Chapter 2: Thermal Energy Storage for Energy Decarbonization

Thermal energy storage (TES) deployed with concentrating solar power (CSP) has shown value and capabilities in generating dispatchable power. It has attracted significant interest for potential roles in energy storage for various capacities and applications. Energy storage plays an important role in expanding renewable generation and is becoming indispensable in future carbon-free electric power. TES development and deployment provide various possibilities for electric storage and have shown advantages in capacity and flexibility to support renewable integration. In addition, renewable energy integrated with a low-cost TES system can potentially provide a reliable thermal energy supply to displace fossil fuels for broad decarbonization. Varieties of TES technologies and developments breed new areas of growth in TES materials, designs, components, and system configurations, which provide opportunities for substantial cost reduction and performance improvements to meet the technoeconomic challenges in practical applications. This chapter will describe recent progress in thermal energy storage research and development and primarily focus on sensible heat storage and its applications in supplying reliable electricity and industry process heat by integrating with variable renewable energy.

concentrating solar thermal power↗

helios: An R package to process heating and cooling degrees for GCAM

helios is an open-source R package that estimates population-weighted heating and cooling degree-hours (HDH and CDH) and degree-days (HDD and CDD) at various temporal (e.g., energy dispatch segments, monthly, yearly) and spatial scales (e.g., U.S. states, global political regions, countries). The degree hour and degree day outputs from helios are used to inform electricity demand load in the Global Change Analysis Model (GCAM) as well as in GCAM-USA (which is the version of GCAM with U.S. state-level details). helios uses a workflow with four steps: processing raw data; calculating heating and cooling degrees; visualizing performance diagnostics; and outputing results in various formats. There are two sources of widely-used climate data compatible with helios: (1) hourly climate data with 12-km resolution that are dynamically downscaled with the Weather Research and Forecasting (WRF) model and projected using a thermal global warming (TGW) approach; and (2) daily climate data with 0.5-degree resolution from the Coupled Model Intercomparison Project (CMIP) that is bias-adjusted and statistical downscaled by the Inter-Sectoral Impact Model Intercomparison Project (ISIMIP). In summary, helios is a model that standardizes methodology of heating and cooling degrees-hours and degree-days using publicly available data and advance the understanding of the impact of spatial and temporal temperature variability on building energy services.

97 MATHEMATICS AND COMPUTING↗

Feasibility Study of Large-Scale Energy Storage in the Earth

Energy storage systems on a large scale are needed when there is a mismatch between electricity generation and demand rates. The mismatch may be due to a variety of reasons: 1. Generation rates of solar are cyclic and are often out of phase with the demand cycles. 2. Generation rates of wind are unpredictable. Furthermore, high-efficiency, low-carbon power plants (e.g., nuclear) typically have high capital cost and low operating cost. Such plants are designed for continuous base-load operation and require a high capacity factor for economic viability (Forsberg, 2017). For these reasons, it is advantageous to be able to store energy when not needed and use it when needed. Our proposed process, called the Air Earth Battery, has been developed to accomplish the task of energy storage and dispatch, using a combination of compressors, expanders, heat exchangers, and subsurface porous, permeable rock formations. This technology utilizes two issued U.S. Patents (Buscheck, 2017a; 2017b), one filed U.S. Patent Application (Buscheck, 2017c), and one filed U.S. Provisional Patent Application (Buscheck and Upadhye, 2018).

25 ENERGY STORAGE↗

Energy-Water Microgrid Opportunity Analysis at the University of Arizona's Biosphere 2 Facility

Microgrids provide reliable and cost-effective energy services in a variety of conditions and locations. There has been minimal effort invested in developing energy-water microgrids that demonstrate the feasibility and leverage synergies of operating renewable energy and water systems in a coordinated framework. Water systems can be operated in ways to provide ancillary services to the electrical grid and renewable energy can be utilized to power water-related infrastructure, but the potential for co-managed systems has not yet been quantified or fully characterized. Energy-water microgrids could be a promising solution to improve energy and water resource management for islands, rural communities, distributed generation, Defense operations, and many parts of the world lacking critical infrastructure. NREL and the University of Arizona have been jointly researching energy-water microgrid opportunities at the University's Biosphere 2 (B2) research facility. B2 is an ideal case study for an energy-water microgrid test site, given its size, its unique mission and operations, the criticality of water and energy infrastructure, and its ability to operate connected to or disconnected from the local electrical grid. Moreover, the B2 is a premier facility for undertaking agricultural research, providing an excellent opportunity to evaluate connections and tradeoffs at the food-energy-water nexus. In this study, NREL used the B2 facility as a case study for an energy-water microgrid test site, with the potential to catalyze future energy-water system integration research. The study identified opportunities for energy and water efficiency and estimated the sizes of renewable energy and storage systems required to meet remaining loads in a microgrid, identified dispatchable loads in the water system, and laid the foundation for an in-depth energy-water microgrid analysis. The foundational work performed at B2 serves a model that can be built upon for identifying relevant energy-water microgrid data, analytical requirements, and operational challenges associated with development of future energy-water microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybridizing a Geothermal Plant with Solar and Thermal Energy Storage to Enhance Power Generation

The objective of this project is to identify cost-effective thermal storage systems for a geothermal/solar hybrid system in order to increase the plant dispatchability. Furthermore, an optimal quantity of thermal storage will also be determined to achieve the best economics of a geothermal/solar hybrid plant. NREL is working with Hyperlight Energy and Coso Operating Company to develop techno-economic models of such a system.

15 GEOTHERMAL ENERGY↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Andhra Pradesh [PowerPoint]

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Gujarat

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Karnataka

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Maharashtra

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Rajasthan

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Tamil Nadu

This chapter on Tamil Nadu is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Heila Microgrid Controller Validation Using CUBE: Cooperative Research and Development Final Report, CRADA Number CRD-17-663

This CRADA facilitates validation of the Heila IQ controller (microgrid controller) using NREL's Consolidated Utility Base Energy (CUBE) hardware platform. The CUBE microgrid platform includes power electronics and controls to integrate PV, battery, and diesel generator assets to serve a common load. The Heila IQ controller includes algorithms to manage and optimize these assets and will be used as the dispatch-level controller for the CUBE. Heila will use the CUBE platform in a number of use cases that will benefit commercialization of the Heila IQ controller.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Analysis of the Eastern Interconnection at Very High Renewable Penetrations

The primary objective of the study reported here is to build on work by Mai et al. (2012) and Brinkman (2015) by performing detailed modeling of the U.S. Eastern Interconnection operations with approximately 70% of all energy coming from wind and solar generation. The study assesses the ability to balance supply and demand for electricity using a unit commitment and economic dispatch model with a five-minute time resolution. In addition, the study explores the implications of different amounts of physical and institutional flexibility for balancing. We also present an analysis of system “stress” by quantifying various metrics, such as the amount of spare online capacity, penetration levels of non-synchronous generators, day-ahead compared to real-time curtailment, and start-ups of peaking generation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Analysis of Refrigeration Units in Off Grid PV/Wind Hybrid Systems on Tribal Land

This paper looks at the performance of residential refrigeration units in off-grid photovoltaic and small wind hybrid (PV/wind) systems with battery storage. Off grid hybrid power systems, dispatched by Navajo Tribal Utility Authority (NTUA), allow Navajo Nation residents in rural areas to have the benefits of electricity. On the Navajo Nation, the rural and rugged nature of the land results in a high capital cost to connecting a house to the grid. In this case, a hybrid PV/wind power generation system may be used at a much lower cost to the customer. In providing affordable power systems to customers, the systems are designed to provide adequate power for use. This requires a constant conservative use of electricity. For systems with refrigerators which are large alternating current (AC) loads, there are performance issues that arise. NTUA reports that new energy star rated refrigerators have performance issues in working with these off grid systems. This paper looks at ways to improve the performance of these systems with the use of a refrigeration unit. This involves looking at conventional refrigerators with its operation. This paper also looks at alternative methods of refrigeration. Also, the power system is looked at to increase the performance in maintaining a proper balance of the system. Lastly, solutions will be recommended to solve the refrigeration issues faced by NTUA.

14 SOLAR ENERGY↗

2018 U.S. Utility-Scale Photovoltaics-Plus-Energy Storage System Costs Benchmark

Market growth for utility-scale photovoltaic (PV) systems has been rapid for several years. Today, with the cost reductions of energy storage technologies, the combining PV and energy storage has become feasible and beneficial, especially for the areas that have only PV standalone systems and need to shift the peak load to meet electricity demand in the evening. Overall, utility-scale PV plus energy storage systems can provide dispatchable energy and reliable capacity. This study details cost factors, including labor costs, material costs, overhead, and permitting costs using a system-level bottom-up cost modeling approach. We use this model to benchmark PV-plus-storage installation system cost and identify the cost difference for AC- and DC-coupled systems and duration variation. Finally, we assess the cost reduction opportunities of colocating PV systems with energy storage systems in order to indicate the possible economic impacts of the PV-plus-storage configuration and help future research and development (R&D) effects in the context of U.S. energy storage policymaking.

14 SOLAR ENERGY↗

2018 U.S. Utility-Scale Photovoltaics-Plus-Energy Storage System Costs Benchmark

Market growth for utility-scale photovoltaic (PV) systems has been rapid for several years. Today, with the cost reductions of energy storage technologies, the combining PV and energy storage has become feasible and beneficial, especially for the areas that have only PV standalone systems and need to shift the peak load to meet electricity demand in the evening. Overall, utility-scale PV plus energy storage systems can provide dispatchable energy and reliable capacity. This study details cost factors, including labor costs, material costs, overhead, and permitting costs using a system-level bottom-up cost modeling approach. We use this model to benchmark PV-plus-storage installation system cost and identify the cost difference for AC- and DC-coupled systems and duration variation. Finally, we assess the cost reduction opportunities of colocating PV systems with energy storage systems in order to indicate the possible economic impacts of the PV-plus-storage configuration and help future research and development (R&D) effects in the context of U.S. energy storage policymaking.

14 SOLAR ENERGY↗

Cross-Border Electricity Trade between India and Sri Lanka: Impact on Power System Operations

Recent developments in South Asia have the potential to increase the incentives for cross-border energy trade (CBET) between India and Sri Lanka. India's surplus power, including from its rapid expansion of wind and solar generation, provides an incentive for it to increase investment returns through exports. Sri Lanka is considering options to increase its power supply, and CBET could alleviate the need for investments in new thermal generation capacity, while giving it access to India's large and diverse power system. Finally, CBET can facilitate renewable energy (RE) integration by allowing the two countries to more efficiently harness balancing resources and smooth out wind and solar variability over larger geographic areas. This study builds on several prior analyses of a potential high-voltage direct current transmission link between India and Sri Lanka. Uniquely, the study makes use of a detailed one-year, 30-minute resolution unit commitment and economic dispatch (UC&ED) model of both countries to examine the technical and economic impacts of CBET between India and Sri Lanka in the year 2025. The study finds that CBET, enabled by a 500-MW high voltage direct current transmission link, could generate annual production cost savings of USD 180 million and improve power system operations. Through better utilization of the most efficient generators, generation from relatively expensive natural gas plants in Sri Lanka is displaced by lower cost imports from India. In addition, increased flexibility through exports reduces RE curtailment in India's Southern region by 400 GWh annually. While the study captures many previously unconsidered intertemporal operational constraints, it does not provide a complete characterization of system operations with a high-voltage direct current interconnection. Additional work should include a dynamic analysis of system stability following interruptions to the direct current interconnection, an AC power flow analysis and consideration of any non-technical barriers to trade which might prevent the optimization of CBET between India and Sri Lanka at 30-minute timescales.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modular Controllable Transformers (MCT)

Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.