Search NASA⌕ Search

SEARCH · Search NASA

Results for “program metrics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Formation Tetrahedron Design for Phase I of the Magnetospheric Multiscale Mission

The Magnetospheric Multiscale Mission (MMS) is a NASA mission intended to make fundamental advancements in our understanding of the Earth's Magnetosphere. There are three processes that MMS will study including magnetic reconnection, charged particle acceleration, and turbulence. There are four phases in the nominal mission and this work addresses some of the outstanding issues in phase I. The nominal phase I orbit is 1.2 x 12 R(sub e) highly elliptic orbit with four spacecraft nominally forming a regular tetrahedron. In this paper we investigate the relative dynamics of the four MMS spacecraft about an assumed reference orbit. There are several tetrahedron dimensions required in Phase I of the mission and in this work we design optimal tetrahedrons for the 10 km baseline. The performance metric used in the optimization process is directly related to the science return, and is based on an extension of previous work performed by Glassmeier. The optimizer we use is a commercially available Sequential Quadratic Programming (SQP) routine. Multiple optimal solutions are found, and we characterize how the performance of the formation varies between different regions of the reference orbit.

Hughes, Steven P.↗

Computations of Wall Distances Based on Differential Equations

The use of differential equations such as Eikonal, Hamilton-Jacobi and Poisson for the economical calculation of the nearest wall distance d, which is needed by some turbulence models, is explored. Modifications that could palliate some turbulence-modeling anomalies are also discussed. Economy is of especial value for deforming/adaptive grid problems. For these, ideally, d is repeatedly computed. It is shown that the Eikonal and Hamilton-Jacobi equations can be easy to implement when written in implicit (or iterated) advection and advection-diffusion equation analogous forms, respectively. These, like the Poisson Laplacian term, are commonly occurring in CFD solvers, allowing the re-use of efficient algorithms and code components. The use of the NASA CFL3D CFD program to solve the implicit Eikonal and Hamilton-Jacobi equations is explored. The re-formulated d equations are easy to implement, and are found to have robust convergence. For accurate Eikonal solutions, upwind metric differences are required. The Poisson approach is also found effective, and easiest to implement. Modified distances are not found to affect global outputs such as lift and drag significantly, at least in common situations such as airfoil flows.

Tucker, Paul G.↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Missouri Agricultural Energy Saving Team-A Revolutionary Opportunity (MAESTRO)

The Missouri Agricultural Energy Saving Team-A Revolutionary Opportunity (MAESTRO) program brought together a team of representatives from government, academia, and private industry to enhance the availability of energy efficiency services for small livestock producers in the State of Missouri. The Missouri Department of Agriculture (MDA) managed the project via a subcontract with the University of Missouri (MU), College of Agriculture Food and Natural Resources, MU Extension, the MU College of Human Environmental Sciences, the MU College of Engineering, and the Missouri Agricultural and Small Business Development Authority (MASBDA). MU teamed with EnSave, Inc, a nationally-recognized expert in agricultural energy efficiency to assist with marketing, outreach, provision of farm energy audits and customer service. MU also teamed with independent home contractors to facilitate energy audits of the farm buildings and homes of these livestock producers. The goals of the project were to: (1) improve the environment by reducing fossil fuel emissions and reducing the total energy used on small animal farms; (2) stimulate the economy of local and regional communities by creating or retaining jobs; and (3) improve the profitability of Missouri livestock producers by reducing their energy expenditures. Historically, Missouri scientists/engineers conducted programs on energy use in agriculture, such as in equipment, grain handling and tillage practices. The MAESTRO program was the first to focus strictly on energy efficiency associated with livestock production systems in Missouri and to investigate the applicability and potential of addressing energy efficiency in animal production from a building efficiency perspective. A. Project Objectives The goal of the MAESTRO program was to strengthen the financial viability and environmental soundness of Missouri's small animal farms by helping them implement energy efficient technologies for the production facility, farm buildings, and the homes on these farms. The expected measurable outcomes of the project were to improve the environment and stimulate the economy by: • Reducing annual fossil fuel emissions by 1,942 metric tons of carbon dioxide equivalent, reducing the total annual energy use on at least 323 small animal farms and 100 farm homes by at least 8,000 kWh and 2,343 therms per farm. • Stimulating the economy by creating or retaining at least 69 jobs, and saving small animal farmers an average of $2,071 per farm in annual energy expenditures. B. Project Scope The MAESTRO team chose the target population of small farms because while all agriculture is traditionally underserved in energy efficiency programs, small farms were particularly underserved because they lack the financial resources and access to energy efficiency technologies that larger farms deploy. The MAESTRO team reasoned that energy conservation, financial and educational programs developed while serving the agricultural community could serve as a national model for other states and their agricultural sectors. The target population was approximately 2,365 small animal farm operations in Missouri, specifically those farms that were not by definition a confined animal feeding operation (CAFO). The program was designed to create jobs by training Missouri contractors and Missouri University Extension staff how to conduct farm audits. The local economy would be stimulated by an increase in construction activity and an increasing demand for energy efficient farm equipment. Additionally, the energy savings were deemed critical in keeping Missouri farms in business. This project leveraged funds using a combination of funds from the Missouri Department of Natural Resources’ Missouri Energy Center and its Soil and Water Conservation Program, from the state's Linked Deposits, MASBDA's agricultural loan guarantee programs, and through the in-kind contribution of faculty and staff time to the project from these agencies and MU. Several hundred Missouri livestock producers were contacted during the MAESTRO project. Of the livestock producers, 254 invited the team to conduct a farm energy assessment which complied with ASABE 612. A total of 147 livestock farm upgrades were implemented, representing 57.5 percent of the farms for which a farm energy assessment was completed. This represented a statewide average annual savings of 1,088,324 kWh and 75,516 therms. The team also reviewed the condition of the livestock producer’s home(s). A total of 106 home energy assessments were completed and 48 individual homes implemented their recommended upgrades, representing 45 percent of the farm homes for which an energy assessment was completed. This represented a statewide average annual savings of 323,029 kWh, and 769.4 therms. More of these farmers likely would have updated their homes but the funding to incentivize them fell short. In spite of the shortfall in incentive funds, some farmers still updated their homes as they saw the value in making these changes to their home.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Machine Learning Approach to Improve Air Traffic Management Initiatives

Collaborating closely with commercial air carriers and related organizations, the Federal Aviation Administration(FAA) regulates air traffic and ensures the safety and efficiency of air operations. Air traffic controllers make strategic decisions, such as delaying, rerouting, or canceling flights, partly based on guidance provided by the FAA’s Air TrafficControl System Command Center (ATCSCC). The guidance includes, among other things, control measures known asTraffic Management Initiatives (TMIs) designed to enhance safety and improve operational efficiency. TMIs play a crucial role in managing the demand and capacity within the U.S. National Airspace System (NAS). Two major TMIs that are routinely used (primarily to mitigate the adverse effects of bad weather) are Ground Delay Programs (GDPs) andGround Stops (GSs). In a GDP, flights destined for airports facing thunderstorm activity experience delays at their origin airports. This proactive approach minimizes the risk of routing aircraft through hazardous weather conditions and also replaces (fuel burning) airborne delays with ground delays. In a GS, a temporary restriction is imposed on the departure or arrival of aircraft at a specific airport or within a designated airspace. Although other TMIs (e.g., miles-in-trail) are also implemented as part of (air) traffic flow management in the NAS, the focus of this work is on GDPs and GSs. Since TMIs, by design, lead to flight delays or cancellations, it is crucial to put in place the right set of parameters(e.g., scope and duration of the GDP). For example, when the end time of a GDP extends beyond what is necessary, it imposes unnecessary delays on departing flights. This situation could occur as a result of inaccurate prediction of the(required) duration of the GDP based on the weather forecast. On the other hand, if a GDP ends prematurely before the underlying capacity constraints are resolved at the destination airport, it may result in airborne holding. The delicate balance lies in matching the termination of the GDP precisely with the resolution of capacity constraints, avoiding both the imposition of unnecessary ground delays and the need for airborne holding due to premature program termination.Failing to specify the right parameters for TMIs also leads to flight delays, creating a significant obstacle in managing the increasing traffic volumes causing increased work load for the controllers. To address this issue, we propose the integration of Machine Learning (ML) models in the traffic flow management(TFM) pipeline. In current operations, decisions are made by human experts based on extensive training, historical patterns, available traffic and weather data. Since we have an abundance of data from past events that tell us the likely impact of various TMIs, by ingesting historical data, properly trained ML models can offer valuable insights and aid human decision-making. With the FAA increasingly exploring advanced analytics, ML emerges as a focal point for enhancing TFM within the National Airspace System (NAS). As a first step, this study aims to provide traffic controllers with decision-making support for the issuance and adjustment of TMIs. Data analytics and machine learning have been previously employed to address some of the challenges associated with TMIs. Numerous studies have concentrated on various facets of TMI issuance, exploring factors influencing TMI parameters, including arrival rate, airport capacity, and delay prediction. For example, using weather forecasts, several statistical methods were used to produce probabilistic capacity profiles which in conjunction with deterministic models provided insights into the GDP planning process [1–4]. The downside of using deterministic models is that they rely on fixed inputs and predetermined rules, which lack the ability to account for the inherent uncertainty and variability present in real-world scenarios. In a separate series of studies, researchers aimed to predict the occurrences of GDPs and GSs. The majority of these studies utilized various supervised learning methods, including Decision Trees, Naive Bayes, Support VectorMachines, and Random Forests to analyze the influence of weather conditions and arrival demand on TMI incidents[5–8]. However, these studies primarily focused on predicting the incidence of TMIs without explicitly addressing the scope of TMIs, including their duration and their geographical coverage. Furthermore, the emphasis of these studies was largely on GDPs, given their higher frequency and longer duration when compared to GSs. A limited number of studies focused on predicting the parameters of TMIs, specifically addressing their duration and extent. In one such study focusing on optimizing the TMI parameters at San Francisco International Airport (SFO),the authors utilized a probabilistic forecast of fog [9]. They simulated various capacity scenarios based on the (fog)burn-off forecasts, selecting GDP parameters that minimized airborne and overall ground delays. However, this approach exclusively emphasizes stratus (fog) burn-off as the primary determinant of GDP and GS, neglecting other influential factors like severe weather events, runway closures, lower capacity than traffic demand, and other important variables. Given the complexity of predicting the TMI and determining its scope, we seek a more holistic approach. We aim to consider all significant factors that could impact TMIs and their parameters. What sets this research apart is the fusion of all data sources relevant to the issuance and adjustment of TMIs and it represents the first comprehensive attempt to optimize TMIs in this manner. Since this comprehensive solution involves various aspects, we break down the problem into smaller components and input all parameters into a unified model called the “TMI Adjuster”. Figure 1 shows the overall framework and the list of datasets used in each model. The objective of the TMI Adjuster module is to deliver reliable, consistent and expedited recommendations for the progression, adjustment, and termination of TMIs. The ML solution entails developing a pipeline capable of predicting the necessity of a TMI (e.g., GS or GDP) along with its various parameters. For example, in the case of a GS, this includes the scope of the GS either in terms of distance from the destination airport or based on pre-defined airspace sectors. Here, scope refers to those regions and departing airports that are subject to the GS. In this paper, we concentrate on the issuance of GSs in the three major airports in the New York area — LaGuardia(LGA), John F. Kennedy International (JFK), and Newark Liberty International (EWR). We fuse traffic, weather and other relevant aviation data from years 2017 to 2019 to train and validate the ML models. In particular, we use the following datasets: •Terminal Aerodrome Forecast (TAF): meteorological forecasts specific to each airport, issued four times a day, covering predefined time periods. •TMI data: includes all GSs and GDPs along with their respective parameters. •Aviation System Performance Metrics (ASPM): includes traffic related data such as aircraft delays, arrival, and departure rates. •Notices to Airmen (NOTAMs): utilized to extract runway closure data and manage interdependencies between terminals in close proximity. •Flight cancellation data •Airspace Flow Programs (AFP): includes information on flight airborne holdings caused by TMIs. The data preprocessing entails transforming ASPM, TMI, AFP, NOTAMs, and weather data into an hourly format and consolidating all datasets by merging them based on date and time as the primary key. The TMI Adjuster framework comprises two parallel models: one dedicated to GS and a second model focused on GDP. As previously mentioned, our specific focus is on the GS model as a multi-classification problem. In this framework, each data point of the GS model input summarizes ten hours of data. Specifically, the data loader for the GS model generates the input and output of the model as follows: at a given time step, the input includes the actual traffic, weather, and TMI data from the two-hour window before the time step, alongside the weather forecast and scheduled traffic for the next 8 hours starting from the time step. Based on this information, the output of the GS model for each time interval consists of three dimensions. The first dimension represents a binary decision on whether there should be a GS in place for the next hour or not. The second dimension is related to the scope of the GS in the United States, and the third dimension is related to the scope of the GS in Canada (i.e., to determine if the GS impacts airports in Canada).One of the challenges with TMI modeling is the sparsity of TMI events, particularly regarding its scope. To address this challenge in the scope of the GS model output, we implement grouping. The GS scope for the US region is defined based on a list of centers that should be included when the GS is in place. With 20 centers in the US, we utilized historical data to group them into 4 categories. In particular, we summarized our historical data in a graph format where nodes represent centers, and link weights are defined based on the co-occurrence of centers in the scope parameter ofTMIs. By identified strongly connected components in this graph, we were able to partition the centers into four groups. We consider two model structures for the GS Model. Firstly, a hierarchical classification model [10], where the human decision-making for a GS is of hierarchical nature. The decision-maker first decides whether there is a need fora GS, and if the answer is yes, determines the scope. A hierarchical classification model organizes the problem into a class hierarchy, typically a tree or a Directed Acyclic Graph (DAG) structure, and considers the dependency of the decision in the previous step to the next component [10]. Here, we employ the local classifier per level approach, which involves training one multi-class classifier for each level of the class hierarchy. The second structure is the independent structure. In this setting, as the name suggests, we do not consider the dependency of the decisions in the different dimensions of the output of the model. Instead, for each dimension, we train a multi-class classifier independently. Table 1 summarizes GS model statistics for training, validation and testing. The table documents the effect of limiting data to the time steps when there was actually a TMI in place or when a TMI had just terminated. This resulted in a more balanced distribution of the GS class(GS positive class)versus “No GS”(GS negative class), which might help the training process. While JFK and LGA follow very similar distributions, with 40% and 42% GS positive class respectively, EWR has proportionally fewer GS incidents at 28%. Our subsequent phase involves evaluating the performance of both hierarchical structure and independent structure using different state-of-the-art multi-class classifier models such as Random Forest, Decision Trees, K-nearest Neighbors, and Logistic Regression and forecast the duration and scope of the GSs.

Farzan Masrour Shalmani↗

Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

SU-E-T-368: Evaluating Dosimetric Outcome of Modulated Photon Radiotherapy (XMRT) Optimization for Head and Neck Patients

Purpose: The dosimetric outcome of optimized treatment plans obtained by modulating the photon beamlet energy and fluence on a small cohort of four Head and Neck (H and N) patients was investigated. This novel optimization technique is denoted XMRT for modulated photon radiotherapy. The dosimetric plans from XMRT for H and N treatment were compared to conventional, 6 MV intensity modulated radiotherapy (IMRT) optimization plans. Methods: An arrangement of two non-coplanar and five coplanar beams was used for all four H and N patients. Both XMRT and IMRT were subject to the same optimization algorithm, with XMRT optimization allowing both 6 and 18 MV beamlets while IMRT was restricted to 6 MV only. The optimization algorithm was based on a linear programming approach with partial-volume constraints implemented via the conditional value-at-risk method. H and N constraints were based off of those mentioned in the Radiation Therapy Oncology Group 1016 protocol. XMRT and IMRT solutions were assessed using metrics suggested by International Commission on Radiation Units and Measurements report 83. The Gurobi solver was used in conjunction with the CVX package to solve each optimization problem. Dose calculations and analysis were done in CERR using Monte Carlo dose calculation with VMC{sub ++}. Results: Both XMRT and IMRT solutions met all clinical criteria. Trade-offs were observed between improved dose uniformity to the primary target volume (PTV1) and increased dose to some of the surrounding healthy organs for XMRT compared to IMRT. On average, IMRT improved dose to the contralateral parotid gland and spinal cord while XMRT improved dose to the brainstem and mandible. Conclusion: Bi-energy XMRT optimization for H and N patients provides benefits in terms of improved dose uniformity to the primary target and reduced dose to some healthy structures, at the expense of increased dose to other healthy structures when compared with IMRT.

60 APPLIED LIFE SCIENCES↗

Environment, Safety, and Health Self-Assessment Report, Fiscal Year 2008

Lawrence Berkeley National Laboratory's Environment, Safety, and Health (ES&H) Self-Assessment Program ensures that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The Self-Assessment Program, managed by the Office of Contract Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The functions of the program are to ensure that work is conducted safely, and with minimal negative impact to workers, the public, and the environment. The Self-Assessment Program is also the mechanism used to institute continuous improvements to the Laboratory's ES&H programs. The program is described in LBNL/PUB 5344, Environment, Safety, and Health Self-Assessment Program and is composed of four distinct assessments: the Division Self-Assessment, the Management of Environment, Safety, and Health (MESH) review, ES&H Technical Assurance, and the Appendix B Self-Assessment. The Division Self-Assessment uses the five core functions and seven guiding principles of ISM as the basis of evaluation. Metrics are created to measure performance in fulfilling ISM core functions and guiding principles, as well as promoting compliance with applicable regulations. The five core functions of ISM are as follows: (1) Define the Scope of Work; (2) Identify and Analyze Hazards; (3) Control the Hazards; (4) Perform the Work; and (5) Feedback and Improvement. The seven guiding principles of ISM are as follows: (1) Line Management Responsibility for ES&H; (2) Clear Roles and Responsibilities; (3) Competence Commensurate with Responsibilities; (4) Balanced Priorities; (5) Identification of ES&H Standards and Requirements; (6) Hazard Controls Tailored to the Work Performed; and (7) Operations Authorization. Performance indicators are developed by consensus with OCA, representatives from each division, and Environment, Health, and Safety (EH&S) Division program managers. Line management of each division performs the Division Self-Assessment annually. The primary focus of the review is workplace safety. The MESH review is an evaluation of division management of ES&H in its research and operations, focusing on implementation and effectiveness of the division's ISM plan. It is a peer review performed by members of the LBNL Safety Review Committee (SRC), with staff support from OCA. Each division receives a MESH review every two to four years, depending on the results of the previous review. The ES&H Technical Assurance Program (TAP) provides the framework for systematic reviews of ES&H programs and processes. The intent of ES&H Technical Assurance assessments is to provide assurance that ES&H programs and processes comply with their guiding regulations, are effective, and are properly implemented by LBNL divisions. The Appendix B Performance Evaluation and Measurement Plan (PEMP) requires that LBNL sustain and enhance the effectiveness of integrated safety, health, and environmental protection through a strong and well-deployed system. Information required for Appendix B is provided by EH&S Division functional managers. The annual Appendix B report is submitted at the close of the fiscal year. This assessment is the Department of Energy's (DOE) primary mechanism for evaluating LBNL's contract performance in ISM.

99 GENERAL AND MISCELLANEOUS↗

Tracking DO 2 with Compensatory Reserve during Whole Blood Resuscitation in Baboons

Background Hemorrhagic shock can be mitigated by timely and accurate resuscitation designed to restore adequate delivery of oxygen (DO 2 ) by increasing cardiac output (CO). However, standard care of using systolic blood pressure (SBP) as a guide for resuscitation has proven ineffective and can be associated with increased morbidity. We have developed a novel vital sign called the compensatory reserve (CRM) generated from analysis of arterial pulse waveform feature changes that has been validated in experimental and clinical models of hemorrhage. We tested the hypothesis that thresholds of DO 2 could be accurately defined by CRM while avoiding over resuscitation during whole blood resuscitation following a 25% hemorrhage in non‐human primates. Methods To accomplish this, adult male baboons (n=12) were exposed to a progressive controlled hemorrhage that resulted in an average (± SD) maximal reduction of 601 ± 18 ml of their estimated circulating blood volume of 1,262 ± 64 ml based on body weight. Values of DO 2 were calculated as the product of CO times O 2 carrying capacity of hemoglobin (i.e., Hb content × 1.34). Results Average (± SD) CRM increased from 6 ± 5 % at the end of hemorrhage to 70 ± 7 % at the end of resuscitation. DO 2 of 12.1, 10.3, and 7.0 ml O 2 ·kg −1 ·min −1 were calculated at 0% (baseline), 12.5% and 25% blood loss. By linear regression, CRM values of 6% (decompensation), 35%, and 68% corresponded to calculated DO 2 values of 6.0, 9.2, and 12.1 ml O 2 ·kg −1 ·min −1 during resuscitation. As such, return of CRM to baseline during resuscitation with only ~ 450 ml provided adequate DO 2 (12.5 ml O 2 ·kg −1 ·min −1 ) while total blood volume replacement (~600 ml) resulted in over resuscitation as indicated by an average increase in SBP (+17 mmHg) and CO (+0.1 L/min) over baseline values. Conclusion Consistent with our hypothesis, thresholds of DO 2 were associated with specific CRM values. A target resuscitation CRM value of 70% minimized the requirement for whole blood, while avoiding over resuscitation. Furthermore, CRM at 0% provided a noninvasive metric for determining critical DO 2 at approximately 5.4 ml O 2 ·kg −1 ·min −1 . Support or Funding Information This research was supported in part by appointment of Ms. Koons to the Postgraduate Research Fellowship Program at the US Army Institute of Surgical Research administered by the Oak Ridge Institute for Science and Education through an interagency agreement between the US Department of Energy and USAMRMC. Study funding was provided by a grant from the US Army Combat Casualty Care Research Program (D‐009‐2014‐USAISR). Linearregression of the relationship between DO 2 and compensatory reserve during whole blood resuscitation in baboons. Data are expressed as mean ± SE. image Linearregression of the relationship between DO 2 and compensatory reserve during whole blood resuscitation in baboons. Data are expressed as mean ± SE. This abstract is from the Experimental Biology 2019 Meeting. There is no full text article associated with this abstract published in The FASEB Journal .

Koons, Natalie Jane↗

Quantifying Climate Change Effects of Bioenergy and BECCS: Critical Considerations and Guidance on Methodology

Bioenergy is a critical element in many national and international climate change mitigation efforts, including as a carbon dioxide removal strategy combined with the capture and durable geological storage of flue gas emissions (BECCS). However, divergent results on the effectiveness of bioenergy as a climate change mitigation measure are reported in the scientific literature. Climate impacts of bioenergy depend on case-specific factors, primarily biophysical features of the biomass production system, and the design and efficiency of conversion and capture processes. Estimates of climate impacts are also strongly affected by methodological choices and assumptions, and much of the divergence between studies derives from differences in the assumed alternate use of the land or feedstock, the alternate energy source and the system boundaries applied. We present a methodology to support robust estimates of the climate change effects of bioenergy systems, updating the standard methodology developed by the International Energy Agency's Technology Collaboration Program on Bioenergy. We provide guidance on the key choices including the reference land use and energy system that bioenergy is assumed to displace, spatial and temporal system boundaries, co-product handling, climate forcers considered, metrics applied and time horizon of impact assessment. Researchers should consider the whole bioenergy system including all life cycle stages, and choose system boundaries, reference systems and treatment of co-products that are consistent with the intended application of the results. The assessment should be normalised to a functional unit that can be compared with other systems delivering an equivalent quantity of the same function. All significant climate forcers should be included, and climate effects should be quantified using appropriate impact assessment methods that distinguish the impact of time. Consistency in methodology and interpretation will facilitate comparison between studies of different bioenergy systems.

09 BIOMASS FUELS↗

Implementation and Rejection of Industrial Steam System Energy Efficiency Measures

Steam systems consume approximately one third of energy applied at U.S. industrial facilities. To reduce energy consumption, steam system energy assessments have been conducted on a wide range of industry types over the course of five years through the Energy Savings Assessment (ESA) program administered by the U.S. Department of Energy (U.S. DOE). ESA energy assessments result in energy efficiency measure recommendations that are given potential energy and energy cost savings and potential implementation cost values. Saving and cost metrics that measure the impact recommended measures will have at facilities, described as percentages of facility baseline energy and energy cost, are developed from ESA data and used in analyses. Developed savings and cost metrics are examined along with implementation and rejection rates of recommended steam system energy efficiency measures. Based on analyses, implementation of steam system energy efficiency measures is driven primarily by cost metrics: payback period and measure implementation cost as a percentage of facility baseline energy cost (implementation cost percentage). Stated reasons for rejecting recommended measures are primarily based upon economic concerns. Additionally, implementation rates of measures are not only functions of savings and cost metrics, but time as well.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pre-Launch Radiometric Characterization of JPSS-1 VIIRS Thermal Emissive Bands

Pre-launch characterization and calibration of the thermal emissive spectral bands on the Joint Polar Satellite System (JPSS-1) Visible Infrared Imaging Radiometer Suite (VIIRS) is critical to ensure high quality data products for environmental and climate data records post-launch. A comprehensive test program was conducted at the Raytheon El Segundo facility in 2013-2014, including extensive environmental testing. This work is focused on the thermal band radiometric performance and stability, including evaluation of a number of sensor performance metrics and estimation of uncertainties. Analysis has shown that JPSS-1 VIIRS thermal bands perform very well in relation to their design specifications, and comparisons to the Suomi National Polar-orbiting Partnership (SNPP) VIIRS instrument have shown their performance to be comparable.

Thermal Bands↗

Consulting on HTGR Design and Analysis Methods - Lommers

The Advanced Reactor Technologies – Gas Cooled Reactor (ART-GCR) program has undertaken an effort to develop point designs of a gas-cooled, graphite moderated irradiation test reactor (TR) and a larger demonstration reactor (DR). The Department of Energy (DOE) is specifying requirements and performance metrics for these two systems. Both designs pose challenges, and their development will benefit from interaction with a potential vendor. The work defined in this subcontract supports the effort to generate point designs for gas-cooled test and demonstration reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Revealing Decision Conservativeness Through Inverse Distributionally Robust Optimization

This paper introduces Inverse Distributionally Robust Optimization (I-DRO) as a method to infer the conservativeness level of a decision-maker, represented by the size of a Wasserstein metric-based ambiguity set, from the optimal decisions made using Forward Distributionally Robust Optimization (F-DRO). By leveraging the Karush-Kuhn-Tucker (KKT) conditions of the convex F-DRO model, we formulate I-DRO as a bi-linear program, which can be solved using off-the-shelf optimization solvers. Additionally, this formulation exhibits several advantageous properties. We demonstrate that I-DRO not only guarantees the existence and uniqueness of an optimal solution but also establishes the necessary and sufficient conditions for this optimal solution to accurately match the actual conservativeness level in F-DRO. Furthermore, we identify three extreme scenarios that may impact I-DRO effectiveness. Our case study applies F-DRO for power system scheduling under uncertainty and employs I-DRO to recover the conservativeness level of system operators. Numerical experiments based on an IEEE 5-bus system and a realistic NYISO 11-zone system demonstrate I-DRO performance in both normal and extreme scenarios. An extended version of this paper with additional analyses is available at li2024revealing.

distributionally robust optimization↗

Integrated Medical Model Project - Overview and Summary of Historical Application

Introduction: The Integrated Medical Model (IMM) Project represents one aspect of NASA's Human Research Program (HRP) to quantitatively assess medical risks to astronauts for existing operational missions as well as missions associated with future exploration and commercial space flight ventures. The IMM takes a probabilistic approach to assessing the likelihood and specific outcomes of one hundred medical conditions within the envelope of accepted space flight standards of care over a selectable range of mission capabilities. A specially developed Integrated Medical Evidence Database (iMED) maintains evidence-based, organizational knowledge across a variety of data sources. Since becoming operational in 2011, version 3.0 of the IMM, the supporting iMED, and the expertise of the IMM project team have contributed to a wide range of decision and informational processes for the space medical and human research community. This presentation provides an overview of the IMM conceptual architecture and range of application through examples of actual space flight community questions posed to the IMM project. Methods: Figure 1 [see document] illustrates the IMM modeling system and scenario process. As illustrated, the IMM computational architecture is based on Probabilistic Risk Assessment techniques. Nineteen assumptions and limitations define the IMM application domain. Scenario definitions include crew medical attributes and mission specific details. The IMM forecasts probabilities of loss of crew life (LOCL), evacuation (EVAC), quality time lost during the mission, number of medical resources utilized and the number and type of medical events by combining scenario information with in-flight, analog, and terrestrial medical information stored in the iMED. In addition, the metrics provide the integrated information necessary to estimate optimized in-flight medical kit contents under constraints of mass and volume or acceptable level of mission risk. Results and Conclusions: Historically, IMM simulations support Science and Technology planning, Exploration mission planning, and ISS program operations by supplying simulation support, iMED data information, and subject matter expertise to Crew Health and Safety and the HRP. Upcoming release of IMM version 4.0 seeks to provide enhanced functionality to increase the quality of risk decisions made using the IMM through a more accurate representation of the real world system.

Myers, J.↗

Summary of NDC Capacity Building Workshop and Regional Seismic Travel Time (RSTT) in combination with Data Sharing and Integration Training

The NNSA Seismic Cooperation Program (SCP) sponsored Stephen Myers (LLNL), Michael Begnaud (LANL), Brian Young (SNL) and Istvan Bondar (Research Center for Astronomy and Earth Sciences, Hungary) to serve as a presenters/trainers at the “NDC Capacity Building Workshop and Regional Seismic Travel Time (RSTT) in combination with Data Sharing and Integration Training” September 4-8 2022 in Muscat, Oman (See Appendix A for the agenda). The workshop and training (workshop from here forward) was organized by the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) Provisional Technical Secretariat (PTS). The first half of the week was devoted to NDC workshop activities, and the second half was devoted to RSTT training. Fifty-five participants from 27 countries and the CTBTO-PTS attended the 5-day workshop (See Appendix B for list of participants and countries of origin). Presentations from the PTS described the International Monitoring System (IMS), International Data Centre (IDC) products, and metrics of regional data utilization. Contributed presentations from each country’s scientists included descriptions of regional and national networks, methods of data analysis, and needs for material and technical assistance. Training included an overview of the RSTT method and instruction on how to locate seismic events with the iLoc program, which utilizes RSTT travel times to reduce bias in event location estimates. Methods of seismic tomography and the need for a high-quality tomographic set, including seismological “ground truth”, were emphasized. Seismological “ground truth” or “GT” is a term that has come to mean both events with known location and events with well-characterized locations that are estimated using seismological data, typically with epicenter accuracy of 5 km or better. Notably, the instructional platform has migrated from UNIX shell scripts to Jupyter Notebooks. Jupyter Notebooks have the advantage being more visually intuitive, including display of graphics within the notebook. Each notebook includes every processing step that participants need to reproduce the entire exercise.

58 GEOSCIENCES↗