Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Redox flow cell development and demonstration project, calendar year 1976

The major focus of the effort was the key technology issues that directly influence the fundamental feasibility of the overall redox concept. These issues were the development of a suitable semipermeable separator membrane for the system, the screening and study of candidate redox couples to achieve optimum cell performance, and the carrying out of systems analysis and modeling to develop system performance goals and cost estimates.

Source record↗

Development of vestibular afferent projections into the hindbrain and their central targets

In contrast to most other sensory systems, hardly anything is known about the neuroanatomical development of central projections of primary vestibular neurons and how their second order target neurons develop. Recent data suggest that afferent projections may develop not unlike other sensory systems, forming first the overall projection by molecular means followed by an as yet unspecified phase of activity mediated refinement. The latter aspect has not been tested critically and most molecules that guide the initial projection are unknown.The molecular and topological origin of the vestibular and cochlear nucleus neurons is also only partially understood. Auditory and vestibular nuclei form from several rhombomeres and a given rhombomere can contribute to two or more auditory or vestibular nuclei. Rhombomere compartments develop as functional subdivisions from a single column that extends from the hindbrain to the spinal cord. Suggestions are provided for the molecular origin of these columns but data on specific mutants testing these proposals are not yet available. Overall, the functional significance of both overlapping and segregated projections are not yet fully experimentally explored in mammals. Such lack of details of the adult organization compromises future developmental analysis.

Review↗

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗

Summary of the NASA Lewis component technology program for Stirling power converters

An update is presented on the NASA Lewis Stirling component technology program. The component technology program has been organized as part of the NASA Lewis effort to develop Stirling converter technology for space power applications. The Stirling space power project is part of the High Capacity Power element of the NASA Civil Space Technology Initiative (CSTI). Lewis is also providing technical management of a DOE funded project to develop Stirling converter systems for distributed dish solar terrestrial power applications. The primary contractors for the space power and solar terrestrial projects develop component technologies directly related to their project goals. This Lewis component technology program, while coordinated with these main projects, is aimed at longer term issues, advanced technologies, and independent assessments. Topics to be discussed include bearings, linear alternators, controls and load interaction, materials/life assessment, and heat exchangers.

Thieme, Lanny G.↗

Space Technology Mission Directorate Game Changing Development Program Astrobee

The HET2/Astrobee project is developing a new free-flying robot to succeed the existing SPHERES facility as a guest science research platform and to perform IVA work on the ISS. Relevance: The project will increase the capabilities of robots to perform IVA/EVA work in space and will increase the efficiency of human explorers by allowing routine, repetitive work to be off-loaded to robots. Approach: The project conducted incremental design and development of a robotic free flyer that meets project, stakeholder, and ISS interface and safety requirements. Results: 3 free flyers are on-orbit. The first robot has been unpacked and has begun flying autonomously within the ISS under crew supervision. Commissioning activities to validate the system continue.

Astrobee↗

Leadership Development Program Final Project

TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

Design products required for Engineering↗

HiMAT systems development results and projections

Significant findings of the Highly Maneuverable Aircraft Technology Remotely Piloted Research Vehicle (HiMAT RPRV) flight test program are presented. Among the topics covered are: aerodynamic scaling relationships, the aeroelastic tailoring of wing and canard twist and camber, and laminate graphite/epoxy composite primary structure performance under high-g loading maneuvers. Attention is also given to the set of actuators used in the test and development program, with a view to the minimization of costs through modularity and interchangeability of components and the extensive use of off-the-shelf equipment. The relationship between composite ply geometry and the shape and magnitude of aeroelastic deformations during maneuvering is discussed in detail.

Brown, L. E., Jr.↗

A statistical rain attenuation prediction model with application to the advanced communication technology satellite project. 1: Theoretical development and application to yearly predictions for selected cities in the United States

A rain attenuation prediction model is described for use in calculating satellite communication link availability for any specific location in the world that is characterized by an extended record of rainfall. Such a formalism is necessary for the accurate assessment of such availability predictions in the case of the small user-terminal concept of the Advanced Communication Technology Satellite (ACTS) Project. The model employs the theory of extreme value statistics to generate the necessary statistical rainrate parameters from rain data in the form compiled by the National Weather Service. These location dependent rain statistics are then applied to a rain attenuation model to obtain a yearly prediction of the occurrence of attenuation on any satellite link at that location. The predictions of this model are compared to those of the Crane Two-Component Rain Model and some empirical data and found to be very good. The model is then used to calculate rain attenuation statistics at 59 locations in the United States (including Alaska and Hawaii) for the 20 GHz downlinks and 30 GHz uplinks of the proposed ACTS system. The flexibility of this modeling formalism is such that it allows a complete and unified treatment of the temporal aspects of rain attenuation that leads to the design of an optimum stochastic power control algorithm, the purpose of which is to efficiently counter such rain fades on a satellite link.

Manning, Robert M.↗

Developing Extended Reality Projects in Support of Design, Fabrication and Procedure

The goal of this internship was to improve and create virtual reality simulations and visualizations for use in parallel with the design, fabrication, and analysis of flight ready hardware for areas like the Environmental Control and Life Support Systems (ECLSS) and also Space Systems. Specifically, my work was done in the XRSpace lab at Marshall Space Flight Center (MSFC) with assistance directly and indirectly from workers at KSC, JSC and LaRC. Led by David Reynolds, the XRSpace lab develops products for various entities at NASA. The work done in the XRSpace lab focuses on Extended Reality (XR) solutions for both simulations and visualization capabilities. The goal of the lab is to support the larger systems of NASA and to help find ways that XR technologies can streamline and optimize the design process. Extended Reality is an umbrella term that encompasses Mixed Reality, Augmented Reality, and Virtual Reality. In this capacity, I was able to complete several elements in the design, building, testing, and deployment for a variety of immersive experiences, including a VR procedure simulation, visualization aids, and a 360-image capture tool.

Joseph Chambers↗

The LuNaMaps Project: Advancing Capabilities for Developing and Validating Digital Elevation Models of Rocky Surfaces from Orbital Data

Both navigation and surface science can benefit from the ability to generate high resolution and accurate maps of the surface of the Moon and other solar system bodies. The primary way these maps are generated is through the use of orbital imagery and ranging data. Traditionally, the process of using orbital imagery and ranging data is tedious and labor-intensive. Additionally, once maps have been built, there has generally been limited effort in developing standards by which to verify the accuracy and quality of the generated maps. The Lunar Navigation Maps (LuNaMaps) project is a NASA Game Changing Development (GCD) project which over the last 4 years has aimed to address these issues both for the Moon and for other rocky solar system bodies. This has been accomplished through development of new and existing capabilities including: a suite of methods and tools to combine all sources of orbital imagery; a benchmark data set as well as basic requirements for high-fidelity simulations of precision landing functions; tools to synthetically enhance map products with lander-scale features for use in the development and testing of hazard detection systems; methods and tools to evaluate the accuracy of developed digital elevation maps (DEMs) and their quality for use in terrain relative navigation scenarios; and tools to realistically render image and lidar data. In this work, we provide an overview of the capabilities developed through LuNaMaps, demonstrating its use for processing existing lunar data, and describing how it can be applied to other use cases. We additionally provide preliminary results showing the application of the developed tools and processes to the generation of elevation maps of the Lunar Surface Proving Grounds (LSPG) lunar analog at Astrobotic’s Mojave testing facility using “orbital imagery” captured by a drone. In this terrestrial demonstration, we have the benefit of being able to compare the results to a ground truth model of the LSPG. We finally describe plans to use the newly created maps in a terrestrial terrain relative navigation demonstration over the LSPG in early 2025.

optical navigation↗

Managing Space Technology Development at NASA

NASA uses a structured process for managing projects that develop advanced space technologies and transition them into the designs of flight systems. The four-part process consists of formulation, approval, implementation, and transition. In the formulation phase, technology needs are derived from mission concept studies, various technical approaches for meeting the technology needs are identified, technical performance goals called Key Performance Parameters (KPPs) are established, and a project plan is developed. Prior to project approval, an Independent Formulation Review is conducted to ensure that the project objectives are aligned with the mission needs, and that the project is well planned to meet the objectives. In the implementation phase, the technology development project matures the technology, and progress towards the KPPs is evaluated in periodic status reviews. Technology Readiness Levels (TRLs) are used throughout the project lifecycle to assess the progress of technology maturation. In the transition phase, technologies that are successful in achieving the required level of maturity are transitioned to a customer for further development, are used in system designs, or are thoroughly documented for resumption of development at a later date. The customer or end-user of the technology is involved in all phases of the technology development process.

Moore, Christopher L.↗

The Fundamentals of Using the Digital Micromirror Device (DMD(TM)) for Projection Display

Developed by Texas Instruments (TI) the digital micromirror device (DMD(tm)) is a quickly emerging and highly useful micro-electro-mechanical structures (MEMS) device. Using standard semiconductor fabrication technology, the DMD's simplicity in concept and design will provide advantageous solutions for many different applications. At the rudimentary level, the DMD is a precision, semiconductor light switch. In the initial commercial development of DMD technology, TI has concentrated on projection display and hardcopy. This paper will focus on how the DMD is used for projection display. Other application areas are being explored and evaluated to find appropriate and beneficial uses for the DMD.

Yoder, Lars A.↗

Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

New Millennium Project NMP DS flight control↗

Hydrogen use projections and supply options

Reference and expanded use projections were developed to estimate future hydrogen demand. The rationale in the development of these projections, which estimate the growth of hydrogen usage of approximately 1 X 10 to the fifteenth power Btu in 1973 to approximately 5.5 X 10 to the fifteenth power for reference use and 22 X 10 to the fifteenth power Btu for expanded use projections in year 2000. Primary energy sources required to produce these demands are discussed in the light of transition from a low merchant to high merchant supply option.

Manvi, R.↗

Automatic control of a robotic vehicle

Over the last several years Jet Propulsion Laboratory has been engaged in a project to develop some of the technology required to build a robotic vehicle for exploring planetary surfaces. An overview of hardware and software being developed for this project is given. Particular emphasis is placed on the description of the current design for the Vehicle System required for locomotion and the path planning algorithm.

Mcreynolds, S. R.↗

Low-cost solar array project

Technology development and technical feasibility are reviewed. Process and materials candidates to meet project goals were investigated. Integration of technical development with cost estimates is discussed.

Callaghan, W. T.↗

solar thermal power systems advanced solar thermal technology project, advanced subsystems development

The preliminary design for a prototype small (20 kWe) solar thermal electric generating unit was completed, consisting of several subsystems. The concentrator and the receiver collect solar energy and a thermal buffer storage with a transport system is used to provide a partially smoothed heat input to the Stirling engine. A fossil-fuel combustor is included in the receiver designs to permit operation with partial or no solar insolation (hybrid). The engine converts the heat input into mechanical action that powers a generator. To obtain electric power on a large scale, multiple solar modules will be required to operate in parallel. The small solar electric power plant used as a baseline design will provide electricity at remote sites and small communities.

Source record↗