Search NASA⌕ Search

SEARCH · Search NASA

Results for “water monitoring program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

846 records · Page 47

The MSP 2001 Mars Environmental Compatibility Assessment (MECA)

The Mars Environmental Compatibility Assessment (MECA) will evaluate the Martian environment for soil and dust-related hazards to human exploration as part of the Mars Surveyor Program 2001 Lander. Sponsored by the Human Exploration and Development of Space (HEDS) enterprise, MECA's goal is to evaluate potential geochemical and environmental hazards that may confront future Martian explorers, and to guide HEDS scientists in the development of high fidelity Mars soil simulants. The integrated MECA payload contains a wet-chemistry laboratory, a microscopy station, an electrometer to characterize the electrostatics of the soil and its environment, and arrays of material patches to study the abrasive and adhesive properties of soil grains. The instrument will acquire soil samples with a robotic arm equipped with a camera. MECA will examine surface and subsurface soil and dust in order to characterize particle size, shape, hardness, and also physical characteristics that may provide clues to mineralogy. MECA will characterize soil/water mixtures with respect to pH, redox potential, total dissolved ions, and trace toxins. MECA will determine the nature of electrostatic charging associated with excavation of soil, and the influence of ionizing radiation on material properties. It will also observe natural dust accumulation on engineering materials. To accomplish these objectives, MECA is allocated a mass of 10 kg within an enclosure of 35 x 25 x 15 cm. The Wet Chemistry Laboratory (WCL) consists of four identical cells that will accept samples from surface and subsurface regions accessible to the Lander's robotic arm, mix them with water, and perform extensive analysis of the solution. Ion-selective electrodes and related sensors will evaluate total dissolved solids, redox potential, pH, and the concentration of many soluble ions and gases in wet Martian soil. These electrodes can detect potentially dangerous heavy-metal ions, emitted pathogenic gases, and the soil's corrosive potential. Experiments will include cyclic voltammetry and anodic stripping voltammetry. Complementary to the Viking experiments, the chemical laboratory will characterize the water-soil solution rather than emitted gases. Nonetheless, through analysis of dissolved gases it will be able to replicate many of the Viking observations related to oxidants. MECA's microscopy station combines optical and atomic-force microscopy (AFM) in an actively focused, controlled illumination environment to image particles from millimeters to nanometers in size. Careful selection of substrates allows controlled experiments in adhesion, abrasion, hardness, aggregation, magnetic and other properties. Special tools allow primitive manipulation (brushing and scraping) of samples. Soil particle properties including size, shape, color, hardness, adhesive potential (electrostatic and magnetic), will be determined using an array of sample receptacles and collection substrates. The simple, rugged atomic-force microscope will image in the submicron size range and has the capability of performing a particle-by-particle analysis of the dust and soil. On Earth, the earliest forms of life are preserved as microfossils. The atomic-force microscope will have the required resolution to image down to the scale of terrestrial microfossils and beyond. Mounted on the end of the robot arm, MECA's electrometer actually consists of four types of sensors: an electric field meter, several triboelectricity monitors, an ion gauge, and a thermometer. Tempered only by ultraviolet-light-induced ions and a low-voltage breakdown threshold, the dry, cold, dusty martian environment presents an imposing electrostatic hazard to both robots and humans. The field meter will measure the ambient field on nearby objects while the triboelectric sensors, using identical circuitry, will measure the charge accumulated on test substances as they are dragged through the soil by the arm. The ion chamber, open to the environment, will sense both charged dust and free ions in the air. Over and above the potential threat to electronics, the electrostatic environment holds one of the keys to transport of dust and, consequently, Martian meteorology. Viewed with the robot arm camera, the abrasion and adhesion plates are strategically placed to allow direct observation of the interaction between materials and soils on a macroscopic scale. Materials of graded hardness are placed directly under the robot arm scoop to sense wear and soil hardness. A second array, placed on the lander deck, is deployed after the dust plume of landing has settled. It can be manipulated in a primitive fashion by the arm, first having dirt deposited on it from the scoop and subsequently shaken clean. A third array will passively collect dust from the atmosphere. In addition to objectives related to human exploration, the MECA data set will be rich in information relevant to basic geology, paleoclimate, and exobiology issues. To understand both contemporaneous and ancient processes on Mars, the mineralogy, petrology, and reactivity of Martian surface materials should be constrained. The MECA experiment will shed light on these quantities through its combination of chemistry and microscopy. MECA will be capable of measuring the composition of ancient surface water environments, observing microscopic evidence of geological (and biological?) processes, inferring soil and dust transport, comminution and weathering mechanisms, and characterizing soil horizons that might be encountered during excavation.

Hecht, M. H.↗

2011 Mound Site Groundwater Plume Rebound Exercise and Follow-Up - 13440

The Mound Site facility near Miamisburg, Ohio, opened in 1948 to support early atomic weapons programs. It grew into a research, development, and production facility performing work in support of the U.S. Department of Energy (DOE) weapons and energy programs. The plant was in operation until 1995. During the course of operation, an onsite landfill was created. The landfill was located over a finger of a buried valley aquifer, which is a sole drinking water source for much of the Miami Valley. In the 1980's, volatile organic compounds (VOCs) were discovered in groundwater at the Mound site. The site was placed on the National Priorities List on November 21, 1989. DOE signed a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Federal Facility Agreement with the U.S. Environmental Protection Agency (EPA) and the Ohio Environmental Protection Agency. The agreement became effective in October 1990. The area that included the landfill was designated Operational Unit 1 (OU-1). In 1995, a Record of Decision was signed that called for the installation and operation of a pump and treatment (P and T) system in order to prevent the VOCs in OU-1 groundwater from being captured by the onsite water production wells. In addition to the P and T system, a soil vapor extraction (SVE) system was installed in 1997 to accelerate removal of VOCs from groundwater in the OU-1 area. The SVE system was successful in removing large amounts of VOCs and continued to operate until 2007, when the amount of VOCs removed became minimal. A rebound study was started in February 2003 to determine how the groundwater system and contaminants would respond to shutting down the P and T system. The rebound test was stopped in February 2004 because predetermined VOC threshold concentrations were exceeded down-gradient of the landfill. The P and T and SVE systems were restarted after the termination of the rebound test. In 2006, the remediation of the Mound site was completed and the site was declared to be protective of human health and the environment, as long as the institutional controls are observed. The institutional controls that apply to the OU-1 area include provisions that no soil be allowed to leave the site, no wells be installed for drinking water, and the site may be approved only for industrial use. The onsite landfill with the operating CERCLA remedy remained. However, the Mound Development Corporation lobbied Congress for funds to remediate the remaining onsite landfill to allow for property reuse. In 2007 DOE received funding from Congress to perform non-CERCLA removal actions at OU-1 to excavate the site sanitary landfill. In 2009, DOE received American Recovery and Reinvestment Act funding to complete the project. Excavation of the landfill occurred intermittently from 2006 through 2010 and the majority of the VOC source was removed; however, VOC levels near the P and T system remained greater than the EPA maximum contaminant levels (MCLs). Presently, groundwater is contained using two extraction wells to create a hydraulic barrier to prevent down-gradient migration of VOC-impacted groundwater. Since the primary contamination source has been removed, the feasibility of moving away from containment to a more passive remedy, namely monitored natural attenuation (MNA), is being considered. A second rebound study was started in June 2011. If contaminant and groundwater behavior met specific conditions during the study, MNA would be evaluated and considered as a viable alternative for the groundwater in the OU-1 area. From June through December 2011, the second rebound study evaluated the changes in VOC concentrations in groundwater when the P and T system was not in operation. As the study progressed, elevated concentrations of VOCs that exceeded predetermined trigger values were measured along the down-gradient boundary of the study area, and so the P and T system was restarted. It was determined that a discrete area with VOC concentrations greater than the MCLs was present in groundwater down-gradient of the extraction wells. The source was not identified, but the contamination was thought not to be caused by residually contaminated soil beneath the former landfill. The data collected so far supports the consideration of MNA as a viable alternative to hydraulic containment. Additional investigations are being performed to identify possible sources or pathways of VOCs in groundwater that may be contributing to the elevated VOC levels measured down-gradient of the extraction well system. Data from this additional investigation will be used to determine whether the VOCs detected down-gradient of the hydraulic boundary are the result of residual soil contamination, a previously unknown contribution of VOC-contaminated water entering the groundwater outside the capture zone of the extraction wells, or a pulse of VOC-contaminated groundwater from the OU-1 landfill that occurred during the rebound study. (authors)

54 ENVIRONMENTAL SCIENCES↗

Quantifying Contaminant Mass for the Feasibility Study of the DuPont Chambers Works FUSRAP Site - 13510

The U.S. Army Corps of Engineers (USACE) - Philadelphia District is conducting an environmental restoration at the DuPont Chambers Works in Deepwater, New Jersey under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Discrete locations are contaminated with natural uranium, thorium-230 and radium-226. The USACE is proposing a preferred remedial alternative consisting of excavation and offsite disposal to address soil contamination followed by monitored natural attenuation to address residual groundwater contamination. Methods were developed to quantify the error associated with contaminant volume estimates and use mass balance calculations of the uranium plume to estimate the removal efficiency of the proposed alternative. During the remedial investigation, the USACE collected approximately 500 soil samples at various depths. As the first step of contaminant mass estimation, soil analytical data was segmented into several depth intervals. Second, using contouring software, analytical data for each depth interval was contoured to determine lateral extent of contamination. Six different contouring algorithms were used to generate alternative interpretations of the lateral extent of the soil contamination. Finally, geographical information system software was used to produce a three dimensional model in order to present both lateral and vertical extent of the soil contamination and to estimate the volume of impacted soil for each depth interval. The average soil volume from all six contouring methods was used to determine the estimated volume of impacted soil. This method also allowed an estimate of a standard deviation of the waste volume estimate. It was determined that the margin of error for the method was plus or minus 17% of the waste volume, which is within the acceptable construction contingency for cost estimation. USACE collected approximately 190 groundwater samples from 40 monitor wells. It is expected that excavation and disposal of contaminated soil will remove the contaminant source zone and significantly reduce contaminant concentrations in groundwater. To test this assumption, a mass balance evaluation was performed to estimate the amount of dissolved uranium that would remain in the groundwater after completion of soil excavation. As part of this evaluation, average groundwater concentrations for the pre-excavation and post-excavation aquifer plume area were calculated to determine the percentage of plume removed during excavation activities. In addition, the volume of the plume removed during excavation dewatering was estimated. The results of the evaluation show that approximately 98% of the aqueous uranium would be removed during the excavation phase. The USACE expects that residual levels of contamination will remain in groundwater after excavation of soil but at levels well suited for the selection of excavation combined with monitored natural attenuation as a preferred alternative. (authors)

54 ENVIRONMENTAL SCIENCES↗

Review of Time-Series Data for the Agra Interim Measure, Fall 2013

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at Agra, Kansas, from the 1950s to the early 1970s. No structures remain on the property, and the land is used for agricultural purposes, specifically wheat production. The property is currently owned by the Kyle Railroad Co. and is leased to Mr. Herb VanEaton. The Pro-Ag Marketing grain storage facility is directly south of the former CCC/USDA facility. In 1985, carbon tetrachloride was detected in groundwater samples collected from Agra public water supply wells PWS-3 and PWS-4, located approximately 2,000 ft south of the former CCC/USDA facility and approximately 1,800 ft south of the Pro-Ag Marketing Facility, at levels below the maximum contaminant level of 5.0 μg/L. In 1986, in response to an increase in carbon tetrachloride to 12 μg/L in well PWS-3, the city was required to remove both PWS-3 and PWS-4 from service. The Agra public water supply system is served by three other wells (PWS-1, PWS-2, and PWS-5) that are outside the area of contamination. In 2005, the Environmental Science Division of Argonne National Laboratory conducted a comprehensive investigation of potential contaminant source areas at Agra, on behalf of the CCC/USDA. Data collected during the 2005 investigation identified three primary source areas for the carbon tetrachloride contamination (Argonne 2006). One source is located on the former CCC/USDA property, and the other two sources are on property owned by Pro-Ag Marketing. In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA initiated source area cleanup as an interim measure (IM) in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup employs five large-diameter boreholes (LDBs) that were excavated by auger drilling. The purposes of these borings were to (1) physically remove soils impacted by carbon tetrachloride from the most contaminated area for treatment by onsite land farming and (2) provide locations for the installation of coupled soil vapor extraction (SVE) and air sparging (AS) wells to facilitate in situ treatment of the remaining carbon tetrachloride in the soils and groundwater. Construction data for the SVE wells, the AS wells, and groundwater and soil gas observation points installed to monitor the progress of the cleanup (as reported on the Kansas Review of Time-Series Data for the Agra Interim Measure 1-2 Version 01, 10/24/13 WWC-5 forms for these installations) are summarized in Table 1.1. The locations of the wells are shown in Figure 1.1. The IMWP/D was approved by the Kansas Department of Health and Environment in November 2008 (KDHE 2008), and operation of the SVE/AS systems began in May 2009. With the approval of the KDHE (2009), landfarming operations to treat the contaminated soils excavated from the LDBs were completed on October 12, 2010. Since start-up, the IM activities have been documented periodically (Argonne 2009a,b,c; Argonne 2010a,b,c,d, 2011a,b,c, 2012, 2013a,b), in accord with the requirements of the KDHEapproved IMWP/D (Argonne 2008). Each of the reports primarily summarizes the operations and maintenance of the SVE and AS equipment and the results of sampling of the groundwater, soil gas, and system effluents for analyses for volatile organic compounds (VOCs) over a specific 3- to 6-month period. Hence, the focus is the incremental performance of the IM. To complement these documents, this report provides a broader perspective by examining the collective data acquired since start-up on May 29, 2009, and through June 2013. The objectives of this approach are to evaluate possible longer-term trends in (1) the operational characteristics of the remedial systems and (2) the corresponding responses in the subsurface environment and their potential relationships to the progress of the cleanup. To facilitate this investigation, time-series diagrams have been developed to illustrate key parameter data for the SVE and AS systems, as well as sampling and additional supporting data obtained from the monitoring program. An overview of the information compiled is in Section 2. In Section 3, observations drawn from these data are discussed. The principal findings of the evaluation and recommendations for consideration are summarized in Sections 4 and 5, respectively.

54 ENVIRONMENTAL SCIENCES↗

Wilson Corners SWMU 001 2019-2020 Annual Long-Term Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.

Jennifer Lynn Joyal↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 19217

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Dry Sorbent Injection Technology for Pre-Combustion CO{sub 2} Capture

This document summarizes the work performed on Cooperative Agreement DE-FE0000465, “Evaluation of Dry Sorbent Technology for Pre-Combustion CO{sub 2} Capture,” during the period of performance of January 1, 2010 through September 30, 2013. This project involves the development of a novel technology that combines a dry sorbent-based carbon capture process with the water-gas-shift reaction for separating CO{sub 2} from syngas. The project objectives were to model, develop, synthesize and screen sorbents for CO{sub 2} capture from gasified coal streams. The project was funded by the DOE National Energy Technology Laboratory with URS as the prime contractor. Illinois Clean Coal Institute and The University of Illinois Urbana-Champaign were project co-funders. The objectives of this project were to identify and evaluate sorbent materials and concepts that were suitable for capturing carbon dioxide (CO{sub 2}) from warm/hot water-gas-shift (WGS) systems under conditions that minimize energy penalties and provide continuous gas flow to advanced synthesis gas combustion and processing systems. Objectives included identifying and evaluating sorbents that efficiently capture CO{sub 2} from a gas stream containing CO{sub 2}, carbon monoxide (CO), and hydrogen (H{sub 2}) at temperatures as high as 650 °C and pressures of 400-600 psi. After capturing the CO{sub 2}, the sorbents would ideally be regenerated using steam, or other condensable purge vapors. Results from the adsorption and regeneration testing were used to determine an optimal design scheme for a sorbent enhanced water gas shift (SEWGS) process and evaluate the technical and economic viability of the dry sorbent approach for CO{sub 2} capture. Project work included computational modeling, which was performed to identify key sorbent properties for the SEWGS process. Thermodynamic modeling was used to identify optimal physical properties for sorbents and helped down-select from the universe of possible sorbent materials to seven that were deemed thermodynamically viable for the process. Molecular modeling was used to guide sorbent synthesis through first principles simulations of adsorption and regeneration. Molecular dynamics simulations also modeled the impact of gas phase impurities common in gasified coal streams (e.g., H{sub 2}S) on the adsorption process. The role of inert dopants added for mechanical durability to active sorbent materials was also investigated through molecular simulations. Process simulations were conducted throughout the project to help determine the overall feasibility of the process and to help guide laboratory operating conditions. A large component of the program was the development of sorbent synthesis methods. Three different approaches were used: mechanical alloying (MA), flame spray pyrolysis (FSP), and ultrasonic spray pyrolysis (USP). Sorbents were characterized by a host of analytical techniques and screened for SEWGS performance using a thermogravimetric analyzer (TGA). A feedback loop from screening efforts to sorbent synthesis was established and used throughout the project lifetime. High temperature, high pressure reactor (HTPR) systems were constructed to test the sorbents at conditions mimicking the SEWGS process as identified through process modeling. These experiments were conducted at the laboratory scale to examine sorbents for their CO{sub 2} capacity, conversion of CO to CO{sub 2}, and impacts of adsorption and regeneration conditions, and syngas composition (including impurities and H2O:CO ratio). Results from the HTPR testing showed sorbents with as high as 0.4 g{sub CO{sub 2}}/g{sub sorbent} capacity with the ability to initially shift the WGS completely towards CO{sub 2}/H{sub 2}. A longer term experiment with a simple syngas matrix and N{sub 2}/steam regeneration stream showed a USP sorbent to be stable through 50 adsorption-regeneration cycles, though the sorbent tested had a somewhat diminished initial capacity. The program culminated in a technoeconomic assessment in which two different approaches were taken; one approach was intended to be technically conservative while the second required several key engineering challenges to be met in order to succeed. The project team is confident that, with the proper support, those challenges could be met. The second approach relies on a slipstream of H{sub 2} from the shifted syngas and O{sub 2} from an air separation unit (ASU) to be combusted in the presence of the sorbent for regeneration; termed a regenerating boiler. The approach also makes use of the heat of adsorption to generate >400 MW of turbine quality steam; total plant gross energy output as high as 1 GW was estimated for an IGCC with an initial gross energy output of 737 MW, without any additional coal usage. The regenerating boiler concept could benefit further from additional heat integration, but the results of this effort show a COE of $97.50 per MWh for a rational combination of operating parameters and sorbent lifetime as well as conservative estimates for steam turbines, gas turbine, and ASU. If the COE of CO{sub 2} transmission, storage and monitoring ($5.60 / MWh) is added to the base case for an IGCC ($81.30 / MWh for Case 5 from the DOE Bituminous Coal Report), the cost of CO{sub 2} capture for the regenerating boiler was only $10.60 / MWh; other regenerating boiler cases are as low $6.90 / MWh. The project met all agreed upon milestones and was completed within budget, more than 25% cost share provided by the project team. Results from the program showed that the SEWGS process has great promise, and with further study and evaluation could become a component of a comprehensive carbon capture program. SEWGS requires a paradigm shift in the traditional approach to carbon capture because the regenerating boiler concept is not a ‘back-end’ solution to CO{sub 2} mitigation. Rather, it is an integral part of the plant operations and is responsible for generating more electricity than the IGCC itself. Schemes could be envisioned where the H{sub 2} production is used exclusively to regenerate the sorbent, with any excess sold as a commodity, and the heat of adsorption serving as the primary driver for power generation. Further work with sorbent evaluation, process modeling and heat integration, and scale-up would be needed to more fully vet SEWGS, but the culmination of this program indicates that additional study is warranted.

20 FOSSIL-FUELED POWER PLANTS↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Earth Observing System (EOS)

The Earth Observing System is a US National Aeronautics and Space Administration (NASA) program consisting of a science segment, a data system, and a space segment made up of a series of polar-orbiting and mid-inclination satellites for long-term monitoring of the Earth as an integrated system, including observations of the land surface, biosphere, atmosphere, cryosphere, and oceans. Initially conceived in the mid-late 1980s, it was implemented as a series of large "flagship" missions and smaller focused satellites, often in partnership with instruments and sometimes spacecraft from other nations. In 1984 NASA formed several instrument panels to develop concepts for “facility instruments” that would provide comprehensive support to the scientific and applications’ communities, each with a supporting science team competitively selected via peer-review. An Announcement of Opportunity was released in 1988 and proposals were solicited for three types of proposals: (i) instrument investigations that would include the provision of instrumentation for flight on a polar platform, including non-Earth science payloads requiring polar orbits (PI instruments), (ii) research facility instrument team member and team leader investigations for facility instruments, and (iii) interdisciplinary science investigations to provide data analysis and modeling, preparing to use data acquired from the space platforms. The initial selections made in 1989 included support for 24 instrument investigations, 6 research facility instrument investigations, and 28 interdisciplinary investigations. Although considerable changes were made over the years in the structure and orbital configuration of the various instruments and platforms, a total of 10 different missions were eventually flown, as shown in Fig. 1. These included three multiinstrument flagship platforms known as Terra (launched in 1999), Aqua (launched in 2002), and Aura (launched in 2004), where the Terra mission emphasis was primarily on land processes, Aqua on the hydrological cycle, and Aura on atmospheric chemistry. In addition to these flagship missions the EOS missions included Landsat 7 (land cover classification and change), QuikScat (wind speed and direction over the oceans), Jason-1 (ocean surface topography and sea level), ACRIMSAT (total solar irradiance (TSI)), SAGE III (stratospheric aerosol and ozone levels), ICESat (ice, cloud, and land elevation), and SORCE (Solar Radiation and Climate Experiment; total and spectral solar irradiance). In addition EOS supported CERES (an Earth radiation budget sensor) and LIS (a lightning sensor), that flew as part of the NASA/JAXA Tropical Rainfall Measuring Mission (1997), and SeaWinds (wind speed and direction), that flew as part of the short-lived ADEOS II (Midori II, 2002) mission of JAXA (Japan Aerospace Exploration Agency). The EOS contributions are too numerous to present in detail in this article, but can be viewed for convenience as a means of obtaining global measurements (with appropriate characteristics) of the 24 variables and variable groups listed in Table 1. This table was created by the EOS community in the late 1990s as a way to succinctly indicate which instruments on the various EOS platforms were expected to contribute to each of the specified variables in primary (bold), secondary (bold italics), or contributing (roman) roles. All of the science data products produced by these space missions are available without charge throughout the world, and are thus highly valued for their many contributions to applications such as air quality, fires, land cover change, and the state of the oceans, as well as for science and monitoring of the state of the Earth system and its changes over time. These and other international satellites have played a crucial role in understanding and documenting global change, including (i) global surface temperature and atmospheric temperature and water vapor profiles, (ii) glacial retreat, (iii) sea ice extent and change, (iv) solar radiation into and out of the Earth-atmosphere system, (v) atmospheric aerosol and cloud properties, (vi) sources and sinks of

ICESat↗

Bubble Generation in a Flowing Liquid Medium and Resulting Two-Phase Flow in Microgravity

The present investigation reports a study of bubble generation under reduced gravity conditions, using both a co-flow and a cross-flow configuration. This study may be used in the conceptual design of a space-based thermal management system. Ensuing two-phase flow void fraction can be accurately monitored using a single nozzle gas injection system within a continuous liquid flow conduit, as utilized in the present investigation. Accurate monitoring of void fraction leads to precise control of heat and mass transfer coefficients related to a thermal management system; hence providing an efficient and highly effective means of removing heat aboard spacecraft or space stations. Our experiments are performed in parabolic flight aboard the modified DC-9 Reduced Gravity Research Aircraft at NASA Lewis Research Center, using an air-water system. For the purpose of bubble dispersion in a flowing liquid, we use both a co-flow and a cross-flow configuration. In the co-flow geometry, air is introduced through a nozzle in the same direction with the liquid flow. On the other hand, in the cross-flow configuration, air is injected perpendicular to the direction of water flow, via a nozzle protruding inside the two-phase flow conduit. Three different flow conduit (pipe) diameters are used, namely, 1.27 cm, 1.9 cm and 2.54 cm. Two different ratios of nozzle to pipe diameter (D(sub N))sup * are considered, namely (D(sub N))sup * = 0.1 and 0.2, while superficial liquid velocities are varied from 8 to 70 cm/s depending on flow conduit diameter. It is experimentally observed that by holding all other flow conditions and geometry constant, generated bubbles decrease in size with increase in superficial liquid velocity. Detached bubble diameter is shown to increase with air injection nozzle diameter. Likewise, generated bubbles grow in size with increasing pipe diameter. Along the same lines, it is shown that bubble frequency of formation increases and hence the time to detachment of a forming bubble decreases, as the superficial liquid velocity is in-creased. Furthermore, it is shown that the void fraction of the resulting two-phase flow increases with volumetric gas flow rate Q(sub d), pipe diameter and gas injection nozzle diameter, while they decrease with surrounding liquid flow. The important role played by flowing liquid in detaching bubbles in a reduced gravity environment is thus emphasized. We observe that the void fraction can be accurately controlled by using single nozzle gas injection, rather than by employing multiple port injection, since the later system gives rise to unpredictable coalescence of adjacent bubbles. It is of interest to note that empirical bubble size and corresponding void fraction are somewhat smaller for the co-flow geometry than the cross-flow configuration at similar flow conditions with similar pipe and nozzle diameters. In order to supplement the empirical data, a theoretical model is employed to study single bubble generation in the dynamic (Q(sub d) = 1 - 1000 cu cm/s) and bubbly flow regime within the framework of the co-flow configuration. This theoretical model is based on an overall force balance acting on the bubble during the two stages of generation, namely the expansion and the detachment stage. Two sets of forces, one aiding and the other inhibiting bubble detachment are identified. Under conditions of reduced gravity, gas momentum flux enhances, while the surface tension force at the air injection nozzle tip inhibits bubble detachment. In parallel, liquid drag and inertia can act as both attaching and detaching forces, depending on the relative velocity of the bubble with respect to the surrounding liquid. Predictions of the theoretical model compare well with our experimental results. However, at higher superficial liquid velocities, as the bubble loses its spherical form, empirical bubble size no longer matches the theoretical predictions. In summary, we have developed a combined experimental and theoretical work, which describes the complex process of bubble generation and resulting two-phase flow in a microgravity environment. Results of the present study can be used in a wide range of space-based applications, such as thermal energy and power generation, propulsion, cryogenic storage and long duration life support systems, necessary for programs such as NASA's Human Exploration for the Development of Space (HEDS).

Pais, S. C.↗

Measurement of advective soil gas flux: Results of field and laboratory experiments with CO2

We modified our multi-channel, steady-state flow-through (SSFT), soil-CO2 flux monitoring system to include an array of inexpensive pyroelectric non-dispersive infrared detectors for full-range (0-100%) coverage of CO2 concentrations without dilution, and a larger-diameter vent tube. We then conducted field testing of this system from late July through mid-September 2010 at the Zero Emissions Research and Technology (ZERT) project site located in Bozeman, MT, and subsequently, laboratory testing at the Pacific Northwest National Laboratory (PNNL) in Richland, WA using a flux bucket filled with dry sand. In the field, an array of twenty-five SSFT and three non-steady-state (NSS) flux chambers was installed in a 10x4 m area, the long boundary of which was directly above a shallow (2-m depth) horizontal injection well located 0.5 m below the water table. Two additional chambers (one SSFT and one NSS) were installed 10 m from the well for background measurements. Volumetric soil moisture sensors were installed at each SSFT chamber to measure mean levels in the top 0.15 m of soil. A total flux of 52 kg CO2 d-1 was injected into the well for 27 d and the efflux from the soil was monitored by the chambers before, during, and for 27 d after the injection. Overall, the results were consistent with those from previous years, showing a radial efflux pattern centered on a known “hot spot”, rapid responses to changes in injection rate and wind power, evidence for movement of the CO2 plume during the injection, and nominal flux levels from the SSFT chambers that were up to 6-fold higher than those measured by adjacent NSS chambers. Soil moisture levels varied during the experiment from moderate to near saturation with the highest levels occurring consistently at the hot spot. The effects of wind on measured flux were complex and decreased as soil moisture content increased. In the laboratory, flux bucket testing with the SSFT chamber showed large measured-flux enhancement due to the Venturi effect on the chamber vent, but an overall decrease in measured flux when wind also reached the sand surface. Flux-bucket tests at a high flux (comparable to that at the hot spot) also showed that the measured flux levels increase linearly with the chamber-flushing rate until the actual level is reached. At the SSFT chamber-flushing rate used in the field experiment the measured flux in the laboratory was only about a third of the actual flux. The ratio of measured to actual flux increased logarithmically as flux decreased, and reached parity at low levels typical of diffusive flux systems. Taken together, our results suggest that values for advective CO2 flux measured by SSFT and NSS chamber systems are likely to be significantly lower than the actual values due to back pressure developed in the chamber that diverts flux from entering the chamber. Chamber designs that counteract the back pressure and also avoid large Venturi effects associated with vent tubes, such as the SSFT with a narrow vent tube operated at a high chamber-flushing rate, are likely to yield flux measurements closer to the true values.

carbon dioxide↗

Niagara Falls Storage Site - Balance of plant investigation results - 15432

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U. S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper details recent investigations into the underground utilities, groundwater/soil contamination, and past storage of contaminated material on the Balance of Plant Operable Unit of the NFSS. Recent fieldwork activities have investigated areas of elevated groundwater contamination as well as an investigation to determine/eliminate any preferential pathway that historical underground utilities may have provided on-site in these areas. Additional areas of investigation included strategic placement of groundwater wells at locations of historic residue storage piles and intersections of various underground utilities (based on aerial photography and geophysical surveys). Several hundred locations across the site were investigated with a gamma walk-over survey, boring, surveying and sampling of soil-cores to aide in the delineation of soil contamination throughout the Balance of Plant Operable Unit. The series of investigations indicated multiple operational areas still have impacts above background conditions, risk-based concentrations, and promulgated maximum contaminant levels for multiple media in the Balance of Plant Operable Unit. The soil, groundwater, sediment, and utility sampling data show that 1) radionuclide impacts derived from ore-residue handling operations still exist, 2) impacts from other inorganic and organic compound exist in TNT manufacturing and support areas, and 3) contaminant transport from past source areas is minimal. The full compendium of site history and recent sampling data provides a well-defined conceptual site model that provides the necessary input data to prepare volumetric soil estimates for the Balance of Plant Operable Unit Feasibility Study. The scale of the NFSS and complexity of prior operations provide many remedial challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Fuel Cycle Research & Development Technical Monthly – May 2012

Management and Integration LANL - Initial coordination meetings with NE and NA-20 were held the first week of May. Additional meetings, to include NA-82 and the new Proliferation and Terrorism Risk Assessment task are scheduled for June. Work package planning as part of the NTD transition is ongoing. Microcalorimetry LANL - Some parts to attempt repair of a malfunctioning water chiller that has been holding up work on the current detector array have arrived. We will attempt to begin running the compressor/cryostat next week to resume work on commissioning the detector array. We have also been working on a backup plan to temporarily move our system to a different lab space. Completed data analysis and prepared a paper summarizing Pu measurements for peer-review journal. Two members of our team presented work at the SORMA West 2012 conference. Completed data analysis and prepared a milestone report summarizing the development of Monte Carlo tools to study systematic errors. Electrochemical Sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Lead slowing down spectrometer LANL - Continued work on perturbation method for LSDS analysis. We are running simulations to delineate issues and are checking additional data libraries to see whether there are differences in simulation results. Electrochemical sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Fast Neutron Multiplicity analysis INL - The University of Michigan team continues its work on the post-experiment analysis of the validation data from JRC ISPRA, as well as scoping studies using the simulation tool MCNPX-PoliMi. At INL, our new staff member working on this project is now working to model performance capabilities for the fast-neutrons scintillator design concepts. At INL our primary analysis approach is focused on the Feynman mean-to-variance approach. At the University of Michigan, the primary analysis approach is multiplicity coincidence analysis. Fast Neutron Imaging to Quantify Nuclear Materials ORNL - Completed additional measurements of the two 'trainer' configurations as well as calibration measurements with sources on an x-y stage. The imager was shipped to Pantex for an NA-22 obligation at the end of May. Lead Slowing Down Spectrometer LANL - Continued to look into He4 detector. A Swiss company was located that makes He4 detectors and associated electronics. Had a teleconference with them to assess the possible help we can get from them. We are also looking in to constructing one locally. Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Multi-isotope Process Monitor PNNL - Attended a training call in advanced multivariate classification and analysis methods. These methods were applied to the multivariate analysis of fuel characteristics based on simulated gamma. Work continued on a computational framework to quantify the impact of gamma-ray counting statistical precision on principal component regression (PCR) analysis of a multi-component (i.e. multi-isotope) gammaray spectrum. Tests of the simulation framework are anticipated to begin in early June. Development of a proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program is ongoing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Field evaluation of remote wind sensing technologies: Shore-based and buoy mounted LIDAR systems

In developing a national energy strategy, the United States has a number of objectives, including increasing economic growth, improving environmental quality, and enhancing national energy security. Wind power contributes to these objectives through the deployment of clean, affordable and reliable domestic energy. To achieve U.S. wind generation objectives, the Wind and Water Power Program within the Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE) instituted the U.S. Offshore Wind: Removing Market Barriers Program in FY 2011. Accurate and comprehensive information on offshore wind resource characteristics across a range of spatial and temporal scales is one market barrier that needs to be addressed through advanced research in remote sensing technologies. There is a pressing need for reliable offshore wind-speed measurements to assess the availability of the potential wind energy resource in terms of power production and to identify any frequently occurring spatial variability in the offshore wind resource that may impact the operational reliability and lifetime of wind turbines and their components and to provide a verification program to validate the “bankability” of the output of these alternative technologies for use by finance institutions for the financing of offshore wind farm construction. The application of emerging remote sensing technologies is viewed as a means to cost-effectively meet the data needs of the offshore wind industry. In particular, scanning and buoy mounted LIDAR have been proposed as a means to obtain accurate offshore wind data at multiple locations without the high cost and regulatory hurdles associated with the construction of offshore meteorological towers. However; before these remote sensing technologies can be accepted the validity of the measured data must be evaluated to ensure their accuracy. The proposed research will establish a unique coastal ocean test-bed in the Mid-Atlantic for the evaluation of LIDAR-based wind measurement systems to validate the accuracy of remotely measured wind data in marine applications. Specifically, the test-bed will be utilized to systematically evaluate the capability of emerging scanning LIDAR and buoy mounted vertically profiling LIDAR by: (1) Evaluating a fixed scanning LIDAR against land-based 50 and 60 meter high meteorological masts fitted with research quality cup-vane and/or sonic anemometers; (2) Evaluating a buoy mounted vertically profiling LIDAR fixed on land and floating in a sheltered bay against a co-located 60 meter high meteorological mast fitted with a research quality cup-vane and/or sonic anemometers and the fixed scanning LIDAR; and (3) Offshore field evaluation of both LIDAR platforms through a comparison of the fixed scanning LIDAR data and data obtained by the buoy mounted LIDAR located 10 miles offshore. The proposed research will systematically validate Light Detection and Ranging (LIDAR) based wind measurement systems and assess the temporal and spatial variability of the offshore wind resource in the Mid-Atlantic east of New Jersey. The goal of the proposed project is to address the technical and commercial challenges of the offshore wind energy industry by validating and assessing cost-effective, over ocean wind resource characterization technologies. The objective is to systematically evaluate the capability of both scanning and vertically profiling LIDARs to accurately measure 3D wind fields through comparison with fixed met masts and intercomparison among LIDAR platforms. Once validated, data collected by both buoy mounted vertically profiling LIDARs and shore-based, pulsed horizontally scanning LIDARs can be used to accurately assess offshore wind resources and to quantify the spatial and temporal variability in the offshore wind fields. One of the fundamental research questions to be addressed in phase 1 is the assessment of various measurement and data processing schemes to retrieve accurate wind vectors in the marine environment over large sampling ranges (10 to 12 km) and varying atmospheric aerosol levels. Atmospheric conditions and aerosol content within the coastal ocean region of the Mid-Atlantic seaboard of the US can vary significantly over short time periods in response to frontal passages and extratropical and tropical low pressure system passage offshore of the coast. Since aerosols provide the scattering medium for the determination of LIDAR Doppler shifts in the atmosphere the accuracy and range of LIDAR derived velocity measurements as a function of variation in aerosol content in the marine environment is a key research question to be addressed. In phase 1, it is desired to capture as much variation in atmospheric conditions and aerosol content as possible. To this end, collocated measurements of LIDAR and standard anemometer wind fields will be captured by the project PIs over all four seasons and during specific events (e.g., coastal low pressure system passage) in year 1. Additionally, since the meteorological masts are permanent structures, additional events can be captured over the three year duration of the field research project. All research instruments are owned by Fishermen’s Energy and made available to the PIs though a lease agreement as part of the DOE grant. Energy Fishermen’s Energy will be responsible for the operation and maintenance of the scanning LIDAR and met mast anemometers. On a daily basis, environmental data and systems performance indicators will be transmitted from each measurement station to the Fishermen’s project team consisting of both in-house personnel and equipment manufacturer engineers. Data sets include compiled LIDAR files as well as data sets from ancillary sensors. Diagnostic parameters to be monitored include standard deviations of measured values, battery levels and charging systems output, and the operational status. Once data have been confirmed as complete and reliable, files will be transferred to the Garrad Hassan (a subcontractor to Fishermen’s Energy) for incorporation in to the validation database, which is accessible to other scientific team members. Data collection times and durations will be determined by the PI and Co-PIs in consultation with instrument engineers to ensure the capture of data representative of the expected range of mid-Atlantic atmospheric conditions (e.g., temperature, moisture, coastal low pressure systems, tropical systems, rain, snow, fog). The collection and processing of the data is a function of site specific measurement requirements (Kelley et.al. 2007; Hannon et.al. 2008). To determine the optimal profiles of wind speed and direction from the LIDAR radial velocities as a function of azimuth angle, rigorous estimates of the bias and random error of each radial velocity estimate are required. Lockheed Martin Coherent Technologies, Inc., under contract with Fishermen’s Energy, will provide analyses of raw and processed data using various scan patterns to determine optimal performance settings for the pulsed scanning LIDAR. Once optimized, appropriate processing and analyses techniques will be evaluated by Garrad Hassan for use in validating the accuracy of the LIDAR wind field measurements against the standard anemometer measurements from the meteorological masts. The most attractive capability of the scanning LIDAR is the ability to provide high spatial resolution observations in a three-dimensional volume which provides superior statistical accuracy due to the large number of samples obtained. Each radial scan provides measurements in 100 range gates over a distance of 10 to 12 km at an update rate of 5 to 10 Hz and rotation of 2.5° per second. Each rotation at a fixed azimuth requires 2.4 minutes. Depending on the number of azimuths desired a complete scan can take up to 10 minutes or longer to complete. Once collected the radial velocities are processed to produce vector wind velocity estimates based on a set of data distributed in angle and range around points of interest, typically a standard grid within the radial wind map. To calculate wind vectors over a limited spatial area of interest for the comparison of data with other measurement platforms a localized least-squares approach has been applied by Hannon et.al. (2008) and a Variation Assimilation (VAR) processing technique has been applied by Chan and al Assimilation (VAR) processing technique has been applied by Chan and Shao (2006). Additionally, Kelley et.al. (2007) applied a “stare” technique that fixed a scanning LIDAR in both azimuth and elevation angles to measure over collocated sampling volumes of the LIDAR and a 3D sonic anemometer mounted to a fixed mast. Although the stare technique is limited to wind directions aligned with the sampling radial of the LIDAR, it does provide a direct comparison of sampling volumes. Each of the processing techniques described above (and possibly others) will be evaluated to determine the validity of the LIDAR derived wind fields in the marine environment. Numerical methods such as linear regression and comparison of probability density functions of wind fields measured by each instrument platform will be used to assess the processing techniques. Linear regression has the advantage of directly evaluating corresponding pairs of wind data measured by each instrument and can lend insight into deviations and bias between instruments as a function of wind speed. Assessment of the coherency between the probability density function of the wind measured by each instrument provides insight into processes that may not be accurately resolved by each instrument at specific frequencies. Once processed and assessed the most appropriate technique will be utilized to provide valid wind measurements from the pulsed scanning LIDAR. A detailed analysis of the measurement data from the LIDAR and the three meteorological towers and comparison of the coastal wind characteristics from the different systems will be performed by the CO_PI at NREL. This analysis will evaluate how the WT LIDAR performance and measurement of the wind characteristics vary with distance from the LIDAR and by atmospheric conditions; using the tower measurements at different distances (4.8, 9.6, and 19 km) from the LIDAR as a reference. The comparative analysis will include, to the extent possible, evaluation of parameters such as wind speed and direction distributions, wind shear, turbulence intensity and their variations by atmospheric conditions, month or season, and time of day.

17 WIND ENERGY↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗