF while the multi-pass arc design based on linear combined-function magnets exhibits a number of advantages over separate-arc or pulsed-arc designs. Here we describe a test of this concept by scaling a GeV scale muon design for electrons. Scaling muon momenta by the muon-to-electron mass ratio leads to a scheme, in which a 4.5 MeV electron beam is injected in the middle of a 3 MeV/pass linac with two double-pass return arcs and is accelerated to 18 MeV in 4.5 passes. All spatial dimensions including the orbit distortion are scaled by a factor of 7.5, which arises from scaling the 200 MHz muon RF to a readily available 1.5 GHz. The hardware requirements are not very demanding making it straightforward to implement. Such an RLA may have applications going beyond muon acceleration: in medical isotope production, radiation cancer therapy and homeland security.
Test Beam and Irradiation Facilities
Progress in particle physics depends on a multitude of unique facilities and capabilities that enable to advance detector technologies. Among others, key facilities involve test beams and irradiation facilities, which allow users to test the performance and lifetime of their detectors under realistic conditions. Test beam facilities are particularly important for collider and neutrino detector applications, while irradiation facilities are crucial for collider as well as some space-based astro particle detectors. This contributed Snowmass paper aims to summarize existing test beam and irradiation facilities as well as develop the need and proposals for future facilities.
Transitioning from Cobalt-60 to X-Ray or E-Beam for Medical Sterilization: Filling Data and Education Gaps
The Office of Radiological Security (ORS) within the U.S. DOE’s National Nuclear Security Administration (NNSA) is charged to “work with government, law enforcement, and businesses across the globe to protect radioactive sources used for medical, research, and commercial purposes; remove and dispose of disused radioactive sources; and reduce the global reliance on high activity radioactive sources through the promotion of viable non-radioisotopic alternative technologies.” In this effort, the NNSA/ORS, along with the Office of Defense Nuclear Nonproliferation R&D, has been working with government and private entities that utilize gamma-ray irradiators in areas that include blood irradiation, radiotherapy, biology research, well logging, and radiation processing to consider alternative technologies that do not depend upon radioactive materials. In the medical device industry, nearly 50% of products are sterilized with ethylene oxide, 40.5% with cobalt-60 gamma-rays, 4.5% with electron-beam (e-beam), and <1% with X-ray.(1,2) The cobalt-60 irradiation facilities use an estimated 150 MCi of isotope to sterilize approximately 200 million cubic feet of product annually.(3) Due to growing safety regulations governing cobalt-60 use, continued advancements in e-beam and X-ray accelerator technology, and the greater irradiation durations and costs for cobalt-60 irradiation compared to e-beam and X-ray, switching to these non-radionuclide modalities is increasingly economically competitive. However, this breakdown of 40.5% cobalt-60 and 5.5% accelerator for product sterilization illustrates the difficulty that market forces and industry players have had in overcoming barriers in transitioning to non-nuclide alternatives. Besides those associated with construction of new e-beam and X-ray facilities, significant financial and regulatory obstacles are also associated with the irradiation and comprehensive testing of product constituent polymers and elastomers. The standards associated with product material performance testing are the Association for the Advancement of Medical Instrumentation (AAMI) Technical Information Report 17 (TIR 17), and its referenced American Society for Testing and Materials (ASTM) polymer testing standards. In the study now underway, and the subject of this article, the NNSA/ORS provided R&D funding to the Pacific Northwest National Laboratory (PNNL) in partnership with university researchers, leading medical product manufacturers, accelerator manufacturers, and contract sterilizers. The resulting Team Nablo (in memory of Sam Nablo) includes individuals representing PNNL, Becton Dickinson (BD), Johnson & Johnson, Stryker, Texas A&M University (TAMU), Steri-Tek, Mevex, Ion Beam Applications (IBA), and Sterigenics. The goals of this study are to 1) Identify specific polymer and/or elastomer-based medical products that are currently sterilized with gamma-rays, and for which there are data gaps and would be of greatest industry impact, 2) Work with relevant ASTM subcommittees for guidance and for potential standard revision, 3) Work with an appropriate Food & Drug Administration (FDA) office for potential collaboration on a guidance document for device manufacturers, 4) Measure the physical effects that product materials exhibit when they are given sterilization-level radiation doses from cobalt-60, e-beam or X-ray, and determine whether these effects would preclude the use of e-beam or X-ray for sterilization, 5) Communicate the resulting scientific datasets and findings via industry conferences, peer-reviewed journals, and relevant trade magazines, and 6) Post the resulting datasets on a publicly accessible website, which can be built on in future years. The end objective is to identify technical barriers preventing the adoption of X-ray and e-beam technologies, and share the results to encourage X-ray and e-beam adoption where feasible.
SAVANNAH RIVER SITE R-REACTOR DISASSEMBLY BASIN IN-SITU DECOMMISSIONING -10499
The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate intact, structurally sound facilities that are no longer needed for their original purpose, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the 105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate it from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,384 cubic meters or 31,894 cubic yards. Portland cement-based structural fill materials were designed and tested for the reactor ISD project, and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and material flow considerations, maximum lift heights and differential height requirements were determined. Pertinent data and information related to the SRS 105-R Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and approximately 3,900 cubic yards (2,989 cubic meters) of structural concrete which will be placed over about an eighteen month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.