Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical progress report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

828 records · Page 46

Nuclear Safety [Vol. 29, No. 1, January-March 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. THE CHERNOBYL ACCIDENT: 1 Core History and Nuclide Inventory of the Chernobyl Core at the Time of Accident by Gerald Kirchner and Cornelius C. Noack; GENERAL SAFETY CONSIDERATIONS: 6 Nonprescriptive Nuclear Safety Regulation: The Example of Loss of Offsite Power by M. W. Golay, V. P. Manno, and C. Vlahoplus, Jr., 20 Nuclear Power Safety Goals in Light of the Chernobyl Accident by C. Whipple and C. Starr; ACCIDENT ANALYSIS: 29 Containment Loads from Severe Accidents—U.S. Program by W. Kerr and M. K. Dey; PLANT SAFETY FEATURES: 36 Safety Characteristics of Modern High-Temperature Reactors: Focus on German Designs by W. Kröger, H. Nickel, and R. Schulten; ENVIRONMENTAL EFFECTS: 49 Radiation Hormesis and Nuclear Safety by C. C. Congdon; OPERATING EXPERIENCES: 58 Evaluation of Nonradiological Water Chemistry at Power Reactors by Harvey Zibulsky, James J. Kottan, Walter J. Pasciak, Mary Ann Castrogivanni, and Sujit Banerjee, 64 Reactor Shutdown Experience Compiled by J. W. Cletcher, 67 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 85 General Administrative Activities Compiled by E. G. Silver, 94 Reports, Standards, and Safety Guides by D. S. Queener, 100 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 103 Proposed Rule Changes as of Sept. 30, 1987; ANNOUNCEMENTS: 5 Northwestern University Short Course on Radiation Safety, 28 International Approach to Nuclear Safety (After Three-Mile Island and Chernobyl), 57 RPI Short Course on Modern Developments in Boiling Heat Transfer and Two-Phase Flow, 107 20th DOE/NRC Nuclear Air Cleaning Conference, 110 Third International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations, 108 The Authors, 111 Indexes to Nuclear Safety, Volume 28.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends with Washed and Unwashed Legacy Coals and Other Waste Fuels to Generate White Hydrogen

The objective of this effort, primarily funded by the United States Department of Energy (DOE), and led by the Electric Power Research Institute, Inc. (EPRI), with support by Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), has been to qualify coal, biomass, and plastic waste blends based on performance testing of selected fuel pellet compositions in a pilot-scale updraft moving-bed (UDMB) gasifier. The testing provided relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are the focus. The gasifier used for testing is HMI’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips (biomass). However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The three feedstocks were densified and pelletized by California Pellet Mill (CPM) to meet the feedstock size required by Sotacarbo’s 30mm ID UDMB gasifier, under contract to HMI. The technical tasks and results from this two-year research project included: (1) Feed Procurement and Preparation: Nine different tri-fuel pellets were prepared from varying compositions of fresh mined PRB coal, corn stover biomass, and car fluff waste plastics. Tri-fuel pellets were produced by CPM and shipped to Sotacarbo’s test facility in Carbonia, Sardinia, Italy. (2) Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different UDMB gasification tests to be performed in Sotacarbo’s 12-inch ID pilot scale gasifier, the process monitoring instrumentation used, and the extractive samples recovered for analysis of the total gasification process mass and energy balance. (3) Gasifier Testing: Nine different gasification runs were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstock compositions generated from varying mixtures of PRB coal, biomass, and plastic wastes. The testing generated performance data on gasification reaction efficiency and performance, yielding relevant data for models used to scale up the gasifier design. This task also included work to refurbish and reassemble the pilot gasifier at Sotacarbo and perform a baseline 100% PRB coal run. (4) Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results are reported in the project’s final report, published in March 2024. The results show that all tri-fuel pellets gasified well and maintained structural integrity throughout the gasification process. The syngas generated can be shifted to hydrogen by using commercial syngas shifting technologies. (5) High Fidelity computational fluid dynamics (CFD) Simulation: The National Energy Technology Laboratory (NETL) team performed CFD simulations of the UDMB gasifier for two of the tri-fuel pellets gasified in Sotacarbo’s pilot scale gasifier. The kinetic mechanisms for the pyrolysis of each constituent, PRB coal, corn stover biomass, and waste plastics are based on thermogravimetric analysis performed by Sotacarbo. The gasification model was validated by comparing the predicted syngas composition at the exit of the gasifier with the measured syngas composition. In addition, the reactor’s measured internal temperature profile agreed well with the predicted internal reactor temperature profile. These results validate that the model can be used to predict the performance of the updraft moving bed gasifier for different feedstocks and operating conditions. This paper summarizes the results of the completed work in which the pelletizing procedure was validated to ensure the viability of the tri-fuel pellets for the gasification runs performed at Sotacarbo’s 30 mm UDMB gasifier. The gasification performance data from this series of nine runs will enable modeling of a full-scale HMI industrial scale gasifier supporting both combined heat and power, and Hydrogen production from coal (both fresh mined and legacy) combined with various biomass and waste plastics. Additionally, plans and progress on a follow-up project, being executed by the same project team, will be presented. In this project, a total of twenty (20) different feedstocks are being prepared from varying compositions of biomass (both woody biomass and corn stover) with a mixture of legacy coal waste, plastic waste, and refuse-derived fuel (RDF). The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design to 50 megawatt electric (MWe) (equivalent hydrogen production). Tests will also be performed on a bench-scale fluidized-bed gasifier for comparison purposes. The results of this testing will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends.

08 HYDROGEN↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2009

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) characterize site environmental management performance; (2) summarize environmental occurrences and responses reported during the calendar year; (3) Confirm compliance with environmental standards and requirements; and (4) highlight the WIPP Environmental Management System (EMS) and significant environmental programs and accomplishments, including progress toward the DOE Environmental Sustainability Goals. The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of EGS Fracture Network Lifecycles

Geothermal energy is relatively clean, and is an important non-hydrocarbon source of energy. It can potentially reduce our dependence on fossil fuels and contribute to reduction in carbon emissions. High-temperature geothermal areas can be used for electricity generation if they contain permeable reservoirs of hot water or steam that can be extracted. The biggest challenge to achieving the full potential of the nation’s resources of this kind is maintaining and creating the fracture networks required for the circulation, heating, and extraction of hot fluids. The fundamental objective of the present research was to understand how fracture networks are created in hydraulic borehole injection experiments, and how they subsequently evolve. When high-pressure fluids are injected into boreholes in geothermal areas, they flow into hot rock at depth inducing thermal cracking and activating critically stressed pre-existing faults. This causes earthquake activity which, if monitored, can provide information on the locations of the cracks formed, their time-development and the type of cracking underway, e.g., whether shear movement on faults occurred or whether cracks opened up. Ultimately it may be possible to monitor the critical earthquake parameters in near-real-time so the information can be used to guide the hydraulic injection while it is in progress, e.g., how to adjust factors such as injectate pressure, volume and temperature. In order to achieve this, it is necessary to mature analysis techniques and software that were, at the start of this project, in an embryonic developmental state. Task 1 of the present project was to develop state-of-the-art techniques and software for calculating highly accurate earthquake locations, earthquake source mechanisms (moment tensors) and temporal changes in reservoir structure. Task 2 was to apply the new techniques to hydrofracturing (Enhanced Geothermal Systems, or “EGS”) experiments performed at the Coso geothermal field, in order to enhance productivity there. Task 3 was to interpret the results jointly with other geological information in order to provide a consistent physical model. All of the original goals of the project have been achieved. An existing program for calculating accurate relative earthquake locations has been enhanced by a technique to improve the accuracy of earthquake arrival-time measurements using waveform cross-correlation. Error analysis has been added to pre-existing moment tensor software. New seismic tomography software has been written to calculate changes in structure that could be due, for example, to reservoir depletion. Data processing procedures have been streamlined and web tools developed for rapid dissemination of the results, e.g., to on-site operations staff. Application of the new analysis tools to the Coso geothermal field has demonstrated the effective use of the techniques and provided important case histories to guide the style of future applications. Changes in reservoir structure with time are imaged throughout the upper 3 km, identifying the areas where large volumes of fluid are being extracted. EGS hydrofracturing experiments in two wells stimulated a nearby fault to the south that ruptured from south to north. The position of this fault could be precisely mapped and its existence was confirmed by surface mapping and data from a borehole televiewer log. No earthquakes occurred far north of the injection wells, suggesting that the wells lie near the northern boundary of the region of critically stressed faults. Minor en-echelon faults were also activated. Significant across-strike fluid flow occurred. The faults activated had significant crack-opening components, indicating that the hydraulic fracturing created open cavities at depth. The fluid injection changed the local stress field orientation and thus the mode of failure was different from the normal background. Initial indications are that the injections modulated stress release, seismicity and natural fracture system evolution for periods of up to months. The research demonstrated full technical effectiveness and economic feasability of seismic monitoring of EGS injections using earthquakes as the sources. It is critical that high-quality data are available for the most useful results to be obtainable. The biggest challenge to the subject at present is to install earthquake monitoring networks of sufficient quality to deliver data that can take full advantage of the new techniques developed by this project. An industrial standard operating approach is proposed in this report. When adopted, it will potentially contribute significantly to developing fully the nations geothermal energy potential by assisting in creating the fracture networks necessary for geothermal resources to be extracted from the ground.

15 GEOTHERMAL ENERGY↗

A New Appraisal- Lessons from the History of Efforts to Value Green and High-Performance Home Attributes in the United States

Rigorous consideration of green and high-performance (“green/HP”) features is rarely included in the property valuation process._ To help illuminate why this is the case, this report takes stock of the history of efforts to improve practices, and identifies barriers that have emerged and opportunities for overcoming them. Particular emphasis is placed on what energy and environmental policymakers and other stakeholders outside the appraisal community can contribute to the broader effort to advance professional practices. The history has unfolded in parallel with turbulent periods in the housing market for which appraisers and their customers are deemed to share responsibility, followed by cycles of regulations, siloing of appraisers in the name of professional integrity, and commoditization of the valuation process itself. This pattern has important ramifications for aspirations that appraisers engage more fully in identifying and valuing the green/HP characteristics of homes. On the one hand, it is legally and ethically incumbent on appraisers to do so, yet on the other hand it is perceived as a risky avenue to follow. Risks arise where findings can be challenged as either over- or under-stating value, together with a market environment in which the complexity of their assignments increases despite downward pressure on appraiser fees. While efforts to address green/HP considerations date back to the early 1980s, the vast majority of activity has taken place within the past five years. Many players have engaged in the efforts to promote improved valuation practices. These include the Appraisal Foundation, The Appraisal Institute, Colorado Energy Office, Earth Advantage, EcoBroker, Elevate Energy, Fannie Mae, Federal Housing Administration, Home Innovation Research Labs, The Institute for Market Transformation, Northwest Energy Efficiency Alliance, National Association of Homebuilders, National Association of State Energy Officials, National Association of Appraisers, RESNET, USEPA, USDOE and its National Laboratories, the U.S. Green Buildings Council, and the Vermont Green Homes Alliance. Many activities have resulted, ranging from trainings, to data-gathering instruments, and the emergence of a literature attempting to statistically isolate the effects of green/HP characteristics on home values. In some cases, the results of studies have been overgeneralized and oversold, and embodied flawed methods. Although the green/HP community has encouraged appraisers to focus on exemplary buildings (e.g., LEED or ENERGY STAR Certified), any level of green or energy performance can in fact influence value, including below-average performance (a.k.a. “brown discount”), irrespective of whether or not the building has been formally rated. This overly narrow focus represents a significant missed opportunity. Other surmountable challenges include limitations to non-appraisers’ understanding of the appraisal process (and practical constraints therein). A byproduct of this can be unrealistic expectations of what appraisers can and will do in the marketplace. These challenges notwithstanding, the environment for moving forward has improved. There is better data today (a critical need); expanded efforts to disclose energy use information (characteristics, consumption, bills); improved and more pervasive building energy codes, building rating and labeling initiatives; and a host of federal, state, and local policies that have collectively brought green/HP practices much more into the mainstream. Meanwhile, a renewed focus on professional standards of care and competency for assessing green/HP homes make it increasingly important for appraisers to consider these factors in their assignments. Despite the past four decades of studies, there is little if any discernible uptake of these practices by the appraisal practice at large. It would behoove interested parties to step back and consider what new strategies might be productive. A key element of any new plan should be to reset the nature of interactions with the industry, with the goal a more collaborative, two-way discussion to help improve outsiders’ understanding of the valuation process. It is not only the appraiser that needs to be engaged and could benefit from awareness raising. Homeowners, builders, lenders, utilities, insurance companies should also provide input on how green/HP factors impact property valuations and ways to accurately reflect these considerations in appraisals and real estate transactions more broadly. Given extensive inertia within the appraisal industry and a mixed history of interactions with the non-appraisal stakeholders, it is unlikely that the status quo will achieve much unless followed with more coordinated and persistent efforts. Workshops, studies, and memoranda of understanding will not on their own have much impact, and do not address deeper structural issues. Expectations are often unrealistic and not attentive to real-world constraints faced by appraisers. The report identifies key barriers impeding more thorough consideration of green/HP factors in residential real estate appraisals, and solutions for mitigating them. Barriers • Although industry standards of practice caution against bias of any sort, a skeptical predisposition towards “green” is reinforced by information deficiencies. • Information deficiencies result from the lack or difficulty of obtaining usable data on green/HP features in subject properties as well as valid sales comparisons or cashflow analyses. • Competency deficiencies, such as lack of conversancy in relevant technical topics, leads to oversights, and disjointed treatment of relevant information. • Time/cost pressure and process commoditization (e.g., template-based approaches) result from highly constrained budgets, quick turn-around times expected of appraisers, and standardized practices that were not developed with green/HP considerations in mind. • Professional differences between appraisers and sustainability professionals include divergent objectives, the former being market observers and the latter market influencers. • Risk aversion arises from multiple concerns including veracity, accuracy, and persistence of energy data, impacts of operational choices, new sources of appraiser liability associated with green/HP assessments, industry pressures not to over-value buildings or suggestion of bias, and concern about spending non-billable time on complex assignments. • A public policy vacuum has been created by disjointed and uncoordinated efforts from public-sector stakeholders, insufficient efforts to discuss and understand the appraisal industry and process, and a perception by some valuation professionals that green/HP is oversold. Opportunities • Elevating the competency of appraisers can be achieved through a combination of improved industry standards of care and equal-access training and professional development offerings. • Development of better information resources must focus on building-level information that provides robust documentation as well as aggregate sales-comparison data and other contextual information such as local codes, typical upgrade costs, energy prices, etc. • Improved energy benchmarking and rating tools could provide appraisers with information more well-adapted to their particular needs, which differ from those of typical audiences such as energy managers. • Better characterizing and managing risk will enable appraisers to cope with uncertainties in performance information, and help identify where risks may be introduced or mitigated by green/HP features, including higher costs or obsolescence of poorly-performing buildings. • Integrating disaster resilience and sustainability in appraisals would recognize important synergisms among these features, including durability and ability of green/HP buildings to better withstand external hazards. • Mitigating the problem of additional time/cost for performing assignments is an essential need that can be addressed by providing easier access to information and analytic procedures, perhaps coupled with new resources to defray the associated costs. • Enhancing demand for improved appraisals is a fundamental need, and depends on owners, developers, lenders, and others soliciting competent appraisers to perform scopes that expressly call out green/HP considerations, and to critically review the work product for compliance before acceptance. • Engaging new market participants, such as energy utilities and insurance companies can ensure fuller representation and participation of market stakeholders already engaged in green/HP activities and capable of furnishing valuable data and managing associated risks. Cutting across these individual activities, there is a need for outside stakeholders to formulate and follow a roadmap instead of piecemeal initiatives, bridging the professional/cultural divide between appraisers and green/HP communities, and tracking progress in order to know what is working. A more coherent communication and training strategy is needed, as the appraisal industry is highly fragmented, with two-thirds of appraisers opting out of membership in trade associations. In sum, while there is no silver bullet for advancing the practice of valuing green/HP features, there are concrete opportunities. Parties seeking solutions must identify barriers they wish to address and select from among potential initiatives that map to those barriers. Close collaboration with the appraisal community is critical, as non-appraisers have historically obtained limited traction with this industry due to lack of understanding of the nuances involved in the valuation profession. Large organizations and agencies should have a united approach; the perception or reality of a fragmented and uncoordinated strategy is unsettling for prospective partners in the appraisal industry. This requires improved communication and education within and among these communities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ultra Efficient Light Duty Powertrain with Gasoline Low Temperature Combustion (Final Report)

This document details the work completed during Project DE-EE0006839 ‘Ultra Efficient Light Duty Powertrain with Gasoline Low Temperature Combustion’. All tasks from the project’s Statement of Project Objectives are discussed. Final demonstration data is also presented and discussed. Further project details can be found in the Quarterly Technicial Reports that were submitted during the course of the project and are stored on the EERE Project Management Center Website. The goal of this project was to develop, implement and demonstrate a low temperature combustion approach called Gasoline Direct Injection Compression Ignition (GDCI) that provides high thermal efficiency with low NOx and PM emissions. The project target was to demonstrate a 35% fuel economy improvement over the baseline vehicle while meeting Tier 3 emissions levels. At the start of this project, GDCI was a moderately mature combustion technology, due in large part to advances made during a Delphi Technologies program funded through an earlier Department of Energy Advanced Technology Powertrains (ATP) opportunity; under that earlier contract, DE-EE0003258, Delphi Technologies assembled a team with complementary industrial and academic experience, and led this team to advance the technology from the original fundamental work to the state of art embodied by a first-generation (Gen 1) multi-cylinder GDCI engine. Key activities during that project centered on engine and combustion chamber design, and development of fuel injection equipment, valvetrain and advanced controls. Performance results with the Gen 1 engine in a development vehicle demonstrated that GDCI had the capability to operate using Low Temperature Combustion (LTC) over a broad speed-load range. Based on benchmarking work, efficiency for the Gen 1 GDCI engine compared favorably overall to production light-duty diesel engines. The second DOE funded project, DE-EE0006839, focused on a number of technical risks and issues that were left to be resolved for GDCI to become a production-viable technology. These risks were:GDCI combustion system refinement to achieve near-ideal air/fuel mixture preparation for high efficiency and low HC and CO emissions; Transient control development for low temperature combustion with high EGR levels during real-world transient driving maneuvers and over a broader range of ambient conditions; Aftertreatment system design that is effective in dealing with the low-temperature challenges of a highly efficient engine. The project was executed in two phases. Phase 1 leveraged the development vehicle from the Advanced Technologies Powertrain 1 (ATP1) project, DE-EE0003258. That vehicle was used as an initial test bed in the development of a high performance low temperature exhaust aftertreatment system. The vehicle was also used to develop calibration refinements for improved exhaust emissions and fuel efficiency. Samples of a new GDCI development level engine, called Gen2 GDCI (and developed outside of the first DOE funded project), were also used during Phase 1 to develop refined controller hardware and control algorithms, as well as improved sensors and actuators. The Gen2 engine was then retrofitted into the development vehicle from the ATP1 project and used for controls refinement and calibration of GDCI to achieve improved cold start, drivability and robustness to real world environments and fuel variations. During Phase 2 of the project, Gen3 versions of the GDCI engine were designed and built specifically for this project based on experience from the earlier engines. These engines were designed to be production-like in construction and, when combined with refined control systems and project specific low temperature exhaust aftertreatment, were intended to support the goal of meeting Tier 3 emissions levels at a vehicle level. Though great progress had been made advancing the GDCI combustion process, and despite extensive presentations of our work on the technology at various conferences and in direct meetings with automotive companies, none of the US domestic automotive OEMs had shown an interest in adopting this combustion process as part of their technology planning as the project approached the Go/No-Go point at the end of Budget Period 3. As a result of this low-level of interest both the US Department of Energy and Delphi Technologies received in this technology from domestic auto manufactures, Delphi Technologies elected a ‘No-Go’ status for the gate between Budget Period 3 and Budget Period 4 which terminated the project without spending any Budget Period 4 funds. The project team concluded that the dynamometer mapping of the most recent level of hardware, combined with the vehicle level simulation by Argonne National Laboratory, was sufficient to document the capabilities and potential of the combustion process without spending the time and money to do the controls development and full calibration necessary for a demonstration vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Final Report: DOE/ID/14215

The proposed straw separation system developed in the research project harvests the large internode sections of the straw which has the greater potential as a feedstock for lignocellulosic ethanol production while leaving the chaff and nodes in the field. This strategy ensures sustainable agriculture by preventing the depletion of soil minerals, and it restores organic matter to the soil in amounts and particle sizes that accommodate farmers’ needs to keep tillage and fertilizer costs low. A ton of these nutrient-rich plant tissues contains as much as $10.55 worth of fertilizer (economic and energy benefits), in terms of nitrogen, phosphorus, potassium, and other nutrients provided to the soil when incorporated by tillage instead of being burned. Biomass conversion to fermentable sugars for the purpose of producing fuels, chemicals, and other industrial products is well understood. Most bioenergy strategies rely on low-cost fermentable sugars for sustainability and economic viability in the marketplace. Exploitation of the “whole crop”—specifically, wheat straw or other plant material currently regarded as residue or waste—is a practical approach for obtaining a reliable and low-cost source of sugars. However, industrial-scale production of sugars from wheat straw, while technically feasible, is plagued by obstacles related to capital costs, energy consumption, waste streams, production logistics, and the quality of the biomass feedstock. Currently available separation options with combine harvesters are not able to achieve sufficient separation of the straw/stover and chaff streams to realize the full potential of selective harvest. Since ethanol yield is a function of feedstock structural carbohydrate content, biomass anatomical fractions of higher product yield can have a significant beneficial impact on minimum ethanol selling price. To address this advanced biomass separation computation engineering models were developed to more effectively and efficiently engineer high-fidelity and high throughput separation systems for biomass components. INL and Iowa State University developed a computational modeling strategy for simulating multi-phase flow with an integrated solver using various computational fluid dynamics (CFD) codes. ISU set up a classic multi-phase test problem to be solved by the various CFD codes. The benchmark case was based on experimental data for bubble gas holdup and bed expansion for a gas/solid fluidized bed. Preliminary fluidization experiments identified some unexpected fluidization behavior, where rather than the bed uniformly fluidizing, a “blow out” would occur where a hole would open up in the bed through which the air would preferentially flow, resulting in erratic fluidization. To improve understanding of this phenomena and aid in building a design tool, improved computational tools were developed. The virtual engineering techniques developed were tested and utilized to design a separation baffle in a CNH combine. A computational engineering approach involving modeling, analysis, and simulation was used in the form of virtual engineering to design a baffle separator capable of accomplishing the high-fidelity residue separation established by the performance targets. Through the use of the virtual engineering model, baffle designs were simulated to (1) determine the effect of the baffle on the airflow of the combine cleaning system, and (2) predict the effectiveness of the baffle in separating the residue streams. A baffle design was selected based on the virtual engineering modeling, built into the INL selective harvest test combine. The result of the baffle changes improved the crop separation capability of the combine, enabling downstream improvement in composition and theoretical ethanol yield. In addition, the positive results from the application of the virtual engineering tools to the CNH combine design resulted in further application of these tools to other INL areas of research. INL and the University of Idaho identified, characterized, and modified a key plant biosynthetic lignin gene, cinnamoyl CoA reductase (CCR), to assess its influence on the efficiency with which the resulting biomaterials interact with and are processed by engineering systems. The characterization of CCR genes and resulting antisense gene constructs enabled the modification and assessment of the impact of cell wall biosynthetic gene in wheat. This allows the model systems needed to study the structural and functional post-harvest properties of straw to be created and assessed. Progress was made toward identifying and using key CCR lignin biosynthesis gene sequences for controlling lignin biosynthesis with the goal of altering lignin content and composition in wheat. This was important because of the potential impact that reduced lignin could have on feedstock harvesting, transportation, storage, pretreatment, and processing.

09 BIOMASS FUELS↗

High Energy Storage Capacity Low Cost Iron Flow Battery

A new flow battery was proposed that utilizes low cost materials: iron as the only active element, cheap aqueous electrolytes, and inexpensive separators. During charging, ferrous iron (Fe 2+ ) is oxidized to ferric iron (Fe 3+ ) at the positive electrode while it (Fe 2+ ) is reduced to form iron metal (Fe 0 ) at the negative electrode. Because iron is plated at the negative electrode during charging, conventional electrode structures couple the energy storage capacity and the power rating of the battery. In order to decouple the energy and power ratings and regain the economic advantages of a flow battery, a slurry electrode design was proposed for use as the negative electrode. The slurry electrode is made by flowing electrically conductive particles in an electrolyte containing the dissolved iron species. On charging, iron is plated onto the particles. The particles can then carry the iron metal out of the cell to be stored in external reservoirs. This project looked to develop a slurry for the negative electrode of the all-iron flow battery that can operate at 200 mA/cm 2 with <100 mV overpotential, be pumped with parasitic energy costs < 10%, and promote plating on the particles. A scalable and stackable cell design of 1100 cm 2 was developed. The project was initially under contract in mid-January 2013. The project was converted from a one-year proof of concept seedling to an additional two-year program, then extended with an 18-month plus-up, and finally with an additional 6-month approved cost-overrun. During the seeding project, the concept of plating on carbon particles in a slurry was demonstrated. However, this was accomplished with high-cost multi-walled carbon nanotubes as the slurry material. The following two-year program discovered several low-cost carbon blacks that could also be used in this application. These findings were supported by an analysis that demonstrated the effectiveness of the carbon that takes into account not just the effective electronic conductivity of the slurry, but also the surface area per volume of the slurry. It was demonstrated that stable, flowable slurries could be created with these carbons, even when the carbons where fully loaded with iron during charging. During the two-year program, laboratory-scale 50 cm 2 single-cells demonstrated charge-discharge cycling at current densities of 150 mA/cm 2 and energy efficiencies of >50%. Meanwhile, cost modeling continued to show promise for this energy storage approach. Following the conversion period, the overall objective of the nominally 18-month plus up period was to close the technical gap of a 25X scale-up and reduce risk to enable commercial investment required to develop a slurry iron flow battery product. A specific objective was to demonstrate 150 cycles of performance exceeding 70% energy efficiency with a 10-cell stack of 1156 cm 2 cells operating at 100 mA/cm 2 . The 10-cell short stack was designed to have a power delivery rating of approximately 1 kW, which represents a size commensurate with the requirements of our commercialization partner at that time. A complete battery support system for the full-size cell was designed, fabricated, and tested. This includes pumps (multiple types were considered, and constant volume hose pumps were found to be acceptable for performance and cost), electrolyte rebalance reactor, and sensors and control systems. The support system proved to be well-behaved and worked well. A new low-cost membrane was developed for this system based on a microporous polymer support with a layer of hydrogel polymer. The membrane had low resistivity, and significantly reduced pressure driven fluid flow across the membrane (as compared to the un-coated microporous support). This membrane approach was scaled-up in conjunction with a commercial toll coating company, and a large amount of membrane was manufactured to support large cell and stack testing. A new concept for an electrolyte rebalance reactor to react hydrogen gas from the negative electrolyte (from plating inefficiency) with excess ferric ion in the positive electrolyte was developed. This design was very simple, low cost, and effective. The full scale 1156 cm 2 single-cell was designed, modeled, fabricated and tested. Modeling showed that uniform flow-distribution should be obtained with the designed flow distributor. The design took into consideration the need to stack the cells, and components were fabricated for a ten-cell stack. Testing of the cell for charge and discharge demonstrated current densities of 50 mA/cm 2 with efficiencies of 50%. However, optimization and long cycling could not be accomplished because the slurry electrode would plug within the cell and block the flow. This would shut down the cell after several charge-discharge cycles. Various approaches were pursued to address this problem with some progress. However, there was not adequate time to find solutions to the problem although several promising approaches were identified for future work. The final deliverable for this proposed 18-month effort was to be a 1 kW, 6 kWh slurry flow battery, with complete balance of plant, ready for testing at an ARPA-E ‘Charges’ site with an estimated capital cost less than $\$ $45/kWh for a six-hour system (excluding power electronics). The deliverable milestone was not achieved for reasons mentioned above related to the slurry plugging. At the completion of this project, it was determined that the cost targets are achievable. The cost estimate for a 1 MW system with a one-hour capacity was estimated at $\$ $140/kWh (including power electronics) and for a six-hour system was estimated at $\$ $40/kWh (including power electronics). These costs include the battery, the balance of plant, the power conditioning and a concrete pad. This program resulted in three patents including the slurry-based iron flow battery, the rebalance reactor, and the membrane separator. At the time of this report, slurry-based iron flow battery patents have been issued in the US, China, Japan, Korea, and Europe. The other patent applications were under various stages of examination. A licensee was identified and the company initiated a scale-up and development program to take this technology to the marketplace, and CWRU staff have transferred their know-how and knowledge base to the company. This technology will enhance the economic and energy security of the United States by enabling the use of intermittent renewable energy technology, such as wind and solar power, as dispatchable resources. This report summarizes the results of this research and development program.

25 ENERGY STORAGE↗

Technical Review Report for the Mound 1KW Package Safety Analysis Report for Packaging Waiver for the Use of Modified Primary Containment Vessel (PCV)

This Technical Review Report (TRR) documents the review, performed by the Lawrence Livermore National Laboratory (LLNL) staff, at the request of the U.S. Department of Energy (DOE), on the Waiver for the Use of Modified Primary Containment Vessels (PCV). The waiver is to be used to support a limited number of shipments of fuel for the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) Project in support of the National Aeronautics and Space Administration's (NASA's) Mars Science Laboratory (MSL) mission. Under the waiver, an inventory of existing national security PCVs will be converted to standard PCVs. Both types of PCVs are currently approved for use by the Office of Nuclear Energy. LLNL has previously reviewed the national security PCVs under Mound 1KW Package Safety Analysis Report for Packaging, Addendum No. 1, Revision c, dated June 2007 (Addendum 1). The safety analysis of the package is documented in the Safety Analysis Report for Packaging (SARP) for the Mound 1KW Package (i.e., the Mound 1KW SARP, or the SARP) where the standard PCVs have been reviewed by LLNL. The Mound 1KW Package is certified by DOE Certificate of Compliance (CoC) number USA/9516/B(U)F-85 for the transportation of Type B quantities of plutonium heat source material. The waiver requests an exemption, claiming safety equivalent to the requirements specified in 10 CFR 71.12, Specific Exemptions, and will lead to a letter amendment to the CoC. Under the waiver, the Office of Radioisotope Power Systems, NE-34, is seeking an exemption from 10 CFR 71.19(d)(1), Previously Approved Package,[5] which states: '(d) NRC will approve modifications to the design and authorized contents of a Type B package, or a fissile material package, previously approved by NRC, provided--(1) The modifications of a Type B package are not significant with respect to the design, operating characteristics, or safe performance of the containment system, when the package is subjected to the tests specified in {section}71.71 and 71.73.' The LLNL staff had previously reviewed a request from Idaho National Laboratory (INL) to reconfigure national security PCVs to standard PCVs. With a nominal 50% reduction in both the height and the volume, the LLNL staff initially deemed the modifications to be significant, which would not be allowed under the provisions of 10 CFR 71.19(d)(1)--see above. As a follow-up, the DOE requested additional clarification from the Nuclear Regulatory Commission (NRC). The NRC concluded that the reconfiguration would be a new fabrication, and that an exemption to the regulations would be required to allow its use, as per the requirements specified in 10 CFR 71.19(c)(1), Previously Approved Package: '(c) A Type B(U) package, a Type B(M) package, or a fissile material package previously approved by the NRC with the designation '-85' in the identification number of the NRC CoC, may be used under the general license of {section}71.17 with the following additional conditions: (1) Fabrication of the package must be satisfactorily completed by December 31, 2006, as demonstrated by application of its model number in accordance with 71.85(c).' Although the preferred approach toward the resolution of this issue would be for the applicant to submit an updated SARP, the applicant has stated that the process of updating the Model Mound 1KW Package SARP is a work that is in progress, but that the updated SARP is not yet ready for submittal. The applicant has to provide a submittal, proving that the package meets the '-96' requirements of International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1, in order to fabricate approved packagings after December 31, 2006. The applicant has further stated that all other packaging features, as described in the currently approved Model Mound 1KW Package SARP, remain unchanged. This report documents the LLNL review of the waiver request. The specific review for each SARP Chapter is documented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

R&D for a Soft X-Ray Free Electron Laser Facility

Several recent reports have identified the scientific requirements for a future soft x-ray light source, and a high-repetition-rate free-electron laser (FEL) facility that is responsive to these requirements is now on the horizon. R&D in some critical areas is needed, however, to demonstrate technical performance, thus reducing technical risks and construction costs. Such a facility most likely will be based on a CW superconducting linear accelerator with beam supplied by a high-brightness, high-repetition-rate photocathode electron gun operating in CW mode, and on an array of FELs to which the accelerated beam is distributed, each operating at high repetition rate and with even pulse spacing. Dependent on experimental requirements, the individual FELs can be configured for either self-amplified spontaneous emission (SASE), seeded, or oscillator mode of operation, including the use of high-gain harmonic generation (HGHG), echo-enhanced harmonic generation (EEHG), harmonic cascade, or other configurations. In this White Paper we identify the overall accelerator R&D needs, and highlight the most important pre-construction R&D tasks required to value-engineer the design configuration and deliverables for such a facility. In Section 1.4 we identify the comprehensive R&D ultimately needed. We identify below the highest-priority requirements for understanding machine performance and reduce risk and costs at this pre-conceptual design stage. Details of implementing the required tasks will be the subject of future evaluation. Our highest-priority R&D program is the injector, which must be capable of delivering a beam with bunches up to a nanocoulomb at MHz repetition rate and with normalized emittance {le} 1 mm {center_dot} mrad. This will require integrated accelerating structure, cathode, and laser systems development. Cathode materials will impact the choice of laser technology in wavelength and energy per pulse, as well as vacuum requirements in the accelerating structure. Demonstration experiments in advanced seeding techniques, such as EEHG, and other optical manipulations to enhance the FEL process are required to reduce technical risk in producing temporally coherent and ultrashort x-ray output using optical seed lasers. Success of EEHG in particular would result in reduced development and cost of laser systems and accelerator hardware for seeded FELs. With a 1.5-2.5 GeV linac, FELs could operate in the VUV-soft x-ray range, where the actual beam energy will be determined by undulator technology; for example, to use the lower energy would require the use of advanced designs for which undulator R&D is needed. Significant reductions in both unit costs and accelerator costs resulting from the lower electron beam energy required to achieve lasing at a particular wavelength could be obtained with undulator development. Characterization of the wakefields of the vacuum chambers in narrow-gap undulators will be needed to minimize risk in ability to deliver close to transform limited pulses. CW superconducting RF technology for an FEL facility with short bunches at MHz rate and up to mA average current will require selection of design choices in cavity frequency and geometry, higher order mode suppression and power dissipation, RF power supply and distribution, accelerating gradient, and cryogenics systems. R&D is needed to define a cost and performance optimum. Developments in laser technology are proceeding at rapid pace, and progress in high-power lasers, harmonic generation, and tunable sources will need to be tracked.

43 PARTICLE ACCELERATORS↗

Transfer of Physical and Hydraulic Properties Databases to the Hanford Environmental Information System - PNNL Remediation Decision Support Project, Task 1, Activity 6

This report documents the requirements for transferring physical and hydraulic property data compiled by PNNL into the Hanford Environmental Information System (HEIS). The Remediation Decision Support (RDS) Project is managed by Pacific Northwest National Laboratory (PNNL) to support Hanford Site waste management and remedial action decisions by the U.S. Department of Energy and one of their current site contractors - CH2M-Hill Plateau Remediation Company (CHPRC). The objective of Task 1, Activity 6 of the RDS project is to compile all available physical and hydraulic property data for sediments from the Hanford Site, to port these data into the Hanford Environmental Information System (HEIS), and to make the data web-accessible to anyone on the Hanford Local Area Network via the so-called Virtual Library.1 These physical and hydraulic property data are used to estimate parameters for analytical and numerical flow and transport models that are used for site risk assessments and evaluation of remedial action alternatives. In past years efforts were made by RDS project staff to compile all available physical and hydraulic property data for Hanford sediments and to transfer these data into SoilVision®, a commercial geotechnical software package designed for storing, analyzing, and manipulating soils data. Although SoilVision® has proven to be useful, its access and use restrictions have been recognized as a limitation to the effective use of the physical and hydraulic property databases by the broader group of potential users involved in Hanford waste site issues. In order to make these data more widely available and useable, a decision was made to port them to HEIS and to make them web-accessible via a Virtual Library module. In FY08 the original objectives of this activity on the RDS project were to: (1) ensure traceability and defensibility of all physical and hydraulic property data currently residing in the SoilVision® database maintained by PNNL, (2) transfer the physical and hydraulic property data from the Microsoft Access database files used by SoilVision® into HEIS, which is currently being maintained by CHRPC, (3) develop a Virtual Library module for accessing these data from HEIS, and (4) write a User's Manual for the Virtual Library module. The intent of these activities is to make the available physical and hydraulic property data more readily accessible and useable by technical staff and operable unit managers involved in waste site assessments and remedial action decisions for Hanford. In FY08 communications were established between PNNL and staff from Fluor-Hanford Co. (who formerly managed HEIS) to outline the design of a Virtual Library module that could be used to access the physical and hydraulic property data that are to be transferred into HEIS. Data dictionaries used by SoilVision® were also provided to Fluor-Hanford personnel (who are now with CHPRC). During ongoing work to ensure traceability and defensibility of all physical and hydraulic property data that currently reside in the SoilVision® database, it was recognized that further work would be required in this effort before the data were actually ported into HEIS. Therefore work on the Virtual Library module development and an accompanying User's Guide was deferred until an unspecified later date. In FY09 efforts have continued to verify the traceability and defensibility of the physical and hydraulic property datasets that are currently being maintained by PNNL. Although this is a work in progress, several of these datasets should be ready for transfer to HEIS in the very near future. This document outlines a plan for the migration of these datasets into HEIS.

54 ENVIRONMENTAL SCIENCES↗

International Linear Collider Accelerator Physics R&D

ILC work at Illinois has concentrated primarily on technical issues relating to the design of the accelerator. Because many of the problems to be resolved require a working knowledge of classical mechanics and electrodynamics, most of our research projects lend themselves well to the participation of undergraduate research assistants. The undergraduates in the group are scientists, not technicians, and find solutions to problems that, for example, have stumped PhD-level staff elsewhere. The ILC Reference Design Report calls for 6.7 km circumference damping rings (which prepare the beams for focusing) using “conventional” stripline kickers driven by fast HV pulsers. Our primary goal was to determine the suitability of the 16 MeV electron beam in the AØ region at Fermilab for precision kicker studies.We found that the low beam energy and lack of redundancy in the beam position monitor system complicated the analysis of our data. In spite of these issues we concluded that the precision we could obtain was adequate to measure the performance and stability of a production module of an ILC kicker, namely 0.5%. We concluded that the kicker was stable to an accuracy of ~2.0% and that we could measure this precision to an accuracy of ~0.5%. As a result, a low energy beam like that at AØ could be used as a rapid-turnaround facility for testing ILC production kicker modules. The ILC timing precision for arrival of bunches at the collision point is required to be 0.1 picosecond or better. We studied the bunch-to-bunch timing accuracy of a “phase detector” installed in AØ in order to determine its suitability as an ILC bunch timing device. A phase detector is an RF structure excited by the passage of a bunch. Its signal is fed through a 1240 MHz high-Q resonant circuit and then down-mixed with the AØ 1300 MHz accelerator RF. We used a kind of autocorrelation technique to compare the phase detector signal with a reference signal obtained from the phase detector’s response to an event at the beginning of the run. We determined that the device installed in our beam, which was instrumented with an 8-bit 500 MHz ADC, could measure the beam timing to an accuracy of 0.4 picoseconds. Simulations of the device showed that an increase in ADC clock rate to 2 GHz would improve measurement precision by the required factor of four. As a result, we felt that a device of this sort, assuming matters concerning dynamic range and long-term stability can be addressed successfully, would work at the ILC. Cost effective operation of the ILC will demand highly reliable, fault tolerant and adaptive solutions for both hardware and software. The large numbers of subsystems and large multipliers associated with the modules in those subsystems will cause even a strong level of unit reliability to become an unacceptable level of system availability. An evaluation effort is underway to evaluate standards associated with high availability, and to guide ILC development with standard practices and well-supported commercial solutions. One area of evaluation involves the Advanced Telecom Computing Architecture (ATCA) hardware and software. We worked with an ATCA crate, processor monitors, and a small amount of ATCA circuit boards in order to develop a backplane “spy” board that would let us watch the ATCA backplane communications and pursue development of an inexpensive processor monitor that could be used as a physics-driven component of the crate-level controls system. We made good progress, and felt that we had determined a productive direction to extend this work. We felt that we had learned enough to begin designing a workable processor monitor chip if there were to be sufficient interest in ATCA shown by the ILC community. Fault recognition is a challenging issue in the crafting a high reliability controls system. With tens of thousands of independent processors running hundreds of thousands of critical processes, how can the system identify that a problem has arisen and determine the appropriate steps to take to correct, or compensate, for the failure? One possible solution might come through the use of the OpenClovis supervisory system, which runs on Linux processors and allows a select set of processors to monitor the behavior of individual processes and processors in a large, distributed controls network. We found that OpenClovis exhibited an irritating amount of sensitivity to the exact version of the Linux kernel running on the processors, and that it was poorly equipped to help us sort through problems that arose through conflicts so deep in the operating systems of the processors. But once this issue was addressed, we found that it performed as expected, recognizing crashes and process (and processor) failures.

43 PARTICLE ACCELERATORS↗

Evaluation of Carbon Dioxide Capture From Existing Coal Fired Plants by Hybrid Sorption Using Solid Sorbents

A novel hybrid solid sorbent technology for CO₂ capture and separation from coal combustion-derived flue gas was evaluated. The technology – Capture of CO₂ by Hybrid Sorption (CACHYS™) – is a solid sorbent technology based on the following ideas: 1) reduction of energy for sorbent regeneration, 2) utilization of novel process chemistry, 3) contactor conditions that minimize sorbent-CO₂ heat of reaction and promote fast CO₂ capture, and 4) low-cost method of heat management. This report provides key information developed during the course of the project that includes sorbent performance, energy for sorbent regeneration, physical properties of the sorbent, the integration of process components, sizing of equipment, and overall capital and operational cost of the integrated CACHYS™ system. Seven sorbent formulations were prepared and evaluated at the lab-scale for energy requirements and CO₂ capture performance. Sorbent heat of regeneration ranged from 30-80 kJ/mol CO₂ and was found to be dependent on process conditions. Two sorbent formulations (designated HCK-4 & HCK-7) were down-selected for additional fixed-bed testing. Additional testing involved subjecting the sorbents to 100 continuous cycles in the fixed-bed reactor to determine performance as a function of time. The working capacity achieved for HCK-4 sorbent ranged from 5.5-8.0 g CO₂/100 g sorbent, while the HCK-7 typically ranged from 8.0-10.0 g CO₂/100 g sorbent. Overall, there was no deterioration in capacity with continuous cycling for either sorbent. The CACHYS™ bench-scale testing system designed and fabricated under this award consists of a dual circulating fluidized-bed adsorber and a moving-bed regenerator. The system takes a flue gas slipstream from the University of North Dakota’s coal-fired steam plant. Prior to being sent to the adsorber, the flue gas is scrubbed to remove SO₂ and particulate. During parametric testing of the adsorber, CO₂ capture achieved using the 2-bed configuration with recirculation in both beds was 65-70% with a high flue gas CO₂ loading (~7%) and up to 85% with a low flue gas CO₂ loading (~4%). A sorbent regenerator system consisting of a pre-heater, desorber, and cooler is used to heat the CO₂-rich sorbent with direct and indirect steam producing a nearly 100% pure stream of CO₂. Parametric testing of the regenerator system demonstrated the impact of process conditions on both desorption rate and the heat of regeneration. Clear evidence of the use of specific process conditions that lower the overall energy of desorption was identified. This observation validates measurements made at the laboratory-scale. Several longer-term continuous tests were conducted to evaluate the performance of the sorbent/process as a function of time. Using a 2-bed configuration, sustained capture efficiency of 40-60% with a high flue gas CO₂ loading (~8%) and 70-80% with a low flue gas CO₂ loading (~4%) were achieved. However, sorbent working capacity was found to be considerably lower than laboratory-scale measurements. The low working capacity is attributed to insufficient sorbent/gas contact time in the adsorber. Sorbent properties that had a significant impact on CO₂ capture performance were identified. The results show that controlling these sorbent properties substantially improves CO₂ capture performance, with preliminary estimates indicating that relative improvement of ~30% is possible. Testing culminated with an operationally trouble-free test of 15 hours with sustainable performance. Overall, several practical strategies to increase performance of the sorbent and process were identified. The initial technical and economic assessment of the CACHYS™ process estimated the cost of CO2 capture was $36.19/ton with a 48.6% increase in levelized cost of electricity (LCOE) for the 550 MWe net plant. Using additional data gathered over the course of the project, and with revised technical and economic assumptions, the estimated cost of CO₂ capture with the CACHYS™ process is $39/ton (only includes the cost of the CO2 capture system) with an increase in LCOE of 55.9%. Overall, CACHYS™ represents a significant improvement over the benchmark MEA system, and has demonstrated progress towards achieving DOE’s goals for CO₂ capture technologies.

01 COAL, LIGNITE, AND PEAT↗

Sensor Network Demonstration for In Situ Decommissioning - 13332

Florida International University's (FIU's) Applied Research Center is currently supporting the Department of Energy's (DOE) Environmental Management Office of D and D and Facility Engineering program. FIU is supporting DOE's initiative to improve safety, reduce technical risks, and limit uncertainty within D and D operations by identifying technologies suitable to meet specific facility D and D requirements, assessing the readiness of those technologies for field deployment, and conducting feasibility studies and large scale demonstrations of promising technologies. During FY11, FIU collaborated with Savannah River National Laboratory in the development of an experimental test site for the demonstration of multiple sensor systems for potential use in the in situ decommissioning process. In situ decommissioning is a process in which the above ground portion of a facility is dismantled and removed, and the underground portion is filled with a cementious material such as grout. In such a scenario, the question remains on how to effectively monitor the structural health of the grout (cracking, flexing, and sinking), as well as track possible migration of contaminants within and out of the grouted monolith. The right types of sensors can aid personnel in better understanding the conditions within the entombed structure. Without sensors embedded in and around the monolith, it will be very difficult to estimate structural integrity and contaminant transport. Yet, to fully utilize the appropriate sensors and the provided data, their performance and reliability must be evaluated outside a laboratory setting. To this end, a large scale experimental setup and demonstration was conducted at FIU. In order to evaluate a large suite of sensor systems, FIU personnel designed and purchased a pre-cast concrete open-top cube, which served as a mock-up of an in situ DOE decommissioned facility. The inside of the cube measures 10 ft x 10 ft x 8 ft. In order to ensure that the individual sensors would be immobilized during the grout pouring activities, a set of nine sensor racks were designed. The 270 sensors provided by Idaho National Laboratory (INL), Mississippi State University (MSU), University of Houston (UH), and University of South Carolina (USC) were secured to these racks based on predetermined locations. Once sensor racks were installed inside the test cube, connected and debugged, approximately 32 cubic yards of special grout material was used to entomb the sensors. MSU provided and demonstrated four types of fiber loop ring-down (FLR) sensors for detection of water, temperature, cracks, and movement of fluids. INL provided and demonstrated time differenced 3D electrical resistivity tomography (ERT), advanced tensiometers for moisture content, and thermocouples for temperature measurements. University of Houston provided smart aggregate (SA) sensors, which detect crack severity and water presence. An additional UH sensor system demonstrated was a Fiber Bragg Grating (FBG) fiber optic system measuring strain, presence of water, and temperature. USC provided a system which measured acoustic emissions during cracking, as well as temperature and pH sensors. All systems were connected to a Sensor Remote Access System (SRAS) data networking and collection system designed, developed and provided by FIU. The purpose of SRAS was to collect and allow download of the raw sensor data from all the sensor system, as well as allow upload of the processed data and any analysis reports and graphs. All this information was made available to the research teams via the Deactivation and Decommissioning Knowledge Management and Information Tool (D and D KM-IT). As a current research effort, FIU is performing an energy analysis, and transferring several sensor systems to a Photovoltaic (PV) System to continuously monitor energy consumption parameters and overall power demands. Also, One final component of this research is focusing on developing an integrated data network to capture, log and analyze sensor system data in near real time from a single interface. FIU personnel and DOE Fellows monitored the progress and condition of the sensors for a period of six months. During this time, the sensors recorded data pertaining to strain, compression, temperature, crack detection, moisture presence, fluid mobility, shock resistance, monolith movement, and electrical resistivity. In addition, FIU regularly observed the curing process of the grout and documented the cube condition via the nine racks of sensors. The sensors held up throughout the curing process, withstood the natural elements for six months, and monitored the integrity of the grout. The large scale experiment and demonstration conducted at FIU was the first of its kind to demonstrate the feasibility of state of the art sensors for in situ decommissioning applications. These efforts successfully measured the durability, performance, and precision of the sensors in question as well as monitored and recorded the curing process of the selected grout material under natural environmental conditions. The current energy analysis work is resulting in data on the constraints placed by some of the sensor systems on a power network that requires high reliability and low losses. In addition, a sensor system demonstration has determined that it is feasible to develop an integrated data network where data can be accessed in near real-time from all systems, thereby allowing for larger-scale integrated system testing to be performed. Information collected during the execution of this research project will aid decision makers in the identification of sensors to be used in nuclear facilities selected for in situ decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Communication and Control for Distributed Energy Resource Integration: Phase 2 Scientific Report

The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design and proof-of-design, and Phase II involves real-world demonstration of the Phase I design architecture. The scope of work for Phase II of this ACCP involves demonstrating the Phase I design architecture in large scale real-world settings while integrating with the operations of one or more electricity supplier feeder lines. The communication and control architectures for integrated demonstration shall encompass combinations of software and hardware components, including: sensors, data acquisition and communication systems, remote monitoring systems, metering (interval revenue, real-time), local and wide area networks, Web-based systems, smart controls, energy management/information systems with control and automation of building energy loads, and demand-response management with integration of real-time market pricing. For Phase II, BPL Global shall demonstrate the Phase I design for integrating and controlling the operation of more than 10 DER units, dispersed at various locations in one or more Independent System Operator (ISO) Control Areas, at an aggregated scale of more than 1 MW, to provide grid support. Actual performance data with respect to each specified function above is to be collected during the Phase II field demonstration. At a minimum, the Phase II demonstration shall span one year of field operations. The demonstration performance will need to be validated by the target customer(s) for acceptance and subsequent implementation. An ISO must be involved in demonstration planning and execution. As part of the Phase II work, BPL Global shall develop a roadmap to commercialization that identifies and quantifies the potential markets for the integrated, aggregated DER systems and for the communication and control technologies demonstrated in Phase I. In addition, the roadmap must identify strategies and actions, as well as the regional and national markets where the aggregated DER systems with communication and control solutions will be introduced, along with a timeline projected for introduction into each identified market. In Phase I of this project, we developed a proof-of-concept ACCP system and architecture and began to test its functionality at real-world sites. These sites had just over 10 MW of DERs and allowed us to identify what needed to be done to commercialize this concept. As a result, we started Phase II by looking at our existing platform and identified its strengths and weaknesses as well as how it would need to evolve for commercialization. During this process, we worked with different stakeholders in the market including: Independent System Operators, DER owners and operators, and electric utility companies to fully understand the issues from all of the different perspectives. Once we had an understanding of the commercialized ACCP system, we began to document and prepare detailed designs of the different system components. The components of the system with the most significant design improvements were: the on-site remote terminal unit, the communication technology between the remote site and the data center, and the scalability and reliability of the data center application. As we began to implement the Phase II ACCP system, we upgraded the real-world demonstration sites from Phase I of the project as well as added additional sites to broaden the types of DER the platform was tested with. We worked with the owners and operators of these sites to understand how the system was meeting their needs and made modifications throughout the project as needed. This also included an effort to continue to understand the barriers to commercial adoption of the ACCP architecture and standardized communication protocols. The final aspect of this phase of the project was to prepare resources to aid in the commercial adoption of the ACCP architecture and standardized communication protocols. This entailed: presentations at conferences, published articles and papers, and web-based technical resources to provide tools to aid in the design and implementation of ACCP systems.

03 NATURAL GAS↗

DWPF CATALYTIC HYDROGEN GENERATION PROGRAM - REVIEW OF CURRENT STATUS

Significant progress has been made in the past two years in improving the understanding of acid consumption and catalytic hydrogen generation during the Defense Waste Processing Facility (DWPF) processing of waste sludges in the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME). This report reviews issues listed in prior internal reviews, describes progress with respect to the recommendations made by the December 2006 external review panel, and presents a summary of the current understanding of catalytic hydrogen generation in the DWPF Chemical Process Cell (CPC). Noble metals, such as Pd, Rh, and Ru, are historically known catalysts for the conversion of formic acid into hydrogen and carbon dioxide. Rh, Ru, and Pd are present in the DWPF SRAT feed as by-products of thermal neutron fission of {sup 235}U in the original waste. Rhodium appears to become most active for hydrogen as the nitrite ion concentration becomes low (within a factor of ten of the Rh concentration). Prior to hydrogen generation, Rh is definitely active for nitrite destruction to N{sub 2}O and potentially active for nitrite to NO formation. These reactions are all consistent with the presence of a nitro-Rh complex catalyst, although definite proof for the existence of this complex during Savannah River Site (SRS) waste processing does not exist. Ruthenium does not appear to become active for hydrogen generation until nitrite destruction is nearly complete (perhaps less nitrite than Ru in the system). Catalytic activity of Ru during nitrite destruction is significantly lower than that of either Rh or Pd. Ru appears to start activating as Rh is deactivating from its maximum catalytic activity for hydrogen generation. The slow activation of the Ru, as inferred from the slow rate of increase in hydrogen generation that occurs after initiation, may imply that some species (perhaps Ru itself) has some bound nitrite on it. Ru, rather than Rh, is primarily responsible for the hydrogen generation in the SME cycle when the hydrogen levels are high enough to be noteworthy. Mercury has a role in catalytic hydrogen generation. Two potentially distinct roles have been identified. The most dramatic effect of Hg on hydrogen generation occurs between runs with and without any Hg. When a small amount of Hg is present, it has a major inhibiting effect on Rh-catalyzed H{sub 2} generation. The Rh-Ru-Hg matrix study showed that increasing mercury from 0.5 to 2.5 wt% in the SRAT receipt total solids did not improve the inhibiting effect significantly. The next most readily identified role for Hg is the impact it has on accelerating NO production from nitrite ion. This reaction shifts the time that the ideal concentration of nitrite relative to Rh occurs, and consequently causes the most active nitro-Rh species to form sooner. The potential consequences of this shift in timing are expected to be a function of other factors such as amount of excess acid, Rh concentration, etc. Graphical data from the Rh-Ru-Hg study suggested that Hg might also be responsible for partially inhibiting Ru-catalysis initially, but that the inhibition was not sustained through the SRAT and SME cycles. Continued processing led to a subsequent increase in hydrogen generation that was often abrupt and that frequently more than doubled the hydrogen generation rate. This phenomenon may have been a function of the extent of Hg stripping versus the initial Ru concentration in these tests. Palladium is an active catalyst, and activates during (or prior to) nitrite destruction to promote N{sub 2}O formation followed by a very small amount of hydrogen. Pd then appears to deactivate. Data to date indicate that Pd should not be a species of primary concern relative to Rh and Ru for hydrogen generation. Pd was a very mild catalyst for hydrogen generation compared to Rh and Ru in the simulated waste system. Pd was comparable to Rh in enhancing N{sub 2}O production when present at equal concentration. Pd, however, is almost always present at less than a quarter of the Rh concentration in SRS sludge waste. Ag did not appear to ever become active for hydrogen generation. Data from two tests spiked with silver were comparable to the data from two tests with no noble metals. All significant technical gaps and inconsistencies with historical data in the prior two internal reviews of catalytic hydrogen generation work at SRS have been resolved. About 90% of the recommended work from the external technical review panel has been completed. Work planned or in progress could bring progress on the review panel recommendations up to about 95% by the end of calendar 2009. This primarily covers the sludge simulant matrix study on bulk compositional factors plus some follow-up work on X-ray absorption spectroscopy and improved acid equations.

08 HYDROGEN↗

Making Coal Relevant for Small Scale Applications: Modular Gasification for Syngas/Engine CHP Applications in Challenging Environments

This Front-End Engineering Design (FEED) study is funded by the US Department of Energy (DOE), and managed by the National Energy Technology Laboratory (NETL) through a Cooperative Agreement awarded to the University of Alaska Fairbanks (UAF) to perform a technical and cost study for the design and installation of a Hamilton-Maurer International (HMI) gasifier for generating a clean syngas for firing in reciprocating engines. An existing diesel engine generator (DEG) and a commercially available spark ignition engine are used to generate electricity with the low-Btu syngas. Other than the HMI gasifier, only commercially available technologies were assumed for this study. An important objective of this design study was to estimate capital and operating costs of small modular coal and coal/biomass fired generating units to provide wind regulation services. Although this study is based on retrofitting an existing coal fired power plant with the HMI gasifier, sufficient data was developed to characterize greenfield units. The original concept was to provide clean syngas and tars/oils from the gasification process to the existing Colt-Pielstick PC2.6B diesel engine generator (9.6 MWe) installed at the UAF Atkinson Power Plant. The intent was to convert the diesel engine to operate in a dual fuel mode, firing both syngas and tars/oils. As the project progressed, Fairbanks Morse Engine (FME), current licensee for the Colt-Pielstick engine line, was not able to develop a modification package for the engine to allow for syngas firing. Although this type of modification is available for firing natural gas, the capability does not extend to syngas. Western Energy Systems, distributor for Innio Jenbacher, was able to offer the Jenbacher Model JMS620 engine. After review of available options, the project team selected a design configuration using two Jenbacher engines rated at 1965 kWe each to fire the syngas, with the oils/tars directed to the Colt Pielstick diesel to be blended with ultra-low sulfur diesel oil (ULSD). The Jenbacher engines are expected to operate at continuous base load, with some load-following ability, while the existing diesel engine will operate in grid support service, with loads varying from a nominal 25% to 100%. An annual capacity factor for the diesel engine is projected to be between 50% and 60%. The overall gasifier and gas clean-up system is sized to produce enough syngas to adequately fuel three Jenbacher Engines for a nominal power output of 5.9 MWe, but this study assumes that only two Jenbacher engines will be installed due to space constraints in the Atkinson Power Plant, and because of expected air emission permit limitations. There is still potential that the excess syngas capacity equivalent to about 2 MWe could be used as supplemental fuel for the DEG. The exhaust from the Jenbacher engines is passed through heat recovery units to generate low pressure steam, thereby providing a significant portion of the steam required for operating the gasifier. The overall performance of the HMI gasifier/engine configuration is summarized as follows: 1) Overall electric efficiency, Jenbacher and diesel engines, based on gasifier fuel production (syngas and pyrolysis liquids) is 35.2% LHV, 2) Overall cogenerating efficiency (electricity plus steam), based on gasifier fuel production (syngas and pyrolysis liquids) is 54.8% LHV, 3) Overall electric efficiency, Jenbacher and diesel engines, based on coal input, is 29.6% LHV, and 4) Overall cogenerating efficiency, electricity plus steam, based on coal input is 46.0%. This project is estimated to have a Bare Erected Cost (BEC) of $\$$ 33.4 million and a Total Plant Cost (TPC) of $\$$ 45.7 million. Based on the original scope, sending both the clean syngas and the oils and tars to the existing diesel engine, the BEC and TPC values would have been $\$$ 23.3 million and $\$$ 32.1 million, respectively. A variable Cost of Electricity (COE) is calculated to reflect only those costs that will be incurred by incremental operation of the system for the HMI gasifier/Jenbacher engine combination. Operation of the diesel engine is determined separately. The variable COE values are: Case 1: 100% Usibelli Coal: (a) HMI gasifier/Jenbacher Engines -- 8.3 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh, and Case 2: 80% Usibelli Coal + 20% wood chips (proportion based on Btu input, LHV basis): (a) HMI Gasifier/Jenbacher -- 13.7 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh. The incremental cost of operating the gasifier/Jenbacher system increases with co-firing of wood chips due to the high cost of this material, over five times as costly as Usibelli coal delivered to the Atkinson Power building. The diesel cost is constant as the oils and tars are priced at the same value as the ULSD for the purposes of fueling the diesel engine. Section 8 of this report provides details of the O&M costs. The overall power system is configured to be modular and scalable to provide a wide range of generating capacity using the same components. This allows for reduction in cost, risk, schedule time to engineer and construct, and provides some degree of repeatability for air permitting.

01 COAL, LIGNITE, AND PEAT↗

Novel Carbon (C)-Boron (B)-Nitrogen (N)-Containing H2 Storage Materials

The following summarizes the research conducted for DOE project DE-EE0005658 “Novel Carbon(C)-Boron(B)-Nitrogen(N)-Containing H2 Storage Materials”. This work focused in part on the continued study of two materials identified from the preceding project DE-FG360GO18143 (“Hydrogen Storage by Novel CBN Heterocycle Materials”) as lead candidates to meet the DOE technical targets for either vehicular or non-automotive hydrogen storage applications. Specifically, a room-temperature liquid, 3-methyl-1,2-cyclopentane (B), and a high H2 capacity solid, 1,2-BN-cyclohexane (J), were selected for further characterization and performance optimization. In addition to these compounds, the current project also aimed to prepare several new materials predicted to be disposed towards direct reversibility of H2 release and uptake, a feature deemed critical to achieving efficient recycling of spent fuel end products. To assist in the rational design of these and other next-generation materials, this project undertook to investigate the mechanism of hydrogen release from established compounds (mainly B and J) using a combined experimental/computational approach. Among this project’s signature accomplishments, the preliminary synthetic route to B was optimized for production on decagram scale. With such quantities of material available, its performance in powering an actual 30 W proton exchange membrane (PEM) fuel cell stack was tested and found to be identical to that of facility H2. Despite this positive proof-of-concept achievement, however, further consideration of neat B as a potential hydrogen storage material was abandoned due to evidence of thermal instability. Specifically, mass spectrometry-coupled thermogravimetric analysis (TGA-MS) revealed significant H2 release from B to initiate at 50 °C, well below the 60 °C minimum threshold set by the DOE. This result prompted a more extensive investigation in the decomposition mechanism of B vis-à-vis that of J, which exhibited in neat form a substantially higher onset temperature for spontaneous H2 release (70 °C). Solution-phase kinetic experiments using ReactIR established a second-order dependence for the initial loss of H2 from both B and J; Arrhenius analysis, however, revealed the activation barrier for this reaction was lower for B than for J, which presumably contributes to the diminished thermal stability of the former. On the basis of these and other experimental results, extensive computational efforts yielded a reasonable mechanistic model for the dehydrogenation of 1,2-BN-cycloalkane materials. While the prospect of neat B as a suitable hydrogen storage material was discarded, it was proposed that the combination of B with more thermally stable amine-borane-based materials might afford mixtures with improved properties. Indeed, when B was combined with ammonia borane (AB) in a 2:1 molar ratio, the two materials formed a liquid. More significantly, this mixture remained liquid even after complete dehydrogenation, thus establishing the potential for a single-phase fuel cycle. (In contrast, the dehydrogenation product of neat B is a low melting solid (mp = 28-30 °C).) Another advantage conferred by the blend formulation was a dramatic reduction in the amount of borazine produced by AB. Borazine is a well-known contaminant of H2 produced by the thermal decomposition of neat AB, and exerts deleterious effects on fuel cell performance. Residual gas analysis (RGA) of the gas stream generated from the B-AB blend, however, detected just 0.01% borazine content when a Pt-Ni nanoparticle dehydrogenation catalyst was used. In all ii then, the 2:1 B-AB blend marks a major achievement in the effort to develop a suitable liquid amine-borane hydrogen storage material, and merits further investigation into the optimization for practical adoption. Similar realization of the potential of J as a high % wt. H2 material required a method to dehydrogenate the carbonaceous components of the molecule without the use of a sacrificial hydrogen acceptor, as had been reported in the previous project. Ultimately, this reaction was achieved for a B,N-disubstituted BN-cyclohexene model substrate using a gas flow system with a fixed Pd/C catalyst bed. Considerable work remains, however, to translate these initial results into a general protocol for complete dehydrogenation of fully saturated BN-cycloalkane materials such as J. With concrete confirmation of the possibility to perform both BN and CC dehydrogenation on a single theoretical substrate, COMSOL modeling was used to evaluate the effects of thermodynamically coupling the two reactions. It was hypothesized that the heat generated from exothermic BN dehydrogenation would partially drive the endothermic CC dehydrogenation reaction; this additional heat consumption was expected to in turn confer the benefit of lowering the maximum reactor temperature. A two-dimensional model of an axisymmetric reactor including experimental kinetic and calculated thermodynamic parameters for both reactions did indeed predict these outcomes. The extent to which the effects of thermodynamic coupling actually manifested, however, were also revealed to depend strongly on the relative rates of the two reactions, as well as the magnitude of the equilibrium constant governing the progress of the endothermic process. Given the evident complexity of attaining high effective % wt. H2 capacity with J, alternative systems were investigated for greater facility of extensive H2 release. Among those studied, 1,2,4,5-bis-BN-cyclohexane (H) demonstrated the most favorable properties, particularly with respect to thermal stability: rather than decompose, a neat sample instead sublimed when heated above 150 °C. Nevertheless, two commercially available catalytic systems were identified to effect release of two H2 equivalents from H. Release of further equivalents were apparently impeded by the formation of either polymeric material or one of two dimeric cage compounds depending on the catalyst used. Notably, a method to regenerate H from these product mixtures remains to be developed. Thus, while H may prove useful for certain long-term energy storage needs, it is currently less suited applications involving frequent fuel consumption. Similar difficulties were also encountered in attempts to realize the complete fuel cycle of 1,3-BN-cyclohexane (E) and B,N-substituted derivatives thereof. It had been initially proposed that E would provide for readily reversible BN dehydrogenation through a measure of frustrated Lewis pair-type character. Indeed, computations predicted this reaction would be essentially thermoneutral in solution. In the course of attempts to fully hydrogenate the spent fuel, however, dimeric species formed and proved resistant to further BN reduction. While a number of monomeric cyclic compounds were also successfully synthesized as formal boron-nitrogen frustrated Lewis pairs, none demonstrated any capacity to split H2 across the BN unit. The challenge of developing a practical amine-borane-based material for readily reversible hydrogen storage thus remains unresolved at this time. As such, it deserves consideration as a major objective of any future work.

08 HYDROGEN↗