Search NASA⌕ Search

SEARCH · Search NASA

Results for “Requirement analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Xyce™ Parallel Electronic Simulator Users’ Guide, Version 7.10

This manual describes the use of the Xyce Parallel Electronic Simulator. Xyce has been designed as a SPICE-compatible, high-performance analog circuit simulator, and has been written to support the simulation needs of the Sandia National Laboratories electrical designers. This development has focused on improving capability over the current state-of-the-art in the following areas: • Capability to solve extremely large circuit problems by supporting large-scale parallel computing platforms (up to thousands of processors). This includes support for most popular parallel and serial computers. • A differential-algebraic-equation (DAE) formulation, which better isolates the device model package from solver algorithms. This allows one to develop new types of analysis without requiring the implementation of analysis-specific device models. • Device models that are specifically tailored to meet Sandia’s needs, including some radiation-aware devices (for Sandia users only). • Object-oriented code design and implementation using modern coding practices. Xyce is a parallel code in the most general sense of the phrase — a message passing parallel implementation — which allows it to run efficiently a wide range of computing platforms. These include serial, shared-memory and distributed-memory parallel platforms. Attention has been paid to the specific nature of circuit-simulation problems to ensure that optimal parallel efficiency is achieved as the number of processors grows.

97 MATHEMATICS AND COMPUTING↗

Application of advanced reliability methods to local strain fatigue analysis

When design factors are considered as random variables and the failure condition cannot be expressed by a closed form algebraic inequality, computations of risk (or probability of failure) might become extremely difficult or very inefficient. This study suggests using a simple, and easily constructed, second degree polynomial to approximate the complicated limit state in the neighborhood of the design point; a computer analysis relates the design variables at selected points. Then a fast probability integration technique (i.e., the Rackwitz-Fiessler algorithm) can be used to estimate risk. The capability of the proposed method is demonstrated in an example of a low cycle fatigue problem for which a computer analysis is required to perform local strain analysis to relate the design variables. A comparison of the performance of this method is made with a far more costly Monte Carlo solution. Agreement of the proposed method with Monte Carlo is considered to be good.

Wu, T. T.↗

Advanced reliability method for fatigue analysis

When design factors are considered as random variables and the failure condition cannot be expressed by a closed form algebraic inequality, computations of risk (or probability of failure) may become extremely difficult or very inefficient. This study suggests using a simple and easily constructed second degree polynomial to approximate the complicated limit state in the neighborhood of the design point; a computer analysis relates the design variables at selected points. Then a fast probability integration technique (i.e., the Rackwitz-Fiessler algorithm) can be used to estimate risk. The capability of the proposed method is demonstrated in an example of a low cycle fatigue problem for which a computer analysis is required to perform local strain analysis to relate the design variables. A comparison of the performance of this method is made with a far more costly Monte Carlo solution. Agreement of the proposed method with Monte Carlo is considered to be good.

Wu, Y.-T.↗

Assessing Engine Hot Fire Data for Human Spaceflight Applications

Development and certification of liquid engine systems for human spaceflight missions requires exhaustive analysis to meet the NASA’s requirements for engine health, reliability, and performance. The techniques used to assess requirement conformance and test-to-test engine health pose many unique challenges including the unusually large scale of data, complex component and system analysis, and rigorous engineering judgement standards. To address these challenges, NASA Marshall Space Flight Center’s Engine Systems branch has developed and maintained a robust software suite and operational processes that satisfy programmatic requirements levied on engines and the 7 Elements of Flight Rationale. Analysis at a systems level includes subsystem assessment of components such as turbomachinery and combustion devices as well as structural and fluid dynamics and transient and steady-state assessment at a systems level. Some of the most important tools to accomplish this analysis are automated script databases, creation of historical and statistical comparisons, and parameters calculated at the full data rate. These tools greatly simplify the crucial processes of anomaly investigation, limit monitoring, health assessment, and timely communication of key conclusions drawn from hot fire testing and flight data analysis.

Data Assessment↗

Assessing Engine Hot Fire Data for Human Spaceflight Applications

Development and certification of liquid engine systems for human spaceflight missions requires exhaustive analysis to meet the NASA’s requirements for engine health, reliability, and performance. The techniques used to assess requirement conformance and test-to-test engine health pose many unique challenges including the unusually large scale of data, complex component and system analysis, and rigorous engineering judgement standards. To address these challenges, NASA Marshall Space Flight Center’s Engine Systems branch has developed and maintained a robust software suite and operational processes that satisfy programmatic requirements levied on engines and the 7 Elements of Flight Rationale. Analysis at a systems level includes subsystem assessment of components such as turbomachinery and combustion devices as well as structural and fluid dynamics and transient and steady-state assessment at a systems level. Some of the most important tools to accomplish this analysis are automated script databases, creation of historical and statistical comparisons, and parameters calculated at the full data rate. These tools greatly simplify the crucial processes of anomaly investigation, limit monitoring, health assessment, and timely communication of key conclusions drawn from hot fire testing and flight data analysis.

Data Assessment↗

Analysis of 2009 International Energy Conservation Code Requirements for Residential Buildings in Utah

The 2009 International Energy Conservation Code (IECC) contains several major improvements in energy efficiency over the current Utah code, the 2006 IECC. The most notable changes are improved duct sealing and efficient lighting requirements. A limited analysis of these changes resulted in estimated savings of $168 to $188 for an average new house in Utah at recent fuel prices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing Hot Fire Data with WinPlot

Development and certification of liquid engine systems for human spaceflight missions requires exhaustive analysis to meet the NASA’s requirements for engine health, reliability, and performance. The techniques used to assess requirement conformance and test-to-test engine health and performance pose many unique challenges including the unusually large scale of data, complex component and system analysis, and rigorous engineering judgement standards. To address these challenges, NASA Marshall Space Flight Center’s Engine Systems branch has developed and maintained a robust software suite and operational processes that satisfy programmatic requirements levied on engines and the 7 Elements of Flight Rationale. Analysis at a systems level includes subsystem assessment of components such as turbomachinery and combustion devices as well as structural and fluid dynamics and transient and steady-state assessment at a systems level. Some of the most important tools to accomplish this analysis are automated script databases, creation of historical and statistical comparisons, and parameters calculated at the full data rate. These tools greatly simplify the crucial processes of anomaly investigation, limit monitoring, health assessment, and timely communication of key conclusions drawn from hot fire testing and flight data analysis.

J. Davis Hunter↗

Structural Requirements for Design and Analysis of 25% Scale Subsonic Single Aft Engine (SUSAN) Research Aircraft

The purpose of this paper is to define a set of structural requirements which can be used for conceptual design studies of the Subsonic Single Aft eNgine (SUSAN) aircraft and the early design phases of a quarter scale flight research aircraft. SUSAN presents an architecture for a subsonic regional jet transport aircraft coupling a single turbofan engine to an electrified aircraft propulsion system (EAP). Presented within this paper are a consolidated set of requirements drawn from NASA, FAA (FAR), and non-government structural standards with a focus on loads. An example application of the breakout load tables and the approach for applying existing standards to those configurations is presented for the SUSAN 25% flight research vehicle. Positioning of the turbofan, electric engines, battery and the requirement for the 25% vehicle to be shippable in a cargo box are atypical structural design requirements. Particular focus is given to the primary aircraft structural elements such as the engine/tail mount, fuselage structure, and wing structure.

structures↗

Structural Requirements for Design and Analysis of 25% Scale Subsonic Single Aft Engine (SUSAN) Research Aircraft

The purpose of this paper is to define a set of structural requirements which can be used for conceptual design studies of the Subsonic Single Aft eNgine (SUSAN) aircraft and the early design phases of a quarter scale flight research aircraft. SUSAN presents an architecture for a subsonic regional jet transport aircraft coupling a single turbofan engine to an electrified aircraft propulsion system (EAP). Presented within this paper are a consolidated set of requirements drawn from NASA, FAA (FAR), and non-government structural standards with a focus on loads. An example application of the breakout load tables and the approach for applying existing standards to those configurations is presented for the SUSAN 25% flight research vehicle. Positioning of the turbofan, electric engines, battery and the requirement for the 25% vehicle to be shippable in a cargo box are atypical structural design requirements. Particular focus is given to the primary aircraft structural elements such as the engine/tail mount, fuselage structure, and wing structure.

Structures↗

Thermal/structural Tailoring of Engine Blades (T/STAEBL) User's Manual

The Thermal/Structural Tailoring of Engine Blades (T/STAEBL) system is a family of computer programs executed by a control program. The T/STAEBL system performs design optimizations of cooled, hollow turbine blades and vanes. This manual contains an overview of the system, fundamentals of the data block structure, and detailed descriptions of the inputs required by the optimizer. Additionally, the thermal analysis input requirements are described as well as the inputs required to perform a finite element blade vibrations analysis.

Brown, K. W.↗

Rapid Detection of the Varicella Zoster Virus

1.Technology Description-Researchers discovered that when the Varicella Zoster Virus (VZV) reactivates from latency in the body, the virus is consistently present in saliva before the appearance of skin lesions. A small saliva sample is mixed with a specialized reagent in a test kit. If the virus is present in the saliva sample, the mixture turns a red color. The sensitivity and specificity emanates from an antibody-antigen reaction. This technology is a rapid, non-invasive, point of-of-care testing kit for detecting the virus from a saliva sample. The device is easy to use and can be used in clinics and in remote locations to quickly detect VZV and begin treatment with antiviral drugs. 2.Market Opportunity- RST Bioscience will be the first and only company to market a rapid, same day test kit for the detection of VZV in saliva. The RST detection test kit will have several advantages over existing, competitive technology. The test kit is self contained and laboratory equipment is not required for analysis of the sample. Only a single saliva sample is required to be taken instead of blood or cerebral spinal fluid. The test kit is portable, sterile and disposable after use. RST detection test kits require no electrical power or expensive storage equipment and can be used in remote locations. 3.Market Analysis- According to the CDC, it is estimated that 1 million cases of shingles occur each year in the U.S. with more than half over the age of sixty. There is a high demand for rapid diagnostics by the public. The point-of-care testing (POCT) market is growing faster than other segments of in vitro diagnostics. According to a July 2007 InteLab Corporation industry report the overall market for POCT was forecast to increase from $10.3 billion in 2005 to $18.7 billion by 2011. The market value of this test kit has not been determined. 4.Competition- The VZV vaccine prevents 50% of cases and reduces neuralgia by 66%. The most popular test detects VZV-specific IgM antibody in blood. Other tests include running a sample in a polymerase chain reaction analyzer, enzyme immunoassay, latex agglutination, indirect fluorescent antibody and fluorescent antibody to membrane antigen assay. These existing tests require laboratory analysis by trained personnel, expensive equipment, invasive procedures and a longer period of time to obtain test results.

Lewis, Michelle P.↗

A systematic approach to the analysis of double faults within design basic accident methodology - 14501

Within the UK there is a general trend towards adopting Design Basis Accident (DBA) methodology for the assessment of radiological hazards, including criticality. DBA is a single fault methodology and comprises identifying the initiating event, its frequency and consequence. A fault with a very low initiating event frequency will not require further analysis. A fault sequence that terminates in a sub-critical configuration would also not require further analysis; although the identified passive features ensuring sub-criticality are subjected to engineering substantiation. Where faults do not pass this initial screening, two safety measures are generally required to ensure the fault does not progress to a criticality incident. This methodology provides a robust approach to single faults ensuring that an appropriate level and range of plant measures are identified and subjected to appropriate substantiation. However, a criticality is a cliff-edge effect and is dependent on multiple parameters. It is entirely possible under DBA to evaluate several single fault sequences and conclude that no measures are required because the single faults terminate in a sub-critical configuration. Importantly, for criticality safety, under DBA, there is no requirement to prevent important parameters from deviating from normal or upper bound 'safe' levels leaving the plant at greater risk in the event that further faults initiate. The combination of two faults could lead to a criticality incident but there is no current driver within DBA methodology to analyze these coincident or double faults. There is, therefore, potential to significantly under estimate the risk of criticality. This understanding is embodied within other methodologies such as the Double Contingency Principle. However, within the UK the DBA methodology has so significantly improved the analysis of single faults that, in some instances, consideration of double faults has taken a back seat. This is despite the UK regulator stating that 'criticality safety cases should employ the double contingency approach'. This paper presents a systematic approach to ensure that the potential for double faults or multiple parameter deviations to result in a criticality is effectively evaluated within the wider DBA methodology. The methodology determines which faults may be screened out from double fault analysis on the grounds of being 'unlikely' to initiate and being present for a 'short' duration. For those faults screened into double fault analysis, this guidance sets out the potential means of determining acceptable risk. These means include the specific evaluation of the risk of two criticality control parameters deviating simultaneously, the definition of additional safety measures and the definition of the boundary of safety for multiple parameters and the risk of exceeding this boundary. (authors)

42 ENGINEERING↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Preliminary Energy Savings Analysis: 2018 IECC Residential Requirements

The most recent edition, the 2018 IECC, was published in August 2017, triggering the DOE review and determination process. In response, DOE and Pacific Northwest National Laboratory (PNNL) conducted a preliminary analysis to determine energy savings for the 2018 IECC residential provisions relative to the previous edition, the 2015 IECC. This report documents the methodology used to conduct the analysis and summarizes the results and findings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Tutorial: Lessons Learned for Behavior Analysts from Data Scientists

Big data is a computing term used to refer to large and complex data sets, typically consisting of terabytes or more of diverse data that is produced rapidly. The analysis of such complex data sets requires advanced analysis techniques with the capacity to identify patterns and abstract meanings from the vast data. The field of data science combines computer science with mathematics/statistics and leverages artificial intelligence, in particular machine learning, to analyze big data. This field holds great promise for behavior analysis, where both clinical and research studies produce large volumes of diverse data at a rapid pace (i.e., big data). This article presents basic lessons for the behavior analytic researchers and clinicians regarding integration of data science into the field of behavior analysis. We provide guidance on how to collect, protect, and process the data, while highlighting the importance of collaborating with data scientists to select a proper machine learning model that aligns with the project goals and develop models with input from human experts. Here, we hope this serves as a guide to support the behavior analysts interested in the field of data science to advance their practice or research, and helps them avoid some common pitfalls.

42 ENGINEERING↗

Tritium glovebox stripper system seismic design evaluation

The use of glovebox confinement at US Department of Energy (DOE) tritium facilities has been discussed in numerous publications. Glovebox confinement protects the workers from radioactive material (especially tritium oxide), provides an inert atmosphere for prevention of flammable gas mixtures and deflagrations, and allows recovery of tritium released from the process into the glovebox when a glovebox stripper system (GBSS) is part of the design. Tritium recovery from the glovebox atmosphere reduces emissions from the facility and the radiological dose to the public. Location of US DOE defense programs facilities away from public boundaries also aids in reducing radiological doses to the public. This is a study based upon design concepts to identify issues and considerations for design of a Seismic GBSS. Safety requirements and analysis should be considered preliminary. Safety requirements for design of GBSS should be developed and finalized as a part of the final design process.

42 ENGINEERING↗

Force Limited Vibration Testing

This slide presentation reviews the concept and applications of Force Limited Vibration Testing. The goal of vibration testing of aerospace hardware is to identify problems that would result in flight failures. The commonly used aerospace vibration tests uses artificially high shaker forces and responses at the resonance frequencies of the test item. It has become common to limit the acceleration responses in the test to those predicted for the flight. This requires an analysis of the acceleration response, and requires placing accelerometers on the test item. With the advent of piezoelectric gages it has become possible to improve vibration testing. The basic equations have are reviewed. Force limits are analogous and complementary to the acceleration specifications used in conventional vibration testing. Just as the acceleration specification is the frequency spectrum envelope of the in-flight acceleration at the interface between the test item and flight mounting structure, the force limit is the envelope of the in-flight force at the interface . In force limited vibration tests, both the acceleration and force specifications are needed, and the force specification is generally based on and proportional to the acceleration specification. Therefore, force limiting does not compensate for errors in the development of the acceleration specification, e.g., too much conservatism or the lack thereof. These errors will carry over into the force specification. Since in-flight vibratory force data are scarce, force limits are often derived from coupled system analyses and impedance information obtained from measurements or finite element models (FEM). Fortunately, data on the interface forces between systems and components are now available from system acoustic and vibration tests of development test models and from a few flight experiments. Semi-empirical methods of predicting force limits are currently being developed on the basis of the limited flight and system test data. A simple two degree of freedom system is shown and the governing equations for basic force limiting results for this system are reviewed. The design and results of the shuttle vibration forces (SVF) experiments are reviewed. The Advanced Composition Explorer (ACE) also was used to validate force limiting. Test instrumentation and supporting equipment are reviewed including piezo-electric force transducers, signal processing and conditioning systems, test fixtures, and vibration controller systems. Several examples of force limited vibration testing are presented with some results.

random vibration testing↗

Selenium Metabolism in Cancer Cells: The Combined Application of XAS and XFM Techniques to the Problem of Selenium Speciation in Biological Systems

Determining the speciation of selenium in vivo is crucial to understanding the biological activity of this essential element, which is a popular dietary supplement due to its anti-cancer properties. Hyphenated techniques that combine separation and detection methods are traditionally and effectively used in selenium speciation analysis, but require extensive sample preparation that may affect speciation. Synchrotron-based X-ray absorption and fluorescence techniques offer an alternative approach to selenium speciation analysis that requires minimal sample preparation. We present a brief summary of some key HPLC-ICP-MS and ESI-MS/MS studies of the speciation of selenium in cells and rat tissues. We review the results of a top-down approach to selenium speciation in human lung cancer cells that aims to link the speciation and distribution of selenium to its biological activity using a combination of X-ray absorption spectroscopy (XAS) and X-ray fluorescence microscopy (XFM). The results of this approach highlight the distinct fates of selenomethionine, methylselenocysteine and selenite in terms of their speciation and distribution within cells: organic selenium metabolites were widely distributed throughout the cells, whereas inorganic selenium metabolites were compartmentalized and associated with copper. New data from the XFM mapping of electrophoretically-separated cell lysates show the distribution of selenium in the proteins of selenomethionine-treated cells. Future applications of this top-down approach are discussed.

60 APPLIED LIFE SCIENCES↗