Search NASA⌕ Search

SEARCH · Search NASA

Results for “Plant Protection System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

The Oak Ridge Refrigerant Management Program

For many years, chlorofluorocarbons (CFC's) have been used by the Department of Energy's (DOE) Oak Ridge Y-12 Plant in air conditioning and process refrigeration systems. However, Title 6 of the Clean Air Act Amendments (CAAA) and Executive Order 12843 (Procurement Requirements and Policies for Federal Agencies for Ozone Depleting Substances) signed by President Clinton require, as policy, that all federal agencies maximize their use of safe, alternate refrigerants and minimize, where economically practical, the use of Class 1 refrigerants. Unfortunately, many government facilities and industrial plants have no plan or strategy in place to make this changeover, even though their air conditioning and process refrigeration equipment may not be sustainable after CFC production ends December 31, 1995. The Y-12 Plant in Oak Ridge, Tennessee, has taken an aggressive approach to complying with the CAAA and is working with private industry and other government agencies to solve tough manufacturing and application problems associated with CFC and hydrochlorofluorocarbon (HCFC) alternatives. Y-12 was the first DOE Defense Program (DP) facility to develop a long-range Stratospheric Ozone Protection Plan for refrigerant management for compliance with the CAAA. It was also the first DOE DP facility to complete detailed engineering studies on retrofitting and replacing all air conditioning and process refrigeration equipment to enable operation with alternate refrigerants. The management plan and engineering studies are models for use by other government agencies, manufacturing plants, and private industry. This presentation identifies some of the hidden pitfalls to be encountered in the accelerated phaseout schedule of CFC's and explains how to overcome and prevent these problems. In addition, it outlines the general issues that must be considered when addressing the phase-out of ozone depleting substances and gives some 'lessons learned' by Y-12 from its Refrigerant Management Program. Discussion topics include requirements for developing a refrigerant management plan and establishing priorities for cost-effective compliance with the CAAA, as well as ways in which employees can be empowered to develop a comprehensive refrigerant management plan. The result of this employee empowerment was a cooperative labor-management effort that is beneficial for Y-12, DOE, and the environment.

Kevil, Thomas H.↗

Adaptation of Commercially Available Robots for Conditioning and Packaging ILW at Sellafield - 18282

The Legacy Ponds and Silos at Sellafield site contain some of the most hazardous Intermediate Level Waste (ILW) in the UK. As part of a multi-billion pound decommissioning programme, this waste will be retrieved and transported across the site for conditioning and packaging in the Box Encapsulation Plant (BEP). Current plans are to commence plant active commissioning in 2022, which will represent a major milestone in the UK nuclear decommissioning programme. Within the plant, skips of waste will be transferred from the shielded transport package into standard 3 cubic metre ILW containers. Waste from the Pile Fuel Storage Pond and First Generation Magnox Storage Pond will be immobilised in cementitious grout before being transferred to an adjacent store. Waste from the Magnox Swarf Storage Silo will not be immobilised in grout, but will be packaged, providing multi-barrier containment. During the concept design, the project team selected commercially available robots as the most viable technology for carrying out the numerous dexterous and repetitive tasks involved in characterising, conditioning and packaging the waste within the shielded 'hot' cells. Significant technical challenges had to be overcome during the design to adapt a commercially available robot for use within a high radiation / high contamination environment, where human access is not safe even for short periods of time. These challenges included: - Designing robot assemblies that could be retrofitted into the existing cell structure that was constructed as part of an earlier project but never completed; - Designing robot assemblies that could be recovered to their 'transport' position without requiring manual intervention; - Designing robot assemblies that could be remotely removed and replaced with new ones if they failed part way through the plant operational life; - Designing through-wall service and power connections that allow maintenance and recovery; - Designing control systems and human-machine interfaces that enable both manual and automated operation of the robot, whilst avoiding collisions with the in-cell cranes and other in cell furniture; - Assessing the radiation tolerance of all items. Bespoke computer simulations and full-scale development trials have been carried out, using non-active test materials, in order to demonstrate the Technology Readiness Level (TRL) required by Sellafield Limited (SL) at each stage of the project [1]. The results of these trials have been recorded in both video and written form so that they can form part of the project's Knowledge Management database. Detailed designs and specifications for the robot assemblies have been updated to incorporate the recommendations from the development trials. Procurement and manufacture of robot assemblies has already commenced to deliver two waste handling robots, two waste container lidding / swabbing robots and associated critical spares. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Baseline Fuel Fabrication Facility

PRO-RR is the research reactor focused program element of the broader Proliferation Resistance Optimization program (PRO-X) under the National Nuclear Safety Administration (NNSA) in the U.S. Department of Energy (DOE). PRO-X provides a framework for integrating proliferation resistance in nuclear system designs to minimize weapons usable nuclear materials (WUNM) production and diversion pathways while optimizing systems performance for peaceful use missions. PRO-RR applies the PRO-X mission objectives to research reactor system design. This document serves as one of the foundational documents for the PRO-RR-Fuel System Design technical team by documenting a baseline fuel fabrication facility to be used for further optimization studies. The PRO-RR-Fuel System Design technical team consists of subject matter experts from Argonne National Laboratory (Argonne) and Savannah River National Laboratory (SRNL). In order to develop specific strategies for fuel fabrication facilities to optimize proliferation resistance, performance, and safety, a baseline fuel fabrication facility design basis was developed. Having a baseline design basis allows for the qualitative and quantitative comparison of design choices in the optimization process. This report describes the baseline fuel fabrication facility and general optimization strategy. Chapter 2 describes the fuel system selected for examination, the fabrication process used as the baseline, a description of the model developed to track uranium utilization, and a generic floorplan of the fabrication facility. Chapter 3 describes the overarching optimization strategy that could be implemented for a fabrication facility.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Role of Chromohalobacter on Transport of Lanthanides and Cesium in the Dolomite Mineral System

The chemical behavior of actinide series elements and fission products is a concern for the Waste Isolation Pilot Plant repository due to their uncertain mobility in the subsurface salt formation. In this work, we are observing the behavior of the halophilic bacterium, Chromohalobacter, and its effect on the mobility of lanthanides and cesium in the presence of dolomite. Batch and minicolumn experiments were conducted with Cs + and lanthanides (Nd 3+ , Eu 3+ ) to quantify potential transport with bacteria. Preliminary results show that Cs does not interact strongly with dolomite or Chromohalobacter, while the lanthanides can interact strongly with both minerals and bacteria depending on which the Ln contacts first.

54 ENVIRONMENTAL SCIENCES↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BPA Facts

The Bonneville Power Administration is a federal nonprofit power marketing administration based in the Pacific Northwest . Although BPA is part of the U .S . Department of Energy, it is self-funding and covers its costs by selling its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small nonfederal power plants . The dams are operated by the U .S . Army Corps of Engineers and the Bureau of Reclamation . About 30 percent of the electric power used in the Northwest comes from BPA . BPA’s resources — primarily hydroelectric — make its power nearly carbon free . BPA also operates and maintains about three- fourths of the high-voltage transmission in its service territory . BPA’s service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming . BPA promotes energy efficiency, renewable resources and new technologies that improve its ability to deliver on its mission . BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River Basin . BPA is committed to public service and seeks to make its decisions in a manner that provides opportunities for input from stakeholders . In its vision statement, BPA dedicates itself to providing high system reliability, low rates consistent with sound business principles, environmental stewardship and accountability

BPA Vision, BPA Mission, Pacific Northwest, dams, ↗

Should WIPP Resume Unfiltered Discharge of Underground Ventilation?

On February 14, 2014 an incident in Panel 7, Room 7 of the Waste Isolation Pilot Plant (WIPP) underground repository resulted in the release of americium and plutonium (mostly {sup 241}Am) into the environment and contaminated portions of the repository primarily along the ventilation path from the location of the incident. The WIPP uses a ventilation system to ensure that underground air is circulated throughout the repository and to ensure that conditions are safe for the workers. Since the air in the repository exits to the surface through an exhaust shaft, this shaft is the sole potential pathway for airborne radioactivity release from the repository. During normal operations, exhaust air is released to the environment unfiltered. However, since the radiation release event, the WIPP ventilation system has been, and will likely remain in what is called 'filtration mode', (i.e., exhaust air is routed through a HEPA filter system). Redirection of the ventilation system through the HEPA (High Efficiency Particulate Air) filter system was necessary at the peak of the radiation release event to protect aboveground workers at the site and the public in the surrounding areas. However, evaluation of more than two years of underground ventilation sampling data indicates that residual radioactivity levels in the underground no longer warrant HEPA filtration in order to meet either worker or environmental protection criteria. WIPP should consider resumption of the unfiltered discharge of underground ventilation to the environment. Recent sampling data indicate that there have been no detectable releases that would have resulted in a hypothetical dose to a worker or a member of the public in excess of the 0.1 mSv (10 mrem) per year limit for periodic confirmatory sampling as required for operating repositories by the Environmental Protection Agency (40 CFR 191)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FIDVR Capability of Hybrid Grid-Forming PV Power Plants During Feeder Restoration

Grid-forming inverters must optimally transfer power from dc-coupled photovoltaic arrays and batteries into an ac grid. Further, they must be able to restore single-phase induction motors (SPIMs) and withstand fault-induced delayed voltage-recovery (FIDVR) events. These resilience and reliability challenges are addressed here by: (i) engineering a controller to optimally operate dc-coupled hybrid resources; (ii) modeling residential air-conditioning compressors for restoration/FIDVR studies; and (iii) analyzing SPIM thermal-relay performance under limited inverter currents and designing an electronic protection for stalled SPIMs. Furthermore, these contributions are demonstrated via electromagnetic-transient simulations and can be helpful to understand recommendations by the North American Electric Reliability Corporation.

14 SOLAR ENERGY↗

Level-3 Probabilistic Safety Analysis VAB-3 as an NPP Safety Enhancement Stage

Questions pertaining to the development of reactors from the standpoint of the evolution of protection and emergency response systems for large radiation accidents, and development of probabilistic safety analysis at different levels are examined. Examples are presented of the calculation of quantitative characteristics of risk in an accident at a model NPP that show the possibility of using VAB-3 to evaluate the scale of countermeasures as a function of the level of intervention, their effectiveness as a function of the time of application and validation of countermeasures for an individual populated point. It is shown that the VAB-3 methodology must be developed in order to increase NPP safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bacterial synergies amplify nitrogenase activity in diverse systems

Endophytes are microbes living within plant tissue, with some having the capacity to fix atmospheric nitrogen in both a free-living state and within their plant host. They are part of a diverse microbial community whose interactions sometimes result in a more productive symbiosis with the host plant. Here, we report the co-isolation of diazotrophic endophytes with synergistic partners sourced from two separate nutrient-limited sites. In the presence of these synergistic strains, the nitrogen-fixing activity of the diazotroph is amplified. One such partnership was co-isolated from extracts of plants from a nutrient-limited Hawaiian lava field and another from the roots of Populus trees on a nutrient-limited gravel bar in the Pacific Northwest. The synergistic strains were capable of increasing the nitrogenase activity of different diazotrophic species from other environments, perhaps indicating that these endophytic microbial interactions are common to environments where nutrients are particularly limited. Multiple overlapping mechanisms seem to be involved in this interaction. Though synergistic strains are likely capable of protecting nitrogenase from oxygen, another mechanism seems evident in both environments. The synergies do not depend exclusively on physical contact, indicating a secreted compound may be involved. This work offers insights into beneficial microbial interactions, providing potential avenues for optimizing inocula for use in agriculture.

60 APPLIED LIFE SCIENCES↗

Modeling and Simulation for Safeguards [Slides]

The purpose of this talk is to give an overview of the role of modeling and simulation in Safeguards R&D and introduce you to (some of) the tools used. Some definitions are: (1) Modeling - the representation, often mathematical, of a process, concept, or operation of a system, often implemented by a computer program; (2) Simulation - the representation of the behavior or characteristics of one system through the use of another system, especially a computer program designed for the purpose; and (3) Safeguards - the timely detection of diversion of significant quantities of nuclear material. The role of modeling and simulation are: (1) Calculate amounts of material (plant modeling); (2) Calculate signatures of nuclear material etc. (source terms); and (3) Detector performance (radiation transport and detection). Plant modeling software (e.g. FACSIM) gives the flows and amount of material stored at all parts of the process. In safeguards this allow us to calculate the expected uncertainty of the mass and evaluate the expected MUF. We can determine the measurement accuracy required to achieve a certain performance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Safeguards by Design (SBD): Safeguards Guidance for Research Reactors and Critical Assemblies

This document is part of a series of guidance documents developed by the National Nuclear Security Administration’s (NNSA’s) Next Generation Safeguards Initiative to assist facility designers and operators in implementing international safeguards by design (SBD). SBD has two main objectives: (1) avoid costly and time-consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save both industry and the International Atomic Energy Agency (IAEA, or the Agency) time, money, and resources—a mutually beneficial, win-win endeavor. The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards, the safeguards rights and obligations in safeguards agreements and additional protocols, and technical measures implemented pursuant to those agreements. Of foremost importance as a basis for IAEA safeguards is the international safeguards agreement between a country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT).

Energy Planning, Policy, & Economy(29)↗

Nitrogen Deposition Weakens Soil Carbon Control of Nitrogen Dynamics Across the Contiguous United States

ABSTRACT Anthropogenic nitrogen (N) deposition is unequally distributed across space and time, with inputs to terrestrial ecosystems impacted by industry regulations and variations in human activity. Soil carbon (C) content normally controls the fraction of mineralized N that is nitrified ( ƒ nitrified ), affecting N bioavailability for plants and microbes. However, it is unknown whether N deposition has modified the relationships among soil C, net N mineralization, and net nitrification. To test whether N deposition alters the relationship between soil C and net N transformations, we collected soils from coniferous and deciduous forests, grasslands, and residential yards in 14 regions across the contiguous United States that vary in N deposition rates. We quantified rates of net nitrification and N mineralization, soil chemistry (soil C, N, and pH), and microbial biomass and function (as beta‐glucosidase (BG) and N ‐acetylglucosaminidase (NAG) activity) across these regions. Following expectations, soil C was a driver of ƒ nitrified across regions, whereby increasing soil C resulted in a decline in net nitrification and ƒ nitrified . The ƒ nitrified value increased with lower microbial enzymatic investment in N acquisition (increasing BG:NAG ratio) and lower active microbial biomass, providing some evidence that heterotrophic microbial N demand controls the ammonium pool for nitrifiers. However, higher total N deposition increased ƒ nitrified , including for high soil C sites predicted to have low ƒ nitrified , which decreased the role of soil C as a predictor of ƒ nitrified . Notably, the drop in contemporary atmospheric N deposition rates during the 2020 COVID‐19 pandemic did not weaken the effect of N deposition on relationships between soil C and ƒ nitrified . Our results suggest that N deposition can disrupt the relationship between soil C and net N transformations, with this change potentially explained by weaker microbial competition for N. Therefore, past N inputs and soil C should be used together to predict N dynamics across terrestrial ecosystems.

Nieland, Matthew A. [Stockbridge School of Agricul↗

Air Monitoring of Emissions from the Fukushima Daiichi Reactor

In response to the disasters in Japan on March 11, 2011, and the subsequent emissions from Fukushima-Daiichi, we monitored the air near Los Alamos using four air-monitoring systems: the standard AIRNET samplers, the standard rad-NESHAP samplers, the NEWNET system, and high-volume air samplers. Each of these systems has advantages and disadvantages. In combination, they provide a comprehensive set of measurements of airborne radionuclides near Los Alamos during the weeks following March 11. We report air-monitoring measurements of the fission products released from the Fukushima-Daiichi nuclear-power-plant accident in 2011. Clear gamma-spectrometry peaks were observed from Cs-134, Cs-136, Cs-137, I-131, I132, Te-132, and Te-129m. These data, together with measurements of other radionuclides, are adequate for an assessment and assure us that radionuclides from Fukushima Daiichi did not present a threat to human health at or near Los Alamos. The data demonstrate the capabilities of the Los Alamos air-monitoring systems.

54 ENVIRONMENTAL SCIENCES↗

Nuclear Power Plant Cyber Security Discrete Dynamic Event Tree Analysis (LDRD 17-0958) FY17 Report

Instrumentation and control of nuclear power is transforming from analog to modern digital assets. These control systems perform key safety and security functions. This transformation is occurring in new plant designs as well as in the existing fleet of plants as the operation of those plants is extended to 60 years. This transformation introduces new and unknown issues involving both digital asset induced safety issues and security issues. Traditional nuclear power risk assessment tools and cyber security assessment methods have not been modified or developed to address the unique nature of cyber failure modes and of cyber security threat vulnerabilities. iii This Lab-Directed Research and Development project has developed a dynamic cyber-risk in- formed tool to facilitate the analysis of unique cyber failure modes and the time sequencing of cyber faults, both malicious and non-malicious, and impose those cyber exploits and cyber faults onto a nuclear power plant accident sequence simulator code to assess how cyber exploits and cyber faults could interact with a plants digital instrumentation and control (DI&C) system and defeat or circumvent a plants cyber security controls. This was achieved by coupling an existing Sandia National Laboratories nuclear accident dynamic simulator code with a cyber emulytics code to demonstrate real-time simulation of cyber exploits and their impact on automatic DI&C responses. Studying such potential time-sequenced cyber-attacks and their risks (i.e., the associated impact and the associated degree of difficulty to achieve the attack vector) on accident management establishes a technical risk informed framework for developing effective cyber security controls for nuclear power.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Model Validation and Uncertainty Quantification on the KRUSTY Microreactor Design Using GRIFFIN Neutron Transport Code [Poster]

Argonne National Laboratory (ANL) and INL have developed a GRIFFIN steady state neutronics model for the multiphysics simulations of the Kilopower Reactor Using Sterling TechnologY (KRUSTY) microreactor in the Multiphysics Object Oriented Simulation Environment (MOOSE). The reliability of such deterministic neutronics models can be validated by comparing with computations from Monte Carlo codes (e.g. MCNP, SERPENT, OpenMC, Shift, etc). Furthermore, potential modeling/design improvements can be identified by incorporating uncertainty quantification (UQ), which can be performed by MOOSE’s Stochastic Tools Module (STM). KRUSTY is a prototype for a 5-kW thermal nuclear-powered space reactor. Its primary components consist of nuclear fuel, heat pipes, a control rod, a reflector, and the shielding. The fuel consists of 3 stacked U-7.65Mo cylinders with a hole in the center for the control rod. 8 liquid sodium heat pipes transfer fission energy from the solid fuel block to the Sterling power conversion system where the energy is extracted, and the cooled sodium flows back to the core via capillary action . The movable Boron Carbide control rod regulates the neutron population during startup or when a reactor temperature boost is needed . The beryllium oxide reflector is in 3 places in the reactor; it surrounds the core axially, it lies beneath the core on a platen, and it is present in the shim. The axial and lower reflectors rest on an adjustable stainless-steel platen that moves upward to cover the fuel and help the reactor reach criticality. Lastly, radial stainless steel surrounds the core offering protection from radiation exposure .

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S (Phase III) (Final Progress Report)

“Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (Project ECO 2 S)” is an early mover project within the U.S. Department of Energy (DOE) and National Energy Technology Laboratory’s Carbon Storage Assurance Facility Enterprise, or CarbonSAFE, initiative. Phase III of Project ECO2S advanced the foundational work of Phase II, which confirmed the potential for safely, permanently, and economically storing commercial volumes of carbon dioxide (CO 2 ) in the regionally significant saline reservoir system near Mississippi Power Company’s (MPC) Kemper County Energy Facility. The primary objective of Phase III was to complete detailed site characterization necessary to obtain an Underground Injection Control (UIC) Class VI Permit to Construct from the U.S. Environmental Protection Agency. This involved transitioning from regional geologic assessments to high-resolution site-specific analyses.

03 NATURAL GAS↗