Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Adapting Human Reliability Analysis from Nuclear Power to Oil and Gas Applications

ABSTRACT: Human reliability analysis (HRA), as currently used in risk assessments, largely derives its methods and guidance from application in the nuclear energy domain. While there are many similarities be-tween nuclear energy and other safety critical domains such as oil and gas, there remain clear differences. This paper provides an overview of HRA state of the practice in nuclear energy and then describes areas where refinements to the methods may be necessary to capture the operational context of oil and gas. Many key distinctions important to nuclear energy HRA such as Level 1 vs. Level 2 analysis may prove insignifi-cant for oil and gas applications. On the other hand, existing HRA methods may not be sensitive enough to factors like the extensive use of digital controls in oil and gas. This paper provides an overview of these con-siderations to assist in the adaptation of existing nuclear-centered HRA methods to the petroleum sector.

human reliability analysis↗

Reliability Analysis of Complex NASA Systems with Model Based Engineering

The emergence of model-based engineering, with Model- Based Systems Engineering (MBSE) leading the way, is transforming design and analysis methodologies. The recognized benefits to systems development include moving from document-centric information systems and document-centric project communication to a model-centric environment in which control of design changes in the life cycles is facilitated. In addition, a “single source of truth” about the system, that is up-to-date in all respects of the design, becomes the authoritative source of data and information about the system. This promotes consistency and efficiency in regard to integration of the system elements as the design emerges and thereby may further optimize the design. Therefore Reliability Engineers (REs) supporting NASA missions must be integrated into model-based engineering to ensure the outputs of their analyses are relevant and value-needed to the design, development, and operational processes for failure risks assessment and communication.

Reliability prediction↗

Reliability Analysis of Complex NASA Systems with Model-Based Engineering

The emergence of model-based engineering, with Model- Based Systems Engineering (MBSE) leading the way, is transforming design and analysis methodologies. The recognized benefits to systems development include moving from document-centric information systems and document-centric project communication to a model-centric environment in which control of design changes in the life cycles is facilitated. In addition, a “single source of truth” about the system, that is up-to-date in all respects of the design, becomes the authoritative source of data and information about the system. This promotes consistency and efficiency in regard to integration of the system elements as the design emerges and thereby may further optimize the design. Therefore Reliability Engineers (REs) supporting NASA missions must be integrated into model-based engineering to ensure the outputs of their analyses are relevant and value-needed to the design, development, and operational processes for failure risks assessment and communication.

FMEA/FMECA↗

Uncertainty Analysis of Consequence Management Data Products

An interlaboratory effort has developed a probabilistic framework to characterize uncertainty in data products that are developed by the US Department of Energy Consequence Management Program in support of the Federal Radiological Monitoring and Assessment Center. The purpose of this paper is to provide an overview of the probability distributions of input variables and the statistical methods used to propagate and quantify the overall uncertainty of the derived response levels that are used as contours on data products due to the uncertainty in input parameters. Uncertainty analysis results are also presented for several study scenarios. This paper includes an example data product to illustrate the potential real-world implications of incorporating uncertainty analysis results into data products that inform protective action decisions. Data product contours that indicate areas where public protection actions may be warranted can be customized to an acceptable level of uncertainty. Finally, the investigators seek feedback from decision makers and the radiological emergency response community to determine how uncertainty information can be used to support the protective action decision-making process and how it can be presented on data products.

61 RADIATION PROTECTION AND DOSIMETRY↗

Stochastic decision analysis

Small space flight project design at NASA Langley Research Center goes through a multi-phase process from preliminary analysis to flight operations. The process insures that each system achieves its technical objectives with demonstrated quality and within planned budgets and schedules. A key technical component of early phases is decision analysis, which is a structure procedure for determining the best of a number of feasible concepts based upon project objectives. Feasible system concepts are generated by the designers and analyzed for schedule, cost, risk, and technical measures. Each performance measure value is normalized between the best and worst values and a weighted average score of all measures is calculated for each concept. The concept(s) with the highest scores are retained, while others are eliminated from further analysis. This project automated and enhanced the decision analysis process. Automation of the decision analysis process was done by creating a user-friendly, menu-driven, spreadsheet macro based decision analysis software program. The program contains data entry dialog boxes, automated data and output report generation, and automated output chart generation. The enhancements to the decision analysis process permit stochastic data entry and analysis. Rather than enter single measure values, the designers enter the range and most likely value for each measure and concept. The data can be entered at the system or subsystem level. System level data can be calculated as either sum, maximum, or product functions of the subsystem data. For each concept, the probability distributions are approximated for each measure and the total score for each concept as either constant, triangular, normal, or log-normal distributions. Based on these distributions, formulas are derived for the probability that the concept meets any given constraint, the probability that the concept meets all constraints, and the probability that the concept is within a given amount of the best score. Formulas are also derived for the probability that one concept's total score is within a given amount of a second concept's total score. These probabilistic calculations provide more realistic data entry and output information for designers, enabling designers to better determine which concepts to eliminate and which concepts to retain at the decision points of each design phase.

Lacksonen, Thomas A.↗

The HUNTER Dynamic Human Reliability Analysis Tool: Development of a Module for Performance Shaping Factors

Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) is a framework to support dynamic human reliability analysis (HRA) in communication with a variety of methods and tools. In this paper, how we have developed one of the HUNTER modules, the individual module for evaluating performance shaping factors (PSFs), is introduced. The PSF refers to any factor that influences human performance such as workload or complexity. It has been used for highlighting human errors and adjusting the error probabilities in the existing HRA. We consider the eight PSFs suggested in the Standardized Plant Analysis Risk-HRA (SPAR-H) method, which is the representative HRA method widely used in the nuclear field. To support our dynamic modeling using the eight SPAR-H PSFs, we reviewed human performance literature and developed data-based mathematical models to rate and quantify PSFs in the context of dynamic HRA. We also design the individual module composed of the two functions: 1) the PSF qualification function that automatically or manually evaluates a PSF level, and 2) the PSF quantification function that dynamically or statically determines the PSF multiplier values and integrate them to adjust human error probabilities (HEPs). How each function works with the SPAR-H PSFs and how the PSFs adjust the HEPs are investigated through literature and discussed in this paper.

99 GENERAL AND MISCELLANEOUS↗

POSSIBILITIES FOR ASSESSMENT AND OPTIMIZATION OF NPP PHYSICAL PROTECTION SYSTEMS IN UKRAINE ON THE BASIS OF NUCLEAR SAFETY ANALYSIS

The design requirements for physical protection systems currently adopted at Ukrainian NPPs were established in the middle of the nineties on the basis of deterministic analyses and expert evaluations of the vulnerabilities of reactor facilities. At the present time the in-depth assessment of the nuclear safety of Ukrainian NPPs with VVER-1000/B320 reactors has been completed using Probabilistic Safety Assessment (PSA). PSA has established and provided a qualitative assessment of the significance of the equipment for maintaining the integrity of a reactor core and preventing an abnormal radioactive release. The availability of qualitative assessments of the importance of equipment for nuclear safety allows one to assess the existing physical protection system using (1) comparative analysis: to determine whether all equipment and zones that may be affected, as established by the nuclear safety assessment, are actually included into the vital zones protected by the existing physical protection system; (2) specific analysis of dominant contributors: since nuclear safety analyses provide qualitative assessment of the equipment’s importance for safety, it is easy to select a limited group of essential equipment that makes the major contribution to safety, and (3) specific equipment analysis included in dominant emergency sets: part of the components might not be included in the essential equipment group, but it might be included in the dominant emergency sets. If some equipment is found not to be covered by the physical protection system, it is possible, using qualitative assessment of the importance of this equipment for safety, to assess the required degree of enhancement of physical protection. Such analysis will permit an assessment of the sufficiency of the existing physical protection system, to define the "tight" system areas and, therefore, to develop a justified optimization of a PPS with the objective of implementing priority upgrades to enhance safety, and using limited resources in the most effective way. The application of risk-informed approaches to assessment, and subsequent optimization of the physical protection system will permit establishing basis for the implementation of the so-called graded-protection concept.

Shcherbinin, Konstantin↗

Integrated Medical Model Overview

The Integrated Medical Model (IMM) Project represents one aspect of NASA's Human Research Program (HRP) to quantitatively assess medical risks to astronauts for existing operational missions as well as missions associated with future exploration and commercial space flight ventures. The IMM takes a probabilistic approach to assessing the likelihood and specific outcomes of one hundred medical conditions within the envelope of accepted space flight standards of care over a selectable range of mission capabilities. A specially developed Integrated Medical Evidence Database (iMED) maintains evidence-based, organizational knowledge across a variety of data sources. Since becoming operational in 2011, version 3.0 of the IMM, the supporting iMED, and the expertise of the IMM project team have contributed to a wide range of decision and informational processes for the space medical and human research community. This presentation provides an overview of the IMM conceptual architecture and range of application through examples of actual space flight community questions posed to the IMM project.

Spae Adaptation Syndrome↗

Enhanced Component Performance Study: Emergency Diesel Generators 1998-2020

This report presents an enhanced performance evaluation of emergency power system (EPS) and high-pressure core spray (HPCS) emergency diesel generators (EDGs) at U.S. commercial nuclear power plants. This report evaluates component performance over time using (1) Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS) data from 1998 through 2020 and (2) maintenance unavailability performance data from Mitigating Systems Performance Index (MSPI) Basis Document data from 2002 through 2020. The objective is to show estimates of current failure probabilities and rates related to EDGs, trend these data on an annual basis, determine if the current data are consistent with the probability distributions currently recommended for use in NRC probabilistic risk assessments, show how the reliability data differ for different EDG manufacturers and for EDGs with different ratings; and summarize the subcomponents, causes, detection methods, and recovery associated with each EDG failure mode. The EDG failure modes considered are fail to start (FTS), fail to load and run (FTLR), and fail to run after one hour of operation (FTR>1H). Engineering analyses were performed with respect to time period and failure mode without regard to the actual number of EDGs at each plant. The factors analyzed are: subcomponent, failure cause, detection method, recovery, manufacturer, and EDG rating. The following increasing trends were identified for EDGs for the most recent 10-year period: • HPCS EDG FTS failure probability • EPS and HPCS EDG frequency of start demands (demands per reactor year) • EPS and HPCS EDG frequency of FTLR demands. The following decreasing trends were identified for EDGs for the most recent 10-year period: • EPS EDG FTS failure probability • EPS EDG FTLR failure probability • EPS EDG unavailability • EPS and HPCS EDG frequency of FTLR events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Application of Point Precipitation Frequency Estimates to Watersheds

This report documents work sponsored by the U.S. Nuclear Regulatory Commission (NRC) at the Oak Ridge National Laboratory (ORNL) as part of the RES project, “Application of Point Precipitation Frequency Estimates to Watersheds.” This project was implemented as part of the Probabilistic Flood Hazard Assessment (PFHA) Research Program. The objective of the PFHA Research Program is to develop tools and guidance on the use of PFHA methods to risk-inform NRC’s licensing of new facilities as well as licensing and oversight of currently operating facilities as they relate to flooding hazards. Many nuclear power plants (NPPs) are located on or near rivers so riverine flooding hazards need to be considered in their design and operation. Probabilistic riverine flood models are important tools for realistic assessment of flooding risks. However, these models require areal estimates of the depth, duration, and frequency of rainfall distributed over the watershed, which are not often available. Point precipitation frequency estimates are more widely available. For example, the National Oceanic and Atmospheric Administration (NOAA) has published NOAA Atlas 14, which provides point precipitation frequency estimates for 5-minute through 60-day durations at average recurrence intervals of 1-year through 1,000-year. The research documented in this report addresses areal reduction factors (ARFs), which can be used to convert the widely available point precipitation frequency estimates, to estimates of areal precipitation frequency over a watershed. The most widely used ARF source is Technical Paper 29 (TP-29) published by the then U.S. Weather Bureau in 1958. However, both the methods and the underlying precipitation data used to produce TP-29 are seriously out of date. For example, due to the small gauge network available at the time of TP-29’s compilation, ARF estimates developed are only for watersheds smaller than about 400 square miles. Due to the relatively short record lengths of precipitation data available, frequency considerations could not be accurately determined. Other factors such as regional climate and seasonality were not addressed. Several newer methods have been published since TP-29 was developed and both the type and quantity of precipitation data have increased significantly, along with computational resources and analytical tools such as geographic information systems. This report reviewed and assessed the available precipitation products and methods for conducting ARF analysis. The work applied up-to-date precipitation data products and analysis methods with a novel watershed-based approach to investigate how ARF estimates vary across different methods, data sources, geographical locations, return periods, and seasons. The overall findings reported here regarding basic ARF trends are in line with other recent studies showing that ARFs decrease with increasing area, increase with increasing duration, and decrease with increasing return period. This study found significant differences among the available ARF methods. This work also found a strong geographical variability across different US hydrologic regions, suggesting that the ARF are specific to regional climate patterns and geographical characteristics and should not be applied arbitrarily to other locations. The results also reveal the importance of data record length, especially for high return level ARFs. The work reported in NUREG/CR-7271 will assist NRC staff in assessing different classes of ARF methods in conjunction with available rainfall data sets. It will also support the development of guidance for application of point precipitation data in PFHAs. It should be noted that the ARF values presented in this report for any location or region were developed for the purposes of comparing methods and investigating the factors that influence ARFs. They should not be considered official and should not be used in leu of a site-specific analysis.

54 ENVIRONMENTAL SCIENCES↗

A Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 19295

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The reprocessing wastes include high-level waste (HLW), so U.S. Department of Energy (DOE) was compelled to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980, including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the contamination at the West Valley Site and its potential implications for human health and the environment. The West Valley PPA Model (the Model), developed using the GoldSim modeling software, is a tool intended to provide support for decision making with uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-organized contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of HLW resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife are exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion in subsurface air and water, and erosion of the Site. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes that contribute most to overall uncertainty. With this information, the Supplemental Environmental Impact Statement (SEIS) can inform defensible decisions regarding remediation of the Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predicting Biological Cleanliness: An Empirical Bayes Approach for Spacecraft Bioburden Accounting

To comply with the international planetary protection policy set forth by the Committee on Space Research and NASA Agency level requirements, spacecraft destined to biologically sensitive planetary bodies have to minimize terrestrial biological contamination. Analysis, testing and inspection are the standard forward verification activities that are used to demonstrate compliance with the biological contamination requirements. For testing of spacecraft surface areas, a swab or wipe sample is collected from surfaces prior to last access and subsequently processed in the lab using NASA Approved Planetary Protection Methods for Culture Based Assays. Raw data resulting from this assay is then statistically treated employing a mathematical paradigm stemming from the 1970’s Viking Lander Project to generate the bioburden density and total microbial bioburden present. This standard approach arbitrarily accounts for error and provides an upper conservative bound as it reports the maximum number of spores estimated to be present on flight hardware surfaces. A bioburden density estimate factors in the following variables: the observed bioburden count, representative volume processed, sampling efficiencies. Notably, to account for error in the approach, a 0 observed count is arbitrarily changed to a count of 1 for each hardware grouping. The data generated by spacecraft bioburden verification campaigns in the past have resulted in <80% of wipes and <90% of swabs containing a bioburden count of 0. As such, having a robust and well documented statistical approach for dealing with the probability of low incident rates is necessary to be able to estimate spacecraft bioburden. Being able to statistically describe the bioburden distribution and associated confidence level is a gamechanger for the development of bioburden allocations during mission design and will allow for tighter management of risk throughout spacecraft build. Thus, Empirical Bayes statistical approach was evaluated to estimate the microbial bioburden on spacecraft to mitigate the aforementioned mathematical concerns and provide a probabilistic bioburden distribution of the flight hardware surface. For application of this approach to performing bioburden calculations, a range of non-informative prior assumptions on hardware surfaces are explored for Bayesian analyses while informative priors using posterior distributions from prior assays are utilized for Empirical Bayes analyses. Several non-informative priors are currently under investigation to assess fitness including use of these priors to serve as a foundation to build off of NASA specification values or a basis of risk to account for unknowns during the integration and testing process. Informative priors under consideration are generated using sampled bioburden values from hardware originating within like processing environments (e.g. vendor cleaning process or similar assembly process), temporal spacecraft status events as a prediction for hardware cleanliness of future samples, and heritage system bioburden actuals to predict allocation for subsequent missions. Informative priors and probabilistic bioburden distributions are then validated using data sets from the Mars Exploration Rover, Mars Science Laboratory, and InSight missions. Using Empirical Bayes approach to generate a probabilistic bioburden distribution as demonstrated through mission use cases provides a valid approach for use in the end-to-end requirements verification process.

97 MATHEMATICS AND COMPUTING↗

Bayesian Framework for Bioburden Density Estimation in Planetary Protection

To comply with the international planetary protection policy set forth by the Committee on Space Research and NASA Agency level requirements, spacecraft destined to biologically sensitive planetary bodies have to minimize terrestrial biological contamination. Analysis, testing and inspection are the standard forward verification activities that are used to demonstrate compliance with the biological contamination requirements. For testing of spacecraft surface areas, a swab or wipe sample is collected from surfaces prior to last access and subsequently processed in the lab using NASA Approved Planetary Protection Methods for Culture Based Assays. Raw data resulting from this assay is then statistically treated employing a mathematical paradigm stemming from the 1970’s Viking Lander Project to generate the bioburden density and total microbial bioburden present. This standard approach arbitrarily accounts for error and provides an upper conservative bound as it reports the maximum number of spores estimated to be present on flight hardware surfaces. A bioburden density estimate factors in the following variables: the observed bioburden count, representative volume processed, sampling efficiencies. Notably, to account for error in the approach, a 0 observed count is arbitrarily changed to a count of 1 for each hardware grouping. The data generated by spacecraft bioburden verification campaigns in the past have resulted in <80% of wipes and <90% of swabs containing a bioburden count of 0. As such, having a robust and well documented statistical approach for dealing with the probability of low incident rates is necessary to be able to estimate spacecraft bioburden. Being able to statistically describe the bioburden distribution and associated confidence level is a gamechanger for the development of bioburden allocations during mission design and will allow for tighter management of risk throughout spacecraft build. Thus, Empirical Bayes statistical approach was evaluated to estimate the microbial bioburden on spacecraft to mitigate the aforementioned mathematical concerns and provide a probabilistic bioburden distribution of the flight hardware surface. For application of this approach to performing bioburden calculations, a range of non-informative prior assumptions on hardware surfaces are explored for Bayesian analyses while informative priors using posterior distributions from prior assays are utilized for Empirical Bayes analyses. Several non-informative priors are currently under investigation to assess fitness including use of these priors to serve as a foundation to build off of NASA specification values or a basis of risk to account for unknowns during the integration and testing process. Informative priors under consideration are generated using sampled bioburden values from hardware originating within like processing environments (e.g. vendor cleaning process or similar assembly process), temporal spacecraft status events as a prediction for hardware cleanliness of future samples, and heritage system bioburden actuals to predict allocation for subsequent missions. Informative priors and probabilistic bioburden distributions are then validated using data sets from the Mars Exploration Rover, Mars Science Laboratory, and InSight missions. Using Empirical Bayes approach to generate a probabilistic bioburden distribution as demonstrated through mission use cases provides a valid approach for use in the end-to-end requirements verification process.

97 - MATHEMATICS AND COMPUTING↗

Sensorimotor Application of Proposed Methods to Combine the Effects of Multiple Countermeasures for PRisM

Risk associated with human systems is challenging to quantify but is critical for the mission planning and decision making required to enable future Lunar and Martian missions. To address this gap, the Crew Health and Performance-Probabilistic Risk Assessment (CHP-PRA) project is developing an integrated computational model for CHP mission risk. Much like how MEDPRAT is designed to allow medical resource trades informed by medical risk, CHP-PRA will enable analogous trades in human system risks across multiple CHP functions and capabilities. Human performance is one component of the risk intended to be captured by CHP-PRA through the Performance Risk Model (PRisM). The sensorimotor risk area provides a good frame of reference for investigating the structure of a performance model because most tasks that astronauts are expected to perform require input from the sensory system and/or movement/motor control. Additionally, sensorimotor countermeasures are an area of particular concern for NASA’s Human Research Program because of the increased sensorimotor risk associated with surface operations in Lunar and Martian missions. Thus, a tool that can quickly compare risk reductions of potential countermeasures would be beneficial in guiding research and development of effective countermeasures. In this proof of concept, we present a systematic way to combine multiple performance data sets for humans subjected to different countermeasures such that we can predict the countermeasure(s) that optimize astronaut performance on relevant tasks. PRisM assumes that both the tests that are used to measure countermeasure effectiveness (input data) and the tasks we use to represent astronaut performance, can be broken down and represented as a function/vector of the human systems required to perform that test/task. Through mathematical combination, test data are used to predict performance on astronaut tasks that use similar systems. We propose that when combining countermeasures evaluated using the same test, that only one value should be used to represent their combined effectiveness. We start our analysis with the assumption that two countermeasures together will perform better than each countermeasure individually. Our initial implementation of this framework compares various space motion sickness countermeasures and the most up to date analysis will be demonstrated at the IWS.

Caroline R Austin↗

Multi-Mechanism Flood Hazard Assessment: Critical Review of Current Practice and Approaches

This report documents the initial findings from the Nuclear Regulatory commission (NRC)-sponsored research project Methods for Estimating Joint Probabilities of Coincident and Correlated Flooding Mechanisms for Nuclear Power Plant Flood Hazard Assessments.1 This research project is a part of NRC’s Probabilistic Flood Hazard Assessment (PFHA) Research Program and will aid the development of guidance on the use of PFHA methods to evaluate infrastructure safety for existing and proposed US nuclear power plants (NPPs). More specifically, this project intends to provide technical background for the development of flood hazard curves for multi-mechanism floods (MMFs). MMFs are flood events caused by more than one flooding mechanism (e.g., flood events due to the simultaneous occurrence of precipitation-induced river flooding and storm surge). Project activities include three main tasks: Task 1—Survey of current concepts and methods in assessing MMF hazards; Task 2—Critical assessment of selected methods and approaches for quantifying probabilistic MMF hazard risk; Task 3—Development of example case studies to illustrate best practices for quantifying probabilistic MMF hazard risk The initial findings from Tasks 1 and 2 are documented in this report. Task 1 comprised a survey of approaches and methods that have been applied to understand and assess flood hazards due to MMFs. Task 2 involved a critical review of the selected approaches and methods. To that end, the scope of this report includes documentation of (1) a reconnaissance-level survey of the current state of concepts and practice for MMF hazard assessment; (2) a generalized MMF assessment framework to address the distinctions among various types of flood-forcing phenomena, flood mechanisms (grouped into three mechanism types), and flood severity metrics; (3) a wide-ranging survey of approaches and methods that have been applied to various flooding phenomena and settings; and (4) a critical assessment of MMF hazard assessment methods. Studies were identified involving MMFs related to coastal flooding mechanisms, fluvial (rivers/streams) flooding mechanisms, and associated combinations of coastal and fluvial flooding mechanisms. Studies were also identified that address MMFs involving coastal and fluvial flooding mechanisms as well as coastal flooding mechanisms along with extreme precipitation (without specific attribution to fluvial or pluvial mechanisms). The studies identified for review in this report included assessments at varying spatial scales (from local to global) with differing geographic regions of focus using both observed and synthetic data. The majority of studies identified and reviewed were site-specific assessments focusing on relatively short return periods. Studies considered a range of flood severity metrics, made differing assumptions regarding the occurrence of extrema, and used multiple statistical techniques; the use of copulas for the development of joint distributions was a particularly popular analysis technique. The literature review highlighted the differences among existing studies relative to terminology used, means of presenting results, framework and techniques employed, and level of sophistication regarding the number and types of variables considered. Despite the significant diversity in existing studies, the review identified several promising techniques that will be considered in future work under this project, including the development of joint distributions for MMFs using copula and Bayesian-motivated approaches.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Natural Language Processing-Enhanced Nuclear Industry Operating Experience Data Analysis: Aggregation and Interpretation of Multi-Report Analysis Results

Industry-wide operating experience is a critical source of raw data for reliability and risk model parameter estimations for nuclear power plants. A large portion of operating experience data are failure events stored as reports that contain unstructured data, such as narratives. In current practice, a failure report is usually reviewed and manually coded by analysts. The coding is based on extracting several event characteristics such as system name, component type, sub-part type, failure mode, and failure cause. Event narratives are mostly used to help understand events and extract their characteristics. In this line of research, we aim to maximize the usage of event narratives by leveraging natural language processing (NLP) methods to automatically convert an event narrative to a causal graph. This research has promise to improve physical understanding of failure initiation and propagation and to facilitate use of non-failure data (e.g., near-misses and degradations) to complement the limited data pool of failures. In our previous work, we developed an NLP tool and applied it to analyze a number of licensee event reports submitted by U.S. nuclear power plants to the Nuclear Regulatory Commission. In this paper, we will report our recent research progress in aggregating the results of multiple reports, developing network model(s), and drawing statistical insights.

99 GENERAL AND MISCELLANEOUS↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Performance Modeling: Platform Comparison

Zapadnoe Uranium Mill Tailings Site, Pridneprovsky Chemical Plant Ukraine: Two exposure scenarios were utilized to develop performance assessment models in GoldSim and NORMALYSA. The first scenario is an onsite worker exposed to radioactivity through external ground irradiation as well as radon and radioactive dust inhalation. The second being an offsite Resident 300 years after institutional control exposed through the ingestion of garden vegetables irrigated by contaminated ground water, ingestion of fish from Konoplyanka River, and agricultural activities in contaminated garden. NORMALYSA utilizes a modular interface to connect extensive pre-created modules to develop contaminant transport and risk assessment models for safety assessments and performance assessments at NORM and legacy sites. Developed by Facilia AB, the program was tested with the creation of the Zapadnoe model under the International Atomic Energy Agency MODARIA Il Working Group 1 (WG1). Default values are provided for input parameters where site specific data and distributions lack. Probabilistic simulations and inputs are limited to parameters with assigned Gaussian probability functions. Similar results for transient worker inhalation dose were found in comparison with the Zapadnoe GoldSim model. However, the NORMALYSA model has results larger by an order of magnitude for external radiation in the transient worker and for aquatic food ingestion, inhalation, and garden food ingestion to the resident. Performance Assessment Modeling: Radiological performance models promote good management and support in remediation and environmental decision making by optimizing radioactive waste disposal site performance. a performance assessment model of the Zapadnoe uranium mill tailings site and a model for calculating authorized limits at Los Alamos National Laboratory are created to demonstrate and highlight the respective capabilities of three modeling platforms: GoldSim, NORMALYSA, and RESRAD-Onsite. GoldSim is a general-purpose modeling platform with the ability to simulate site-specific FT radionuclide transport and risk assessment using a graphical interface to create and link elements that act as indivisible building blocks of the model. The Zapadnoe performance assessment model created in GoldSim is composed of input parameters collected from site specific parameters from WG1 as well as standard assumptions seen in the Generic PA Model from Neptune and Company. The multivariate Zapadnoe simulation contains both deterministic and probabilistic simulation capabilities with the ability to quantitatively represent the uncertainty and associated risks of the site via the Monte Carlo simulation method. Model parameters, documentation, and assumptions are built directly into the model creating a transparent, reproducible, and more purposeful site specific model. To demonstrate this, an ingestion of water pathway was included in addition to the exposure pathways included in the NORMALYSA model. GoldSim offers a wide variety of probability distributions to choose from as well as many tools to visualize the uncertainty of the models and explore which pathways and radionuclides dominate dose. In contrast to the NORMALYSA model, the GoldSim model uses dynamic simulation to calculate tritium concentrations. Authorized limits support the evaluation of radiological health effects from radionuclides present in bulk contaminated soil in order to assist in the process of clearing land for release under different uses. Calculations of authorized limits in RESRAD-Onsite and GoldSim models support the evaluation for 15 radionuclides using a residential exposure scenario, indoor and outdoor inhalation of dust and vapor phase radionuclides (tritium), incidental soil ingestion, and ingestion grown fruits and Vegetables. RESRAD-Onsite, developed by Argonne National Laboratory is a dedicated computer code for calculating radiation doses and cancer risks to an individual located on top of radioactively contaminated soils. It can also be used to provide guidelines for deriving radionuclide soil levels corresponding to a specific dose criterion. The menu driven user interface facilitates selection of radionuclides and soil concentrations, as well as defines parameter values related to materials, environmental factors, and exposure pathways. The program contains radionuclide-specific data such as dose conversion factors and risk coefficients, as well as soil-water partition coefficients and transfer factors for biotic media. The GoldSim model successfully emulates the RESRAD-Onsite code using identical radiological decay and ingrowth factors, radiation dose conversion factors, and other input parameters. DE EEDE ETS Each model supports dynamic modeling of radionuclide ingrowth and decay over time, and integrate this capability with the transport of radionuclides in the environment via processes such as advection and/or diffusion in fluids, or within porous solid media, The applicability of each program is heavily dependent on project context. In the context of developing Authorized Limits, RESRAD-Onsite may be a more desirable option as it was developed for this particular application. For simple disposal or legacy sites or sites that do not need site-specific model structure, NORMALYSA may be a desirable modeling platform, GoldSim can be used to model any problem for which RESRAD or NORMALYSA is applicable, but its strength lies in its flexibility, analytical, and probabilistic capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗