Search NASA⌕ Search

SEARCH · Search NASA

Results for “Estimates”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Center of Mass Estimation for a Spinning Spacecraft Using Doppler Shift of the GPS Carrier Frequency

A sequential filter is presented for estimating the center of mass (CM) of a spinning spacecraft using Doppler shift data from a set of onboard Global Positioning System (GPS) receivers. The advantage of the proposed method is that it is passive and can be run continuously in the background without using commanded thruster firings to excite spacecraft dynamical motion for observability. The NASA Magnetospheric Multiscale (MMS) mission is used as a test case for the CM estimator. The four MMS spacecraft carry star cameras for accurate attitude and spin rate estimation. The angle between the spacecraft nominal spin axis (for MMS this is the geometric body Z-axis) and the major principal axis of inertia is called the coning angle. The transverse components of the estimated rate provide a direct measure of the coning angle. The coning angle has been seen to shift slightly after every orbit and attitude maneuver. This change is attributed to a small asymmetry in the fuel distribution that changes with each burn. This paper shows a correlation between the apparent mass asymmetry deduced from the variations in the coning angle and the CM estimates made using the GPS Doppler data. The consistency between the changes in the coning angle and the CM provides validation of the proposed GPS Doppler method for estimation of the CM on spinning spacecraft.

Estimation↗

Multi-Pass Sequential Mini-Batch Stochastic Gradient Descent Algorithms for Noise Covariance Estimation in Adaptive Kalman Filtering

Estimation of unknown noise covariances in a Kalman filter is a problem of significant practical interest in a wide array of applications. Although this problem has a long history, reliable algorithms for their estimation were scant, and necessary and sufficient conditions for identifiability of the covariances were in dispute until recently. Necessary and sufficient conditions for covariance estimation and a batch estimation algorithm were presented in our previous study. This paper presents stochastic gradient descent algorithms for noise covariance estimation in adaptive Kalman filters that are an order of magnitude faster than the batch method for similar or better root mean square error. More significantly, these algorithms are applicable to non-stationary systems where the noise covariances can occasionally jump up or down by an unknown magnitude. The computational efficiency of the new algorithms stems from adaptive thresholds for convergence, recursive fading memory estimation of the sample cross-correlations of the innovations, and accelerated stochastic gradient descent algorithms. The comparative evaluation of the proposed methods on a number of test cases demonstrates their computational efficiency and accuracy.

Adaptive Kalman filtering↗

Development of a Trip Energy Estimation Model Using Real-World Global Positioning System Driving Data: Preprint

A data-driven technique for estimation of energy requirements for a proposed vehicle trip has been developed. Based on over 700,000 miles of driving data, the technique has been applied to generate a model that estimates trip energy requirements. The model uses a novel binning approach to categorize driving by road type, traffic conditions, and driving profile. The trip-level energy estimations can easily be aggregated to any higher-level transportation system network desired. The model has been tested and validated on the Austin, Texas, data set used to build this model. Ground-truth energy consumption for the data set was obtained from Future Automotive Systems Technology Simulator (FASTSim) vehicle simulation results. The energy estimation model has demonstrated 12.1 percent normalized total absolute error. The energy estimation from the model can be used to inform control strategies in routing tools, such as change in departure time, alternate routing, and alternate destinations, to reduce energy consumption. The model can also be used to determine more accurate energy consumption of regional or national transportation networks if trip origin and destinations are known. Additionally, this method allows the estimation tool to be tuned to a specific driver or vehicle type.

33 ADVANCED PROPULSION SYSTEMS↗

Sample Complexity of Power System State Estimation using Matrix Completion: Preprint

In this paper, we propose an analytical framework to quantify the amount of data samples needed to obtain accurate state estimation in a power system-a problem known as \emph{sample complexity} analysis in computer science. Motivated by the increasing adoption of distributed energy resources into the distribution-level grids, it becomes imperative to estimate the state of distribution grids in order to ensure stable operation. Traditional power system state estimation techniques mainly focus on the transmission network which involve solving an overdetermined system and eliminating bad data. However, distribution networks are typically \emph{underdetermined} due to the large number of connection points and high cost of pervasive installation of measurement devices. In this paper, we consider the recently proposed state-estimation method for underdetermined systems that is based on \emph{matrix completion}. In particular, a \emph{constrained} matrix completion algorithm was proposed, wherein the standard matrix completion problem is augmented with additional equality constraints representing the physics (namely power-flow constraints). We analyze the sample complexity of this general method by proving an upper bound on the sample complexity that depends directly on the properties of these constraints that can lower number of needed samples as compared to the unconstrained problem. To demonstrate the improvement that the constraints add to state estimation, we test the method on a 141-bus distribution network case study and compare it to the traditional least squares minimization state estimation method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Power Network State Estimation with Asynchronous Measurements: Preprint

The operation of distribution networks is becoming increasingly volatile, due to fast variations of renewables and, hence, net-loading conditions. To perform a reliable state estimation under these conditions, this paper considers the case where measurements from meters, phasor measurement units, and distributed energy resources are collected and processed in real time to produce estimates of the state at a fast time scale. Streams of measurements collected in real time and at heterogenous rates render the underlying processing asynchronous, and poses severe strains on workhorse state estimation algorithms. In this work, a real-time state estimation algorithm is proposed, where data are processed on the fly. Starting from a regularized least-squares model, and leveraging appropriate linear models, the proposed scheme boils down to a linear dynamical system where the state is updated based on the previous estimate and on the measurement gathered from a few available sensors. The estimation error is shown to be always bounded under mild condition. Numerical simulations are provided to corroborate the analytical findings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synchrophasors-based Master State Awareness Estimator for Cybersecurity in Power Grid: Testbed Implementation & Field Demonstration

The integration of distributed energy resources(DERs) and expansion of complex network in the distribution grid requires an advanced distributed state estimator to monitor the grid health at micro-level. The distribution state estimator will improve the situational awareness and resiliency of distributed power system. This paper proposes a synchrophasors-based master state awareness (MSA) estimator to enhance the cybersecurity in distribution grid by providing a real-time estimation of system operating states to control center operators. In this paper, the proposed MSA estimator utilizes only phasor measurements, bus magnitudes and angles, from phasor measurement units (PMUs),deployed in local substations, to estimate the system states and also detects data integrity attacks, such as load tripping attack that disconnects the load. To validate the proof of concept, we implement the proposed methodology in cyber-physical testbed environment at the Idaho National Laboratory (INL) Electric Grid Security Testbed. Further, to address the “valley of death” and support technology commercialization, field demonstration is also performed at the Critical Infrastructure Test Range Complex(CITRC) at the INL. Our experimental results reveal a promising performance in detecting load tripping attack and providing an accurate situational awareness through an alert visualization dashboard in real-time

42 ENGINEERING↗

A new estimate of the China temperature anomaly series and uncertainty assessment in 1900–2006

While global warming during the last century has been well recognized, the magnitude of the climate warming in regions such as China over the past 100 years still has some uncertainty due to limited observations during the early years. Several series of temperature anomalies for the 20th century in China have been independently developed by different groups. The uncertainty arises mainly from the sparse observations before 1950, where statistics are sensitive to the small and potentially biased sample. In this study, BSHADE–MSN (Biased Sentinel Hospitals Areal Disease Estimation and Means of Stratified Nonhomogeneous Surface), a combination of two novel distinct statistical methods that are applicable with different sample situations to a spatial heterogeneous surface, is applied to estimate annual mean temperature anomalies for China. This method takes into account prior knowledge of geographical spatial autocorrelation and nonhomogeneity of target domains, remedies the biased sample, and maximizes an objective function for the best linear unbiased estimation (BLUE) of the regional mean quantity. For the period 1900–1999, the overall trend estimated by BSHADE–MSN is 0.80°C with a 95% confidential interval between 0.41°C and 1.18°C. This is significantly lower than that calculated by Climate Anomaly Method (CAM) and Block Kriging. The new temperature anomaly series for China exhibits slightly warmer conditions for the period before 1950 than existing studies. All the methods applied so far agree well with each other for the period after 1950, when there are sufficient stations across the country for the estimation of temperature anomaly series. Cross validation shows that the new regional mean temperature anomaly series has smaller estimation error variance and higher accuracy than those based on the other methods assessed in this study.

54 ENVIRONMENTAL SCIENCES↗

Estimating groundwater dynamics at a Colorado River floodplain site using historical hydrological data and climate information

Long-term prediction of groundwater dynamics is important for assessing water resources and their impacts on biogeochemical cycling. However, estimating future groundwater dynamics is challenging due to the wide range of spatiotemporal scales in hydrological processes and uncertainty in future climate conditions. In this study, we develop a Bayesian model to combine small-scale historical hydrological data with large-scale climate information to estimate groundwater dynamics at a floodplain site in Rifle, Colorado. Although we have only a few years of groundwater elevation measurements, we have 47 years of streamflow data from a gaging station approximately 43 km upstream and long-term climate prediction on the Upper Colorado River Basin. To estimate future daily groundwater dynamics, we first develop a time series model to downscale the monthly streamflow derived from climate information to daily streamflow, and then transform the daily streamflow to groundwater dynamics at the downstream floodplain site. We use Monte Carlo methods to estimate future groundwater dynamics at the site through sampling from the joint posterior probability distribution. The results suggest that although future groundwater levels are expected to be similar to the current levels, the timing of the high groundwater levels is predicted to occur about 1 month earlier. The developed framework is extendable to other sites to estimate future groundwater dynamics given disparate data sets and climate projections. Additionally, the obtained estimates are being used as input to a site-specific watershed reactive transport models to predict how climate-induced changes will influence future biogeochemical cycling relevant to a variety of ecosystem services.

58 GEOSCIENCES↗

Comparison of Big-Leaf, Two-Big-Leaf, and Two-Leaf Upscaling Schemes for Evapotranspiration Estimation Using Coupled Carbon-Water Modeling

Evapotranspiration (ET) is commonly estimated using the Penman-Monteith equation, which assumes that the plant canopy is a big leaf (BL) and the water flux from vegetation is regulated by canopy stomatal conductance (G s ). However, BL has been found to be unsuitable for terrestrial biosphere models built on the carbon-water coupling principle because it fails to capture daily variations of gross primary productivity (GPP). A two-big-leaf scheme (TBL) and a two-leaf scheme (TL) that stratify a canopy into sunlit and shaded leaves have been developed to address this issue. However, there is a lack of comparison of these upscaling schemes for ET estimation, especially on the difference between TBL and TL. We find that TL shows strong performance (r 2 = 0.71, root-mean-square error = 0.05 mm/h) in estimating ET at nine eddy covariance towers in Canada. BL simulates lower annual ET and GPP than TL and TBL. The biases of estimated ET and GPP increase with leaf area index (LAI) in BL and TBL, and the biases of TL show no trends with LAI. BL miscalculates the portions of light-saturated and light-unsaturated leaves in the canopy, incurring negative biases in its flux estimation. TBL and TL showed improved yet different GPP and ET estimations. This difference is attributed to the lower Gsand intercellular CO 2 concentration simulated in TBL compared to their counterparts in TL. Finally, we suggest to use TL for ET modeling to avoid the uncertainty propagated from the artificial upscaling of leaf-level processes to the canopy scale in BL and TBL.

54 ENVIRONMENTAL SCIENCES↗

A Review of Global Precipitation Data Sets: Data Sources, Estimation, and Intercomparisons

Abstract In this paper, we present a comprehensive review of the data sources and estimation methods of 30 currently available global precipitation data sets, including gauge‐based, satellite‐related, and reanalysis data sets. We analyzed the discrepancies between the data sets from daily to annual timescales and found large differences in both the magnitude and the variability of precipitation estimates. The magnitude of annual precipitation estimates over global land deviated by as much as 300 mm/yr among the products. Reanalysis data sets had a larger degree of variability than the other types of data sets. The degree of variability in precipitation estimates also varied by region. Large differences in annual and seasonal estimates were found in tropical oceans, complex mountain areas, northern Africa, and some high‐latitude regions. Overall, the variability associated with extreme precipitation estimates was slightly greater at lower latitudes than at higher latitudes. The reliability of precipitation data sets is mainly limited by the number and spatial coverage of surface stations, the satellite algorithms, and the data assimilation models. The inconsistencies described limit the capability of the products for climate monitoring, attribution, and model validation.

54 ENVIRONMENTAL SCIENCES↗

A new approach to estimate fecundity rate from inter‐birth intervals

Abstract Accurate estimates of fecundity rate are key to population assessments and effectively direct conservation efforts. We present a new approach to estimate fecundity rate based on the probability of a female giving birth, conditional on a previous birth t years ago, from which an expected inter‐birth interval ( IBI ) can be estimated. We use generalized linear mixed‐effects models to account for individual and temporal variability and apply the approach to individual reproductive histories of bottlenose dolphins ( Tursiops truncatus ) from the east coast of Scotland. We estimate a fecundity rate of 0.222 (95% CI = 0.218–0.253) and an expected IBI of 4.49 yr (95% CI = 3.94–4.93 yr). We use simulated data samples to show that the approach produces estimates with a minimum bias of <3%. Simulations are also used to investigate the effect of the most common data‐driven biases in the estimates of birth intervals and fecundity rate; we recommend longitudinal studies of at least 10 yr and capture probabilities of at least 0.3 when using this methodology. The approach may be modified to incorporate other parameters of interest and should be applicable to any population with comprehensive data on birth intervals.

Arso Civil, Mònica↗

Benchmark estimate of the effect of anthropogenic emissions on the ocean surface

Abstract Investigations into the role of anthropogenic emissions in the occurrence of extreme weather often use a method that compares simulations of atmospheric climate models run under a factual scenario of historical boundary conditions observed during the period of the event against simulations run under a counterfactual scenario of what those boundary conditions might naturally have been over that same period in the absence of anthropogenic emissions. A particular requirement for this experiment design is an accurate estimation of ocean surface boundary conditions for use by the counterfactual natural simulations. Here we use output from the CMIP5 multi‐climate‐model archive to develop a robust estimate of sea surface temperatures and sea ice conditions for use in counterfactual natural simulations, intended as a benchmark estimate to facilitate comparison across climate models and across studies. This development includes tests to ensure that the final estimate is stable from year‐to‐year and stable against other perturbations to the methodology, as well as consideration of the strengths and weaknesses in comparison to other available attributable warming estimates. While this estimate is tailored specifically for the International CLIVAR C20C+ Detection and Attribution Project, it can be used by related projects as well.

Stone, Dáithí A.↗

Estimating basis functions in massive fields under the spatial mixed effects model

Abstract Spatial prediction is commonly achieved under the assumption of a Gaussian random field by obtaining maximum likelihood estimates of parameters, and then using the kriging equations to arrive at predicted values. For massive datasets, fixed rank kriging using the expectation–maximization algorithm for estimation has been proposed as an alternative to the usual but computationally prohibitive kriging method. The method reduces computation cost of estimation by redefining the spatial process as a linear combination of basis functions and spatial random effects. A disadvantage of this method is that it imposes constraints on the relationship between the observed locations and the knots. We develop an alternative method that utilizes the spatial mixed effects model, but allows for additional flexibility by estimating the range of the spatial dependence between the observations and the knots via an alternating expectation conditional maximization algorithm. Experiments show that our methodology improves estimation without sacrificing prediction accuracy while also minimizing the additional computational burden of extra parameter estimation. The methodology is applied to a temperature dataset archived by the United States National Climate Data Center, with improved results over previous methodology.

Pazdernik, Karl↗

Input estimation from measured structural response

This report will focus on the estimation of unmeasured dynamic inputs to a structure given a numerical model of the structure and measured response acquired at discrete locations. While the estimation of inputs has not received as much attention historically as state estimation, there are many applications where an improved understanding of the immeasurable input to a structure is vital (e.g. validating temporally varying and spatially-varying load models for large structures such as buildings and ships). In this paper, the introduction contains a brief summary of previous input estimation studies. Next, an adjoint-based optimization method is used to estimate dynamic inputs to two experimental structures. The technique is evaluated in simulation and with experimental data both on a cantilever beam and on a three-story frame structure. The performance and limitations of the adjoint-based input estimation technique are discussed.

42 ENGINEERING↗

Estimating and Evaluating Roughness Length and Displacement Height in Heterogeneous Urban Environments

The roughness length (z 0 ) and displacement height (z d ) are essential surface-layer parameters in numerical models (e.g., weather, climate, wall-modeled LES, etc.). This work evaluates the consistency of z 0 and z d estimates from morphometric and anemometric methods using data from two eddy-covariance flux towers (AmeriFlux US-INg and US-INc) in Indianapolis, IN. Results show inconsistencies in estimated z 0 and z d values depending on the chosen method. The two evaluated anemometric methods estimate non-physical values of z d when compared to roughness elements surrounding both towers. Additionally, predictions of mean wind speed using surface-layer similarity theory with morphometric estimates exhibit a bias during near-neutral and stable conditions relative to observations. The overestimation of mean wind speed by surface layer similarity theory is consistent with previous observational and modeling studies in urban areas, suggesting that the application of similarity theories to urban environments may have limitations. Differentiation of vegetation from built structures appears to impact morphometric z 0 and z d estimates, particularly where vegetation is abundant; however, it has little impact on correcting biases in the similarity theory. Specifically, we find that existing similarity theories using morphometric estimates underestimate integral velocity and length scales, and the degree of underestimation depends on the stability conditions. Accounting for the degree of anisotropy in surface-layer turbulence helps reduce the biases between similarity theories and observations during unstable conditions, but not in near-neutral cases. Future work is needed to identify the cause of such biases for near-neutral conditions.

Aerodynamic roughness length↗

Conditions of Asymptotic Normality of One-Step M-Estimators

In the case of independent identically distributed observations, we study the asymptotic properties of one-step M-estimators served as explicit approximations of consistent M-estimators. We find rather general conditions for the asymptotic normality of one-step M-estimators. We consider Fisher’s approximations of consistent maximum likelihood estimators and find general conditions guaranteeing the asymptotic normality of the Fisher estimators even in the case where maximum likelihood estimators do not necessarily exist or are not necessarily consistent.

97 MATHEMATICS AND COMPUTING↗

Cost Implications of Uncertainty in CO{sub 2} Storage Resource Estimates: A Review

Carbon capture from stationary sources and geologic storage of carbon dioxide (CO{sub 2}) is an important option to include in strategies to mitigate greenhouse gas emissions. However, the potential costs of commercial-scale CO{sub 2} storage are not well constrained, stemming from the inherent uncertainty in storage resource estimates coupled with a lack of detailed estimates of the infrastructure needed to access those resources. Storage resource estimates are highly dependent on storage efficiency values or storage coefficients, which are calculated based on ranges of uncertain geological and physical reservoir parameters. If dynamic factors (such as variability in storage efficiencies, pressure interference, and acceptable injection rates over time), reservoir pressure limitations, boundaries on migration of CO{sub 2}, consideration of closed or semi-closed saline reservoir systems, and other possible constraints on the technically accessible CO{sub 2} storage resource (TASR) are accounted for, it is likely that only a fraction of the TASR could be available without incurring significant additional costs. Although storage resource estimates typically assume that any issues with pressure buildup due to CO{sub 2} injection will be mitigated by reservoir pressure management, estimates of the costs of CO{sub 2} storage generally do not include the costs of active pressure management. Production of saline waters (brines) could be essential to increasing the dynamic storage capacity of most reservoirs, but including the costs of this critical method of reservoir pressure management could increase current estimates of the costs of CO{sub 2} storage by two times, or more. Even without considering the implications for reservoir pressure management, geologic uncertainty can significantly impact CO{sub 2} storage capacities and costs, and contribute to uncertainty in carbon capture and storage (CCS) systems. Given the current state of available information and the scarcity of (data from) long-term commercial-scale CO{sub 2} storage projects, decision makers may experience considerable difficulty in ascertaining the realistic potential, the likely costs, and the most beneficial pattern of deployment of CCS as an option to reduce CO{sub 2} concentrations in the atmosphere.

54 ENVIRONMENTAL SCIENCES↗

Deep learning to estimate permeability using geophysical data

Time-lapse electrical resistivity tomography (ERT) is a popular geophysical method to estimate three-dimensional (3D) permeability fields from electrical potential difference measurements. Traditional inversion and data assimilation methods are used to ingest this ERT data into hydrogeophysical models to estimate permeability. Due to ill-posedness and the curse of dimensionality, existing inversion strategies provide poor estimates and low resolution of the 3D permeability field. Recent advances in deep learning provide us with powerful algorithms to overcome this challenge. This paper presents a deep learning (DL) framework to estimate the 3D subsurface permeability from time-lapse ERT data. To test the feasibility of the proposed framework, we train DL-enabled inverse models on simulation data. Each measurement in both synthetic and field data is standardized by removing the mean and scaling the time-series to unit variance. This pre-processing step is necessary to bring simulation data closer to field observations. Subsurface process models based on hydrogeophysics are used to generate this synthetic data. Training performed on limited simulation data resulted in the DL model over-fitting. An advanced data augmentation based on mixup is implemented to generate additional training samples to overcome this issue. This mixup technique creates weakly labeled (low-fidelity) samples from strongly labeled (high-fidelity) data. The weakly labeled training data is then used to develop DL-enabled inverse models and reduce over-fitting. As both time-lapse ERT (1133048 features/realization) and 3D permeability (585453 features/realization) data samples are from a high-dimensional space, principal component analysis (PCA) is employed to reduce dimensionality. Encoded ERT and encoded permeability are generated using the trained PCA estimators. A deep neural network is then trained to map the encoded ERT to encoded permeability. This mixup training and unsupervised learning allowed us to build a fast and reasonably accurate DL-based inverse model under limited simulation data. Results show that proposed weak supervised learning can capture salient spatial features in the 3D permeability field. Quantitatively, the average mean squared error (in terms of the natural log) on the strongly labeled training, validation, and test datasets is less than 0.5. The R 2 -score (global metric) is greater than 0.75, and the percent error in each cell (local metric) is less than 10%. Finally, an added benefit in terms of computational cost is that the proposed DL-based inverse model is at least O(10 4 ) times faster than running a forward model once it is trained. Data generation, DL model training, and hyperparameter tuning to identify optimal neural network architectures utilized high-performance computing resources while the DL inference is performed on a standard laptop. Approximately, O(10 5 ) processor hours are used for generating data and DL tuning and training. We acknowledge that the data generation and DL model development are expensive. But once a DL model is trained, it can be re-used for inversion rapidly for the given system, with set physics and domain. Note that traditional inversion may require multiple forward model simulations (e.g., in the order of 10 to 1000), which are very expensive. This computational savings ≈ O(10 5 ) – O(10 7 )) makes the proposed DL-based inverse model attractive for subsurface imaging and real-time ERT monitoring applications due to fast and yet reasonably accurate estimations of permeability field.

58 GEOSCIENCES↗