Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, High-Level Use Cases for DMS

Many distribution management systems (DMS) projects have achieved limited success because the electric utility did not sufficiently plan for actual use of the DMS functions in the control room environment. As a result, end users were not clear on how to use the new application software in actual production environments with existing, well-established business processes. An important first step in the DMS implementation process is development and refinement of the “to be” business processes. Development of use cases for the required DMS application functions is a key activity that leads to the formulation of the “to be” requirements. It is also an important activity that is needed to develop specifications that are used to procure a new DMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Laurentian Bioenergy Project

Work performed under this contract involves development of forest management guidelines related to removal of forest harvest residues from forested sites and brushlands in Minnesota, assessments of biomass availability from forests and brushlands and logistics and equipment associated with handling woody biomass with emphasis on evaluation of a trailer-mounted bundling system. Also, work on hybrid poplar breeding, field testing and yield analysis is included. Evaluation of the production of aspen and red pine along with opportunities to procure woody biomass through thinning operations in red pine is described. Finally, an assessment of issues related to increasing biomass usage at the Laurentian Energy Authority generation facilities is discussed.

09 BIOMASS FUELS↗

Heritage Park Facilities PV Project

Project Objective: To procure a photovoltaic array (PV) system which will generate approximately 256kW of power to be used for the operations of the Aquatic Complex and the adjacent Senior Facility at the Heritage Park. This project complies with the EERE’s work and objectives by promoting the development and deployment of an energy system that will provide current and future generations with clean, efficient, affordable, and reliable energy.

14 SOLAR ENERGY↗

Elastic/Inelastic Measurement Project

The work scope involves the measurement of neutron scattering from natural sodium ( 23 Na) and two isotopes of iron, 56 Fe and 54 Fe. Angular distributions, i.e., differential cross sections, of the scattered neutrons will be measured for 5 to 10 incident neutron energies per year. The work of the first year concentrates on 23 Na, while the enriched iron samples are procured. Differential neutron scattering cross sections provide information to guide nuclear reaction model calculations in the low-­energy (few MeV) fast-­neutron region. This region lies just above the isolated resonance region, which in general is well studied; however, model calculations are difficult in this region because overlapping resonance structure is evident and direct nuclear reactions are becoming important. The standard optical model treatment exhibits good predictive ability for the wide-­region average cross sections but cannot treat the overlapping resonance features. In addition, models that do predict the direct reaction component must be guided by measurements to describe correctly the strength of the direct component, e.g., β 2 must be known to describe the direct component of the scattering to the first excited state. Measurements of the elastic scattering differential cross sections guide the optical model calculations, while inelastic differential cross sections provide the crucial information for correctly describing the direct component. Activities occurring during the performance period are described.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

NEET Enhanced Micro Pocket Fission Detector for High Temperature Reactors - FY15 Status Report

A new project, that is a collaboration between the Idaho National Laboratory (INL), the Kansas State University (KSU), and the French Atomic Energy Agency, Commissariat à l'Énergie Atomique et aux Energies Alternatives, (CEA), has been initiated by the Nuclear Energy Enabling Technologies (NEET) Advanced Sensors and Instrumentation (ASI) program for developing and testing High Temperature Micro-Pocket Fission Detectors (HT MPFD), which are compact fission chambers capable of simultaneously measuring thermal neutron flux, fast neutron flux and temperature within a single package for temperatures up to 800 °C. The MPFD technology utilizes a small, multi-purpose, robust, in-core parallel plate fission chamber and thermocouple. As discussed within this report, the small size, variable sensitivity, and increased accuracy of the MPFD technology represent a revolutionary improvement over current methods used to support irradiations in US Material Test Reactors (MTRs). Previous research conducted through NEET ASI1-3 has shown that the MPFD technology could be made robust and was successfully tested in a reactor core. This new project will further the MPFD technology for higher temperature regimes and other reactor applications by developing a HT MPFD suitable for temperatures up to 800 °C. This report summarizes the research progress for year one of this three year project. Highlights from research accomplishments include: A joint collaboration was initiated between INL, KSU, and CEA. Note that CEA is participating at their own expense because of interest in this unique new sensor. An updated HT MPFD design was developed. New high temperature-compatible materials for HT MPFD construction were procured. Construction methods to support the new design were evaluated at INL. Laboratory evaluations of HT MPFD were initiated. Electrical contact and fissile material plating has been performed at KSU. Updated detector electronics are undergoing evaluations at KSU. A project meeting was held at KSU to discuss the roles and responsibilities between INL and KSU for development of the HT MPFDs. Provide input to various irradiation programs for installation of the MPFD technology in irradiation tests. As documented in this report, FY15 funding has allowed the project to meet year one planned accomplishments to develop a HT MPFD that offers US MTR users enhanced capabilities for real-time measurement of flux and temperature with a single detector. In addition, the accomplishments of this project have attracted funding from other Department of Energy Office of Nuclear Energy (DOE-NE) programs for additional applications. The work in those programs will build on current activities completed in this NEETASI HT MPFD project, but the MPFD will be specifically tailored to meet their program needs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design, Fabrication, and Shakeout Testing of ATALANTE Dissolver Off-Gas Sorbent-Based Capture System

A sorbent-based capture system designed for integration into the existing dissolver off-gas (DOG) treatment system at the ATelier Alpha et Laboratoires pour ANalyses, Transuraniens et Etudes de retraitement (ATALANTE) facility has been successfully designed and fabricated and has undergone shakeout testing. Discussions with personnel from the ATALANTE facility provided guidance that was used for the design. All components for this system were specified, procured, and received on site at Oak Ridge National Laboratory (ORNL). The system was then fabricated and tested at ORNL to verify operation. Shakeout testing resulted in a simplified system. This system should be easily installed into the existing facility and should be straightforward to operate during future experimental testing. All parts were selected to be compatible with ATALANTE power supplies, space requirements, and the existing DOG treatment system. Additionally, the system was demonstrated to meet all of four design requirements. These include (1) a dissolver off-gas flow rate of ≤100 L/h (1.67 L/min), (2) an external temperature of ≤50°C for all system components placed in the hot cell, (3) a sorbent bed temperature of ~150°C, and (4) a gas temperature of ~150°C upon entry into the sorbent bed. The system will be ready for shipment and installation in the existing DOG treatment system at ATALANTE in FY 2016.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Technical Report

ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was already in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive inhibitors from wood breakdown products, resulting in a non-viable process from an economic point of view. Later runs with the Chem Frac unit switched to a configuration that used dilute acid pretreatment followed by enzymatic hydrolysis. This change improved yield, increased sugar concentrations, and improved fermentability of sugars. The Hydrogenolysis unit met or exceeded all expectations with respect to unit capacity, technical performance, and economic performance. The US DOE funds for the project were provided through the American Recovery and Reinvestment Act of 2009. In addition to the scientific/technical merit of the project, this project benefited the public through the creation of approximately 75 onsite direct construction-related jobs, 25 direct on-going operations-related jobs, plus numerous indirect jobs, and thus was well aligned with the goals of the American Recovery and Reinvestment Act of 2009.

09 BIOMASS FUELS↗

Fabrication of ATALANTE Dissolver Off-Gas Sorbent-Based Capture System

A small sorbent-based capture system was designed that could be placed in the off-gas line from the fuel dissolver in the ATALANTE hot cells with minimal modifications to the ATALANTE dissolver off-gas system. Discussions with personnel from the ATALANTE facility provided guidance that was used for the design. All components for this system have been specified, procured, and received on site at Oak Ridge National Laboratory (ORNL), meeting the April 30, 2015, milestone for completing the fabrication of the ATALANTE dissolver off-gas capture system. This system will be tested at ORNL to verify operation and to ensure that all design requirements for ATALANTE are met. Modifications to the system will be made, as indicated by the testing, before the system is shipped to ATALANTE for installation in the hot cell facility.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Survey of U.S. Ancillary Services Markets

In addition to providing energy to end-consumers, power system operators are also responsible for ensuring system reliability. To this end, power markets maintain an array of ancillary services to ensure that it is always possible to balance the supply and demand for energy in real-time. A subset of these ancillary services are commonly procured through market-based mechanisms: namely, Regulation, Spinning, and Non-spinning Reserves. Regulation Reserves are maintained to respond to supply/demand imbalances over short time frames, typically on the order of several seconds to one minute. Resources that provide Regulation Reserves adjust their generation or load levels in response to automatic generation control (AGC) signals provided by the system operator. Contingency reserves are maintained to provide additional generation capacity in the event that load increases substantially or supply side resources reduce their output or are taken offline. The reserves are typically segmented into two categories, 1) Spinning or Synchronized Reserves that are provided by generation units that are actively generating and have the ability to increase or decrease their output, 2) Non-spinning or Non-synchronized Reserves that are provided by generation resources that are not actively generating, but are able to start up and provide generation within a specified timeframe. Contingency reserves typically have response times on the order of ten to 30 minutes and can also be provided by demand-side resources that are capable of reducing their load. There are seven distinct power markets in the United States, each operated by a Regional Transmission Operator (RTO) or Independent System Operator (ISO) that operates the transmission system in its territory, operates markets for energy and ancillary services, and maintains system reliability. Each power market offers its own set of ancillary services, and precise definitions, requirements, and market mechanisms differ between markets. Despite the differences between markets, both in terms of services offered and system requirements, some broad trends generally apply. Regulation Reserves typically have the highest market prices, followed by Spinning Reserves and Non-spinning Reserves. Prices for Regulation Reserves have been the highest in the PJM market, since it opened in October 2012. This is partially because PJM experienced large price spikes during the period of extreme weather conditions in early 2014. ERCOT has traditionally had the highest prices for Spinning Reserves (called Responsive Reserves in ERCOT), including several periods of sustained high prices between 2010 and 2012. This can be explained in part by the relatively high penetration of variable wind resources and a similarly high requirement relative to peak load. ERCOT has also traditionally had the highest price for Non-spinning Reserves, followed by the NYISO East region. Both have experienced several periods of prolonged high prices since their inception, an occurrence that has not been regularly seen in other markets. In ISO-NE and PJM for example, the market clearing price for Non-spinning Reserves is typically $0/MWh more than 95% of the time. Market volume (in terms of the average amount of capacity of each service that is provided to a system) typically follows the reverse order of prices, as systems maintain the most Non-spinning Reserves capacity followed by Spinning Reserves and Regulation Reserves. PJM generally has the largest market for Regulation Reserves both in terms of capacity. The size of most Regulation Reserves markets in terms of capacity stay relatively constant year-to-year, as this is dictated largely by system requirements. PJM also generally has the largest Spinning Reserves market in terms of capacity. SPP, MISO, ISO-NE and SPP (beginning in 2014) all have Spinning Reserve markets with similar average capacity levels. When combined, the markets for Non-spinning and Operating reserves in ISO-NE have a comparable capacity to the market for Primary Reserves 1 in PJM. SPP, MISO, and CAISO all have smaller markets for their respective Non-spinning Reserves products that are roughly the same size as each other in terms of capacity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.

54 ENVIRONMENTAL SCIENCES↗

Printed Spacecraft Separation System

In this project Planetary Systems Corporation proposed utilizing additive manufacturing (3D printing) to manufacture a titanium spacecraft separation system for commercial and US government customers to realize a 90% reduction in the cost and energy. These savings were demonstrated via “printing-in” many of the parts and sub-assemblies into one part, thus greatly reducing the labor associated with design, procurement, assembly and calibration of mechanisms. Planetary Systems Corporation redesigned several of the components of the separation system based on additive manufacturing principles including geometric flexibility and the ability to fabricate complex designs, ability to combine multiple parts of an assembly into a single component, and the ability to optimize design for specific mechanical property targets. Shock absorption was specifically targeted and requirements were established to attenuate damage to the Lightband system from shock of initiation. Planetary Systems Corporation redesigned components based on these requirements and sent the designs to Oak Ridge National Laboratory to be printed. ORNL printed the parts using the Arcam electron beam melting technology based on the desire for the parts to be fabricated from Ti-6Al-4V based on the weight and mechanical performance of the material. A second set of components was fabricated from stainless steel material on the Renishaw laser powder bed technology due to the improved geometric accuracy, surface finish, and wear resistance of the material. Planetary Systems Corporation evaluated these components and determined that 3D printing is potentially a viable method for achieving significant cost and savings metrics.

42 ENGINEERING↗

Multiple (Two) Met Bel 601 In Series Ultimate Vacuum Testing

SRNL Environmental and Chemical Process Technology (E&CPT) was requested to perform testing of vacuum pumps per a verbal request from the Customer, SRNL Hydrogen Processing Technology. Tritium Operations is currently having difficulties procuring the Normetex™® Model 15 m 3 /hr (9 CFM) vacuum pump (formerly Normetex Pompes, now Eumeca SARL ). One possible solution proposed by Hydrogen Processing Technology personnel is to use two Senior Aerospace Metal Bellows MB-601 vacuum pumps piped with the heads in series, and the pumps in series (Figure 1 below). This memorandum documents the ultimate vacuum testing that was performed to determine if this concept was a viable alternate vacuum pump strategy. This testing dovetails with previous pump evaluations documented in references 1 and 2.

42 ENGINEERING↗

Toughness testing and high-temperature oxidation evaluations of advanced alloys for core internals

Alloy X-750 was procured from Carpenter Technology and Bodycote in this year. An appropriate TMT was developed on Alloy 439 to obtain materials with refined grain size for property screening tests. Charpy V-notch impact tests were completed for the three ferritic steels Grade 92, Alloy 439, and 14YWT. Fracture toughness tests at elevated temperatures were completed for 14YWT. The tests will be completed for the other alloys in next fiscal year. Steam oxidation tests of the three ferritic steels, 316L, and Zr–2.5Nb have been completed. The steam tests of the Ni-based superalloys and the other austenitic stainless steels will be continued and finished in next fiscal year. Performance ranking in terms of steam oxidation resistance and impact/fracture toughness of the alloys will be deduced.

36 MATERIALS SCIENCE↗

Technical Proposal for Loading 3000 Gallon Crude Oil Samples from Field Terminal to Sandia Pressurized Tanker to Support US DOE/DOT Crude Oil Characterization Research Study

Sandia National Laboratories is seeking access to crude oil samples for a research project evaluating crude oil combustion properties in large-scale tests at Sandia National Laboratories in Albuquerque, NM. Samples must be collected from a source location and transported to Albuquerque in a tanker that complies with all applicable regulations for transportation of crude oil over public roadways. Moreover, the samples must not gain or lose any components, to include dissolved gases, from the point of loading through the time of combustion at the Sandia testing facility. In order to achieve this, Sandia designed and is currently procuring a custom tanker that utilizes water displacement in order to achieve these performance requirements. The water displacement procedure is modeled after the GPA 2174 standard “Obtaining Liquid Hydrocarbons Samples for Analysis by Gas Chromatography” (GPA 2014) that is used routinely by crude oil analytical laboratories for capturing and testing condensates and “live” crude oils, though it is practiced at the liter scale in most applications. The Sandia testing requires 3,000 gallons of crude. As such, the water displacement method will be upscaled and implemented in a custom tanker. This report describes the loading process for acquiring a ~3,000 gallon crude oil sample from commercial process piping containing single phase liquid crude oil at nominally 50-100 psig. This document contains a general description of the process (Section 2), detailed loading procedure (Section 3) and associated oil testing protocols (Section 4).

02 PETROLEUM↗

Gas Cylinder Safety, Course 9518

This course, Gas Cylinder Safety (#9518), presents an overview of the hazards and controls associated with handling, storing, using, and transporting gas cylinders. Standard components and markings of gas cylinders are also presented, as well as the process for the procurement, delivery, and return of gas cylinders at Los Alamos National Laboratory (LANL).

33 ADVANCED PROPULSION SYSTEMS↗

Hyperspectral Sensors Final Report CRADA No. TC02173.0

This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Science Applications International Corporation (SAIC), National Security Space Operations/SRBU, to develop long-wave infrared (LWIR) hyperspectral imaging (HSI) sensors for airborne and potentially ground and space, platforms. The overarching purpose of the CRADA project was to facilitate the transfer of the necessary technology from LLNL to SAIC thereby allowing the U.S. Government to procure LWIR HSI sensors from this company. The purpose of the initial activities involving BIG GREEN sensors was to meet the customer’s delivery schedule for all of the BIG GREEN sensors. BIG GREEN is a complex and sophisticated instrument, and the requisite technology must be imparted to SAIC to allow them to successfully produce the instrument. It was expected that in the first few months of joint work, sensor models (performance, structural, thermal and optical) would be provided to SAIC. Additionally, existing drawings, assembly procedures, test procedures, test equipment definitions, software descriptions and code, and complete Bills of Material (BOM) would be provided. SAIC would analyze the models, purchase material per the BOM, create its own set of production drawings, models and procedures, and identify areas of concern or where further information transfer is required.

47 OTHER INSTRUMENTATION↗

DOE Centers of Excellence Performance Portability Meeting

Performance portability is a phrase often used, but not well understood. The DOE is deploying systems at all of the major facilities across ASCR and ASC that are forcing application developers to confront head-on the challenges of running applications across these diverse systems. With GPU-based systems at the OLCF and LLNL, and Phi-based systems landing at NERSC, ACES (LANL/SNL), and the ALCF – the issue of performance portability is confronting the DOE mission like never before. A new best practice in the DOE is to include “Centers of Excellence” with each major procurement, with a goal of focusing efforts on preparing key applications to be ready for the systems coming to each site, and engaging the vendors directly in a “shared fate” approach to ensuring success. While each COE is necessarily focused on a particular deployment, applications almost invariably must be able to run effectively across the entire DOE HPC ecosystem. This tension between optimizing performance for a particular platform, while still being able to run with acceptable performance wherever the resources are available, is the crux of the challenge we call “performance portability”. This meeting was an opportunity to bring application developers, software providers, and vendors together to discuss this challenge and begin to chart a path forward.

97 MATHEMATICS AND COMPUTING↗

Operational Benefits of Meeting California’s Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) issued rules for its jurisdictional utilities to procure a minimum of 1,325 megawatts (MW) of energy storage systems by 2020. The goal of this study is to examine the operational value of this storage portfolio in California and the rest of the Western Electricity Coordinating Council (WECC) region. Modeled results show that the storage portfolio, when providing energy and operating reserves, reduces the total WECC-wide production costs by $78 million per year in the 33% scenario. This value increases to $144 million per year in the 40% scenario, primarily because of the increase in off-peak and peak price differences that are due to additional solar generation. These values are equivalent to $59/kW-year for the storage portfolio for the 33% scenario and $109/kW-year for the 40% scenario.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗