Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

San Francisco Bar Pilot Fatigue Study

The purpose of this study was to evaluate the extent of fatigue among San Francisco Bar Pilots (Maritime Pilots) and its potential impact on safety, and to make recommendations concerning how the risk of fatigue could be managed. Information was gathered via a literature review, observations of Bar Pilots at work, surveys, a task analysis, and an analysis of dispatch records.The work of San Francisco Bar Pilots involves an unusual mix of activities and job demands. Their work calls for situational awareness, reasoning, communication, and perceptual abilities comparable to those required by airline pilots and air traffic controllers. Errors can have severe consequences for public safety and the environment, as well as significant financial costs. Fatigue is increasingly recognized as a hazard that must be managed by the transportation industry. The reduced sleep quality and quantity experienced by personnel who work at night, in conjunction with human circadian rhythms can lead to an operationally significant level of cognitive impairment. The cognitive impact of fatigue includes functions that are critical to safe maritime piloting, such as vigilance, judgment, reaction time and communication. The surveys distributed to Bar Pilots did not uncover evidence of widespread fatigue. The survey results also suggested that fatigue was not a major concern of Bar Pilots. Bar Pilots had overall low scores on the subjective fatigue measures used in the survey, and generally assessed the safety risk due to fatigue as low. Compared to air traffic controllers, Bar Pilots gave significantly lower ratings on questions concerning the prevalence and impact of fatigue. The application of fatigue modeling software to Bar Pilot dispatch records identified that in most cases, pilot's cognitive effectiveness was predicted to be acceptable during their duty periods. However, these results could not be verified with objective data.The study identified a number of fatigue issues that deserve attention. These include Bar Pilot work periods that frequently infringe on the circadian low, consecutive work periods without a significant break, consecutive periods of night work, unpredictable work schedules, start time variability, the potential for sleep inertia, and the number of pilots on the board at any given time.

fatigue↗

Parallel software support for computational structural mechanics

The application of the parallel programming methodology known as the Force was conducted. Two application issues were addressed. The first involves the efficiency of the implementation and its completeness in terms of satisfying the needs of other researchers implementing parallel algorithms. Support for, and interaction with, other Computational Structural Mechanics (CSM) researchers using the Force was the main issue, but some independent investigation of the Barrier construct, which is extremely important to overall performance, was also undertaken. Another efficiency issue which was addressed was that of relaxing the strong synchronization condition imposed on the self-scheduled parallel DO loop. The Force was extended by the addition of logical conditions to the cases of a parallel case construct and by the inclusion of a self-scheduled version of this construct. The second issue involved applying the Force to the parallelization of finite element codes such as those found in the NICE/SPAR testbed system. One of the more difficult problems encountered is the determination of what information in COMMON blocks is actually used outside of a subroutine and when a subroutine uses a COMMON block merely as scratch storage for internal temporary results.

Jordan, Harry F.↗

NASA Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.

Formulation↗

QUEST/Ada: Query utility environment for software testing of Ada

Results of research and development efforts are presented for Task 1, Phase 2 of a general project entitled, The Development of a Program Analysis Environment for Ada. A prototype of the QUEST/Ada system was developed to collect data to determine the effectiveness of the rule-based testing paradigm. The prototype consists of five parts: the test data generator, the parser/scanner, the test coverage analyzer, a symbolic evaluator, and a data management facility, known as the Librarian. These components are discussed at length. Also presented is an experimental design for the evaluations, an overview of the project, and a schedule for its completion.

Brown, David B.↗

Retargeting of existing FORTRAN program and development of parallel compilers

The software models used in implementing the parallelizing compiler for the B-HIVE multiprocessor system are described. The various models and strategies used in the compiler development are: flexible granularity model, which allows a compromise between two extreme granularity models; communication model, which is capable of precisely describing the interprocessor communication timings and patterns; loop type detection strategy, which identifies different types of loops; critical path with coloring scheme, which is a versatile scheduling strategy for any multicomputer with some associated communication costs; and loop allocation strategy, which realizes optimum overlapped operations between computation and communication of the system. Using these models, several sample routines of the AIR3D package are examined and tested. It may be noted that automatically generated codes are highly parallelized to provide the maximized degree of parallelism, obtaining the speedup up to a 28 to 32-processor system. A comparison of parallel codes for both the existing and proposed communication model, is performed and the corresponding expected speedup factors are obtained. The experimentation shows that the B-HIVE compiler produces more efficient codes than existing techniques. Work is progressing well in completing the final phase of the compiler. Numerous enhancements are needed to improve the capabilities of the parallelizing compiler.

Agrawal, Dharma P.↗

Autonomy Architectures for a Constellation of Spacecraft

Until the past few years, missions typically involved fairly large expensive spacecraft. Such missions have primarily favored using older proven technologies over more recently developed ones, and humans controlled spacecraft by manually generating detailed command sequences with low-level tools and then transmitting the sequences for subsequent execution on a spacecraft controller. This approach toward controlling a spacecraft has worked spectacularly on previous missions, but it has limitations deriving from communications restrictions - scheduling time to communicate with a particular spacecraft involves competing with other projects due to the limited number of deep space network antennae. This implies that a spacecraft can spend a long time just waiting whenever a command sequence fails. This is one reason why the New Millennium program has an objective to migrate parts of mission control tasks onboard a spacecraft to reduce wait time by making spacecraft more robust. The migrated software is called a "remote agent" and has 4 components: a mission manager to generate the high level goals, a planner/scheduler to turn goals into activities while reasoning about future expected situations, an executive/diagnostics engine to initiate and maintain activities while interpreting sensed events by reasoning about past and present situations, and a conventional real-time subsystem to interface with the spacecraft to implement an activity's primitive actions. In addition to needing remote planning and execution for isolated spacecraft, a trend toward multiple-spacecraft missions points to the need for remote distributed planning and execution. The past few years have seen missions with growing numbers of probes. Pathfinder has its rover (Sojourner), Cassini has its lander (Huygens), and the New Millenium Deep Space 3 (DS3) proposal involves a constellation of 3 spacecraft for interferometric mapping. This trend is expected to continue to progressively larger fleets. For example, one mission proposed to succeed DS3 would have 18 spacecraft flying in formation in order to detect earth-sized planets orbiting other stars. A proposed magnetospheric constellation would involve 5 to 500 spacecraft in Earth orbit to measure global phenomena within the magnetosphere. This work describes and compares three autonomy architectures for a system that continuously plans to control a fleet of spacecraft using collective mission goals instead of goals or command sequences for each spacecraft. A fleet of self-commanding spacecraft would autonomously coordinate itself to satisfy high level science and engineering goals in a changing partially-understood environment making feasible the operation of tens or even a hundred spacecraft (such as for interferometry or plasma physics missions). The easiest way to adapt autonomous spacecraft research to controlling constellations involves treating the constellation as a single spacecraft. Here one spacecraft directly controls the others as if they were connected. The controlling "master" spacecraft performs all autonomy reasoning, and the slaves only have real-time subsystems to execute the master's commands and transmit local telemetry/observations. The executive/diagnostics module starts actions and the master's real-time subsystem controls the action either locally or remotely through a slave. While the master/slave approach benefits from conceptual simplicity, it relies on an assumption that the master spacecraft's executive can continuously monitor the slaves' real-time subsystems, and this relies on high-bandwidth highly-reliable communications. Since unintended results occur fairly rarely, one way to relax the bandwidth requirements involves only monitoring unexpected events in spacecraft. Unfortunately, this disables the ability to monitor for unexpected events between spacecraft and leads to a host of coordination problems among the slaves. Also, failures in the communications system can result in losing slaves. The other two architectures improve robustness while reducing communications by progressively distributing more of the other three remote agent components across the constellation. In a teamwork architecture, all spacecraft have executives and real-time subsystems - only the leader has the planner/scheduler and mission manager. Finally, distributing all remote agent components leads to a peer-to-peer approach toward constellation control.

Barrett, Anthony↗

User modeling techniques for enhanced usability of OPSMODEL operations simulation software

The PC based OPSMODEL operations software for modeling and simulation of space station crew activities supports engineering and cost analyses and operations planning. Using top-down modeling, the level of detail required in the data base can be limited to being commensurate with the results required of any particular analysis. To perform a simulation, a resource environment consisting of locations, crew definition, equipment, and consumables is first defined. Activities to be simulated are then defined as operations and scheduled as desired. These operations are defined within a 1000 level priority structure. The simulation on OPSMODEL, then, consists of the following: user defined, user scheduled operations executing within an environment of user defined resource and priority constraints. Techniques for prioritizing operations to realistically model a representative daily scenario of on-orbit space station crew activities are discussed. The large number of priority levels allows priorities to be assigned commensurate with the detail necessary for a given simulation. Several techniques for realistic modeling of day-to-day work carryover are also addressed.

Davis, William T.↗

Rapid Development of the Seeker Free-Flying Inspector Guidance, Navigation, and Control System

Seeker is an automated extravehicular free-flying inspector CubeSat designed and built in-house at the Johnson Space Center (JSC). As a Class 1E project funded by the International Space Station (ISS) Program, Seeker had a stream-lined process to flight certification, but the vehicle had to be designed, developed, tested, and delivered within approximately one year after authority to proceed (ATP) and within a $1.8 million budget. These constraints necessitated an expedited Guidance, Navigation, and Control (GNC) development schedule. Development began with a navigation sensor trade study using Linear Covariance (LinCov) analysis and a rapid sensor down-selection process, resulting in the use of commercial off-the-shelf (COTS) sensors which could be procured quickly and subjected to in-house environmental testing to qualify them for flight. A neural network was used to enable a COTS camera to provide bearing measure-ments for visual navigation. The GNC flight software (FSW) algorithms utilized lean development practices and leveraged the Core Flight Software (CFS) architecture to rapidly develop the GNC system, tune the system parameters, and verify performance in simulation. This pace was anchored by several Hardware-Software Integration (HSI) milestones, which forced the Seeker GNC team to develop the interfaces both between hardware and software and between the GNC domains early in the project and to enable a timely delivery.

Sullivan, Jake↗

Research Traffic Management Advisor (rTMA) Up-level Final Report

The FAA Time Based Flow Management (TBFM) Program provides for operational use and continued development of the Traffic Management Advisor (TMA) technology that NASA demonstrated in 1996. Although NASA's Center-TRACON Automation System (CTAS) software baseline includes advanced versions of TMA, some research activities are better served by a version of TMA that more closely matches the FAA's TBFM software. Beginning in 2009, NASA created Research TMA (rTMA) to enable researchers to work with FAA TBFM software in a research environment. The original rTMA was derived from TBFM v3.10 and later up-leveled to TBFM v3.12. This report documents the most recent up-level effort in which rTMA was re-derived from TBFM v4.00.07.

traffic management↗

6DOF Testing of the SLS Inertial Navigation Unit

The Navigation System on the NASA Space Launch System (SLS) Block 1 vehicle performs initial alignment of the Inertial Navigation System (INS) navigation frame through gyrocompass alignment (GCA). Because the navigation architecture for the SLS Block 1 vehicle is a purely inertial system, the accuracy of the achieved orbit relative to mission requirements is very sensitive to initial alignment accuracy. The assessment of this sensitivity and many others via simulation is a part of the SLS Model-Based Design and Model-Based Requirements approach. As a part of the aforementioned, 6DOF Monte Carlo simulation is used in large part to develop and demonstrate verification of program requirements. To facilitate this and the GN&C flight software design process, an SLS-Program-controlled Design Math Model (DMM) of the SLS INS was developed by the SLS Navigation Team. The SLS INS model implements all of the key functions of the hardware-namely, GCA, inertial navigation, and FDIR (Fault Detection, Isolation, and Recovery)-in support of SLS GN&C design requirements verification. Despite the strong sensitivity to initial alignment, GCA accuracy requirements were not verified by test due to program cost and schedule constraints. Instead, the system relies upon assessments performed using the SLS INS model. In order to verify SLS program requirements by analysis, the SLS INS model is verified and validated against flight hardware. In lieu of direct testing of GCA accuracy in support of requirement verification, the SLS Navigation Team proposed and conducted an engineering test to, among other things, validate the GCA performance and overall behavior of the SLS INS model through comparison with test data. This paper will detail dynamic hardware testing of the SLS INS, conducted by the SLS Navigation Team at Marshall Space Flight Center's 6DOF Table Facility, in support of GCA performance characterization and INS model validation. A 6-DOF motion platform was used to produce 6DOF pad twist and sway dynamics while a simulated SLS flight computer communicated with the INS. Tests conducted include an evaluation of GCA algorithm robustness to increasingly dynamic pad environments, an examination of GCA algorithm stability and accuracy over long durations, and a long-duration static test to gather enough data for Allan Variance analysis. Test setup, execution, and data analysis will be discussed, including analysis performed in support of SLS INS model validation.

Geohagan, Kevin↗

Space Station Data Systems development

The content and status of the evolving Space Station Data System (SSDS) development program are presented. High level system requirements and schedules are reviewed, and the challenges of SSDS development are discussed. Present content of the program consists of three major activities: (1) two contracted parallel Space Station Data System architecture studies; (2) the space station phase B definition studies to be awarded in early 1985; and (3) a test bed project for the evaluation and proof-of-concept of data systems technology for space station applications and for the advanced development of long-lead hardware and software for the initial and growth space station configurations. An overview of the present SSDS concept is provided, and the roles of NASA centers in this activity are summarized.

Bigham, J. P., Jr.↗

Stochastic decision analysis

Small space flight project design at NASA Langley Research Center goes through a multi-phase process from preliminary analysis to flight operations. The process insures that each system achieves its technical objectives with demonstrated quality and within planned budgets and schedules. A key technical component of early phases is decision analysis, which is a structure procedure for determining the best of a number of feasible concepts based upon project objectives. Feasible system concepts are generated by the designers and analyzed for schedule, cost, risk, and technical measures. Each performance measure value is normalized between the best and worst values and a weighted average score of all measures is calculated for each concept. The concept(s) with the highest scores are retained, while others are eliminated from further analysis. This project automated and enhanced the decision analysis process. Automation of the decision analysis process was done by creating a user-friendly, menu-driven, spreadsheet macro based decision analysis software program. The program contains data entry dialog boxes, automated data and output report generation, and automated output chart generation. The enhancements to the decision analysis process permit stochastic data entry and analysis. Rather than enter single measure values, the designers enter the range and most likely value for each measure and concept. The data can be entered at the system or subsystem level. System level data can be calculated as either sum, maximum, or product functions of the subsystem data. For each concept, the probability distributions are approximated for each measure and the total score for each concept as either constant, triangular, normal, or log-normal distributions. Based on these distributions, formulas are derived for the probability that the concept meets any given constraint, the probability that the concept meets all constraints, and the probability that the concept is within a given amount of the best score. Formulas are also derived for the probability that one concept's total score is within a given amount of a second concept's total score. These probabilistic calculations provide more realistic data entry and output information for designers, enabling designers to better determine which concepts to eliminate and which concepts to retain at the decision points of each design phase.

Lacksonen, Thomas A.↗

The Inertial Stellar Compass (ISC): A Multifunction, Low Power, Attitude Determination Technology Breakthrough

The Inertial Stellar Compass (ISC) is a miniature, low power, stellar inertial attitude determination system with an accuracy of better than 0.1 degree (1 sigma) in three axes. The ISC consumes only 3.5 Watts of power and is contained in a 2.5 kg package. With its embedded on-board processor, the ISC provides attitude quaternion information and has Lost-in-Space (LIS) initialization capability. The attitude accuracy and LIS capability are provided by combining a wide field of view Active Pixel Sensor (APS) star camera and Micro- ElectroMechanical System (MEMS) inertial sensor information in an integrated sensor system. The performance and small form factor make the ISC a useful sensor for a wide range of missions. In particular, the ISC represents an enabling, fully integrated, micro-satellite attitude determination system. Other applications include using the ISC as a single sensor solution for attitude determination on medium performance spacecraft and as a bolt on independent safe-hold sensor or coarse acquisition sensor for many other spacecraft. NASA's New Millennium Program (NMP) has selected the ISC technology for a Space Technology 6 (ST6) flight validation experiment scheduled for 2004. NMP missions, such a s ST6, are intended to validate advanced technologies that have not flown in space in order to reduce the risk associated with their infusion into future NASA missions. This paper describes the design, operation, and performance of the ISC and outlines the technology validation plan. A number of mission applications for the ISC technology are highlighted, both for the baseline ST6 ISC configuration and more ambitious applications where ISC hardware and software modifications would be required. These applications demonstrate the wide range of Space and Earth Science missions that would benefit from infusion of the ISC technology.

Bauer, Frank H.↗

Planning the FUSE Mission Using the SOVA Algorithm

Three documents discuss the Sustainable Objective Valuation and Attainability (SOVA) algorithm and software as used to plan tasks (principally, scientific observations and associated maneuvers) for the Far Ultraviolet Spectroscopic Explorer (FUSE) satellite. SOVA is a means of managing risk in a complex system, based on a concept of computing the expected return value of a candidate ordered set of tasks as a product of pre-assigned task values and assessments of attainability made against qualitatively defined strategic objectives. For the FUSE mission, SOVA autonomously assembles a week-long schedule of target observations and associated maneuvers so as to maximize the expected scientific return value while keeping the satellite stable, managing the angular momentum of spacecraft attitude- control reaction wheels, and striving for other strategic objectives. A six-degree-of-freedom model of the spacecraft is used in simulating the tasks, and the attainability of a task is calculated at each step by use of strategic objectives as defined by use of fuzzy inference systems. SOVA utilizes a variant of a graph-search algorithm known as the A* search algorithm to assemble the tasks into a week-long target schedule, using the expected scientific return value to guide the search.

Lanzi, James↗

IV&V Project Assessment Process Validation

The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

Driskell, Stephen↗

Lessons Learned During the Refurbishment and Testing of an Observatory After Long-Term Storage

Thermal Fluids Analysis Workshop (TFAWS) 2015, Silver Spring, MD NCTS 21070-15. This paper addresses the lessons learned during the refurbishment and testing of the thermal control system for a spacecraft which was placed into long-term storage. The DSCOVR (Deep Space Climate Observatory) Observatory (formerly known as Triana) was originally scheduled to launch on the Space Shuttle in 2002. With the Triana spacecraft nearly complete, the mission was canceled and the satellite was abruptly put into storage in 2001. In 2008 the observatory was removed from storage to begin refurbishment and testing. Problems arose associated with hardware that was not currently manufactured, coatings degradation, and a significant lack of documentation. Also addressed is the conversion of the thermal and geometric math models for use with updated thermal analysis software tools.

Thermal Control System↗

Collaborative Systems Engineering in the Ascent Abort-2 Crew Module/Separation Ring Project

Generally speaking, systems engineering (SE) tool-sets face a dilemma balancing power and accessibility. High-powered SE tools (MagicDraw, Cradle, Core, etc.) tend to be specialized and are available only to highly trained Systems Engineers, and/or through the use of a 'back room' developer team making the output products available to the broader team. On the other hand, highly accessible tools (MS Word, Excel, etc.) do not have the power to implement SE in a rigorous manner. NASA has to test all aspects of the new human-rated Orion Multi-Purpose Crew Vehicle spacecraft prior to its first crewed mission. The test program includes uncrewed launch abort flight tests to demonstrate the capability to save the crew in the event that a launch failure occurs. Orion's second abort flight test will be a low-altitude flight test known as "Ascent Abort 2 (AA-2)." This test is currently scheduled to be carried out at Cape Canaveral Air Force Station's Space Launch Complex 46 (SLC-46) in Florida in 2019. NASA's in-house AA-2 Crew Module and Separation Ring (CSR) Team is producing the crew module and separation ring. Operating jointly as both an Advanced Exploration Systems (AES) Project and an Orion Project, the CSR project charter includes development of innovative, streamlined and generally more efficient practices for creation of flight hardware and software. One result of this tasking has been development of a collaborative and data-centric systems engineering environment within the team's shared web environment (Microsoft SharePoint). Through the use of built-in, 'out of the box capabilities' present in MS SharePoint, the CSR Systems Engineering team has created (with some limited developer support) a data-centric architecture for the project's SE implementation, including functional and interface analysis, requirements development and management, risk management, verification planning and management, test results, and end item management. Data elements are linked between data structures so as to define and control relationships between item types, link requirements to parents and children, and link tests to the requirements that they verify. The overall project team integration is increased by also linking SE content to project management content over the project life cycle, including team communication, action items, configuration management, decisional and meeting materials, and life cycle reviews. This presentation will provide an overview of the collaborative SE environment, showing how it provides the power for a number of SE tasks while still providing the accessibility and transparency to allow the full project team to collaborate and succeed. Given the project phase, we'll be able to present a nearly full lifecycle discussion, from concept through verification and approaching delivery.

Systems Engineering environments↗

Algorithms and software for nonlinear structural dynamics

The objective of this research is to develop efficient methods for explicit time integration in nonlinear structural dynamics for computers which utilize both concurrency and vectorization. As a framework for these studies, the program WHAMS, which is described in Explicit Algorithms for the Nonlinear Dynamics of Shells (T. Belytschko, J. I. Lin, and C.-S. Tsay, Computer Methods in Applied Mechanics and Engineering, Vol. 42, 1984, pp 225 to 251), is used. There are two factors which make the development of efficient concurrent explicit time integration programs a challenge in a structural dynamics program: (1) the need for a variety of element types, which complicates the scheduling-allocation problem; and (2) the need for different time steps in different parts of the mesh, which is here called mixed delta t integration, so that a few stiff elements do not reduce the time steps throughout the mesh.

Belytschko, Ted↗