Search NASA⌕ Search

SEARCH · Search NASA

Results for “optimisation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Cigeo, The French Geological Disposal Facility Project: Preliminary Design (APS) Phase - 16038

The Cigeo project has been in the works for 25 years. Numerous studies have been conducted, increasingly associated with the Meuse/Haute-Marne site, with further specific research thanks to direct access to the Callovo-Oxfordian clay formation from the underground laboratory of Bure-Saudron. These studies and research initially aimed to demonstrate the feasibility of the repository. They also helped gain a high level of understanding of phenomena to support design studies and demonstrate safety. Transition to the industrial phase began with the development of a plan for delivering waste to the facility for disposal. The plan introduced sequencing for the various types of waste to be disposed of, and was optimised to determine the size of inspection, transfer and handling facilities. In describing the life of the repository and therefore the vision for its operation, it has become obvious that our generation should not impose choices on future generations. We must provide them with reference technical solutions, with the financial resources to implement them. It is also our duty to begin the construction and initial operating phases. However, because the facility will operate over several generations, we must leave a degree of flexibility so that they may reassess the options that we define and adopt their own solutions, as necessary. They will also benefit from operational experience gathered as facility operations develop. This is the context in which the preliminary design phase is being finalised in preparation for the detailed design phase, with the aim of gradual commissioning during the latter part of the next decade. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practice on Facility Characterisation from a Material and Waste End- State Perspective - 16041

Radiological characterisation plays a significant role in the process of decommissioning of shut-down nuclear facilities in order to ensure the protection of the environment and radiation safety. At all stages of a decommissioning programme or project, adequate radiological characterisation is of crucial importance, not least from a material and waste perspective. The radiological characterisation is a key element for planning, controlling and optimising decommissioning and dismantling activities. Experience has shown that data and information from the operation of a facility can - supplemented by recently collected and analysed data and information - be of crucial importance for decisions on waste management and for characterisation of radioactive waste. Once the dismantling has been done, some information may be hard, costly or even impossible to obtain later in the waste management process. This was the reason why the Working Party on Decommissioning and Dismantling (WPDD) of the OECD Nuclear Energy Agency (NEA) decided in late 2013 to extend the mandate of the Task Group on Radiological Characterisation and Decommissioning (TGRCD) for a second phase focusing on nuclear facility characterisation from a waste and material end-state perspective whereas the first phase focused on overall strategies of radiological characterisation. This paper gives an overview of the activities and findings within both phases up to now. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life Extension of Nuclear Plant Facilities through Monitoring and Detailed Analysis - 16175

The UK has accumulated a substantial legacy of radioactive waste from various civil nuclear and defence programmes. Presently, however most of the UK radioactive waste is generated from nine power stations which generate approximately one sixth of the of the country's electricity. Irradiated fuel is removed from these reactors and safe management of the radioactive solid and liquid effluents is required. The safe management of these effluents is essential. Sellafield, in West Cumbria UK, contains two reprocessing plants, one designed to process nuclear fuel from Magnox reactors (CO{sub 2} cooled with Uranium bar fuel) and the other to process nuclear fuel from Advanced Gas cooled Reactors and Pressurized Water Reactors. The reprocessing stage enables extraction of fissile material for recycling. This leaves a volume of dilute but high-level waste. The high-level radioactive liquid waste is concentrated to reduce its volume and then incorporated into borosilicate glass, using a process called vitrification. The glass is then poured into stainless steel containers and placed in long term storage. This required concentration of HLW liquor is achieved using a suite of aging evaporators. All evaporators are of similar design constructed from corrosion resistant stainless steel having dimensions height ∼11 m, internal diameter 3.05 m and capable of holding 13.7 m{sup 3} of liquor. The basic principle of operation is to heat the dilute liquor under partial vacuum, at constant volume, until the target concentration is achieved. Heating of the liquor is achieved using steam heated coils within the evaporator, and steam in the jacket which surrounds the lower half of the evaporator vessel. The evaporator is then brought to atmospheric pressure and the concentrated liquor is ejected whilst hot. The evaporator is then cooled with water cooled coils and a water filled jacket. New dilute liquor is then added for a new batch. The process is then repeated. As the evaporators reach the end of their original design life accurate prediction of the current condition of nuclear plant facilities is essential to safely justify continued plant operation by ensuring structural integrity. This poses a significant challenge as many aging UK nuclear facilities were not inherently built with inspection in mind. The potential life limiting components of the HA evaporators at Sellafield are the surfaces that contact the product liquor at elevated temperatures i.e. the steam heated surfaces of the coils within the evaporator vessel and the vessel base and wall surrounded by the steam jacket. Each heating component is critical to the operational life of the evaporator - the removal from service of a coil heating component significantly reduces the operational flexibility and remnant life of this plant. Over the last decade a variety of cutting-edge expertise and methodologies have been utilised to accurately measure and then predict the current condition of the plant and also to predict its remnant life. This paper provides an overview of the development of several techniques deployed, namely non-destructive testing/inspection, in-house software development and finite element modelling. These methods have been validated by lab-scale or full-scale experiments along with historical plant data. These techniques have been evolved and refined for over a decade, providing vital insights into the physical behaviour of this complex reprocessing system. This enables not only accurate assessment of the current condition of the plant equipment but also allows scientifically underpinned predictions to be made of how it will behave into the future. This is critical for Sellafield as this knowledge feeds into their safety case to the Office of Nuclear Regulation to justify continued operation. It is concluded that this integrated approach provides a robust analysis tool which has driven change and optimisation of plant procedures ensuring continued safe operation whilst extending the life of the facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Working in partnership with the UK nuclear industry to package waste - 16263

Radioactive Waste Management (RWM) is a wholly owned subsidiary of the Nuclear Decommissioning Authority (NDA), which is responsible for managing the effective clean-up of the UK's nuclear legacy. RWM is responsible for delivering a geological disposal facility and providing radioactive waste management solutions. To this end, RWM provides advice to waste owners to help them retrieve, condition and package waste now in ways that make them suitable for disposal later. To facilitate planning decisions and hazard reduction, RWM operates the Disposability Assessment process. This is used to provide advice to waste producing organisations on approaches to waste packaging and interim storage of packaged wastes. This advice is intended to ensure compatibility with future geological disposal requirements, as far as this is possible in advance of the availability of Waste Acceptance Criteria for a Geological Disposal Facility (GDF). As such, it is an enabler for early hazard reduction on UK nuclear sites through the facilitation of packaging. This paper explains how RWM is working with waste owners through the Disposability Assessment process to deliver optimised waste packaging solutions through proactive and early engagement. This includes specific examples of how the process has been used in a flexible way to contribute to accelerated and sustainable hazard reduction at UK sites using a partnership approach. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Magnox Clean-Up Programme - Integrating and Making Best Use of the Supply Chain - 16603

In 2010, the UK Nuclear Decommissioning Authority (NDA) secured a funding settlement of British Pounds 2.5 Bn from the Government for the period to 2015 for the Magnox Care and Maintenance programme. This settlement was a reflection of the importance placed on discharging the decommissioning liability associated with the UK's first generation Magnox reactors. It also reflected the NDA's confidence in the Magnox Optimised Decommissioning Plan (MODP), which aimed to accelerate entry into Care and Maintenance and reduce the Magnox decommissioning liability by British Pounds 1.2 Bn. Despite the settlement, huge challenges remained if the MODP was to be delivered within the funding envelope. Essentially, the supply chain had to be able to participate in the delivery of the MODP and make the investment in skills and techniques required to minimise the threats and uncertainties remaining in the Programme. The Magnox Commercial and Supply Chain Strategy was, therefore, an integral part of the MODP. At the highest level, the Strategy involved: - Classifying and segregating procurements by risk and value - Moving the contracting philosophy from risk transfer to risk management - Focusing on relationships and results rather than activities and processes By aligning the supply chain to the MODP, Magnox was able to better organise itself to deliver against the MODP, to act on feedback from suppliers and enable a culture of 'Lead and Learn' to take root. Using feedback and learning from other organisations and applying these to contract management approaches improved project outcomes. In particular, learning from previous experience of dealing with Programme 'unknowns' increased the company's ability to control and improve on the overall Programme cost and schedule. The impact of the MODP was to reduce the Magnox baseline by over British Pounds 1.5 Bn and remove 34 reactor-years from the Care and Maintenance preparations period. This huge gain resulted from a range of technical, process and commercial improvements across the organisation. Perhaps the greatest achievement of the MODP and its supply chain strategy was to quantify and stabilise the Magnox Life-cycle scope and cost and enable the successful competition and transfer of the Management and Operating (M and O) contract in 2014 and lay the foundations for further cost-savings to the UK taxpayer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solutions for Disposal of Intermediate Level Waste in the UK - 16693

GNS mbH is a competence centre owned by of the German utilities and tasked with the management of spent fuel and nuclear waste of all activity levels arising from operation and decommissioning of the commercial German nuclear power plants. Waste management products and methods developed by GNS over the past decades are at present the standard solutions for their respective tasks in Germany. While regulatory environments in the nuclear industry vary strongly from country to country thus limiting the one-to-one portability of such established solutions, GNS has managed to offer its services abroad, with continuously growing success. Challenges and first results of GNS' activities in the UK are the subject of this paper. Content: GNS in Germany and UK; Ion Exchange Resin at Sizewell-B; Drying of wet Intermediate Level Waste at Bradwell NPP; Lessons Learnt in the UK; New Technology Optimised for UK waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hot Isostatically Pressed Ceramic Waste forms for High Dose Spent Adsorbents - 18129

Decommissioning and clean-up of nuclear facilities requires the development of new technologies to condition radioactive wastes, producing passively safe waste packages of minimal volume, to reduce storage and disposal costs. We have applied hot isostatic pressing to demonstrate conceptual waste forms for high dose spent adsorbents (i.e. ion exchange materials) present on the Sellafield site, UK, and Fukushima Daiichi site, Japan. These radioactive wastes pose several challenges which demand early conditioning to produce a passively safe wasteform, including: a wet and granular nature, and hence dispersible as a result of loss of containment; a very high dose rates as a result of their selectivity for short lived radionuclides (e.g. Sr-90, Cs-137, Co-60); radiogenic self-heating, as a result of the concentration of such lived radio nuclides; hydrogen production as a result of radiolysis of entrained water [1]. Here, we demonstrate the conversion of natural inorganic ion exchange materials into multiphase ceramic waste forms, achieving a waste loading of 100 wt.% and density in excess of 97% theoretical. High resolution thermogravimetric analysis coupled with mass spectroscopy was utilised to characterise the evolution of water and volatiles during the in-can bake out step, prior to the HIP cycle. This allowed optimisation of the bake out parameters (temperature, time and vacuum) to enable complete removal of water and volatiles, affording ceramic bodies with minimal residual porosity by hot isostatic pressing at 1250 deg. C for 4 h in stainless steel canisters. Characterisation of the ceramic waste forms by SEM /EDX and X-ray diffraction revealed the nuclides of concern to be incorporated within well-known natural mineral and synthetic phases, with Cs partitioning into the K-feldspar. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fit for Purpose Remote Technology Decommissioning Solutions - 18630

The Magnox Decommissioning Project is actively progressing clean-up and decommissioning of 12 reactor sites across England, Scotland and Wales. Funded and directed by the United Kingdom's Nuclear Decommissioning Authority (NDA) and managed by the Cavendish Fluor Partnership (CFP), the Magnox Decommissioning Project introduces a wide range of radiological and industrial hazards warranting deployment of remote technologies to safely de-inventory, decontaminate and decommission a vast array of nuclear facilities. The Magnox Decommissioning Project encompasses 22 former Magnox nuclear power production reactors across 10 reactor sites and five research/test reactors at two former research sites. Decommissioning activities have been underway at some sites for nearly 20 years with early focus on retrieving and stabilising wastes and draining and stabilising spent fuel ponds. The Magnox decommissioning strategy invokes a programme perspective to drive consistency in tackling similar decommissioning and waste challenges across multiple sites. Programme central teams have worked with technology suppliers to foster learning from industry experience to develop and deploy tooling and robotics. The programme approach has also facilitated learning from one site to the next. In many cases, this central programme approach has promoted an evolution of technologies resulting in optimisation of simple remote tooling. In other instances, collaboration with suppliers is producing state-of-the-art technologies to tackle more unique challenges including, most recently, early demonstration of laser cutting for reactor vessel dismantling. This paper will outline the programme management approach and the scalable optioneering process Magnox employs to select the engineered controls and technologies used in decommissioning and waste management activities. It will provide an overview of the broad range of remote tooling and robotics deployed across the 12 Magnox sites by exploring some specific examples. Lastly, the paper will summarise key lessons learned in the now extensive history of selecting and using remote technologies to decommission Magnox nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Hot Lab Concept for Advanced D and D Application - 19175

Hot Labs are used in the nuclear industry for various purposes: maintenance of nuclear reactor, sampling and testing of fuel, inspection activities and decommissioning. Despite their vast use, their current designs and operations do not meet entirely today's needs and requirements of the operations nor tomorrow's. This paper will give an overview of the research and investigations performed around Hot Cells design and concept in order to integrate new operability modes and functions. The overall idea is to bring modularity, flexibility and adaptability to the Hot Lab nuclear industry. Taking the key principles of Model Based System Engineering, an interoperable data model, the most advanced digital technologies (Building Information Modelling - BIM, Virtual Reality / Augmented Reality, Artificial Intelligence), and looking at all the life-cycle of such a facility, a concept design of a new type of Hot Lab has been developed. Four mains aspects are implemented during this study: Implement the principles of the Industry 4.0; use modular and flexible solutions; explore the concept of in service maintenance and predictive maintenance; optimise the decommissioning and dismantling process by taking into account the entire life-cycle of the facility. The design was developed as a case study taking several assumptions to adapt to any project. The design developed demonstrates that modularity and flexibility can be brought in without compromising the core safety functions of such a facility. This Hot Lab concept brings the current Hot Lab to the next level as the design has been adapted to meet the current operational needs, implement novel ideas and consider its entire life-cycle. This paper will demonstrate how decommissioning and dismantling operations can become more efficient and safer with such a concept. In addition, the Model Based System Engineering approach used from the beginning of the design phase allows to have an optimum architecture during its entire lifetime. It also allowed to flag new topics to be further developed for the benefit of the nuclear industry as a whole. A first example would be the development of the Control System using digital tools and artificial intelligence to run remotely controlled equipment inside the Hot Lab. Assystem is an international engineering group. As a key participant in the nuclear industry for over 50 years, the Group supports its clients in managing their capital expenditure throughout their asset life-cycles. Assystem can offer support in project management, design, digital engineering, industrial control systems, security and safety and industrial digitalisation. Assystem's Imagine program is an internal program intending to serve as an incubator for the development of innovations. The Innovative Hot Lab project integrates one of the four innovation projects Assystem choose to develop and invest in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of Rapid Assay Systems for Real-time Sorting of Excavation Spoil on Contaminated Land - 19258

To optimise segregation at source, and hence minimise waste production, NUVIA have developed and utilised the Gamma Excavation Monitor (GEM) system. The GEM was designed for land remediation projects, to provide a rapid screening tool for excavator buckets of material. Following successful deployment in the UK, including the Olympic Park site in London, and two major Magnox land remediation projects, the first GEM unit was deployed to Canadian Nuclear Laboratories' (CNL) Chalk River Laboratory (CRL) in 2016. The GEM unit was fitted with a plastic scintillator detector; recent developments have included the utilisation of a sodium iodide. The system is initiated by the presence of an excavator bucket above the detector which triggers proximity switches that automatically start the counting routine. At the end of a short count time, typically 10 seconds, the materials category is indicated by means of a traffic light system, based on either the gross gamma activity or a photo-peak. Using this instrument, material determined not to be radioactive can be re-used on-site. In addition to the traffic light system, results are also transmitted wirelessly to a tablet device. These combined features allow operation of the system without the need to have operatives near the mechanical excavator bucket; therefore, eliminating a significant industrial hazard. Deployments of the GEM on the CRL site have included Storm Water Management project, within the CRL controlled area, and the Foundation Road Landfill Project. The use of the GEM in these projects enabled in-situ decisions to be made regarding the segregation and sentencing of soil rather than having to wait for the analysis of samples; saving time and cost to the project. The Building 492 project involved the excavation of soil within a supervised area to prepare for the installation of modular trailer units. For this specific job, the GEM was calibrated to ensure soil met clearance criteria as stipulated in the Nuclear Substances and Radiation Devices Regulations (Canadian Nuclear Safety Commission; SOR/2000-207). A total of 326 loads of soil were monitored during this project and re-assurance sampling conducted by CNL corroborated the results produced by the GEM system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study into the Benefits of Using Discrete Event Simulation in TRU and Mixed Low-Level Waste (MLLW) Disposal at Advanced Mixed Waste Treatment Plant (AMWTP) - 19536

As part of the 1995 Settlement agreement reached between the Idaho State Government and the Idaho National laboratory, it was agreed that the approximately 65,000 cubic metres of waste stored at the AMWTP site was to be shipped out of the state to the waste isolation pilot plant (WIPP) in New Mexico or a similar disposal facility by the end of December 2018. In June 2016, the operation of AMWTP was taken over by Fluor Idaho, a subsidiary of Fluor Inc. To improve their capability of processing all of the varied waste contained on the extensive site, Fluor Idaho requested the assistance of DBD Ltd. We were tasked with producing an all-encompassing operational research (OR) model/discrete event simulation (DES) model of the site, which is able to produce live end-date predictions based on current inventory and waste tracking against milestones. The DES model, is capable of predicting years worth of plant operation in a matter of minutes including the variation caused by such complexities as resource/staff availability, equipment breakdown and maintenance, prioritisation of different waste types, and varying shift patterns of both staff and facilities. The DES model can be run from its own bespoke dashboard, that can be customised to suit the audience it is being used to inform, producing clear key performance indicator (KPI) graphics and high-level overviews for senior management, down to drum by drum breakdowns of the predicted feed plans for each individual facility on the AMWTP site for a work planner to analyse and compare to the current operations. Simulation can produce these types of outputs for very low cost and low risk, as it avoids experimentation to find potential alternatives to the status-quo that could result in loss of production or time. These methods can also be used to produce cost benefit analyses for suggested processing options feeding into optioneering studies and cost reduction strategies. As a tool for plant optimisation and tracking, discrete event simulation can provide detailed results quickly and reliably. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: Theme 2 - Site Decommissioning, Deconstruction and Remediation - 20329

This paper will discuss the aims, objectives and progress to-date under Theme 2 of the TRANSCEND consortium project: Site decommissioning, deconstruction and remediation. Decommissioning nuclear sites involves waste retrieval, decontamination, deconstruction and, where necessary, containment and/or remediation of the remaining structure and surrounding land. Critical to management of these processes is limiting radiation exposure for the workforce, restricting the spread of radionuclides in groundwater, surface water and airborne particulates, and minimising the volume of contaminated waste for disposal. The aim of Theme 2 research is to develop new technologies for monitoring, remediation and containment that serve to minimise the volume of radioactively contaminated waste for disposal, for application prior to, during and after retrieval, deconstruction and decontamination operations. Prior research, conducted under the previous DISTINCTIVE project, demonstrated that colloidal silica grout can penetrate low permeability materials (including cement) for hydraulic barrier formation, and improved sorption capacity. The silica grout can be injected at surface using extremely small (potentially gravity-driven) fluid pressures, without the need for borehole drilling. Current work is investigating the erodibility of silica-grouted soils for inhibition of airborne and water-borne particulates as well as enhancing the grout's sorption capacity by addition of other materials to provide a chemical, as well as hydraulic, barrier to subsurface migration. EK remediation uses low voltage DC current to control migration of contaminants in porous media as well as to remove or degrade them. Researchers in the consortium have already demonstrated that low-energy ex-situ EK techniques can be used to provide remediation and volume minimisation for AWE legacy wastes in the UK. Under the current project researchers are building EK test cells containing simulated site materials at laboratory and intermediate(m)-scales to: remove, focus or degrade contaminants (remediation or waste minimisation); and direct subsurface water, chemical and colloid flow (fencing/containment or forced migration). This lab-based research is being informed by numerical models of EK processes that can subsequently be used to design full-scale on-site applications by nuclear site holders. Research under theme 2 of TRANSCEND will ultimately combine novel non-invasive detection technologies with EK techniques and colloidal silica grout barriers, to optimise the containment of radionuclide contamination in soils. Thus, allowing us to detect in-situ contamination, mobilise it to a selected location and grout it in-situ, prior to the initiation of decommissioning and deconstruction operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drying Wet Stored and Corroded Magnox Fuel for Interim Dry Storage - 20187

To investigate the feasibility of drying corroded Magnesium alloy clad nuclear fuel, the corrosion products of inactive and unirradiated Magnox simulant dry corrosion product and dried corroded Magnox sludge were characterised by X-ray diffraction and thermogravimetric analysis. XRD identified brucite in the dried corrosion product and both brucite and hydromagnesite in the sludge. TGA identified mass loss on dehydration of ∼9.1% up to 250 deg. C and 27.9% from dehydroxylation up to 440 deg. C, with total mass loss of 41.9% up to 800 deg. C for the dried corrosion product. The sludge TGA showed 8.3% mass loss up to 250 deg. C from dehydration, 7.5% up to 330 deg. C from dehydroxylation and 31.4% mass loss up to 47.2% for decarbonation, with total mass loss of 49.2% up to 800 deg. C. Water removal up to 1.8 g was performed by cold vacuum drying (40 deg. C-120 deg. C) on a ≅14.8 g (wet) corroded Magnox sample. The process was monitored by observing pressure, dew point, temperature and gas flow changes supported by measuring the sample mass loss as water is removed. From these tests, it was observed that the dried corroded Magnox displayed some hygroscopic capacity which has implications for water retention following vacuum drying and the length of exposure required to achieve the desired dryness. Whilst at higher temperatures the water was removed faster, the increased temperature also risks the fuel cladding undergoing unwanted chemical reactions with the residual water during the process. However, at lower temperatures the achievable levels of dryness were reduced. Therefore, from these observations this work has identified that there is a temperature balance that may be necessary to optimise the drying process with respect to allowing the greatest level of dryness whilst restricting unwanted chemical reactions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On Temperature Limits for the Outer Surface of a Container in a Disposal Facility - 20313

The temperature in a disposal facility for high-level radioactive waste (HLRW) is an issue for safety. When the recommencement of the search for and selection of a site for a disposal facility for HLRW in Germany was stipulated by the Site Selection Act (StandAG 2017) in 2017, a precautionary temperature limit of 100 deg. C on the outer surface of the containers with high-level radioactive waste in the disposal facility section was set. This precautionary temperature limit shall be applied in preliminary safety analyses provided that the 'maximum physically possible temperatures' in the respective host rocks have not yet been determined due to pending research. Therefore, this issue is addressed and discussed in this paper, contributing to 'pending research' by a review of the literature. This paper briefly discusses a few examples of thermohydraulic, mechanical, chemical and biological processes in a disposal facility, because temperature limits are derived based on safety impacts regarding THMCB-processes. The temperature-dependent processes have been extracted from databases for features, events and processes (FEP-databases). Furthermore, it is discussed if the feasibility to retrieve and recover HLRW is hampered at high temperatures. A design temperature concerning single components of a disposal facility for the preservation of their features can be derived when a safety concept is established. However, the interactions of all relevant processes in a disposal concept must be considered to determine a specific temperature limit for the outer surface of the containers. Therefore, applicable temperature limits may vary for particular safety and disposal concepts in the following host rocks: rock salt, clay stone and crystalline rock. Technical solutions for retrieval and design options for recovery seem to be viable up to temperatures of 200 deg. C with different, sometimes severe, downsides according to expert judgement. Temperature limits regarding the outer surface of the containers can be derived specifically for each safety concept and design of the disposal facility in a host rock. General temperature limits without reference to specific safety concepts or the particular design of the disposal facility may narrow down the possibilities for optimisation of the disposal facility and could adversely affect the site selection process in finding the best suitable site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of the OECD/NEA PWR MOX/UO{sub 2} core transient benchmark using a coupled whole core pin-by-pin route in WIMS

This paper investigates the new CAMELOT coupling route developed in WIMS, which uses prepared tabulated cross-sections combined with the flux solver MERLIN module and the integrated sub-channel thermal hydraulics solver ARTHUR module to solve for the coupled core state. This coupling route is applied to the OECD/NEA pressurized water reactor (PWR) core transient benchmark exercise, involving 3-D neutronics and thermal-hydraulics analysis of a full-sized PWR core featuring MOX fuel at various core states, as well as simulating a control rod ejection transient. Analysis of the results for each part of the benchmark demonstrate that the high-resolution pin-by-pin analysis used in WIMS closely matches the other participants in the benchmark, with differences of between 20-200 pcm for k-effective, 1-2.5% RMS difference for assembly-averaged powers, 2-8% difference in rod worth calculations, < 200 ppm for calculations of critical boron concentration, zero difference in delayed neutron fraction calculation and a very close match for power response to the rod ejection transient. This is the first application of the WIMS-CAMELOT approach for the transient analysis of a full-sized reactor and as such further improvements such as reducing computational cost through parallelization, optimisation and memory reduction, are currently in active development. This paper demonstrates the accuracy and flexibility of the CAMELOT coupling route, providing a straightforward and consistent user image that can be easily used for a variety of modelling problems involving coupled neutronics and thermal-hydraulics. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dark Energy Survey Year 6 Results: improved mitigation of spatially varying observational systematics with masking

As photometric surveys reach unprecedented statistical precision, systematic uncertainties increasingly dominate large-scale structure probes relying on galaxy number density. Defining the final survey footprint is critical, as it excludes regions affected by artefacts or suboptimal observing conditions. For galaxy clustering, spatially varying observational systematics, such as seeing, are a leading source of bias. Template maps of contaminants are used to derive spatially dependent corrections, but extreme values may fall outside the applicability range of mitigation methods, compromising correction reliability. The complexity and accuracy of systematics modelling depend on footprint conservativeness, with aggressive masking enabling simpler, robust mitigation. We present a unified approach to define the DES Year 6 joint footprint, integrating observational systematics templates and artefact indicators that degrade mitigation performance. This removes extreme values from an initial seed footprint, leading to the final joint footprint. By evaluating the DES Year 6 lens sample MagLim++ plus plus on this footprint, we enhance the Iterative Systematics Decontamination (ISD) method, detecting non-linear systematic contamination and improving correction accuracy. While the mask's impact on clustering is less significant than systematics decontamination, it remains non-negligible, comparable to statistical uncertainties in certain w(theta) scales and redshift bins. Supporting coherent analyses of galaxy clustering and cosmic shear, the final footprint spans 4031.04 deg2, setting the basis for DES Year 6 1x2pt, 2x2pt, and 3x2pt analyses. This work highlights how targeted masking strategies optimise the balance between statistical power and systematic control in Stage-III and -IV surveys.

Rodríguez-Monroy, M. [Madrid, IFT; IJCLab, Orsay]↗