Search NASA⌕ Search

SEARCH · Search NASA

Results for “Constellation program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Battery Health Quantification for TDRS Spacecraft by Using Signature Discriminability Measurement

The NASA/GSFC Space Network Project Office (SN) currently operates a constellation of ten geosynchronous TDRS spacecraft launched over the past 30 years. The SN project collects up to 16.5 Gigabytes of telemetry every month. Generally, the spacecraft health and functionality are obtained by the use of real-time telemetry data for the multiple spacecraft subsystems, which are transmitted to the main ground station at the White Sands Complex in Las Cruces, NM. Recently, the SN has instituted a program of Big Data to analyze the large amounts of data using a variety of tools including Machine Learning, Artificial Intelligence, development of training sets, and a variety of mathematical modeling tools. The goal is to improve spacecraft management and obtain a more accurate prediction of the spacecraft end of life. The combination of these efforts with those of the Aerospace Corporation, which has a contract with the SN to produce yearly reliability estimates for the TDRS fleet, will be performed. This paper presents a new concept called telemetry quality quantification (TQQ) and discusses the progress that has been made in battery performance estimation for the second-generation TDRS spacecraft using a signature discriminability measures (SDM) algorithm combined with the Aerospace Corp. battery life estimation models. This activity is important because many of the TDRS fleet of spacecraft have exceeded their on-orbit design lifetime and, therefore, NASA must carefully manage the spacecraft to continue operations while avoiding an end-of-mission scenario that leaves a non-functioning spacecraft in geosynchronous orbit.

Ma, Kenneth Y.↗

Assessment of New Radio Occultation Measurements at the Global Modeling and Assimilation Office

Recent advances at the Global Modeling and Assimilation Office (GMAO) have focused on the assimilation of additional radio occultation (RO) bending angle measurements in the Goddard Earth Observing System (GEOS) atmospheric data assimilation system. These efforts targeted the GEOS near-real-time forward processing system and may serve as the backbone for the next atmospheric reanalysis of the 21st century. In the most recent system upgrade, the assimilated RO counts increased by a factor of four with the addition of the COSMIC-2 constellation. Furthermore, with the advent of near-real-time commercial RO measurements, even more growth is expected. This presentation will quantify the impacts of new public and commercially-sourced data available to the GEOS system. The RO data assimilated in these experiments are from both the routinely acquired operational data streams as well as those from Spire Global, Inc. available via the Commercial SmallSat Data Acquisition (CSDA) Program.

Will McCarty↗

Multisatellite constellation configuration selection for multiregional highly elliptical orbit constellations

The Archimedes Project is a joint effort of the European Space Agency (ESA) and the National Space Development Agency of Japan (NASDA). The primary goal of the Archimedes project is to perform a technical feasibility analysis and preliminary design of a highly inclined multisatellite constellation for direct broadcast and mobile communications services for Europe, Japan and much of North America. This report addresses one aspect of this project, specifically an analysis of continuous satellite coverage using multiregional highly elliptical orbits (M-HEO's). The analysis methodology and ensuing software tool, named SPIFF, were developed specifically for this project by the author during the summer of 1992 under the STA/NSF Summer Institute in Japan Program at Tsukuba Space Center.

Matossian, Mark G.↗

Key Issues for Navigation and Time Dissemination in NASA's Space Exploration Program

The renewed emphasis on robotic and human missions within NASA's space exploration program warrants a detailed consideration of how the positions of objects in space will be determined and tracked, whether they be spacecraft, human explorers, robots, surface vehicles, or science instrumentation. The Navigation Team within the NASA Space Communications Architecture Working Group (SCAWG) has addressed several key technical issues in this area and the principle findings are reported here. For navigation in the vicinity of the Moon, a variety of satellite constellations have been investigated that provide global or regional surface position determination and timely services analogous to those offered by GPS at Earth. In the vicinity of Mars, there are options for satellite constellations not available at the Moon due to the gravitational perturbations from Earth, such as two satellites in an aerostationary orbit. Alternate methods of radiometric navigation as considered, including one- and two-way signals, as well as autonomous navigation. The use of a software radio capable of receiving all available signal sources, such as GPS, pseudolites, and communication channels, is discussed. Methods of time transfer and dissemination are also considered in this paper.

Nelson, R. A.↗

The NASA Constellation University Institutes Project: Thrust Chamber Assembly Virtual Institute

This paper documents key aspects of the Constellation University Institutes Project (CUIP) Thrust Chamber Assembly (TCA) Virtual Institute (VI). Specifically, the paper details the TCA VI organizational and functional aspects relative to providing support for Constellation Systems. The TCA VI vision is put forth and discussed in detail. The vision provides the objective and approach for improving thrust chamber assembly design methodologies by replacing the current empirical tools with verified and validated CFD codes. The vision also sets out ignition, performance, thermal environments and combustion stability as focus areas where application of these improved tools is required. Flow physics and a study of the Space Shuttle Main Engine development program are used to conclude that the injector is the key to robust TCA design. Requirements are set out in terms of fidelity, robustness and demonstrated accuracy of the design tool. Lack of demonstrated accuracy is noted as the most significant obstacle to realizing the potential of CFD to be widely used as an injector design tool. A hierarchical decomposition process is outlined to facilitate the validation process. A simulation readiness level tool used to gauge progress toward the goal is described. Finally, there is a description of the current efforts in each focus area. The background of each focus area is discussed. The state of the art in each focus area is noted along with the TCA VI research focus in the area. Brief highlights of work in the area are also included.

Tucker, P. Kevin↗

Architecture for Cognitive Networking within NASAs Future Space Communications Infrastructure

Future space mission concepts and designs pose many networking challenges for command, telemetry, and science data applications with diverse end-to-end data delivery needs. For future end-to-end architecture designs, a key challenge is meeting expected application quality of service requirements for multiple simultaneous mission data flows with options to use diverse onboard local data buses, commercial ground networks, and multiple satellite relay constellations in LEO, MEO, GEO, or even deep space relay links. Effectively utilizing a complex network topology requires orchestration and direction that spans the many discrete, individually addressable computer systems, which cause them to act in concert to achieve the overall network goals. The system must be intelligent enough to not only function under nominal conditions, but also adapt to unexpected situations, and reorganize or adapt to perform roles not originally intended for the system or explicitly programmed. This paper describes architecture features of cognitive networking within the future NASA space communications infrastructure, and interacting with the legacy systems and infrastructure in the meantime. The paper begins by discussing the need for increased automation, including inter-system collaboration. This discussion motivates the features of an architecture including cognitive networking for future missions and relays, interoperating with both existing endpoint-based networking models and emerging information-centric models. From this basis, we discuss progress on a proof-of-concept implementation of this architecture as a cognitive networking on-orbit application on the SCaN Testbed attached to the International Space Station.

space networks↗

Architecture for Cognitive Networking within NASA's Future Space Communications Infrastructure

Future space mission concepts and designs pose many networking challenges for command, telemetry, and science data applications with diverse end-to-end data delivery needs. For future end-to-end architecture designs, a key challenge is meeting expected application quality of service requirements for multiple simultaneous mission data flows with options to use diverse onboard local data buses, commercial ground networks, and multiple satellite relay constellations in LEO, GEO, MEO, or even deep space relay links. Effectively utilizing a complex network topology requires orchestration and direction that spans the many discrete, individually addressable computer systems, which cause them to act in concert to achieve the overall network goals. The system must be intelligent enough to not only function under nominal conditions, but also adapt to unexpected situations, and reorganize or adapt to perform roles not originally intended for the system or explicitly programmed. This paper describes an architecture enabling the development and deployment of cognitive networking capabilities into the envisioned future NASA space communications infrastructure. We begin by discussing the need for increased automation, including inter-system discovery and collaboration. This discussion frames the requirements for an architecture supporting cognitive networking for future missions and relays, including both existing endpoint-based networking models and emerging information-centric models. From this basis, we discuss progress on a proof-of-concept implementation of this architecture, and results of implementation and initial testing of a cognitive networking on-orbit application on the SCaN Testbed attached to the International Space Station.

space networks↗

Fast Data Processing for Hyperspectral Sensors on Small Platforms

Hyperspectral imaging is a very promising technology for nuclear proliferation detection. However, due to size and weight restrictions, small hyperspectral platforms such as satellites and small drones lack the on-board computing resources for accurate, real-time analysis of the enormous flow of data that a continuously operating hyperspectral sensor generates. This severely limits satellite systems, which can collect far more data than what they can telemeter, and hinders the ability of all platforms to adapt their missions on the fly in response to observations. This program addresses the hyperspectral data processing challenge through development of new, fast and accurate algorithms that produce data products in real time. The algorithms circumvent the major computational bottlenecks in existing processing streams, and would be incorporated in lightweight, power-efficient single-board computer systems. The toolkit of fast algorithms will be immediately useful in current and future hyperspectral systems being built by the Government and by private industry, including drone-based systems and satellite constellations that acquire timely global imagery.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Flood Detection with Synthetic Aperture Radar: A Case Study of Houston, Texas Following Hurricane Harvey (2017) using C- and X-Band Observations

Hurricane Harvey produced record-breaking rainfall of up to 60 inches resulting in extensive flooding in Houston, Texas, in late August and early September of 2017. The slow forward motion of the storm following landfall left much of the area unobservable to optical remote sensing instruments for several days due to cloud cover. The active nature of Synthetic Aperture Radar (SAR) instruments allows for observations through clouds, which can supplement efforts to estimate hurricane-induced flood impacts. A growing fleet of SAR constellations has helped lower the latency of imagery following a hurricane, allowing for more timely detections of flooding to help support emergency response efforts. In this study, we leverage publicly available C-band SAR observations from the European Space Agency’s Sentinel-1B (S1B) satellite, collected on 30 August, and X-band SAR imagery collected on 1 September by the Airbus TanDEM-X (TDX) satellite made available through the NASA Commercial Smallsat Data Acquisition (CSDA) program. For each dataset, one co-polarized, StripMap, Radiometric Terrain Corrected (RTC) image was used to create a binary water/no water classification map by referencing permanent water in the Cropland Data Layer (CDL) dataset to determine thresholds. A validation dataset of randomly distributed “ground truth” points was generated using optical imagery from PlanetScope on 31 August, where the domain had relatively little cloud cover. We found that the S1B- and TDX-derived open water maps achieved overall accuracies of 94.17% and 91.57%, respectively. The variation in performance is attributed to both the penetrative abilities of C- and X-band SAR wavelengths in vegetated areas and the increased spatial resolution of the commercial SAR (~3 m) over Sentinel-1 (30 m). While publicly available Sentinel-1 observations are commonly relied upon in response and recovery efforts, these results suggest that including commercial X-band SAR imagery could be beneficial by providing both increased spatial resolution and more frequent revisits when deriving post-event flood mapping products.

Alexander M Melancon↗

NASA's Next Generation Optical Communications Relay

NASA's Space Communications and Navigation (SCaN) program is creating an operational optical communications network to complement its current radio frequency (RF) networks. NASA is currently planning for a new optical communications relay node in geostationary (GEO) orbit to be commissioned in 2025, developed by NASA's Goddard Space Flight Center (GSFC), as evolved from Goddard's Laser Communications Relay Demonstration (LCRD) GEO relay payload that will launch in 2019. The Next Generation optical relay node will serve as an initial element in a larger optical networking constellation that will consist of Government and commercial, and international relays. NASA's nodes will aggregate traffic at data rates of up to 10 Gigabits per second (Gbps) from users on the Earth's surface and up through suborbital, LEO, MEO, GEO, cislunar and even out to Earth-Sun Lagrange (1.25 Mkm) distances. Users that require low-latency will be serviced with an onboard complementary Ka-band downlink service. The next generation network will deploy > 100 Gbps space-to-ground links and also optical crosslinks between nodes to allow for user traffic backhaul to minimize ground station location constraints.

Israel, David↗

NASA's Next Generation ≥100 Gbps Optical Communications Relay

NASA’s Space Communications and Navigation (SCaN) program is creating an operational optical communications network to complement its current radio frequency (RF) networks. NASA is currently planning for a new optical communications relay node in geostationary (GEO) orbit to be commissioned in 2025, developed by NASA’s Goddard Space Flight Center (GSFC), as evolved from Goddard’s Laser Communications Relay Demonstration (LCRD) GEO relay payload that will launch in 2019. The Next Generation optical relay node will serve as an initial element in a larger optical networking constellation that will consist of Government and commercial, and international relays. NASA’s nodes will aggregate traffic at data rates of up to 10 Gigabits per second (Gbps) from users on the Earth’s surface and up through suborbital, LEO, MEO, GEO, cislunar and even out to Earth-Sun Lagrange (1.25 Mkm) distances. Users that require low-latency will be serviced with an onboard complementary Ka-band downlink service. The next generation network will deploy ≥ 100 Gbps space-to-ground links and also optical crosslinks between nodes to allow for user traffic backhaul to minimize ground station location constraints.

Park, Elizabeth A.↗

IceCube: Spaceflight Demonstration of 883-GHz Cloud Radiometer for Future Science

Cloud ice play important roles in Earth’s climate and weather systems through their interactions with atmospheric radiation, dynamics, energy and precipitation processes. Submillimeter (submm) wave remote sensing at 200-1000 GHz is able to provide the sensitivity not covered by visible (VIS)/infrared (IR) and low-frequency microwave (MW) sensors (10-183 GHz), and measure cloud ice in the middle-to-upper troposphere. The IceCube 883-GHz cloud radiometer is the latest of NASA’s efforts to advance the technology readiness level (TRL) of submm-wave receiver technology for future compact, low-cost implementation of Earth observing systems. Emerging CubeSat opportunities allow a fast-track development and spaceflight demonstration of IceCube on a 3-U CubeSat. Funded by NASA’s In-Space Validation of Earth Science Technologies (InVEST) program and Science Mission Directorate (SMD), IceCube is the first CubeSat developed and flown by Goddard Space Flight Center (GSFC) in 2.5 years, using commercial off-the-shelf (COTS) components and subsystems. It was successfully released from International Space Station (ISS) in May 2017, acquired 15-month science data and produced the first global map of the 883-GHz cloud ice. It achieved all mission objectives and provided a pathway for future cost-effective cloud observations from CubeSat constellation.

Submm-wave remote sensing↗

Global Precipitation Measurement (GPM) Orbit Design and Autonomous Maneuvers

The NASA Goddard Space Flight Center's Global Precipitation Measurement (GPM) mission will meet a challenge of measuring worldwide precipitation every three hours. The GPM spacecraft, part of a constellation, will be required to maintain a circular orbit in a high drag environment to accomplish this challenge. Analysis by the Flight Dynamics Analysis Branch has shown that the prime orbit altitude of 40% is necessary to prevent ground track repeating. Combined with goals to minimize maneuver impacts to science data collection and enabling reasonable long-term orbit predictions, the GPM project has decided to fly an autonomous maneuver system. This system is a derivative of the successful New Millennium Program technology flown onboard the Earth Observing-1 mission. This paper presents the driving science requirements and goals of the mission and shows how they will be met. Analysis of the orbit optimization and the AV requirements for several ballistic properties are presented. The architecture of the autonomous maneuvering system to meet the goals and requirements is presented along with simulations using a GPM prototype. Additionally, the use of the GPM autonomous system to mitigate possible collision avoidance and to aid other spacecraft systems during navigation outages is explored.

Folta, David↗

Can We Power Future Mars Missions?

The Vision for Space Exploration identified the exploration of Mars as one of the key pathways. In response, NASAs Mars Program Office is developing a detailed mission lineup for the next decade that would lead to future explorations. Mission architectures for the next decade include both orbiters and landers. Existing power technologies, which could include solar panels, batteries, radioisotope power systems, and in the future fission power, could support these missions. Second and third decade explorations could target human precursor and human in-situ missions, building on increasingly complex architectures. Some of these could use potential feed forward from earlier Constellation missions to the Moon, discussed in the ESAS study. From a potential Mars Sample Return mission to human missions the complexity of the architectures increases, and with it the delivered mass and power requirements also amplify. The delivered mass at Mars mostly depends on the launch vehicle, while the landed mass might be further limited by EDL technologies, including the aeroshell, parachutes, landing platform, and pinpoint landing. The resulting in-situ mass could be further divided into payload elements and suitable supporting power systems. These power systems can range from tens of watts to multi-kilowatts, influenced by mission type, mission configuration, landing location, mission duration, and season. Regardless, the power system design should match the power needs of these surface assets within a given architecture. Consequently, in this paper we will identify potential needs and bounds of delivered mass and architecture dependent power requirements to surface assets that would enable future in-situ exploration of Mars.

solar panels↗

Ares First Stage "Systemology" - Combining Advanced Systems Engineering and Planning Tools to Assure Mission Success

Ares is an integral part of NASA s Constellation architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Ares replaces the Space Shuttle in the post 2010 time frame. Ares I is an in-line, two-stage rocket topped by the Orion Crew Exploration Vehicle, its service module, and a launch abort system. The Ares I first stage is a single, five-segment reusable solid rocket booster derived from the Space Shuttle Program's reusable solid rocket motor. The Ares second or upper stage is propelled by a J-2X main engine fueled with liquid oxygen and liquid hydrogen. This paper describes the advanced systems engineering and planning tools being utilized for the design, test, and qualification of the Ares I first stage element. Included are descriptions of the current first stage design, the milestone schedule requirements, and the marriage of systems engineering, detailed planning efforts, and roadmapping employed to achieve these goals.

Seiler, James↗

Modeling the Launch Abort Vehicle's Subsonic Aerodynamics from Free Flight Testing

An investigation into the aerodynamics of the Launch Abort Vehicle for NASA's Constellation Crew Launch Vehicle in the subsonic, incompressible flow regime was conducted in the NASA Langley 20-ft Vertical Spin Tunnel. Time histories of center of mass position and Euler Angles are captured using photogrammetry. Time histories of the wind tunnel's airspeed and dynamic pressure are recorded as well. The primary objective of the investigation is to determine models for the aerodynamic yaw and pitch moments that provide insight into the static and dynamic stability of the vehicle. System IDentification Programs for AirCraft (SIDPAC) is used to determine the aerodynamic model structure and estimate model parameters. Aerodynamic models for the aerodynamic body Y and Z force coefficients, and the pitching and yawing moment coefficients were identified.

Hartman, Christopher L.↗

NASA CA Operations Devolution: Status Update

What is Devolution? Devolution is a spreading of CA (Conjunction Assessment) operations responsibilities to mission FOTs (Flight Operations Teams): Permits efficiencies in handling the increased workload caused by Space Fence and large constellations; Missions given more flexibility in choosing specific approach to CA requirements that resonates best with their particular needs; CARA (Conjunction Assessment Risk Analysis) retains Agency oversight through an established NASA Standard - will establish requirements for devolved CA preparations, processing, and operations conduct. Devolution is a PROPOSED paradigm under consideration by SMD (Space Missions Directorate): Number of activities required before Agency-level decision can be rendered; Agency requirements established via approved CA Standard; Operational experience testimony from two separate pilot programs; After these activities complete, decision will be made whether devolution is a feasible option for missions; CARA is recommending devolution to exist as an option for missions.

conjunction↗

Autonomous Lunar PNT Simulator (ALPS)

In this paper we present a simulation tool that has been used to develop an architecture for a low-cost Position, Navigation and Time (PNT) system to provide PNT services on and around the Moon using non-dedicated low-cost orbital and ground assets. The simulation tool has been developed to be flexible and is capable of modeling and analyzing the many different capabilities and configurations that the non-dedicated assets could support. The tool models the creation of an ad hoc swarm, the localization of this swarm and the subsequent provision of PNT services from this swarm. We present results from several studies of select configurations chosen to reflect existing and future real-world needs and capabilities. Over the next few decades there is expected to be a substantial increase in Lunar missions supporting and inspired by NASA’s Artemis Program. It is expected that a large fraction of these missions will be low cost, utilizing rideshares and CubeSats, just as has seen in Earth orbit over the past decade. Many of these missions will need navigation capabilities but may be unable to support the large power, mass and weight that a weak GNSS or DSN based navigation solution would entail. As Lunar PNT service demand is not likely to be needed over the entire lunar surface 24/7, the creation of a dedicated Lunar GNSS constellation cannot be justified. Hence, our proposed architecture envisions utilizing existing Lunar science and exploration assets to create ad hoc and on demand Lunar PNT swarms capable of providing PNT services to low cost missions. The simulation reflects the two distinct parts of the architecture: the creation of a Lunar PNT swarm using non-dedicated existing assets, and the quantitative modeling of the quality of the PNT services that this swarm provides. To support the former, the simulation supports various swarm localization techniques, including centralized and distributed EKFs both of which support pluggable dynamics models. In modeling the PNT service performance the simulation adopts standard techniques from the GNSS community, including providing degree of precision (DOP) estimates for theoretical end users. Crucially, all asset capabilities, including clock accuracy, independent location self-knowledge and timing measurement precision can be set independently for each asset, reflecting the key concept of utilizing non-dedicated assets. The simulation is predominantly implemented in MATLAB, with GMAT being used for the propagation of orbital assets. The paper will present results from the simulation reflecting the tool’s flexibility and focusing on scenarios that match real-world proposed missions, including scenarios designed to provide PNT support to lunar surface missions similar to NASA Ames' forthcoming VIPER mission. The performance of centralized and decentralized swarm configuration and localization techniques will be compared. Finally, performance of the PNT service provided by an autonomous Lunar PNT swarm will be compared to existing radiometric and weak GNSS methods.

Kelley Elizabeth Hashemi↗