Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Forecasting Wind and Solar Generation: Improving System Operations, Greening the Grid (Spanish Version)

This document is the Spanish version of 'Greening the Grid- Forecasting Wind and Solar Generation Improving System Operations'. It discusses improving system operations with forecasting with and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA Feedback to DLA Land & Maritime Moratorium on Wafer Fab Audits

On September 29, 2017 the Defense Logistics Agency (DLA), Land and Maritime, announced that on September 1, 2017 they had begun a moratorium on the auditing of wafer fabrication facilities (fabs) used in the production of semiconductor die for military (MIL) qualified integrated circuits and discrete semiconductors (transistors and diodes). The announcement said the moratorium would last for six months initially and would apply to all wafer fabs qualified to MIL-PRF-19500 (discretes) and MIL-PRF-38535 (ICs) located, onshore or offshore. The stated rationale behind this action was to give DLA time to evaluate the risk of modifying current surveillance practices across 70+ Federal Stock Classes (FSC) under the jurisdiction of the DLA Qualifying Activity (VQ). The objective was to free up the resources used in these audits so they could be redirected towards audits of other commodities which were under resourced, notably connectors. In the announcement letter, DLA-VQ requested data from the community to assist with decisions on wafer fab re-audit cycle modifications. NASA used available information on current and historical audit schedules to gather such data and analyzed it to provide an in-depth understanding of the impact of locations, part types, in-house or out-of-house fabs on those schedules over time. This presentation provides the results of NASA's data analysis and suggest some changes to auditing practices that could increase efficient use of resources without significant increases in risk.

fab audits↗

SPRINT: Scheduling Planning Routing Intersatellite Network Tool

The Scheduling Planning Routing Intersatellite Network Tool (SPRINT) software system plans and schedules the operations (observations, inter-satellite crosslink communications, and ground communications) of Earth observation (EO) constellations of hundreds of resource-constrained small satellites to enable global, near real-time science. Historically, most CubeSats have flown radios only for direct-to-ground downlink of data; as a result, data availability is delayed by as long as it takes for the capturing satellite to pass over a ground station, typically hours. Current Planning and Scheduling (P&S) systems for constellations cannot handle data routing through a large, dynamic network topology, and all planning is handled on the ground without .the ability to autonomously prioritize important observations, or respond to unexpected changes in communication window or bandwidth. SPRINT directly handles both data routing for low latency bulk observation data downlink and replanning onboard to deal with dynamic priorities and fault response, maximizing the utility of downlinked data.

Kerri Cahoy↗

Get the Power You Need, When and Where You Need It Aboard the International Space Station (ISS) Using the ISS Plug-In Plan (IPiP) Requirement Request Process

Trying to get your experiment aboard ISS? You likely will need power. Many enditem providers do. ISS Plug-In Plan (IPiP) supports power and data for science, Payloads (or Utilization), vehicle systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Yet limited resources and increasing requirements continue to influence decisions on deployment of ISS end items. Given the fluid launch schedule and the rapidly- increasing number of end item providers requiring power support, the focus of the Plug-In Plan has evolved from a simple FIFO recommendation to provide power to end item users, to anticipating future requirements by judicious development and delivery of support equipment (cables, power supplies, power strips, and alternating current (AC) power inverters), employing innovative deployment strategies, and collaborating on end item development. This paper describes the evolution of the ISS Program Office, Engineering Directorate, Flight Operations Directorate (FOD), International Partners and the end item provider relationship and how collaboration successfully leverages unique requirements with limited on- board equipment and resources, tools and processes which result in more agile integration, and describes the process designed for the new ISS end item provider to assure that their power requirements will be met.

Moore, Kevin D.↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact, a Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support - Status of Development

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database (consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources), dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the tool suite, its constituent parts and the plans for when it will deploy as an operational product, currently scheduled for the end of FY22. Recent development successes on the IMPACT project include the ability to cluster medical resources into medical capabilities and mutually-dependent bundles, the ability to perform trade analyses on different medical sets, different DRMs, and different crew complements, and the ability to specify mission segments as periods of time assigned to one or more members of the crew during which unique mission events occur (e.g., extravehicular activities, surface operations, gravity well adaptations, etc.). IMPACT is gearing up for its verification and validation phase to compile the data package necessary for a successful Transition to Operations (TtO), per the guidance in NPR 8900.1B .

IMPACT↗

Geological Modeling of Gold Deposit Based on Grade Domaining Using Plurigaussian Simulation Technique

Mineral resource evaluation requires defining grade domains of an ore deposit. Common practice in mineral resource estimation consists of partitioning the ore body into several grade domains before the geostatistical modeling and estimation at unsampled locations. Many ore deposits are made up of different mineralogical ensembles such as oxide and sulfide zone: being able to model the spatial layout of the different grades is vital to good mine planning and management. This study addresses the application of the plurigaussian simulation to Sivas (Turkey) gold deposits for constructing grade domain models that reproduce the contacts between different grade domains in accordance with geologist's interpretation. The method is based on the relationship between indicator variables from grade distributions on the Gaussian random functions chosen to represent them. Geological knowledge is incorporated into the model by the definition of the indicator variables, their truncation strategy, and the grade domain proportions. The advantages of the plurigaussian simulation are exhibited through the case study. The results indicated that the processes are seen to respect reproducing complex geometrical grades of an ore deposit by means of simulating several grade domains with different spatial structure and taking into account their global proportions. The proposed proportion model proves as simple to use in resource estimation, to account for spatial variations of the grade characteristics and their distribution across the studied area, and for the uncertainty in the grade domain proportions. The simulated models can also be incorporated into mine planning and scheduling.

58 GEOSCIENCES↗

A comparison of price-taker and production cost models for determining system value, revenue, and scheduling of concentrating solar power plants

Concentrating solar power (CSP) plants convert solar energy into electricity and can be coupled with low-cost thermal energy storage to provide a dispatchable renewable resource. Maximizing the economic benefits of CSP systems requires deliberate selection of the timing of thermal energy dispatch to coincide with high-price or high-value periods. The performance and value of CSP systems have traditionally been evaluated using two distinct approaches: (1) production cost models (PCMs), which optimize commitment and dispatch schedules for an entire fleet of generators to minimize the cost of satisfying electricity demand; and (2) price-taker (PT) models, which optimize dispatch of the CSP system against historical or forecasted electricity prices to maximize revenue available to the CSP operator. The PCM approach is, in principle, superior because of the ability to capture system-level details such as transmission pathways and associated constraints, and feedback between CSP dispatch schedules and operation of other generators. The computationally simpler PT technique cannot explicitly address these concerns, but the comparative reduction in solution time is attractive for sensitivity analysis and rigorous optimization of CSP plant design and operation. In this work, we directly compare the dispatch profiles, net revenue, and operational value of CSP systems using implementations of each technique to assess how closely the solutions from the PT technique can approach those from the PCM for a specific market scenario. The PT implementation produced characteristically similar dispatch profiles as the PCM for both a large solar-multiple configuration and a small solar-multiple peaking configuration, while requiring only 1% of the computational time of the PCM. In addition, dispatching the CSP plant according to the self-scheduled PT solution - as opposed to the system-optimized PCM solution - only reduced the total CSP operational value by 1-5%, with consistent trends across CSP configurations and locations. This analysis validates the ability of the PT approach to substantially capture the economic benefits of CSP systems when pricing profiles are available, and indicates that the PT approach is suitable for initial design and optimization of CSP technologies.

14 SOLAR ENERGY↗

Revisiting the definition of field capacity as a functional parameter in a layered agronomic soil profile beneath irrigated maize

The soil water content at the condition of field capacity (θ FC ) is a key parameter in irrigation scheduling and has been suggested to be determined by running a synthetic drainage experiment until the flux rate (q) at the bottom of the soil profile achieves a predefined negligible value (q FC ). We question the impact of q FC on the assessment of field capacity. Moreover, calculating θ FC as the integral mean of the water content profile when q is equal to q FC is strictly valid only for uniform soil profiles. By contrast, this practice is ambiguous and biased for stratified soil profiles due to the soil water content discontinuity at the layer interfaces. In this study, the concept of field capacity was revisited and adapted to practical agronomic heuristics. By resorting to the assessment of root-zone water storage capacity (W), we envision field capacity as a functional hydraulic parameter derived from synthetic irrigation scheduling scenarios to minimize drought stress, drainage, and nitrate leachate below the root zone. A functional analysis was carried out on a 135-cm-thick layered soil profile beneath maize in eastern Nebraska. On-farm irrigation scheduling applications and agricultural practices were recorded for 20 years (2001–2020) at a daily time step. Hydrus-1D was calibrated and validated with direct measurements of the soil water retention curve and soil water content data, respectively, in each soil layer. A set of functional field capacity values was derived from 24 irrigation scheduling scenarios, and the optimal water storage capacity at field capacity (W FC ) was approximately 50 cm (corresponding to about 80% saturation in the soil profile). An average irrigation amount of 217.5 mm distributed over 21 events was obtained by using optimal irrigation scheduling, which was initiated when the matric pressure head took on a value of –700 cm and the irrigation rate was set at 1.0 cm d –1 . This irrigation practice ensured water storage at approximately the same level (ideally at W FC ) by sustaining only evapotranspiration fluxes in the uppermost portion of the root zone and by limiting excessive drainage. This protocol can be transferred to other agricultural fields.

54 ENVIRONMENTAL SCIENCES↗

Multitarget Rydberg gates via spatial blockade engineering

Multi-target gates offer the potential to reduce gate depth in syndrome extraction for quantum error correction. Although neutral-atom quantum computers have demonstrated native multi-qubit gates, existing approaches that avoid additional control or multiple atomic species have been limited to single-target gates. We propose single-control-multi-target CZ^n gates on a single-species neutral-atom platform that require no extra control and have gate durations comparable to standard CZ gates. Our approach leverages tailored interatomic distances to create an asymmetric blockade between the control and target atoms. Using a GPU-accelerated pulse synthesis protocol, we design smooth control pulses for CZZ and CZZZ gates, achieving fidelities of up to 99.55% and $99.24\%$, respectively, even in the presence of simulated atom placement errors and Rydberg-state decay. Our approach is most effective for N=2 (CZZ) and N=3 targets (CZZZ); for larger N, increasing spatial crowding of the targets introduces significant challenges for maintaining the required blockade asymmetry. This work presents a practical path to implementing low-overhead multi-target gates in single-species neutral-atom systems, significantly reducing the resource overhead for syndrome extraction. To motivate the impact of these gates, we apply a greedy scheduling algorithm and we demonstrate that our proposed gates can reduce the number of atom reconfiguration costs by up to 50% for color code syndrome extraction of code distances greater than 5.

Stein, Samuel A.↗

Urban-Scale Control of School Bus Fleet Charging and Discharging Strategies Using Single and Multi-Stage Optimization

This paper presents a dual-strategy approach to optimizing charging and discharging schedules for school bus fleets, using the limited charging infrastructure effectively. We aim to ensure that each bus is fully charged for daily operations and aids in grid stability during peak demand. The first strategy utilizes linear programming to schedule overnight charging at available station sockets and strategic discharging during peak periods, efficiently coordinating limited resources. The second strategy employs metaheuristic techniques for continuous optimization, focusing on precise power requirements and offering greater flexibility than the linear model.

Selim, Alaa↗

Control and Size Energy Storage for Managing Energy balance of Variable Generation Resources

This paper presents control algorithms and sizing strategies for using energy storage to manage energy balance for variable generation resources. The control objective is to minimize the hourly generation imbalance between the actual and the scheduled generation of the wind farm. Three control algorithms are compared: tracking power imbalance, post-compensation, and pre-compensation. Measurement data from a wind farm located in South-central Washington State are used in the study. The results show that tracking power imbalance yields the best performance by keeping the hourly energy imbalances zero. However, the energy storage system (ESS) will be significantly oversized. Post-compensation reduces power rating of the ESS but the hourly imbalance may not be kept as zero when large and long-lasting energy imbalances occur. A linear regression forecasting algorithm is developed for the pre-compensation algorithm to pre-charge or pre-discharge the ESS based on predicted energy imbalances. The performance comparison shows that the pre-compensation method significantly reduces the size of the ESS while maintaining satisfactory performance.

ENERGY MANAGEMENT↗

Communication Characterization and Optimization of Applications Using Topology-Aware Task Mapping on Large Supercomputers

On large supercomputers, the job scheduling systems may assign a non-contiguous node allocation for user applications depending on available resources. With parallel applications using MPI (Message Passing Interface), the default process ordering does not take into account the actual physical node layout available to the application. This contributes to non-locality in terms of physical network topology and impacts communication performance of the application. In order to mitigate such performance penalties, this work describes techniques to identify suitable task mapping that takes the layout of the allocated nodes as well as the application's communication behavior into account. During the first phase of this research, we instrumented and collected performance data to characterize communication behavior of critical US DOE (United States - Department of Energy) applications using an augmented version of the mpiP tool. Subsequently, we developed several reordering methods (spectral bisection, neighbor join tree etc.) to combine node layout and application communication data for optimized task placement. We developed a tool called mpiAproxy to facilitate detailed evaluation of the various reordering algorithms without requiring full application executions. This work presents a comprehensive performance evaluation (14,000 experiments) of the various task mapping techniques in lowering communication costs on Titan, the leadership class supercomputer at Oak Ridge National Laboratory.

97 MATHEMATICS AND COMPUTING↗

Autonomic Management of Application Workflows on Hybrid Computing Infrastructure

In this paper, we present a programming and runtime framework that enables the autonomic management of complex application workflows on hybrid computing infrastructures. The framework is designed to address system and application heterogeneity and dynamics to ensure that application objectives and constraints are satisfied. The need for such autonomic system and application management is becoming critical as computing infrastructures become increasingly heterogeneous, integrating different classes of resources from high-end HPC systems to commodity clusters and clouds. For example, the framework presented in this paper can be used to provision the appropriate mix of resources based on application requirements and constraints. The framework also monitors the system/application state and adapts the application and/or resources to respond to changing requirements or environment. To demonstrate the operation of the framework and to evaluate its ability, we employ a workflow used to characterize an oil reservoir executing on a hybrid infrastructure composed of TeraGrid nodes and Amazon EC2 instances of various types. Specifically, we show how different applications objectives such as acceleration, conservation and resilience can be effectively achieved while satisfying deadline and budget constraints, using an appropriate mix of dynamically provisioned resources. Our evaluations also demonstrate that public clouds can be used to complement and reinforce the scheduling and usage of traditional high performance computing infrastructure.

Kim, Hyunjoo↗

Small experiment, Big Data: the data production of the Muon $g-2$ Experiment

The Muon $g-2$ Experiment at Fermilab aims to measure the muon anomalous magnetic moment with the unprecedented precision of 140 parts per billion (ppb). In April 2021 the collaboration published the first measurement, based on the first year of data taking. The result confirmed the previous experiment at Brookhaven National Laboratory (BNL), and increased the long-standing tension with the Standard Model prediction to 4.2 $\sigma$. The experiment is now running the sixth year of data acquisition of positive muon data, having accumulated a total of $\sim$19 times the statistics of the BNL experiment. A collaboration-wide effort is now in place to help produce the multi-petabyte-sized data sets, a challenge typically faced by much bigger experiments. Having a quick production turnaround time is of critical importance in order to achieve a timely analysis and publication schedule. In this paper I will describe the production workflow, the former and current challenges, the resources, tools, and the future prospects of the Muon $g-2$ Experiment.

Girotti, Paolo↗

Space station systems analysis study. Part 3: Documentation. Volume 4: Supporting research and technology report

A brief description of recommended supporting research and technology items resulting from the space station analysis study is provided. Descriptions include the title; the status with respect to the state of the art; the justification; the technical plan including objectives and technical approach; resource requirements categorized by manpower, specialized facilities, and funding in 1977 dollars; and also the target schedule. The goal is to provide high confidence in the solutions for the various functional system development problems, and to do so within a time period compatible with the overall evolutionary space construction base schedule.

Source record↗

Neural-Network Processor Would Allocate Resources

Global optimization problems solved quickly. Neural-network processor optimizes allocation of M resources among N expenditures according to cost of pairing each resource with each expenditure and subject to limit on number of resources feeding into each expenditure and/or limit on number of expenditures to which each resource allocated. One cell performs several analog and digital functions. Potential applications include assignment of jobs, scheduling, dispatching, and planning of military maneuvers.

Eberhardt, Silvio P.↗

Payload accommodation and development planning tools - A Desktop Resource Leveling Model (DRLM)

The Desktop Resource Leveling Model (DRLM) has been developed as a tool to rapidly structure and manipulate accommodation, schedule, and funding profiles for any kind of experiments, payloads, facilities, and flight systems or other project hardware. The model creates detailed databases describing 'end item' parameters, such as mass, volume, power requirements or costs and schedules for payload, subsystem, or flight system elements. It automatically spreads costs by calendar quarters and sums costs or accommodation parameters by total project, payload, facility, payload launch, or program phase. Final results can be saved or printed out, automatically documenting all assumptions, inputs, and defaults.

Hilchey, John D.↗