Search NASA⌕ Search

SEARCH · Search NASA

Results for “variance estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Mass Variance from Archival X-ray Properties of Dark Energy Survey Year-1 Galaxy Clusters

Using archival X-ray observations and a log-normal population model, we estimate constraints on the intrinsic scatter in halo mass at fixed optical richness for a galaxy cluster sample identified in Dark Energy Survey Year-One (DES-Y1) data with the redMaPPer algorithm. We examine the scaling behavior of X-ray temperatures, $T_X$, with optical richness, $\lambda_{RM}$, for clusters in the redshift range $0.2 50\%$ complete for clusters with $\lambda_{RM} > 130$. Regression analysis on the two samples produces consistent posterior scaling parameters, from which we derive a combined constraint on the residual scatter, $\sigma_{\ln Tx | \lambda} = 0.275 \pm 0.019$. Joined with constraints for $T_X$ scaling with halo mass from the Weighing the Giants program and richness--temperature covariance estimates from the LoCuSS sample, we derive the richness-conditioned scatter in mass, $\sigma_{\ln M | \lambda} = 0.30 \pm 0.04\, _{({\rm stat})} \pm 0.09\, _{({\rm sys})}$, at an optical richness of approximately 70. Uncertainties in external parameters, particularly the slope and variance of the $T_X$--mass relation and the covariance of $T_X$ and $\lambda_{RM}$ at fixed mass, dominate the systematic error. The $95\%$ confidence region from joint sample analysis is relatively broad, $\sigma_{\ln M | \lambda} \in [0.14, \, 0.55]$, or a factor ten in variance.

79 ASTRONOMY AND ASTROPHYSICS↗

Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, Portugal, that began on May 1, 2009. The AMF will also have additional observational capabilities by the end of 2011. The second ARM Mobile Facility (AMF2) was deployed this quarter to Steamboat Springs, Colorado, in support of the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX). The first field deployment of the second ARM Mobile Facility will be used to validate ARM-developed algorithms that convert the remote sensing measurements to cloud properties for liquid and mixed phase clouds. Although AMF2 is being set up this quarter, the official start date of the field campaign is not until November 1, 2010. This quarterly report provides the cumulative numbers of scientific user accounts by site for the period October 1, 2009-September 30, 2010.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP locale has historically had a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning this quarter, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original and new instrumentation made available through the American Recovery and Reinvestment Act (ARRA). The central facility and 4 extended facilities will remain, but there will be up to 16 surface new characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place within the next 12 months. The AMF continues its 20-month deployment in Graciosa Island, Azores, Portugal, that started May 1, 2009. The AMF will also have additional observational capabilities within the next 12 months. Users can participate in field experiments at the sites and mobile facility, or they can participate remotely. Therefore, a variety of mechanisms are provided to users to access site information. Users who have immediate (real-time) needs for data access can request a research account on the local site data systems. This access is particularly useful to users for quick decisions in executing time-dependent activities associated with field campaigns at the fixed sites and mobile facility locations. The eight computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the AMF; and the DMF at PNNL. However, users are warned that the data provided at the time of collection have not been fully screened for quality and therefore are not considered to be official ACRF data. Hence, these accounts are considered to be part of the facility activities associated with field campaign activities, and users are tracked. In addition, users who visit sites can connect their computer or instrument to an ACRF site data system network, which requires an on-site device account. Remote (off-site) users can also have remote access to any ACRF instrument or computer system at any ACRF site, which requires an off-site device account. These accounts are also managed and tracked.

54 ENVIRONMENTAL SCIENCES↗

Adaptive Error Estimation in Linearized Ocean General Circulation Models

Data assimilation methods are routinely used in oceanography. The statistics of the model and measurement errors need to be specified a priori. This study addresses the problem of estimating model and measurement error statistics from observations. We start by testing innovation based methods of adaptive error estimation with low-dimensional models in the North Pacific (5-60 deg N, 132-252 deg E) to TOPEX/POSEIDON (TIP) sea level anomaly data, acoustic tomography data from the ATOC project, and the MIT General Circulation Model (GCM). A reduced state linear model that describes large scale internal (baroclinic) error dynamics is used. The methods are shown to be sensitive to the initial guess for the error statistics and the type of observations. A new off-line approach is developed, the covariance matching approach (CMA), where covariance matrices of model-data residuals are "matched" to their theoretical expectations using familiar least squares methods. This method uses observations directly instead of the innovations sequence and is shown to be related to the MT method and the method of Fu et al. (1993). Twin experiments using the same linearized MIT GCM suggest that altimetric data are ill-suited to the estimation of internal GCM errors, but that such estimates can in theory be obtained using acoustic data. The CMA is then applied to T/P sea level anomaly data and a linearization of a global GFDL GCM which uses two vertical modes. We show that the CMA method can be used with a global model and a global data set, and that the estimates of the error statistics are robust. We show that the fraction of the GCM-T/P residual variance explained by the model error is larger than that derived in Fukumori et al.(1999) with the method of Fu et al.(1993). Most of the model error is explained by the barotropic mode. However, we find that impact of the change in the error statistics on the data assimilation estimates is very small. This is explained by the large representation error, i.e. the dominance of the mesoscale eddies in the T/P signal, which are not part of the 21 by 1" GCM. Therefore, the impact of the observations on the assimilation is very small even after the adjustment of the error statistics. This work demonstrates that simult&neous estimation of the model and measurement error statistics for data assimilation with global ocean data sets and linearized GCMs is possible. However, the error covariance estimation problem is in general highly underdetermined, much more so than the state estimation problem. In other words there exist a very large number of statistical models that can be made consistent with the available data. Therefore, methods for obtaining quantitative error estimates, powerful though they may be, cannot replace physical insight. Used in the right context, as a tool for guiding the choice of a small number of model error parameters, covariance matching can be a useful addition to the repertory of tools available to oceanographers.

Chechelnitsky, Michael Y.↗

Unbiased Resource Evaluations with Kriging and Stochastic Models of Heterogeneous Rock Properties

This paper revisits the computation of product combinations for quantification of resources (e.g., pore volume for hydrocarbon reservoir formations). The explanations have been simplified by considering the exhaustive numerical model for properties that are multiplied first and then added or averaged for evaluation. The analysis starts without any probabilistic considerations. Abbreviated (up-scaled) computations in the sum of multiplications are proposed by substituting the individual values by averages for each rock property in the coarser cell resolution model. A result found is that averaged properties can be utilized for estimation at non-sampled locations, instead of individual values; however, covariances and cumulants must also be included in the abbreviated computations. The smoothing effect of kriging is found to be irrelevant if the kriging variance is also included in the up-scaled abbreviated pore volume computations. Thus, the equivalence between computation of resource volumes from kriging estimates and conditional stochastic simulations is established, with the condition that numerical estimation must incorporate the complete covariance and cumulant information as well. An example shows pore volume prediction from a kriging model matches the unbiased result from stochastic simulations.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

ITAR: A modified TAR method to determine depth dose distribution for an ophthalmic device that performs kilovoltage x-ray pencil-beam stereotaxy

Purpose: New technology has been developed to treat age-related macular degeneration (AMD) using 100 kVp pencil-beams that enter the patient through the radio-resistant sclera with a depth of interest between 1.6 and 2.6 cm. Measurement of reference and relative dose in a kilovoltage x-ray beam with a 0.42 cm diameter field size and a 15 cm source to axis distance (SAD) is a challenge that is not fully addressed in current guidelines to medical physicists. AAPM's TG-61 gives dosimetry recommendations for low and medium energy x-rays, but not all of them are feasible to follow for this modality. Methods: An investigation was conducted to select appropriate equipment for the application. PTW's Type 34013 Soft X-Ray Chamber (Freiburg, Germany) and CIRS's Plastic Water LR (Norfolk, VA) were found to be the best available options. Attenuation curves were measured with minimal scatter contribution and thus called Low Scatter Tissue Air Ratio (LSTAR). A scatter conversion coefficient (C{sub scat}) was derived through Monte Carlo radiation transport simulation using MCNPX (LANL, Los Alamos, NM) to quantify the difference between a traditional TAR curve and the LSTAR curve. A material conversion coefficient (C{sub mat}) was determined through experimentation to evaluate the difference in attenuation properties between water and Plastic Water LR. Validity of performing direct dosimetry measurements with a source to detector distance other than the treatment distance, and therefore a different field size due to a fixed collimator, was explored. A method—Integrated Tissue Air Ratio (ITAR)—has been developed that isolates each of the three main radiological effects (distance from source, attenuation, and scatter) during measurement, and integrates them to determine the dose rate to the macula during treatment. Results: LSTAR curves were determined to be field size independent within the range explored, indicating that direct dosimetry measurements may be performed with a source to detector distance of 20 cm even though the SAD is 15 cm during treatment. C{sub scat} varied from 1.102 to 1.106 within the range of depths of interest. The experimental variance among repeated measurements of C{sub mat} was larger than depth dependence, so C{sub mat} was estimated as1.019 for all depths of interest. Conclusions: Equipment selection, measurement techniques, and formalism for the determination of dose rate to the macula during stereotaxy for AMD have been determined and are strongly recommended by the authors of this paper to be used by clinical medical physicists.

61 RADIATION PROTECTION AND DOSIMETRY↗

On the sea-state bias of the Geosat altimeter

The sea-state bias in a satellite altimeter's range measurement is caused by the influence of ocean waves on the radar return pulse; it results in an estimate of sea level that is too low according to some function of the wave height. This bias is here estimated for Geosat by correlating collinear differences of altimetric sea-surface heights with collinear differences of significant wave heights (H1/3). Corrections for satellite orbit error are estimated simultaneously with the sea-state bias. Based on twenty 17-day repeat cycles of the Geosat Exact Repeat Mission, the solution for the sea-state bias is 2.6 + or - 0.2 percent of H1/3. The least-squares residuals, however, show a correlation with wind speed U, so the traditional model of the bias has been supplemented with a second term: H1/3 + alpha-2H1/3U. This second term produces a small, but statistically significant, reduction in variance of the residuals. Both systematic and random errors in H1/3 and U tend to bias the estimates of alpha-1 and alpha-2, which complicates comparisons of the results with ground-based measurements of the sea-state bias.

Ray, Richard D.↗

Active learning with multifidelity modeling for efficient rare event simulation

Here, while multifidelity modeling provides a cost-effective way to conduct uncertainty quantification with computationally expensive models, much greater efficiency can be achieved by adaptively deciding the number of required high-fidelity (HF) simulations, depending on the type and complexity of the problem and the desired accuracy in the results. We propose a framework for active learning with multifidelity modeling emphasizing the efficient estimation of rare events. Our framework works by fusing a low-fidelity (LF) prediction with an HF-inferred correction, filtering the corrected LF prediction to decide whether to call the high-fidelity model, and for enhanced subsequent accuracy, adapting the correction for the LF prediction after every HF model call. The framework does not make any assumptions as to the LF model type or its correlations with the HF model. In addition, for improved robustness when estimating smaller failure probabilities, we propose using dynamic active learning functions that decide when to call the HF model. We demonstrate our framework using several academic case studies (including some high-dimensional problems) and two finite element model case studies: estimating Navier-Stokes velocities using the Stokes approximation and estimating stresses in a transversely isotropic model subjected to displacements via a coarsely meshed isotropic model. Across these case studies, not only did the proposed framework estimate the failure probabilities accurately, but compared with either Monte Carlo or a standard variance reduction method, it also required only a small fraction of the calls to the HF model.

42 ENGINEERING↗

A Bayesian inferencing framework for ultrasound wave speed measurements in metal additive manufacturing

Process-related changes during metal additive manufacturing introduce microstructural variability in the material properties of printed parts, directly affecting component reliability. Accurate estimation of these property variations with part performance are essential for quality assurance. Ultrasound testing offers a non-destructive means to estimate mechanical properties and detect defects; however, conventional analysis methods often neglect the influence of microstructural variability, limiting their effectiveness. Here, this research presents a Bayesian inference technique for quantifying wave speed uncertainty from ultrasound measurements of metal additive manufactured parts. By integrating prior ultrasound data with a Bayesian model, the proposed approach generates posterior density estimates of wave speed that systematically account for manufacturing-induced variability and uncertainty. The novelty of this research lies in applying a Bayesian framework to analyze experimental ultrasound measurements within the context of metal additive manufacturing variability. The method enhances the accuracy of wave speed estimation by 64%, defect position by 50% and increases confidence associated with wave speed variance by 30% across different porosity levels, thereby providing a robust foundation for improved decision-making and increased reliability in additively manufactured components.

Additive manufacturing↗

BULK FLOW OF HALOS IN {Lambda}CDM SIMULATION

Analysis of the Pangu N-body simulation validates that the bulk flow of halos follows a Maxwellian distribution with variance that is consistent with the prediction of the linear theory of structure formation. We propose that the consistency between the observed bulk velocity and theories should be examined at the effective scale of the radius of a spherical top-hat window function yielding the same smoothed velocity variance in linear theory as the sample window function does. We compared some recently estimated bulk flows from observational samples with the prediction of the {Lambda}CDM model we used; some results deviate from expectation at a level of {approx}3{sigma}, but the discrepancy is not as severe as previously claimed. We show that bulk flow is only weakly correlated with the dipole of the internal mass distribution, that the alignment angle between the mass dipole and the bulk flow has a broad distribution peaked at {approx}30 Degree-Sign -50 Degree-Sign , and also that the bulk flow shows little dependence on the mass of the halos used in the estimation. In a simulation of box size 1 h {sup -1} Gpc, for a cell of radius 100 h {sup -1} Mpc the maximal bulk velocity is >500 km s{sup -1}; dipoles of the environmental mass outside the cell are not tightly aligned with the bulk flow, but are rather located randomly around it with separation angles {approx}20 Degree-Sign -40 Degree-Sign . In the fastest cell there is a slightly smaller number of low-mass halos; however, halos inside are clustered more strongly at scales {approx}> 20 h {sup -1} Mpc, which might be a significant feature since the correlation between bulk flow and halo clustering actually increases in significance beyond such scales.

79 ASTRONOMY AND ASTROPHYSICS↗

Diagnosing multiplicative error with lensing magnification of type Ia supernovae

Weak lensing causes spatially coherent fluctuations in the flux of Type Ia supernovae (SNe Ia). This lensing magnification allows for weak lensing measurement independent of cosmic shear. It is free of the shape measurement errors associated with cosmic shear and can therefore be used to diagnose and calibrate multiplicative error. Although this lensing magnification is difficult to accurately measure in auto correlation, its cross correlation with cosmic shear and galaxy distribution in an overlapping area can be measured to a significantly higher accuracy. Therefore, these cross correlations can put useful constraints on multiplicative error, and the obtained constraint is free of cosmic variance in the weak lensing field. We present two methods implementing this idea and estimate their performances. We find that, with ∼1 million SNe Ia that can be achieved with the proposed D2k survey with the LSST telescope, a multiplicative error of ∼0.5% for source galaxies at z{sub s}∼1 can be detected and a larger multiplicative error can be corrected to the level of 0.5%. It is therefore a promising approach to control the multiplicative error to the sub-percent level required for stage IV projects. The combination of the two methods even has the potential to diagnose and calibrate galaxy intrinsic alignment, which is another major systematic error in cosmic shear cosmology.

79 ASTRONOMY AND ASTROPHYSICS↗

A general reconstruction of the recent expansion history of the universe

Distance measurements are currently the most powerful tool to study the expansion history of the universe without specifying its matter content nor any theory of gravitation. Assuming only an isotropic, homogeneous and flat universe, in this work we introduce a model-independent method to reconstruct directly the deceleration function via a piecewise function. Including a penalty factor, we are able to vary continuously the complexity of the deceleration function from a linear case to an arbitrary (n+1)-knots spline interpolation. We carry out a Monte Carlo (MC) analysis to determine the best penalty factor, evaluating the bias-variance trade-off, given the uncertainties of the SDSS-II and SNLS supernova combined sample (JLA), compilations of baryon acoustic oscillation (BAO) and H(z) data. The bias-variance analysis is done for three fiducial models with different features in the deceleration curve. We perform the MC analysis generating mock catalogs and computing their best-fit. For each fiducial model, we test different reconstructions using, in each case, more than 10{sup 4} catalogs in a total of about 5× 10{sup 5}. This investigation proved to be essential in determining the best reconstruction to study these data. We show that, evaluating a single fiducial model, the conclusions about the bias-variance ratio are misleading. We determine the reconstruction method in which the bias represents at most 10% of the total uncertainty. In all statistical analyses, we fit the coefficients of the deceleration function along with four nuisance parameters of the supernova astrophysical model. For the full sample, we also fit H{sub 0} and the sound horizon r{sub s}(z{sub d}) at the drag redshift. The bias-variance trade-off analysis shows that, apart from the deceleration function, all other estimators are unbiased. Finally, we apply the Ensemble Sampler Markov Chain Monte Carlo (ESMCMC) method to explore the posterior of the deceleration function up to redshift 1.3 (using only JLA) and 2.3 (JLA+BAO+H(z)). We obtain that the standard cosmological model agrees within 3σ level with the reconstructed results in the whole studied redshift intervals. Since our method is calibrated to minimize the bias, the error bars of the reconstructed functions are a good approximation for the total uncertainty.

79 ASTRONOMY AND ASTROPHYSICS↗

A METHOD FOR MEASURING THE BIAS OF HIGH-REDSHIFT GALAXIES FROM COSMIC VARIANCE

As deeper observations discover increasingly distant galaxies, characterizing the properties of high-redshift galaxy populations will become increasingly challenging and paramount. We present a method for measuring the clustering bias of high-redshift galaxies from the field-to-field scatter in their number densities induced by cosmic variance. Multiple widely separated fields are observed to provide a large number of statistically independent samples of the high-redshift galaxy population. The expected Poisson uncertainty is removed from the measured dispersion in the distribution of galaxy number counts observed across these many fields, leaving, on average, only the contribution to the scatter expected from cosmic variance. With knowledge of the {Lambda}-cold dark matter power spectrum, the galaxy bias is then calculated from the measured cosmic variance. The results of cosmological N-body simulations can then be used to estimate the halo mass associated with the measured bias. We use Monte Carlo simulations to demonstrate that Hubble Space Telescope pure parallel programs will be able to determine galaxy bias at z {approx_gt} 6 using this method, complementing future measurements from correlation functions.

79 ASTRONOMY AND ASTROPHYSICS↗

A Calibration to Predict the Concentrations of Impurities in Plutonium Oxide by Prompt Gamma Analysis Revision 2

This report documents the new PG calibration regression equation. These calibration equations incorporate new data that have become available since revision 1 of “A Calibration to Predict the Concentrations of Impurities in Plutonium Oxide by Prompt Gamma Analysis” was issued [3] The calibration equations are based on a weighted least squares (WLS) approach for the regression. The WLS method gives each data point its proper amount of influence over the parameter estimates. This gives two big advantages, more precise parameter estimates and better and more defensible estimates of uncertainties. The WLS approach makes sense both statistically and experimentally because the variances increase with concentration, and there are physical reasons that the higher measurements are less reliable and should be less influential. The new magnesium calibration includes a correction for sodium and separate calibration equation for items with and without chlorine. These additional calibration equations allow for better predictions and smaller uncertainties for sodium in materials with and without chlorine. Chlorine and sodium have separate equations for RICH materials. Again, these equations give better predictions and smaller uncertainties chlorine and sodium for RICH materials.

Instrumentation Related to Nuclear Science & Techn↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The fourth quarter comprises a total of 2,208 hours for the fixed and mobile sites. The average of the fixed sites well exceeded our goal this quarter. The AMF data statistic requires explanation. Since the AMF radar data ingest software is being modified, the data are being stored in the DMF for data processing. Hence, the data are not at the Archive; they are anticipated to become available by the next report.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for April 1 - June 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and are not included in the aggregate average with the fixed sites. The AMF statistics for this reporting period were not available at the time of this report. The third quarter comprises a total of 2,184 hours for the fixed sites. The average well exceeded our goal this quarter.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2009, for the fixed sites. The AMF has completed its mission in China but not all of the data can be released to the public at the time of this report. The second quarter comprises a total of 2,160 hours. The average exceeded our goal this quarter.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The first quarter comprises a total of 2,208 hours. The average exceeded their goal this quarter.

54 ENVIRONMENTAL SCIENCES↗