Search NASA⌕ Search

SEARCH · Search NASA

Results for “Science Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Economics of Automation in Space: Implications of Automated Versus Manned Operations on the High Cost of On-Orbit Assembly, Control and Servicing of Spacecraft

The continued high cost and risk of placing astronauts in space has placed considerable burden on NASA to cut costs and consider other means of achieving mission goals both effectively and safely. Additionally, future science missions which might place a tremendous burden on Shuttle availability, or require extended vehicle duty cycles on the Lunar surface and Mars surface, might preclude the presence of astronauts altogether.

Mars surface↗

Establishing a Disruptive New Capability for NASA to Fly UAV's into Hazardous Conditions

A 2015 NASA Aeronautics Mission "Seedling" Proposal is described for a Severe-Environment UAV (SE-UAV) that can perform in-situ measurements in hazardous atmospheric conditions like lightning, volcanic ash and radiation. Specifically, this paper describes the design of a proof-of-concept vehicle and measurement system that can survive lightning attachment during flight operations into thunderstorms. Elements from three NASA centers draw together for the SE-UAV concept. 1) The NASA KSC Genesis UAV was developed in collaboration with the DARPA Nimbus program to measure electric field and X-rays present within thunderstorms. 2) A novel NASA LaRC fiber-optic sensor uses Faraday-effect polarization rotation to measure total lightning electric current on an air vehicle fuselage. 3) NASA AFRC's state-of-the-art Fiber Optics and Systems Integration Laboratory is envisioned to transition the Faraday system to a compact, light-weight, all-fiber design. The SE-UAV will provide in-flight lightning electric-current return stroke and recoil leader data, and serve as a platform for development of emerging sensors and new missions into hazardous environments. NASA's Aeronautics and Science Missions are interested in a capability to perform in-situ volcanic plume measurements and long-endurance UAV operations in various weather conditions. (Figure 1 shows an artist concept of a SE-UAV flying near a volcano.) This paper concludes with an overview of the NASA Aeronautics Strategic Vision, Programs, and how a SE-UAV is envisioned to impact them. The SE-UAV concept leverages high-value legacy research products into a new capability for NASA to fly a pathfinder UAV into hazardous conditions, and is presented in the SPIE DSS venue to explore teaming, collaboration and advocacy opportunities outside NASA.

Ely, Jay↗

Glenn Extreme Environments Rig (GEER) Independent Review

The Chief of the Space Science Project Office at Glenn Research Center (GRC) requested support from the NASA Engineering and Safety Center (NESC) to satisfy a request from the Science Mission Directorate (SMD) Associate Administrator and the Planetary Science Division Chief to obtain an independent review of the Glenn Extreme Environments Rig (GEER) and the operational controls in place for mitigating any hazard associated with its operation. This document contains the outcome of the NESC assessment.

Jankovsky, Robert S.↗

Explore Earth Science Datasets for STEM with the NASA GES DISC Online Visualization and Analysis Tool, Giovanni

The NASA Goddard Earth Sciences (GES) Data and Information Services Center(DISC) is one of twelve NASA Science Mission Directorate (SMD) Data Centers that provide Earth science data, information, and services to users around the world including research and application scientists, students, citizen scientists, etc. The GESDISC is the home (archive) of remote sensing datasets for NASA Precipitation and Hydrology, Atmospheric Composition and Dynamics, etc. To facilitate Earth science data access, the GES DISC has been developing user-friendly data services for users at different levels in different countries. Among them, the Geospatial Interactive Online Visualization ANd aNalysis Infrastructure (Giovanni, http:giovanni.gsfc.nasa.gov) allows users to explore satellite-based datasets using sophisticated analyses and visualization without downloading data and software, which is particularly suitable for novices (such as students) to use NASA datasets in STEM (science, technology, engineering and mathematics) activities. In this presentation, we will briefly introduce Giovanni along with examples for STEM activities.

precipitation↗

SMD Technology Highlights

Three technology highlights from the Science Mission Directorate (SMD) Astrophysics Division, Biological and Physical Sciences Division, and Planetary Science Division are featured: a) A new class of X-ray detector with unprecedented energy resolution and array size could help transform our understanding of the cosmos through unparalleled vision into the otherwise invisible universe. b) An autonomous microfluidic culturing system with CubeSat heritage is teaming up with two state-of-the-art radiation detectors to measure how biology responds to the radiation and reduced gravity environment on the lunar surface. c) Several core technologies developed via the Hot Operating Temperature Technology (HOTTech) Program were recently tested in the Glenn Extreme Environment Rig (GEER), which simulates the conditions on the surface of Venus.

yeast↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Governing Data Findability, Accessibility, Interoperability and Reusability (FAIR) Compliance

The most recent data strategy documents at both the federal and NASA levels stipulate that systems should strive for the data they manage to be Findable, Accessible, Interoperable, and Reusable (FAIR). The NASA Life Sciences Portal (NLSP) has already begun leading efforts in this area for HRP, initiating efforts to comply with the FAIR principles. The broad interpretation of the FAIR principles has led to a plethora of tools that use a splay of metrics specifically but variably developed to judge how compliant data and systems are with the principles. A recent review [3] identified and studied 1,180 metrics across 20 publicly available tools for checking FAIR compliance of data and systems. Because of their very recent development, many organizations and data systems managers and developers have not yet had adequate time or resources to understand these FAIR compliance tools and metrics, their variations in design, accuracy or ease of application to their specific data sets and systems. Thus, it would be best for larger organizations like NASA to approach formulating a strategy for governance of FAIR compliance that can be flexibly applied and is adaptable to an evolving awareness knowledge of FAIR compliance methods and tools. In September 2024, the NASA Science Mission Directorate(SMD) organized a workshop on NASA science data repositories, including the topics of implementing FAIR and governing FAIR compliance across SMD. The initial part of these FAIR discussions focused on developing consensus around required science metadata fields. This is challenging given the diverse nature of NASA’s scientific data portfolio, the variety of metadata models and vocabularies used, and variable level of resources available to curate these data. Later discussion focused on three possible approaches to governing FAIR compliance: distributed, in which various programs, projects or systems define their own methods for assessing FAIR compliance, reporting results up appropriate management lines; centralized, in which higher-level organization(s) specify compliance tools or methods for the various data systems; and multi-level, in which a group comprised of individuals with expertise from multiple levels with organizations is formed to provide guidance and/or specifications for governing FAIR compliance. We report on the recommendations this session yielded, and how these might be shaped specifically to help implement and govern the compliance with FAIR of Human Research Program data and systems.

governance↗

A Dedicated Relay Network to Enable the Future of Mars Exploration

A highly successful international collaboration, the “Mars Relay Network” (MRN) leverages the combined NASA and ESA orbiter capabilities to transfer data to and from Mars surface missions. The MRN has admirably flight-demonstrated the benefits of a relay network and validated how international protocol standards may be used to ensure interoperability. However, principally designed for science missions, these orbiters addressed relay requirements as a secondary function, which introduced limitations to what can be achieved with the network. Next-decade missions are expected to have significantly greater communication needs than can be accommodated by the aging MRN. This paper reports the results of a broad study that evaluated the potential of a next-generation relay network, referencing the current MRN as a benchmark. A wide variety of orbital altitudes, surface latitudes, and mission scenarios were evaluated around a specific set of assumptions regarding the telecommunications payloads included. The study outlined how current day technologies could be applied to greatly enhance the data throughput to and from Mars on behalf of future science and reconnaissance missions. The instantiation of such a network would be enabling for a variety of missions and mission classes that have been heretofore unachievable, including both large and small orbiters, and landed vehicles representing new mission types (i.e. climbers, diggers, drones, etc.), and further argues that such a network would be instrumental in advancing human exploration interests at Mars.

Davis, Richard M.↗

MEASURE-Jupiter: Low Cost Missions to Explore Jupiter in the Post-Galileo Era

MEASURE-Jupiter is a mission concept for the first wave of new missions to explore the giant planets in the post-Galileo era. This paper addresses the feasibility of low-cost, focused science missions to explore Jupiter based on the science information returned by the Galileo mission.

post-Galileo Jupiter Io Skimmer Jupiter Auroral Ob↗

Entry Systems Modeling and Ground Testing: Enabling Flight Performance and Risk Reduction

Entry, Descent, and Landing (EDL) comprise a relatively small portion of a mission’s timeline, however, it is typically among the largest risks. Flying through a body’s atmosphere reliably and accurately – from orbit to ground or via aerocapture – is a critical step toward successful in situ exploration. This exhibit will highlight EDL simulation and ground test capabilities, both existing and under development, that could support mission design, risk reduction, and post-flight analysis for Planetary Science mission concepts displayed in the 2023 SMD Planetary Science Technology Showcase.

Entry Systems↗

Scheduling Position, Navigation and Time Service Requests from Non-dedicated Lunar Constellations

This paper presents a centralized scheduler that satisfies user requests for Position, Navigation, and Time (PNT) services from an ad-hoc, non-dedicated orbital constellation around the Moon. Traditional, dedicated GNSS networks provide service 24/7, which allows users to acquire localization services at-will. For ad-hoc networks, a coordinated schedule is needed to ensure Quality of Service (QoS) guarantees for user localization, while satisfying non-dedicated assets’ usage constraints. This scheduler bridges this coordination gap by leveraging Mixed Integer-Linear Programming (MILP) to schedule this “as-needed” localization service while respecting the constraints on each asset. In upcoming decades there is expected to be a substantial increase in Lunar missions. Many of these missions will feature low-cost surface assets near the moon’s polar regions and small-sat science missions in orbit. Most missions need PNT capabilities to ensure safe operations and meet their science objectives, but low-cost missions may not be able to support the large power, mass, and weight that a weak GNSS or DSN based navigation solution would entail. Asset localization has been demonstrated using a decentralized extended Kalman Filter (DEKF) in the previously presented Lunar Autonomous PNT System (LAPS). Within the LAPS simulation environment, a module has been developed to generate the coordinated user-asset schedules described above; this Service Scheduler Module (SSM) allows for complete end-to-end testing of the entire system. Within SSM, a user service request consists of a location on the Lunar surface, a cumulative service duration, and a window in which service must occur. SSM takes as input these requests and the LAPS-predicted positional degree of precision as the QoS for each available set of orbital assets. A simple, baseline MILP model is formulated to provide the highest-precision service balanced across all requests. To reflect the non-dedicated nature of the constellation, this baseline model is augmented with additional asset-specific load capacity constraints or availability constraints. The load capacity constraints limit total time spent providing service, and the availability constraints reflect blockout times or availability windows when the assets are not otherwise occupied. SSM outputs two schedules: the user schedule to indicate their service times and expected QoS, and a satellite schedule to be transmitted to the orbiting constellation, describing when each non-dedicated asset provides PNT service. SSM is predominantly implemented in MATLAB and allows the use of any MILP solver to generate the resulting schedules. This paper describes the SSM - LAPS interface, how the output of LAPS is used to construct the MILP, and how SSM provides user localization service while satisfying constraints. It will also demonstrate the tool’s flexibility for formulating schedules for the end user and the constellation, focusing on scenarios that match real-world proposed missions. It will detail how SSM can be used to compare the addition of load capacity constraints, satellite availability constraints, and QoS guarantees for the users. Finally, we describe how SSM can be used to support the design of the ad-hoc constellation itself. The resulting integrated capability will support the design of future ad-hoc Lunar PNT networks, enabling high-quality, low-cost Lunar exploration

Swarm↗

Long-duration Venus lander for seismic and atmospheric science

An exciting and novel science mission concept called Seismic and Atmospheric Exploration of Venus (SAEVe) has been developed which uses high-temperature electronics to enable a three-order magnitude increase in expected surface life (120 Earth days) over what has been achieved to date. This enables study of long-term, variable phenomena such as the seismicity of Venus and near surface weather, near surface energy balance and atmospheric chemical composition. SAEVe also serves as a critical pathfinder for more sophisticated landers in the future. For example, first order seismic measurements by SAEVe will allow future missions to deliver better seismometers and systems to support the yet unknown frequency and magnitude of Venus events. SAEVe is focused on science that can be realized with low data volume instruments and will most benefit for temporal operations. The entire mission architecture and operations maximize science while minimizing energy usage and physical size and mass. The entire SAEVe system including its protective entry system is estimated to be around 45 kg and approximately 0.6 m diameter. These features allow SAEVe to be relatively cost effective and be easily integrated onto a Venus orbiter mission. The technologies needed to implement SAEVe are currently in development by several funded activities. Component and system level work is ongoing under NASA’s HOTTech program and by the Long Lived Insitu Solar System Explorer (LLISSE) project. The SAEVe long duration Venus lander promises groundbreaking science and is an ideal complimentary element to many future Venus orbiter missions being proposed or planned today.

Venus↗

An Automated Approach for Acquiring Onboard Rover Science

Rover traverse distances are increasing at a faster rate than downlink capacity is increasing. As this trend continues, the quantity of data that can be returned to Earth per meter traversed is reduced. The capacity of the rover to collect data, however, remains high. This circumstance leads to an opportunity to increase mission science return by carefully selecting the data with the highest science interest for downlink. We have developed an onboard science analysis technology for increasing science return from missions. Our technology evaluates the geologic data gathered by the rover. This analysis is used to prioritize the data for transmission, so that the data with the highest science value is transmitted to Earth. In addition, the onboard analysis results are used to identify additional science gathering opportunities. A planning and scheduling component of the system enables the rover to take advantage of the identified science opportunity.

Anderson, R. C.↗

Performance and Environmental Test Results of the High Voltage Hall Accelerator Engineering Development Unit

NASA Science Mission Directorate's In-Space Propulsion Technology Program is sponsoring the development of a 3.5 kW-class engineering development unit Hall thruster for implementation in NASA science and exploration missions. NASA Glenn and Aerojet are developing a high fidelity high voltage Hall accelerator that can achieve specific impulse magnitudes greater than 2,700 seconds and xenon throughput capability in excess of 300 kilograms. Performance, plume mappings, thermal characterization, and vibration tests of the high voltage Hall accelerator engineering development unit have been performed. Performance test results indicated that at 3.9 kW the thruster achieved a total thrust efficiency and specific impulse of 58%, and 2,700 sec, respectively. Thermal characterization tests indicated that the thruster component temperatures were within the prescribed material maximum operating temperature limits during full power thruster operation. Finally, thruster vibration tests indicated that the thruster survived the 3-axes qualification full-level random vibration test series. Pre and post-vibration test performance mappings indicated almost identical thruster performance. Finally, an update on the development progress of a power processing unit and a xenon feed system is provided.

Kamhawi, Hani↗

Trajectory design for the Deep Space Program Science Experiment (DSPSE) mission

In 1994, the Deep Space Program Science Experiment (DSPSE) spacecraft will become the first spacecraft to perform, in succession, both a lunar orbiting mission and a deep-space asteroid encounter mission. The primary mission objective is to perform a long-duration flight-test of various new-technology lightweight components, such as sensors, in a deep-space environment. The mission has two secondary science objectives: to provide high-resolution imaging of the entire lunar surface for mapping purposes and flyby imaging of the asteroid 1620 Geographos. The DSPSE mission is sponsored by the Strategic Defense Initiative Organization (SDIO). As prime contractor, the Naval Research Laboratory (NRL) is building the spacecraft and will conduct mission operations. The Goddard Space Flight Center's (GSFC) Flight Dynamics Division is supporting NRL in the areas of The Deep Space Network (DSN) will provide tracking support. The DSPSE mission will begin with a launch from the Western Test Range in late January 1994. Following a minimum 1.5-day stay in a low-Earth parking orbit, a solid kick motor burn will boost DSPSE into an 18-day, 2.5-revolution phasing orbit transfer trajectory to the Moon. Two burns to insert DSPSE into a lunar polar orbit suitable for the mapping mission will be followed by mapping orbit maintenance and adjustment operations over a period of 2 sidereal months. In May 1994, a lunar orbit departure maneuver, in conjunction with a lunar swingby 26 days later, will propel DSPSE onto a heliocentric transfer that will intercept Geographos on September 1, 1994. This paper presents the characteristics, deterministic delta-Vs, and design details of each trajectory phase of this unique mission, together with the requirements, constraints, and design considerations to which each phase is subject. Numerous trajectory plots and tables of significant trajectory events are included. Following a discussion of the results of a preliminary launch window analysis, a summary of the deterministic impulsive delta-V budget required to establish the baseline mission trajectory design is presented.

Carrington, D.↗