Search NASA⌕ Search

SEARCH · Search NASA

Results for “Permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

ORCHA: A performance portability system for extreme heterogeneity

Heterogeneity is the prevalent trend in the rapidly evolving high-performance computing (HPC) landscape in both hardware and application software. The diversity in hardware platforms, currently comprising various accelerators and a future possibility of specializable chiplets, poses a significant challenge for scientific software developers aiming to harness optimal performance across different computing platforms while maintaining the quality of solutions when their applications are simultaneously growing more complex. Code synthesis and code generation can provide mechanisms to mitigate this challenge. We have developed a divide and conquer approach where different aspects of performance are handled by different stand-alone tools that are interfaced with the application through generated code. This portability system, ORCHA, enables users to configure and orchestrate their computations among available resources on a platform by specifying a high-level recipe, thereby permitting a many-to-many paradigm where each recipe results in a different variant of the application. The core design goal is to let users decide the application’s hardware mapping and orchestration by editing only the high-level recipe—without modifying the maintained source code or binding the application to a particular runtime system. Tools in ORCHA distribution are: CG-Kit for translating the recipe into an execution graph; Milhoja to execute the graph by orchestrating data and task movement among hardware resources; and Macroprocessor that enables users to define their own code-shorthand for higher composability and easier management of code variants. Additionally, the design of ORCHA permits tools to work in a plug-and-play mode where the application can build and run without CG-Kit and Milhoja, and either tool can be swapped out for other tools with similar capabilities by modifying the code generation portion of ORCHA. In this paper, we describe the design of ORCHA and the role that code-generation plays in isolating applications from tools. We demonstrate the breadth of configurations ORCHA enables with a case study in which an application configuration is realized on three distinct hardware mappings—a GPU-centric, a CPU/GPU balanced, and a CPU/GPU concurrent layouts by using different recipes.

Lee, Youngjun↗

Nature of innovations affecting photovoltaic system costs

Innovations improve technology costs through various kinds of engineering advancements, including changes to materials choices and device or process designs. Understanding how these innovations relate to cost change can reveal aspects of the process of technology evolution, yet developing such understanding is often not possible with a strictly quantitative approach due to data limitations. In this paper we develop a hybrid quantitative-qualitative framework for relating specific innovations to cost change by using the variables in a quantitative technology cost change model as an organizing principle. We demonstrate this framework by applying it to the cost decline in photovoltaic (PV) systems over the last five decades. This framework generates new understanding of a set of innovations that contributed to PV modules’ sustained cost decline and the more modest trends observed in balance-of-system (BOS) costs. The results show the great diversity of innovations that affected PV costs, drawing on wide-ranging fields of expertise within scientific research and practice. We find that there are differences in the characteristics of innovations that reduced the cost of PV modules compared to innovations influencing BOS costs. Numerous module innovations reduced costs by advancing manufacturing tools and processes that improved material quality. Many BOS innovations reduced costs through a combination of component design changes, integration, automation, digitalization, and standardization. Overall, most innovations in our sample affected PV hardware. However, some also target ‘soft technologies’ such as task durations through innovations like fast-track permitting, which require improved collaboration and process streamlining. This framework also provides insight into the nature of knowledge spillovers between technologies. Both module and BOS hardware innovations show the benefits of PV’s position within an ‘ecosystem’ of continuously advancing technologies in many industries, in particular semiconductors and electronics, and also point to the importance of public institutions for accelerating testing, permitting, and training.

14 SOLAR ENERGY↗

Oilwell Conversion (Well API 121913310501) to Geothermal Heat Storage Well for Flexible Electricity Storage

Geothermal growth is limited by a lack of geographically dispersed high-temperature thermal resources and high initial upfront investment in characterization and well construction. This project intended to address the challenges of energy supply intermittency and enhance grid resilience, reliability, and energy security by storing energy provided from currently available renewable resources in the subsurface to harvest it a later time during at-peak energy demand. This project intended to improve geothermal adoption, reduce initial project risk, and improve price competitiveness through utilizing existing oil and gas infrastructure such as non-productive wells, non-economic fields, dry holes, and orphaned wells. The project also intended to address the lack of geographically dispersed thermal resources and enhance grid resilience, reliability, and energy security by introducing an economical method for storing energy from currently available renewable resources in the subsurface for usage during at-peak energy demand. During this research, the project furthered the understanding of the feasibility of utilizing abandoned oil and gas wells as geothermal heat storage wells. The project team investigated the heat storage and hydrogeological characteristics of subsurface reservoirs in the Illinois Basin to evaluate their response to heat injection for determining the evolution of temperature profiles and heat losses over time using existing and available data sets. The project team then performed modeling and simulation to evaluate the heat losses of returning fluids during heat extraction. The outputs were used to select an optimal candidate reservoir and location in Southern Illinois. The team designed and performed a small-scale field test in an existing oil well to refine the model and to demonstrate the permitting and regulatory pathways necessary for the conversion of oil and gas assets to geothermal use. The field test also serves as a proof of concept and can guide the procedures for future research and implementation. Additionally, the project team, conducted initial market research and customer discovery to develop a go to market strategy for an Advanced Geothermal Energy Storage (AGES) system. The project team in this research also identified the parameters to be refined in future research, to improve the current go to market strategy economic model. To this end several subject matter experts were also identified to assist in future research with geothermal infrastructure setup, energy storage policy and law, energy storage market demand, potential siting based on demand etc. Future research will involve further sophistication of the site commercial modeling, implementing a larger-scale test, and further refinement of the thermodynamic modeling/simulation process. The output will be lifecycle costs and economics suitable for comparison to alternative approaches from a validated full-scale demonstration for venture capital investment into this technology. The project successfully demonstrated the ability to leverage existing oilfield infrastructure, permits, and land access and leasing agreements, to enable geothermal storage projects to come online faster and cheaper than a greenfield development could. This technology could allow for greater energy independence and security through long-term energy storage solutions. The longer duration allows for greater storage for renewables currently limited by hours-long storage durations of lithium-ion. The AGES system would support the growth of renewable energy farms, and provide greater opportunities for a cleaner energy infrastructure.

15 GEOTHERMAL ENERGY↗

Upgrade and Operation of the ATLAS Radiation Interlock System (ARIS)

ATLAS (the Argonne Tandem Linac Accelerator Sys-tem) is a superconducting heavy ion accelerator which can accelerate nearly all stable, and some unstable, iso-topes between hydrogen and uranium. Prompt radiation fields from gamma and or neutron are typically below 1 rem/hr at 30 cm, but are permitted up to 300 rem/hr at 30 cm. The original ATLAS Radiation Interlock System (ARIS), hereafter referred to as ARIS 1.0 was installed 30 years ago. While it has been a functional critical safe-ty system, its age has exposed the facility to high risk of temporary shutdown due to failure of obsolete compo-nents. Topics discussed will be architecture, hardware improvements, functional improvements, and operation permitting personnel access to areas with low levels of radiation.

Blomberg, B. R.↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Sandy Soil Microaggregates: Rethinking Our Understanding of Hydraulic Function

Core Ideas Sandy soil microaggregates are comprised of a solid sand core encrusted with fines. Thick films control a significant proportion of water retention in coarse sandy soil. Three water pools drain sequentially: capillary water, thick films, and adsorptive films. Film seepage rates should be considered when irrigating sandy soil. This study investigated the peculiar structure of microaggregates in coarse sandy soils that exhibit only external porosity and investigated their control on soil hydrology. The microstructure underpins a hydrologic existence that differs from finer textured soils where aggregates have internal porosity. Understanding the impact of these microaggregates on soil hydrology will permit improved agricultural irrigation management and estimates associated with ecosystem capacity and resiliency. Microstructure was investigated using a digital microscope, and aspects of the structure were quantified by sedimentation and computed microtomography. Sandy soil microaggregates were observed to be comprised of a solid sand‐grain core that is coated with fines, presumably cemented by organic media. This microstructure leads to three distinct water pools during drainage: capillary water, followed by thick films (1–20 μm) enveloping the outer surfaces of the crusted microaggregates, followed by adsorbed thin films (<1 μm). The characteristics of the thick films were investigated using an analytical model. These films may provide as much as 10 to 40% saturation in the range of plant‐available water. Using lubrication theory, it was predicted that thick film drainage follows a power law function with an exponent of 2. Thick films may also have a role in the geochemical evolution of soils and in ecosystem function because they provide contiguous water and gas phases at relatively high moisture contents. And, because the rough outer crust of these microaggregates can provide good niches for microbial activity, biofilm physics will dominate thick film processes, and consequently hydrologic, biologic, and geochemical functions for coarse sandy soils.

Paradiś, Ashley↗

Wyoming CarbonSAFE: Advancing Commercialization of Low-Carbon Energy Technologies in Fossil-Rich Wyoming

Wyoming’s Powder River Basin (PRB) is the most prolific coal producer and exporter in the United States and the State of Wyoming’s largest oil-producing basin. In addition to being a leading energy producer, the PRB is the site of research programs whose aim is to develop and integrate low-carbon technologies into existing fossil fuel energy industries. Much of the PRB’s low-carbon research is focused around Dry Fork Station (DFS), which is the newest coal-fired power station in the western US. Currently, DFS hosts five carbon capture projects, including pilot-scale capture projects that utilize different capture technologies and a full front-end engineering and design (FEED) study, a commercial CO 2 pipeline for nearby CO 2 -enhanced oil recovery industry, and is also co-located with the Wyoming Integrated Test Center, which is a host facility for unconventional carbon utilization research (i.e. flue gas carbon-to-products innovations). DFS is also the host site for the Wyoming CarbonSAFE project. Wyoming CarbonSAFE, funded by the Department of Energy/National Energy Technology Laboratory, is a multi-phased program (currently in Phase II) whose core objective is developing and validating storage sites within a complex capable of storing 50 million metric tonnes of CO 2 over a 30 year project period using carbon capture, utilization and storage (CCUS). This paper will provide an overview of the project to-date, showing that CarbonSAFE goals are achievable with respect to geologic, environmental, regulatory, CO 2 source and economic conditions, and why the State of Wyoming offers one of the more favorable environments to advance the commercialization studies. In 2019, the project team designed and completed a ~10,000 foot stratigraphic test well just south of DFS. From this well, the team collected over 600 feet of core, fluid samples from target injection zones, and a full petrophysical log suite. In addition, legacy 2D seismic lines were acquired and a 3D seismic survey was acquired in the fall of 2020. The objective of these field activities has been to identify and characterize target storage reservoirs and associated caprock. This complex has several reservoirs that could meet commercial injection goals, and over 4000 feet of associated caprock. Simulations of site performance suggest that stacked injection provides the most effective storage strategy, and would necessitate several sites within the greater complex to meet final project injection goals. Other work within this project includes the development of a business-case around proximal fields with CO 2 -enhanced oil recovery potential and existing tax credits, assessment of regulatory conditions, including pore space ownership and Class VI injection well permitting requirements, implementation of a robust public outreach Electronic copy available at: https://ssrn.com/abstract=3821220 GHGT-15 McLaughlin 2 program, and surface site characterization activities that have focused on environmental factors. In the PRB and at DFS, the State of Wyoming and other entities have made carbon management a priority of its future energy industry by providing a regulatory and business framework that is favorable to advancing these technologies. These endeavors will become more realistic with the successful implementation of Wyoming CarbonSAFE, and its ability to secure and validate commercial-scale CCUS at the center of Wyoming’s premier low-carbon research efforts.

McLaughlin, Fred↗

Application of quantitative risk assessment to address stakeholder questions in geologic carbon storage

Ambitious international greenhouse gas emissions reduction targets demand a rapid transformation to a low-carbon economy. This transformation includes the accelerated adoption of carbon dioxide (CO2) capture and storage (CCS) technology. However, as with any large-scale engineering enterprise, the widespread commercial-scale deployment of geologic carbon storage (GCS) raises important questions about technology and cost-effectiveness, safety, environmental risk, and long-term liability. Effectively assessing and managing risks and liability associated with GCS projects is a key technical need throughout the project life cycle-from site selection and permitting to monitoring design, operational risk management, and post-operational site closure. This presentation highlights recent advancements in tools for quantitative risk assessment, being developed by the National Risk Assessment Partnership (NRAP). NRAP is a multi-year, multinational laboratory research collaboration sponsored by the U.S. Department of Energy's Office of Fossil Energy and Carbon Management. Our focus will be on these tools' applications in addressing critical stakeholder questions related to supporting permitting to ensure secure and environmentally protective storage; designing effective and efficient monitoring plans; evaluating the effectiveness of remedial actions and risk management alternatives; and informing liability assessment and investment decisions. This paper will detail the key functionality of NRAP’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), a computational framework for assessing leakage risk and containment assurance. This model features streamlined workflows for calculating leakage risk profiles, delineating risk-based area of review, and assessing contingency plans and post-injection site care requirements. ORION is an open-source, observation-based ensemble forecasting toolkit to help operators assess the seismic hazard at a carbon storage site. The State of Stress Analysis Tool (SOSAT), designed to assess subsurface stress conditions and evaluate geomechanical risk resulting from CO2 injection in an area of interest will also be presented. We will also introduce a prototype model to evaluate storage project costs and liability associated with risk management. The Technoeconomic and Liability Evaluation for Storage (TALES) model uses results from forecasts of leakage and induced seismicity risk to estimate the lifecycle cost of managing risk. Finally, a preliminary example of how the NRAP Risk-based Adaptive Monitoring Plan (RAMP) tool can be used to design efficient and effective site monitoring plans and estimate the detectability of fluid leakage will be provided. The relevance of these tools for addressing key stakeholder questions amidst uncertainty will be emphasized.

decision support↗

Structural Code Considerations for Solar Rooftop Installations

Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

Dwyer, Stephen F.↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recovery Act. Sub-Soil Gas and Fluid Inclusion Exploration and Slim Well Drilling, Pumpernickel Valley, Nevada

Nevada Geothermal Power Company (NGP) was awarded DOE Award DE-EE0002834 in January 2010 to conduct sub-soil gas and fluid inclusion studies and slim well drilling at its Black Warrior Project (now known as North Valley) in Washoe and Churchill Counties, Nevada. The project was designed to apply highly detailed, precise, low-cost subsoil and down-hole gas geochemistry methods from the oil and gas industry to identify upflow zone drilling targets in an undeveloped geothermal prospect. NGP ran into multiple institutional barriers with the Black Warrior project relating to property access and extensive cultural survey requirement. NGP requested that the award be transferred to NGP’s Pumpernickel Valley project, due to the timing delay in obtaining permits, along with additional over-budget costs required. Project planning and permit applications were developed for both the original Black Warrior location and at Pumpernickel. This included obtaining proposals from contractors able to conduct required environmental and cultural surveying, designing the two-meter probe survey methodology and locations, and submitting Notices of Intent and liaising with the Bureau of Land Management to have the two-meter probe work approved. The award had an expiry date of April 30, 2013; however, due to the initial project delays at Black Warrior, and the move of the project from Black Warrior to Pumpernickel, NGP requested that the award deadline be extended. DOE was amenable to this, and worked with NGP to extend the deadline. However, following the loss of the Blue Mountain geothermal power plant in Nevada, NGP’s board of directors changed the company’s mandate to one of cash preservation. NGP was unable to move forward with field work on the Pumpernickel property, or any of its other properties, until additional funding was secured. NGP worked to bring in a project partner to form a joint venture on the property, or to buy the property. This was unsuccessful, and NGP notified the DOE on February 13, 2014 that it would not be able to complete the project objectives before the recovery act awards deadline and submitted a mutual termination request to the DOE which was accepted.

15 GEOTHERMAL ENERGY↗

Conversion of CO 2 into Commercial Materials Using Carbon Feedstocks

In this project, our research focused on developing reaction chemistry that would support using carbon as a reductant for CO 2 utilization that would permit CO 2 consumption on a scale that would match or exceed anthropomorphic CO 2 generation for energy production from fossil fuels. Armed with the knowledge that reactions attempting to produce compounds with an energy content greater than CO 2 would be thermodynamically challenged and/or require significant amounts of energy, we developed a potential process that utilized a solid carbon source and recycled the carbon to effectively provide infinite time for the carbon to react. During testing of different carbon sources, we found a wide range of reaction rates. Biomass-derived samples had the most reactivity and coals and petcoke had the lowest. Because we had anticipated this challenge, we recognized that a catalyst would be necessary to improve reaction rates and conversion. From the data analysis of carbon samples, we recognized that alkali metals improved the reaction rate. Through parametric testing of catalyst formulations we were able to increase the reaction rate with petcoke by a factor of >70. Our efforts to identify the reaction mechanism to assist in improving the catalyst formulation demonstrated that the catalyst was catalyzing the extraction of oxygen from CO 2 and using this extracted oxygen to oxidize carbon. This was a significant discovery in that if we could modify the catalyst formulation to permit controlled the oxidation, we would have a very power selective oxidation process. With selective oxidation, CO 2 utilization could be effective used as one of the process steps in making many of the large volume commodity chemicals that support our modern lifestyles. The key challenges for incorporating these functionalities into the catalyst formulation were to make the oxidation selective and lower the temperature required for catalytic activity. We identified four catalyst families that had the potential to meet these challenges. Initial screening of the catalyst families did show that the reduction/oxidation activity did occur at lower temperatures and that these catalysts were able to cause carbon chain growth as well as C—C cleavage. A preliminary techno-economic feasibility of using petcoke/catalyst to produce a CO-rich syngas product was completed and showed significant economic promise. Testing of the different catalyst families demonstrated that Catalyst A was able to stably produce 5 sccm of ethylene/gram of catalyst at 900°C for one hour. For dry methane reforming, our Catalyst 4 was able to achieve production rates of > 10 sccm of CO and > 3 sccm of H2 per gram of catalyst at 600°C and 350 psig. Based on these developments, the potential for CO 2 utilization in the production of large volume commodity chemicals is very promising.

10 SYNTHETIC FUELS↗

2012 Update to the Site Discharge Pollution Prevention Plan, Rev. 1: Sandia/Mortandad Watershed Receiving Waters: Sandia Canyon, Cañada del Buey, Mortandad Canyon, and Ten-Site Canyon (Vol. 2)

Two historical industrial activity areas are associated with S001, S-SMA-0.25: Sites 03-013(a) and 03-052(f). Solid Waste Management Unit (SWMU) 03-013(a) is a 1500-ft-long corrugated metal pipe (CMP) storm drain that served building 03-0038. The storm drain ran underground around building 03-0038, east along the south side of the Otowi Building (building 03-0261) and connected to four other storm drains before daylighting 100 ft east of the Otowi Building where it became an open concrete- and rock-lined ditch. The open drain continued past transportable office buildings (buildings 03-1616 and 03-1617) and passed beneath streets and sidewalks to a point northeast of the Oppenheimer Study Center (building 03-0207) where it discharged to the SWMU 03-052(f) outfall before draining into Sandia Canyon. Most of the CMP associated with SWMU 03-013(a) was removed in 2004 to accommodate the construction of the National Security Science Building (03-1400) and a new parking structure (03-1402) east of the Otowi Building. The CMP was managed as nonhazardous/nonradioactive industrial waste. Inspection of the drainline trench showed no evidence of a release from the drainpipe. A new storm drainline was installed west of SWMU 03-052(f) to manage storm water runoff from the new parking structure. The new storm drain discharges to SWMU 03-052(f). Potential contaminants associated with industrial materials historically managed at this Site are metals and petroleum products. SWMU 03-052(f) is a formerly permitted outfall (U.S. Environmental Protection Agency [EPA] 03A023) that received wastewater from floor drains [Area of Concern (AOC) 03-013(b)], sinks, water fountains, and a storm drain [SWMU 03-013(a)], which served building 03-0038 until 1987 when the drains in building 03-0038 were rerouted to the Technical Area 03 (TA-03) sanitary sewer system. Stoddard solvents, dry acid, and caustic materials from the maintenance shop were discarded through sinks and floor drains to this outfall. Spent paint solvents and cutting oils contaminated with machined beryllium particles may also have been released to the floor drains during the 1960s and 1970s. In addition, cooling water for welding torches was discharged directly to the drains. The first spill was approximately 200 gal. of a water-waste oil mixture that was discharged when an automatic compressor blowdown mechanism failed. A second spill from a ruptured air-compressor oil line resulted in the release of approximately 1 qt of compressor oil to the drain. This spill produced an oily sheen on the surface of the water at the SWMU 03-052(f) outfall. A third spill occurred when approximately 15 gal. of diesel fuel was released from a ruptured truck fuel line into the utilities construction trench between buildings 03-1793 and 03-1794. On the same day, a clay sewer pipe in the utility trench broke, releasing approximately 2000 gal. of wastewater into the excavation. A sump was used to remove the wastewater from the excavation, and the wastewater was discharged to SWMU 03-052(f). The diesel-contaminated asphalt and soil were removed and disposed of. Runoff from parking lots and the surrounding areas also discharges to the outfall. Outfall 03A023 was removed from the National Pollutant Discharge Elimination System (NPDES) permit on July 11, 1997. Potential contaminants associated with industrial materials historically managed at this Site are volatile organic solvents, petroleum products, and metals included in discharges from the maintenance contractor’s shop in building 03-38 and three reported petroleum hydrocarbon spills.

54 ENVIRONMENTAL SCIENCES↗

Port Graham Community Building Biomass Heating Design Project

Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to accommodate hot water from the proposed wood-burning GARN Boiler, once installed, and rely on the existing fuel oil-fired hot water heating equipment for backup. The boiler would use an estimated 125 bone dry tons, equivalent to 100 cords, woody biomass feedstock obtained from local lands per year. Project would use local labor as described in the Port Graham Biomass Project, report completed by Chena Power, Inc. and Winters and Associates as part of the in-kind support to the U. S. Department of Energy (DOE) project for work on a project for State of Alaska’s Alaska Energy Authority (AEA). NVPG will likely initiate operations of the biomass boiler system even though several operational variations were studied. Obtaining the fuel source could be done by contractors, PGVC employees, or NVPG employees. Feeding the system would likely be done by NVPG employees. A majority of the buildings heated would be owned by NVPG. The PGVC office would be heated as well as the Old Fire Hall used as a workshop and storage area for North Pacific Rim Housing Authority. One methodology studied to charge for cost of utilizing the community building biomass system would use a percentage of use of hot water generated by the biomass hot water system based on past heating oil usage in relation to all buildings heated by biomass hot water. The method is better described in the Port Graham Biomass Project report. Fuel source agreements have been drafted to enter into agreements with area landowners. One Native allotment owner has asked Chugachmiut Forestry to begin a timber sale process to sell timber off her lands, specifically wind thrown timber that was determined to be of sufficient quantity to supply to the proposed biomass heating system for approximately 5-years. On NVPG’s behalf, Chugachmiut has presented to PGVC three different documents, attached, that could lead to a sale of woody biomass fuel for the project for up to 25-years, the expected life of the project. PGVC has signed a letter of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry has conducted two different field forest measurements of Native allotment lands and PGVC forest and timber lands. Lands deemed road accessible for biomass harvest were analyzed for this project. Forestry then conducted three different analyses and developed two reports to determine forest biomass on a tons per acre basis in addition to timber volume measurements taken for forest management purposes. Permits required were limited. For the biomass building, the Kenai Peninsula Borough did not require a permit. State of Alaska, Department of Public Safety, Division of Fire and Life Safety requires a plan review for fire and life safety requirements called an application for Fire and Life Safety Plan Review that would require a registered design professional to sign the document. State of Alaska State Forest Practices Act is required to be followed for any timber sale or harvest. This Act also requires consultation with Alaska Department of Fish and Game when operations are in close proximity or cross anadromous waters. Native allotment lands require following U. S. Bureau of Indian Affairs timber sale contracting process and approval.

09 BIOMASS FUELS↗

2013 Los Alamos National Laboratory Hazardous Waste Minimization Report

Waste minimization and pollution prevention are inherent goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE) and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program (a component of the overall Waste Minimization/Pollution Prevention [WMin/PP] Program) administered by the Environmental Stewardship Group (ENV-ES). This report also supports the waste minimization and pollution prevention goals of the Environmental Programs Directorate (EP) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. LANS was very successful in fiscal year (FY) 2013 (October 1-September 30) in WMin/PP efforts. Staff funded four projects specifically related to reduction of waste with hazardous constituents, and LANS won four national awards for pollution prevention efforts from the National Nuclear Security Administration (NNSA). In FY13, there was no hazardous, mixedtransuranic (MTRU), or mixed low-level (MLLW) remediation waste generated at the Laboratory. More hazardous waste, MTRU waste, and MLLW was generated in FY13 than in FY12, and the majority of the increase was related to MTRU processing or lab cleanouts. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.

54 ENVIRONMENTAL SCIENCES↗

Admiralty Inlet Pilot Tidal Project Final Technical Report

This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

16 TIDAL AND WAVE POWER↗

Wave Energy Research, Testing and Demonstration Center

The purpose of this project was to build upon the research, development and testing experience of the Northwest National Marine Renewable Energy Center (NNMREC) to establish a non-grid connected open-ocean testing facility for wave energy converters (WECs) off the coast of Newport, Oregon. The test facility would serve as the first facility of its kind in the continental US with a fully energetic wave resource where WEC technologies could be proven for west coast US markets. The test facility would provide the opportunity for self-contained WEC testing or WEC testing connected via an umbilical cable to a mobile ocean test berth (MOTB). The MOTB would act as a “grid surrogate” measuring energy produced by the WEC and the environmental conditions under which the energy was produced. In order to realize this vision, the ocean site would need to be identified through outreach to community stakeholders, and then regulatory and permitting processes would be undertaken. Part of those processes would require environmental baseline studies and site analysis, including benthic, acoustic and wave resource characterization. The MOTB and its myriad systems would need to be designed and constructed.The first WEC test at the facility with the MOTB was completed within this project with the WET-NZ device in summer 2012. In summer 2013, the MOTB was deployed with load cells on its mooring lines to characterize forces on mooring systems in a variety of sea states. Throughout both testing seasons, studies were done to analyze environmental effects during testing operations. Test protocols and best management practices for open ocean operations were developed. As a result of this project, the non-grid connected fully energetic WEC test facility is operational, and the MOTB system developed provides a portable concept for WEC testing. The permitting process used provides a model for other wave energy projects, especially those in the Pacific Northwest that have similar environmental considerations. While the non-grid connected testing facility provides an option for WEC developers to prove their technology in a fully-energetic wave environment, the absence of grid connection is somewhat of a limitation. To prove that their technology is commercially viable, developers seek a multi-year grid connected testing option. To address this need, NNMREC is developing a companion grid connected test facility in Newport, Oregon, where small arrays of WECs can be tested as well.

16 TIDAL AND WAVE POWER↗