Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROCESSING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 3: Combustors, furnaces and low-BTU gasifiers

Information is presented on the design, performance, operating characteristics, cost, and development status of coal preparation equipment, combustion equipment, furnaces, low-Btu gasification processes, low-temperature carbonization processes, desulfurization processes, and pollution particulate removal equipment. The information was compiled for use by the various cycle concept leaders in determining the performance, capital costs, energy costs, and natural resource requirements of each of their system configurations.

Hamm, J. R.↗

Minimizing Launch Mass for ISRU Processes

The University of Dayton and the Jet Propulsion Laboratory are developing a methodology for estimating the Earth launch mass (ELM) of processes for In-Situ Resource Utilization (ISRU) with a focus on lunar resource recovery. ISRU may be enabling for both an extended presence on the Moon, and for large sample return missions and for a human presence on Mars. To accomplish these exploration goals, the resources recovered by ISRU must offset the ELM for the recovery process. An appropriate figure of merit is the cost of the exploration mission, which is closely related to ELM. For a given production rate and resource concentration, the lowest ELM - and the best ISRU process - is achieved by minimizing capital equipment for both the ISRU process and energy production. ISRU processes incur Carnot limitations and second law losses (irreversibilities) that ultimately determine production rate, material utilization and energy efficiencies. Heat transfer, chemical reaction, and mechanical operations affect the ELM in ways that are best understood by examining the process's detailed energetics. Schemes for chemical and thermal processing that do not incorporate an understanding of second law losses will be incompletely understood. Our team is developing a methodology that will aid design and selection of ISRU processes by identifying the impact of thermodynamic losses on ELM. The methodology includes mechanical, thermal and chemical operations, and, when completed, will provide a procedure and rationale for optimizing their design and minimizing their cost. The technique for optimizing ISRU with respect to ELM draws from work of England and Funk that relates the cost of endothermic processes to their second law efficiencies. Our team joins their approach for recovering resources by chemical processing with analysis of thermal and mechanical operations in space. Commercial firms provide cost inputs for ELM and planetary landing. Additional information is included in the original extended abstract.

England, C.↗

Chemical interaction matrix between reagents in a Purex based process

The United States Department of Energy (DOE) is the responsible entity for the disposal of the United States excess weapons grade plutonium. DOE selected a PUREX-based process to convert plutonium to low-enriched mixed oxide fuel for use in commercial nuclear power plants. To initiate this process in the United States, a Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) is under construction and will be operated by Shaw AREVA MOX Services at the Savannah River Site. This facility will be licensed and regulated by the U.S. Nuclear Regulatory Commission (NRC). A PUREX process, similar to the one used at La Hague, France, will purify plutonium feedstock through solvent extraction. MFFF employs two major process operations to manufacture MOX fuel assemblies: (1) the Aqueous Polishing (AP) process to remove gallium and other impurities from plutonium feedstock and (2) the MOX fuel fabrication process (MP), which processes the oxides into pellets and manufactures the MOX fuel assemblies. The AP process consists of three major steps, dissolution, purification, and conversion, and is the center of the primary chemical processing. A study of process hazards controls has been initiated that will provide knowledge and protection against the chemical risks associated from mixing of reagents over the life time of the process. This paper presents a comprehensive chemical interaction matrix evaluation for the reagents used in the PUREX-based process. Chemical interaction matrix supplements the process conditions by providing a checklist of any potential inadvertent chemical reactions that may take place. It also identifies the chemical compatibility/incompatibility of the reagents if mixed by failure of operations or equipment within the process itself or mixed inadvertently by a technician in the laboratories. (aut0010ho.

07 ISOTOPE AND RADIATION SOURCES↗

Discrete-event Simulation Process Model for the Pyrochemical Processing of Plutonium at Los Alamos National Laboratory

The pyrochemical metal production operations that occur in the Plutonium Facility at Los Alamos National Laboratory perform plutonium purification with the aim to provide plutonium metal for a variety of defense- and non-defense missions within the National Nuclear Security Administration. The demands and constraints associated with the pyrochemical processing of plutonium are complex, making decision analyses challenging for program managers who require plutonium production for their mission applications. The construction of a discrete-event simulation process model is proposed to measure and report the process capacity, material throughput, equipment requirements, and dose accumulation for operators of the pyrochemical metal production operations. The process model, constructed in the ExtendSim™ software, will represent the cause-and-effect relationships between the pyrochemical processing environment and the process constraints, including criticality limitations, material control and accountability measures, chemical analysis requirements, and equipment availability. An accurate representation of the pyrochemical metal production process capacity through simulation modeling will be helpful to program managers in their efforts to forecast plutonium availability for mission applications. Furthermore, the proposed process model will be vital for future analyses that will measure the interactions between the pyrochemical metal production operations and the aqueous reprocessing operations and their ability to minimize transuranic waste disposal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Extraterrestrial processing and manufacturing of large space systems. Volume 3: Executive summary

Facilities and equipment are defined for refining processes to commercial grade of lunar material that is delivered to a 'space manufacturing facility' in beneficiated, primary processed quality. The manufacturing facilities and the equipment for producing elements of large space systems from these materials and providing programmatic assessments of the concepts are also defined. In-space production processes of solar cells (by vapor deposition) and arrays, structures and joints, conduits, waveguides, RF equipment radiators, wire cables, converters, and others are described.

Miller, R. H.↗

Data Input, Processing and Presentation

The problems of data acquisition, processing and display are investigated in the case of a helicopter rotor balance. The types of sensors to be employed are discussed in addition to their placement and application in wind tunnel trials. Finally, the equipment for data processing, evaluation and storage are presented with a description of methods.

Langer, H. J.↗

Built-In Diagnostics (BID) Of Equipment/Systems

Diagnostician(TM)-on-Chip (DOC) technology identifies faults and commands systems reconfiguration. Smart microcontrollers operating in conjunction with other system-control circuits, command self-correcting system/equipment actions in real time. DOC microcontroller generates commands for associated built-in test equipment to stimulate unit of equipment diagnosed, collects and processes response data obtained by built-in test equipment, and performs diagnostic reasoning on response data, using diagnostic knowledge base derived from design data.

Granieri, Michael N.↗

Hanford WTP LAW Melter Startup and Tuning Feed Material Development - 17065

The U.S. Department of Energy's (DOE) Hanford Site in southeast Washington state is home to 56 million gallons of chemical and radioactive waste stored in underground tanks, the result of more than four decades of plutonium production. To address this challenge, the U.S. Department of Energy contracted Bechtel National, Inc., to design and build the world's largest radioactive waste treatment plant. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will use vitrification to immobilize most of Hanford's waste. Vitrification involves blending the waste with glass-forming materials, and heating it to high temperature to form molten glass, then pouring it into stainless steel containers. In this glass form, its radioactivity will decay over hundreds to thousands of years. In advance of full operation of WTP, a sequential process of commissioning will be undertaken to ensure the plant operates safely and within design requirements. The first phase of WTP operations will focus on the Low-Activity Waste (LAW) Vitrification Facility and its supporting facilities and systems. Commissioning of the LAW Facility will employ a progressive approach to address the complexity of system operation and introduction of hazards. This approach starts with introduction of low hazard and simple testing configurations, and incrementally increasing the complexity and hazardous makeup of testing feed materials, culminating in fully integrated treatment of radioactive tank waste during hot commissioning. Testing with simulants that are chemically similar to radioactive tank waste introduces significant chemical hazards into treatment systems in the form of nitrogen oxides (NOx) and anhydrous ammonia. A method of testing to allow tuning and demonstration of equipment and to develop operator proficiency prior to introducing these chemical hazards was deemed necessary. To that end, the development and testing of a new 'tuning feed' material is in progress. The tuning feed is important because its use will enable the first-time integration of all LAW Facility process systems. The tuning feed must include key physical and chemical characteristics that correspond to the commissioning simulant and low activity tank waste, without the inherently hazardous materials or toxic off-gas constituents that result from tank waste treatment. Tuning feed is being developed to provide representative melter feed rheology, glass chemistry, cold cap formation, and off-gas generation rate in order to predict system response to actual tank waste to the extent practical. The tuning feed must also be compatible with process equipment and other process streams that will be encountered during the cold commissioning testing program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Combined Cyclone and Gas Filtration System for Particulate Removal in the Gasification Process

The Wabash gasification facility, owned and operated by sgSolutions LLC, is one of the largest single train solid fuel gasification facilities in the world capable of transforming 2,000 tons per day of petroleum coke or 2,600 tons per day of bituminous coal into synthetic gas for electrical power generation. The Wabash plant utilizes Phillips66 proprietary E-Gas™ Gasification Process to convert solid fuels such as petroleum coke or coal into synthetic gas that is fed to a combined cycle combustion turbine power generation facility. During plant startup in 1995, reliability issues were realized in the gas filtration portion of the gasification process. To address these issues, a slipstream test unit was constructed at the Wabash facility to test various filter designs, materials and process conditions for potential reliability improvement. The char filtration slipstream unit provided a way of testing new materials, maintenance procedures, and process changes without the risk of stopping commercial production in the facility. It also greatly reduced maintenance expenditures associated with full scale testing in the commercial plant. This char filtration slipstream unit was installed with assistance from the United States Department of Energy (built under DOE Contract No. DE-FC26-97FT34158) and began initial testing in November of 1997. It has proven to be extremely beneficial in the advancement of the E-Gas™ char removal technology by accurately predicting filter behavior and potential failure mechanisms that would occur in the commercial process. After completing four (4) years of testing various filter types and configurations on numerous gasification feed stocks, a decision was made to investigate the economic and reliability effects of using a particulate removal gas cyclone upstream of the current gas filtration unit. A paper study had indicated that there was a real potential to lower both installed capital and operating costs by implementing a char cyclone-filtration hybrid unit in the E-Gas™ gasification process. These reductions would help to keep the E-Gas™ technology competitive among other coal-fired power generation technologies. The Wabash combined cyclone and gas filtration slipstream test program was developed to provide design information, equipment specification and process control parameters of a hybrid cyclone and candle filter particulate removal system in the E-Gas™ gasification process that would provide the optimum performance and reliability for future commercial use. The test program objectives were as follows: 1. Evaluate the use of various cyclone materials of construction; 2. Establish the optimal cyclone efficiency that provides stable long term gas filter operation; 3. Determine the particle size distribution of the char separated by both the cyclone and candle filters. This will provide insight into cyclone efficiency and potential future plant design; 4. Determine the optimum filter media size requirements for the cyclone-filtration hybrid unit; 5. Determine the appropriate char transfer rates for both the cyclone and filtration portions of the hybrid unit; 6. Develop operating procedures for the cyclone-filtration hybrid unit; and, 7. Compare the installed capital cost of a scaled-up commercial cyclone-filtration hybrid unit to the current gas filtration design without a cyclone unit, such as currently exists at the Wabash facility.

01 COAL, LIGNITE, AND PEAT↗

Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization Survey of the SPRU Lower Level Hillside Area at the Knolls Atomic Power Laboratory, Niskayuna, New York (Final Report)

The Separations Process Research Unit (SPRU) is located within the boundary of Knolls Atomic Power Laboratory (KAPL) at 2425 River Road, Niskayuna, Schenectady County, New York (Figure A-1). SPRU was designed and developed to research an efficient process to chemically separate plutonium and uranium from processed fuel. Buildings H2 and G2 were the primary research and process facilities. SPRU operated between February 1950 and October 1953 at which time the research was successful in developing useable reduction oxidation and plutonium uranium extraction processes. These processes were subsequently moved to the Hanford and the Savannah River sites for full-scale operations. Building H2 was used by KAPL after the SPRU process ceased until the late 1990s for radioactive wastewater processing and Building G2 was utilized for offices. Process areas and equipment were maintained in a safe condition under a surveillance and maintenance program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Integration of CO 2 Compression Processes with Coal-Fired Power Plants Equipped with Carbon Capture

Coal-fired power plants, equipped either with oxycombustion or post-combustion CO 2 capture, will require a CO 2 compression system to increase the pressure of the CO 2 to the level needed for sequestration. Most analyses show that CO 2 compression will have a significant effect on parasitic load, will be a major capital cost, and will contribute significantly to reduced unit efficiency. This project used first principle engineering analyses and computer simulations to determine the effects of utilizing compressor waste heat to improve power plant efficiency and increase net power output of coal-fired power plants with carbon capture. This was done for units with post combustion solvent-based CO 2 capture systems and for oxyfired power plants, firing bituminous, PRB and lignite coals. The thermal integration opportunities analyzed for oxycombustion capture are use of compressor waste heat to reheat recirculated flue gas, preheat boiler feedwater and predry high-moisture coals prior to pulverizing the coal. Among the thermal integration opportunities analyzed for post combustion capture systems are use of compressor waste heat and heat recovered from the stripper condenser to regenerate post-combustion CO 2 capture solvent, preheat boiler feedwater and predry high-moisture coals. The overall conclusion from the oxyfuel simulations is that thermal integration of compressor heat has the potential to improve net unit heat rate by up to 8.4 percent, but the actual magnitude of the improvement will depend on the type of heat sink used and to a lesser extent, compressor design and coal rank. The simulations of a unit with a MEA post combustion capture system showed that thermal integration of either compressor heat or stripper condenser heat to preheat boiler feedwater would result in heat rate improvements from 1.20 percent to 4.19 percent. The MEA capture simulations further showed that partial drying of low rank coals, done in combination with feedwater heating, would result in heat rate reductions of 7.43 percent for PRB coal and 10.45 percent for lignite.

01 COAL, LIGNITE, AND PEAT↗

Simple non-galvanic flip-chip integration method for hybrid quantum systems

A challenge faced by experimenters exploring hybrid quantum systems is how to integrate and interconnect different materials and different substrates in a quantum-coherent fashion. Here, we present a simple and inexpensive flip-chip bonding process, suitable for integrating hybrid quantum devices on chips from different substrates. The process only requires equipment and materials used routinely for contact photolithography, and it is possible to undo the bonding and reuse the chips. The technique requires minimal compressive force, so it is compatible with a wide range of different substrates. Unlike indium-based bonding, this process does not establish a galvanic connection between the two chips, but as we show, in some situations this is not necessary. We demonstrate the technique using lithographically patterned quarter-wave coplanar waveguide resonators, fabricated on one chip, and couple these inductively to a transmission line patterned lithographically on a separate chip. The two chips have a vertical interchip gap of about 7 μm, and we can repeatedly achieve lateral alignments of better than 2μm. We measure electromagnetic resonances with low-power (similar to ~1 photon) internal quality factors Q i around 5 x 10 5 , comparable to single-chip performances, with as-designed coupling quality factors Q c ranging from 2 x 10 2 to 5 x 10 5 .

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Emplacement Room Mock-up Structure for Testing the Placement of Nuclear Waste Within a Deep Geologic Repository - 19271

The Nuclear Waste Management Organization (NWMO) has conceptualized a unique method of long-term storage for spent nuclear waste. The concept encompasses all aspects of the end-of-life process from the point the spent fuel is no longer in-service; including handling, shipping, containing, storing, monitoring, and finally decommissioning. The equipment developed for each process is unique and designed specifically for each operation. Since these methods have not been implemented before, it is required to prove each process and the related equipment through simulations and eventually practical tests to evaluate performance and to confirm effective and safe operation. The spent fuel will be stored in an underground repository several hundred meters below the surface using autonomous machinery. Considering the significant investment and labour involved in creating full-scale tests underground, it would be impractical at this project stage to attempt tests of the newly developed machinery and methods in other than a surface setting. Therefore, our scope was to provide a customizable mock-up structure to simulate the conditions and constraints an underground repository would present. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DSN Resource Scheduling

TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

Wang, Yeou-Fang↗

Lab-scale Development of a Hybrid Capture System with Advanced Membrane, Solvent system, and Process Integration

The objective of the project is to achieve lab-scale demonstration of a transformational hybrid membrane/solvent system for the capture of CO 2 from flue gas. A novel process integration scheme was proposed to overcome the low partial pressure of CO 2 present in flue gas. This scheme takes advantage of the potential synergies inherent in the membrane and solvent capture systems. The proposed hybrid technology replaces the second-stage membrane with a solvent capture process. The combustion air is used as a sweeping gas in the solvent stripper. This overall configuration has the major advantages of requiring much less air and eliminating the problems associated with oxygen slip in the membrane-based systems. Even more importantly, because of the presence of the air sweep in the stripper, much lower temperatures are required for solvent regeneration, which enables heat integration to the point that no process steam is required. This project was to perform lab-scale demonstration of Liquid Ion Solutions (LIS) transformational hybrid membrane/solvent system for post-combustion CO 2 capture while demonstrating significant progress toward achievement of the overall fossil energy performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. This report is written chronologically based on budget periods. Each budget period discusses the work performed and its results. At the end of each budget period the milestone charts are provided to show the progress. This project was not able to meet its stated goals. The performances of the power plant equipped with the hybrid process and Baseline Case B12B were compared. The simulation results showed that the power plant equipped with hybrid CO2 capture process has an improved thermal efficiency of 33.4% compared to the Baseline Case B12B, which is 32.5%. However, the COE for the hybrid process is $146.3/MWh which is higher than the $142.8/MWh for Case B12B. If this process were to be applied as a retrofit, it may make sense to use this configuration as it does not require any change in an existing plant configuration and steam cycle. However, for a new powerplant the capital cost is higher than the Case B12B. On the membrane development side, we successfully showed that interfacially-controlled envelope (ICE) membranes work. The inclusion of surface modified nano-particles results in much higher gas diffusivities. The Gen-1 ICE membrane developed under this project showed exceptional improved permeability for CO 2 . However, we ran into major problems which were associated with the scalability and reproducibility of the poly(phosphozene) polymers. The issues with scale-up are and batch to batch variability is also discussed. At the end of this report we have provided our recommendations on materials development for better membrane materials and alluded to the use of much simpler chemistry while keeping the concept of ICE membrane intact. It is also clear that vacuum and compression equipment is costly. If a process which can eliminate the use of vacuum and compression equipment would significantly decrease the overall cost of capture. Some thoughts regarding such system is also provided in the outlook portion of this report.

20 FOSSIL-FUELED POWER PLANTS↗

Small Column Ion Exchange Design and Safety Strategy

Small Column Ion Exchange (SCIX) is a transformational technology originally developed by the Department of Energy (DOE) Environmental Management (EM-30) office and is now being deployed at the Savannah River Site (SRS) to significantly increase overall salt processing capacity and accelerate the Liquid Waste System life-cycle. The process combines strontium and actinide removal using Monosodium Titanate (MST), Rotary Microfiltration, and cesium removal using Crystalline Silicotitanate (CST, specifically UOP IONSIV{reg_sign}IE-911 ion exchanger) to create a low level waste stream to be disposed in grout and a high level waste stream to be vitrified. The process also includes preparation of the streams for disposal, e.g., grinding of the loaded CST material. These waste processing components are technically mature and flowsheet integration studies are being performed including glass formulations studies, application specific thermal modeling, and mixing studies. The deployment program includes design and fabrication of the Rotary Microfilter (RMF) assembly, ion-exchange columns (IXCs), and grinder module, utilizing an integrated system safety design approach. The design concept is to install the process inside an existing waste tank, Tank 41H. The process consists of a feed pump with a set of four RMFs, two IXCs, a media grinder, three Submersible Mixer Pumps (SMPs), and all supporting infrastructure including media receipt and preparation facilities. The design addresses MST mixing to achieve the required strontium and actinide removal and to prevent future retrieval problems. CST achieves very high cesium loadings (up to 1,100 curies per gallon (Ci/gal) bed volume). The design addresses the hazards associated with this material including heat management (in column and in-tank), as detailed in the thermal modeling. The CST must be size reduced for compatibility with downstream processes. The design addresses material transport into and out of the grinder and includes provisions for equipment maintenance including remote handling. The design includes a robust set of nuclear safety controls compliant with DOE Standard (STD)-1189, Integration of Safety into the Design Process. The controls cover explosions, spills, boiling, aerosolization, and criticality. Natural Phenomena Hazards (NPH) including seismic event, tornado/high wind, and wildland fire are considered. In addition, the SCIX process equipment was evaluated for impact to existing facility safety equipment including the waste tank itself. SCIX is an innovative program which leverages DOE's technology development capabilities to provide a basis for a successful field deployment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Decontamination Evolution and Revolution - 20349

Decontamination, one of the oldest practices in the nuclear industry, is about to change. While no single approach to decontamination is appropriate in all situations, decontamination of highly contaminated surfaces is historically viewed as difficult and/or marginally effective and fixatives and strippable coatings are often called on to manage time sensitive contamination control issues. The deferral of proper decontamination can lead to accumulated concentrations of radioactive material increasing the risk of cross-contamination of workers and equipment while also increasing radiation levels, which further discourages decontamination. The results of the subject testing demonstrate that superior decontamination factors are readily achievable and the ALARA benefit of decontamination is viable through advanced decontamination technologies in conjunction with innovative application techniques. The collateral benefits will save countless radiological man-hours and personnel radiological exposure. The appropriate use of radiological decontamination techniques can prevent or limit the adverse effects of highly radioactive contamination in the work area. High levels of radiological contamination are typically associated with some of the most physically demanding work in the nuclear industry. Additionally, working in highly contaminated environments increases the risk of exposure to elevated levels of airborne radioactivity and radiation from the source term of the contamination, particularly in hard to reach areas or complex equipment. Veolia's Alaron Nuclear Services (Alaron), a fully integrated nuclear facility, has provided the nuclear industry waste treatment, consolidation, repackaging, and broad decontamination services for almost 35 years. In looking at solutions for its customers, as well as for their own facility, Alaron has recently collaborated with Environmental Alternatives, Inc. (EAI), which has provided innovative solutions addressing difficult nuclear decontamination and industrial cleaning challenges since 1989. This broad range of experience along with the products to support the work created an ideal partner for Alaron's needs at their facility. The benefits of collaboration were immediately recognizable to the management of both companies although the decontamination challenge was significant. Due to the nature of the services offered, contamination at the Alaron facility is routine. The recent decontamination experience at Alaron utilized an innovative surfactant process that quickly produces remarkably higher decontamination factors for both removable surface contamination and fixed contamination. Considering the time to decontaminate areas historically designated for high radiological hazard work, the results from this decontamination effort not only reduced contamination levels but also significantly lowered exposure rates in the working environment. The relative ease with which the surfactant is applied, combined with extraordinary decontamination test results, indicates the potential to alter current radiological work processes in a way that improves worker comfort, and removes radiological engineering barriers, allowing Alaron to complete complex radiological tasks more efficiently and effectively. In a series of two simple applications of the decontamination agent to contaminated high bay vertical surfaces, as well as a variety of horizontal and vertical surfaces with variable porousness and surface sealants, there was an overall reduction in removable contamination of approximately 73% with a reduction in area dose of approximately 93%. The results indicate additional reduction in fixed contamination with application of the surfactant. These values are much higher than experienced with more traditional decontamination agents. In conjunction with demonstrating EAI's surfactant on room surfaces, additional studies were conducted on complex geometry equipment including waste processing equipment, tools, and heavily contaminated parts normally handled from Alaron's customers. Evaluations were made with straight application of EAI's surfactant as well as adding additional techniques to the treatment which afforded revolutionary improvements in the levels of contamination removed. Successful decontamination with up to 95% reduction in removable contamination with just one application were demonstrated in several of the trials. This paper outlines the planned approach to use this technology, the variety of surfaces and equipment treated, and the results of the decontamination efforts. Furthermore, this paper discusses options for pretreatment of certain heavily contaminated equipment prior to employees handling and/or working with the equipment. The potential for dose saving and the reduced risk of cross-contamination with the added benefit of lower PPE requirements, produces an enormous potential for cost and time savings. Attendees will benefit from Alaron's experiences and more fully understand the capabilities of EAI's decontamination process. With the variety of contamination agents, forms and surfaces on which the technology was demonstrated, the information will be valuable to a broad cross-section of industry users. The significance of this report demonstrates superior decontamination factors are achievable utilizing the next evolution of decontamination technology and that the ALARA benefits of decontamination are available through advanced and modern decontamination efforts. The collateral benefits will save countless radiological man-hours and valuable personnel radiological exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗