Search NASA⌕ Search

SEARCH · Search NASA

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

2024 Incubator Final Report: Active Hybrid Mooring

This Incubator project has defined and developed a representation of an active hybrid mooring (AHM) system in Simulink to assess whether the speed and accuracy of AHM is sufficient to warrant further investigation in a larger project. We first built a representative mooring system for the VolturnUS-S 15MW floating offshore wind turbine (FOWT) in 1,000-meter water depth to provide baseline loads and displacements needed in the AHM system, with the results showing off-the-shelf actuators would be practical. We then defined model configurations for the numerical and physical substructures, using standalone MoorDyn v2 with a novel input strategy and chained hydraulic actuators represented in Simulink Simscape, respectively. The remainder of the project has focused on verifying the existing models for speed and accuracy against OpenFAST simulations, increasing their complexity to enable six degree of freedom (6DOF) operation, and connecting the numerical and physical substructures into a single holistic model. The verification phase of the project has shown promising results, though further refinement is needed to resolve accuracy discrepancies and for robust performance across a wider range of metocean conditions. The numerical model we developed is computationally stable and operates faster than real time using a time step of 0.01 seconds or shorter, indicating the model is likely fast enough for our AHM design to operate successfully. Additionally, the Simscape model of a hydraulic actuator operates with less than 0.3% relative error when actuating mooring loads from an OpenFAST simulation of the VolturnUS-S 1,000-meter mooring system. The aforementined refinements will be performed in the next year as a Continuing Incubator, with key remaining tasks include programming the predictor-corrector loop to minimize movement error, testing against more complex nonlinear wave cases, and expanding to enable loads from connected shared mooring lines.

17 WIND ENERGY↗

Preliminary Plan to Inform Testing of a Heat Exchanger Test Article

This report presents a preliminary plan to guide the qualification testing of advanced heat exchanger (HX) components for nuclear-to-industrial heat transfer applications. The objective is to establish a defensible, physics-based methodology that integrates computational modeling, targeted experimentation, and in-service inspection considerations to demonstrate component performance and reliability under representative reactor conditions. The analysis identifies Sodium-cooled Fast Reactor (SFR) and High-Temperature Gas-cooled Reactor (HTGR) systems as reference configurations in terms of temperature, pressure, and chemical environment. Within these operating envelopes, dominant degradation mechanisms— including creep–fatigue interaction, flow-induced vibration, corrosion, and diffusion-bond deterioration—were evaluated to define test requirements. A comprehensive computationalexperimental framework is proposed to support life prediction and qualification activities. The framework couples high-fidelity structural-mechanics, thermal-hydraulic, and fluid-structure interaction models with accelerated degradation testing to produce a traceable linkage between microstructural evolution, mechanical performance, and remaining useful life (RUL). The approach adheres to established Verification, Validation, and Uncertainty Quantification (VVUQ) standards (ASME V&V 10/20; NUREG-2152) and incorporates a digital-twin architecture for continuous model refinement through data assimilation. The plan further outlines testing methodologies, including pre-test analyses, test-loop design parameters, and sensor placement strategies that maximize information yield while maintaining mechanistic fidelity. Complementary sections describe in-service inspection (ISI), on-line monitoring (OLM), and structural-health-monitoring (SHM) techniques applicable to compact HX geometries typical of advanced reactors. Collectively, these activities establish the technical foundation for demonstrating 40-60-year equivalent service life of advanced heat exchangers in support of the U.S. Department of Energy’s Advanced Reactor and Integrated Energy Systems programs. The forthcoming phase will execute the defined pre-test analyses, initiate hardware fabrication, and implement the integrated testing campaign to validate the proposed qualification methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation of Windowed Multipole into MCNP6.3

This work details the implementation of the Windowed MultiPole(WMP) method of generating cross sections into the monte carlo code MCNP6.3, the verification and validation performed, and potential future improvements to be implemented. Further, this work contextualizes WMP within the broader changes to how nuclear data is stored, iterated upon, and used that have been developing over the past decade.

97 MATHEMATICS AND COMPUTING↗

Real-Time Drilling Optimization System for Improved Overall Rate of Penetration and Reduced Cost Per Foot in Geothermal Drilling

The key to success in geothermal drilling is economic feasibility, and a major cost in the development of geothermal resources is the actual drilling of the wells. In this project, a real-time drilling optimization system for geothermal drilling was developed. The system couples three individual components while drilling. The first component is a drill stem vibration analysis model, the second is Mechanical Specific Energy (MSE) analyses, and the third is a detailed PDC Rate of Penetration (ROP) drill bit model for optimum RPM and WOB combinations. The benefit of the coupled system is that the range of WOB and RPM could be selected to avoid drill stem vibrations. Secondly, MSE is used as an efficiency measure and the detailed PDC drill bit model ensures the drill bit does not endure temperatures that exceed the temperature at which the PDC cutters experience accelerated wear. The new detailed PDC bit model is based on rock/bit interaction that physically tracks the PDC cutter wear flats as the bit drills ahead giving the capability to calculate the temperature being generated underneath the worn cutters to better advise on operational parameters to avoid accelerated cutter wear and failure and to ensure that operational parameters are applied so that overall ROP is maximized. By combining the drill stem vibrations and the detailed PDC bit cutter wear and “safe” non-accelerated cutter wear temperature and optimum ranges of operating parameters, it results in higher ROP and lower cost drilling. Single cutter PDC testing performed in different lithologies at Sandia was utilized to verify the PDC cutter forces and depth of cut for new and worn cutters. Based on single cutter PDC temperature modeling, verification using single cutter data from the testing done by National Oilwell Varco (NOV) was performed. Sandia’s Hard-Rock Drilling Facility (HRDF) was utilized to test different drill bit configurations with different cutter designs and wear status with different induced modes of vibration to obtain the critical bit RPM/WOB ranges resulting in ineffective drilling and low ROP. The collected test data were further used to verify and calibrate the full hole PDC ROP model that was developed based on single cutter interaction data. A full coupled drill stem vibration model was formulated and verified with geothermal field data from the Chocolate Mountain Aerial Gunnery Range (CMAGR). A graphical user interface (GUI) was developed using Tkinter library in the computer programming language Python, which integrates all the developed models in one system. The developed system consists mainly of the PDC ROP model, PDC bit wear model, PDC cutter temperature model, Mechanical Specific Energy (MSE) model, and drillstring vibration model integrated into one system. The developed system can be used for both, post well analysis and real-time optimization using different criteria such as ROP maximization or MSE minimization. The software uses Differential Evolution Algorithm (DEA) to find optimum values for operational parameters based on last foot drilled while avoiding the drillstring vibration and cutter temperature critical operating parameters.

15 GEOTHERMAL ENERGY↗

Open Building Control

Best practice control sequences are often not implemented correctly, or are not implemented at all, in large commercial buildings. This typically leads to 10-30 percent energy waste, along with reduced occupant productivity and unnecessary equipment wear. The current process of designing and implementing such control sequences is a manual process that starts with designers who often don’t have adequate training, then requires controls programmers to interpret and program a verbose written sequence. This process has been shown to fail to deliver high performance control sequences at scale. The Open Building Control project digitizes the current control delivery process. The project is developing tools for system designers to select control sequences, assess their energy performance and load flexibility potential using whole building simulation, specify the sequence for implementation using machine-to-machine translation by a control provider and formally testing the as-installed sequences by a commissioning agent. The project developed tools for each stage of this delivery process. The key innovation of the project is the development of the Control Description Language, a language that allows such a digitized control delivery process with end-to-end verification. Libraries of control sequences have been implemented using the Control Description Language, and their performance has been demonstrated using whole building energy simulation. An automated translation of such sequences to a commercial control product line has been conducted using a prototype translator. Tools for formal verification of as-installed control sequences relative to their specification have been developed and demonstrated. The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) started the process of forming a committee to make this language an ASHRAE/ANSI Standard. This new standard will complement existing and emerging ASHRAE standards for building communication and semantic modeling by providing a standard for expressing the control logic - the actual brain of the building. We expect this language and the process it enables to be an important contribution to the deployment of high performance building control sequences at scale because it allows taming the complexity of the control delivery process, which is continually increasing due to the need for higher performance and increased load flexibility to meet goals for net zero energy and increased renewable integration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Next Generation Bipolar Plates for Automotive PEM Fuel Cells

The results of a successful U.S. Department of Energy (DoE) funded two-year $2.9 MM program lead by GrafTech International Inc. (GrafTech) are reported and summarized. The program goal was to develop the next generation of high temperature proton exchange membrane (PEM) fuel cell bipolar plates for use in transportation fuel cell applications operating at temperatures up to 120 °C. The bipolar plate composite developed during the program is based on GrafTech’s GRAFCELL resin impregnated flexible graphite technology and makes use of a high temperature Huntsman Advanced Materials resin system which extends the upper use temperature of the composite to the DoE target. High temperature performance of the new composite is achieved with the added benefit of improvements in strength, modulus, and dimensional stability over the incumbent resin systems. Other physical properties, including thermal and electrical conductivity of the new composite are identical to or not adversely affected by the new resin system. Using the new bipolar plate composite system, machined plates were fabricated and tested in high temperature single-cell fuel cells operating at 120 °C for over 1100 hours by Case Western Reserve University. Final verification of performance was done on embossed full-size plates which were fabricated and glued into bipolar plates by GrafTech. Stack testing was done on a 10-cell full-sized stack under a simulated drive cycle protocol by Ballard Power Systems. Freeze-thaw performance was conducted by Ballard on a separate 5-cell stack and shown to be within specification. A third stack was assembled and shipped to Argonne National Laboratory for independent performance verification. Manufacturing cost estimate for the production of the new bipolar plate composite at current and high volume production scenarios was performed by Directed Technologies Inc. (DTI). The production cost estimates were consistent with previous DoE cost estimates performed by DTI for the DoE on metal plates. The final result of DTI’s analysis for the high volume manufacturing scenario ($6.85 /kW) came in slightly above the DoE target of $3 to $5/kW. This estimate was derived using a “Best Case Scenario” for many of the production process steps and raw material costs with projections to high volumes. Some of the process improvements assumed in this “Best Case Scenario” including high speed high impact forming and solvent-less resins, have not yet been implemented, but have a high probability of potential success.

08 HYDROGEN↗

Effective Access Monitoring at Geological Repositories

Access points at a deep, mined geological repository (GR) for the disposal of spent nuclear fuel (SNF) and other nuclear wastes present potential diversion paths for nuclear material. Because C/S measures are not likely to be used underground, access to a GR will require unprecedented reliance on C/S measures to maintain continuity of knowledge (CoK) on SNF buried underground. We develop a model GR based on common features of GR designs from national programs in order to develop and optimize C/S measures for GR access points that maximize confidence that CoK is maintained on SNF underground. Critical access points identified in this study are surface entrances to (1) the GR ramp (2) the excavation shaft, (3) the main elevator shaft, and (4) the ventilation shaft. The first three are considered critical detection points (DPs), whereas the fourth is considered a non-critical DP. The reason for the distinction is due to the different design capabilities of shaft components: the first three (ramp, excavation shaft, main elevator) are all capable of being used to move material from the underground to the surface, whereas the ventilation shaft is not. Such capabilities are verified during periodic design information verification (DIV) inspections.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advances in the Development and Verification of MCNP5 and MCNP6

The MCNP Monte Carlo code has been used for high-fidelity analyses of criticality safety problems since the 1970s. This paper reviews recent advances in the development and verification of MCNP, including the current production release of MCNP5 and the beta release of MCNP6. End-users in all application areas need to be aware of the forthcoming MCNP6 release and begin planning for the transition to the new code in 2012 and beyond.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

SULI Research Report Paper

The Intelligence and Space Research Group 4 (ISR-4) at the Los Alamos National Laboratory focuses on signal processing and developing space electronics for various national security missions. The Space and Atmospheric Burst Reporting System (SABRS) is a sensing payload designed for nuclear detonation detection. As the sensors from previous payloads become obsolete, the requirement for a novel payload design increases. SABRS Prime is the successor to the previous SABRS payloads and is scheduled for delivery in 2028. As part of the SABRS Prompt Gamma Instrument Interface Board, high frequency signals from silicon photomultiplier tubes need to be split and subsequently transmitted to the Analog to Digital Converter. Prior to developing the Space Grade Instrument Interface Board, evaluation modules with Commercial off-the-shelf (COTS) components are evaluated and tested under rigorous conditions. Verification of power levels and gain specifications are some of the important steps taken during the evaluation stage. Working on the Signal Splitting Board has enabled me to work with various schematic software applications and learn more about the processes behind designing space grade electronic components. In addition, I conducted research on efficiency improvements for space-based power systems. Changes in design approaches were found to be the most significant sources of improvement. Being able to interact with researchers and peers across various scientific disciplines has given me a better insight into my future pursuits. Working in a R&D environment has cemented my decision to work on space applications for Quantum Sensing and pursue a PhD in Electrical Engineering. The SULI internship program at the Los Alamos National Laboratory has helped me develop the skillset of a researcher, understand the rigorous processes behind developing space grade hardware, and improve my critical thinking abilities to support the development of reliable instrumentation for deep space missions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Statistical analysis of pulsed-neutron well logs in monitoring injected carbon dioxide

Pulsed-neutron well logs (PNLs) were acquired to monitor CO 2 storage associated with enhanced oil recovery. This work quantifies the precision of repeat PNLs using data from four wells and 15 repeat PNLs. Root-mean-square (RMS) precision for the repeat PNLs was less than 3%, indicating good agreement between the baseline and repeat PNLs. Evaluations of scaled relative difference (Scaled-D) showed variation in precision among individual wells and formations. Analysis of false-positive rates (FPRs) across the entire data set showed that a Scaled-D threshold in sandstone formations of approximately ±8% resulted in a 1% FPR. These Scaled-D precision thresholds were used to estimate the value of CO 2 saturation able to be confidently distinguished from baseline. The detection limit for CO 2 is lowest for high-porosity formations filled with saline water and is highest for low-porosity formations filled with fresh water. Thus, detection of vertical out-of-zone CO 2 migration using repeat PNLs is a function of instrument precision, petrophysical properties, and hydrology, all of which must be taken into account as part of the monitoring program. Here, the results of this work provide insight into how PNLs may be included within monitoring plans to detect vertical out-of-zone CO 2 migration along a wellbore or instances of wellbore failure and provide a quantitative basis for establishing detection limits of repeat PNLs to distinguish change from baseline conditions.

54 ENVIRONMENTAL SCIENCES↗

MCNP5-1.60 Release & Verification [Slides]

The latest release of the MCNP5 Monte Carlo code is designated MCNP5-1 .60. It includes enhancements to several MCNP capabilities: maximum number of cells, surfaces, materials, and tallies; isotopic reaction rates for mesh tallies; and adjoint-weighting for computing effective lifetimes and delayed neutron parameters. In addition, there are many minor code modifications to fix reported bugs, output formats, error checking, and other difficulties present with previous versions of MCNP. In nearly all cases, the bug fixes addressed problems with infrequently-used combinations of code options. In some cases, the problems that are fixed date back to the 1990s, but were only recently reported and fixed. All previously existing code capabilities are preserved, including physics options, geometry, tallying, plotting, cross-section handling, etc. No errors were found that would affect the code results for basic criticality calculations. Extensive verification and validation testing was performed, involving roughly 5,000 hrs of computing time. Tally results from MCNP5-1 .60 are expected to match the tally results of problems that can be run with the previous MCNP5-1.51, except where bugs were discovered and fixed. In this presentation, we summarize the code enhancements and provide some results from the verification/validation effort.

97 MATHEMATICS AND COMPUTING↗

Annual Site Environmental Report: 2009(ASER)

This report provides information about environmental programs during the calendar year of 2009 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2009/2010 (October 2009 through May 2010), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that Worker safety and health are protected, The environment is protected, and Compliance is ensured. Throughout 2009, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. SLAC's EMS was audited by a review team from the DOE Oak Ridge Office and the DOE SLAC Site Office (SSO) on March 31, 2009. The review team found the EMS to be in substantial conformance with the appropriate EMS requirements. Based on the audit results, SLAC and DOE were able to declare conformance with DOE Order 450.1A ahead of the June 30, 2009 mandated deadline. During 2009, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2009. Hazardous materials field verifications of 36 buildings identified a number of materials that could be removed from inventory due to lack of need or age of the material. In all, 124 chemical containers were removed from inventory. SLAC's chemical purchase approval process was reconfigured to allow for more effective control over purchase of highly toxic materials. One hundred percent of SLAC's purchased desktops, laptops, and monitors were either Silver or Gold level Electronic Product Environmental Assessment Tool (EPEAT) certified in fiscal year (FY) 2009. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in greenhouse gas (GHG) emissions. In 2009, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. During calendar year (CY) 2009, SLAC shipped 1324 cubic feet of low-level radioactive waste, legacy waste accounted for 40 percent of the volume, to appropriate treatment and disposal facilities for low-level radioactive waste. Moreover, SLAC continued its efforts in the inventory reduction of materials no longer needed for its mission: returned 28 sealed sources to the manufacturer, transferred additional 3 sources to Los Alamos National Laboratory, and disposed of 636 kilograms of depleted uranium tiles. In 2009, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region on October 19, 2009, for the investigation and remediation of impacted soil and groundwater at SLAC. Risk-based preliminary cleanup goals for impacted soil and groundwater have been established for SLAC, and the remedial efforts are being designed to meet these established goals.

Source record↗

Safety software release options to support plant start-up and commissioning activities - 285

The schedule demands on new nuclear power plant site testing and commissioning programs challenge the plant's Instrumentation and Control (I and C) supplier's ability to provide certified safety software releases to meet the needs of these programs. This paper outlines the typical certified safety software development and certification process which follows a Waterfall software life-cycle model. The conflicts that result between supporting the site program and the safety software supplier's internal certification program are identified. An adapted 'functional' safety release process is presented that supports the site program's needs for software changes and in parallel enables the safety software certification process to proceed. Comparisons between the two safety software release processes are examined and the benefits realized through the use of the adapted 'functional' safety software release process are discussed. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reducing PV Performance Uncertainty by Accurately Quantifying the PV Resource

Reducing uncertainty in the prediction and/or verification of photovoltaic (PV) plant output can directly increase the expected return on investment for each party in a contract, likely leading to more favorable terms for the contract, including a possible reduction in interest rates. Note that a reduction of 1% in the interest rate is estimated to reduce the levelized cost of energy by approximately 0.5 cents/kWh. This project developed a capability to provide spectrally resolved solar information from the National Solar Radiation Data Base (NSRDB), effectively providing 20 years of half-hourly data for all of the United States at a 4-km by 4-km spatial resolution. These data are now available freely to users directly through a geographic information system-based Web interface (https://nsrdb.nrel.gov) as well as through an application programming interface. Users of these data can conduct more accurate prefeasibility studies and assess multiple PV technologies. It is expected that widely used models such as PVSyst, the National Renewable Energy Laboratory's System Advisor Model (SAM), and PlantPredict, designed by First Solar, will develop the capabilities to use these spectral data.

14 SOLAR ENERGY↗

A Study of B→c$\bar{c}$γK in the BaBar Experiment

The BABAR Collaboration is a high energy physics experiment located at the Stanford Linear Accelerator Center. The primary goal of the experiment is to study charge and parity violation in the B-meson sector, however the copious production of B mesons decaying to other final states allows for a wide-ranging physics program. In particular, one can access the charmonium system via colour-suppressed b → c decays of the type B → c$\bar{c}$K. This thesis presents a study of B →c$\bar{c}$γK decays where c$\bar{c}$ includes J/Ψ and Ψ(2S), and K includes K ± , K S 0 and K*(892). The particular emphasis is on a search for the radiative decays X(3872) → J/Ψγ and X(3872) → Ψ(2S)γ. The X(3872) state is a recently-discovered resonance of undetermined quark composition, speculatively a conventional charmonium state or exotic four-quark di-meson molecule. This research is also sensitive to the well-known radiative charmonium decays B → χ c1,2 K, which are used as verification for the analysis technique. This dissertation sets the best B → χ c1 K branching fraction measurements to date, and sees the first evidence for factorization-suppressed B 0 → χ c2 }K* 0 decay at a level of 3.6σ. It also provides evidence for X(3872) → J/Ψγ and X(3872) → Ψ(2S)γ with 3.6σ and 3.3σ significance, respectively. The product of branching fractions β(B ± → X(3872)K ± ) • β(X(3872) → J/Ψγ) = (2.8 ± 0.8(stat.) ± 0.2(syst.)) x 10{sup -6} and β(B{ ± → X(3872)K ± ) → β(X(3872) → Ψ(2S)γ) = (9.5 ± 2.7(stat.) ± 0.9(syst.)) x 10 - 6 are measured. These results improve upon previous X(3872) → J/Ψγ measurements, and represent the first evidence for X(3872) → Ψ(2S)γ.

43 PARTICLE ACCELERATORS↗

Support for Fuel Fabrication and Characterization

Oak Ridge National Laboratory (ORNL) has participated in the Advanced Gas Reactor (AGR) program for the Next Generation Nuclear Plant (NGNP) and the transition to the Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) Technology Development Office (TDO) since the inception of the program. In this effort, ORNL has fabricated tristructural isotropic (TRISO) fuel and fuel compacts for AGR-1, AGR-2, and AGR-3/4 experiments, provided matrix only components for AGC-2, AGC-4, and AGR 3/4 experiments and for university studies, and provided characterization, coating, and compaction support for INL and BWX Technologies Nuclear Operations Group (BWXT). In fiscal year (FY) 2017, the activities for the INL ART TDO fuel development are focused on preparations for the AGR-5/6/7 experiments and technical support to the Generation IV (GenIV) pre-irradiation leach-burn-leach round robin effort with China and South Korea. With the successful transfer of fuel fabrication technology to BWXT, ORNL’s involvement has shifted toward transferring fuel characterization methods, providing technical support, verification of BWXT laboratory results, and fabricating surrogate fuel materials for university collaborations. ORNL will also provide analytical support to BWXT and INL for uranium dispersion analysis and confirmatory fuel characterization analyses as needed.

Modeling The DLOFC Accident Scenario of HTR-PM Equilibrium Core Using NEAMS Tools

High-Temperature Gas-cooled Reactors (HTGRs) have excellent characteristics in terms of safety and high thermal efficiency, and they are gaining a large interest from the industry as a candidate of Gen-IV reactors for a wide range of applications. The High Temperature gas-cooled Reactor Pebble-bed Module project (HTR-PM) is one of these designs and where helium gas is used to cool the pebble-bed region that consists of spherical fuel elements moderated with graphite. The HTR-PM design is based on the combined experience from the German pebble-bed reactor program from the 1960s through the 1990s and the HTR-10 experience in China during the 2000s. Idaho National Laboratory has a long experience in modeling of HTGRs working in developing neutronics and thermal hydraulics tools for the proper modeling of these reactors. The neutronics code Griffin has the capability to model pebble depletion . While the thermal hydraulics code Pronghorn was developed mainly to model the pebble bed reactors with the porous media assumption. In this work, an equilibrium core Multiphysics model was developed for the HTR-PM reactor to analyze the depressurized loss of forced cooling accident scenario (DLOFC). This paper is organized as follows: First, a brief description of the reactor and model specifications are provided. Then, the developed Multiphysics model is discussed. Finally, verification results of the steady-state equilibrium core and DLOFC accident are presented followed by a summary of the conclusions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗