Search NASA⌕ Search

SEARCH · Search NASA

Results for “Center Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

ATLAS Status and First Results

After more than 20 years of continuous work and several months of commissioning with cosmic muon data, the ATLAS experiment started data taking at the Large Hadron Collider (CERN). From November 2009 to May 2010, ATLAS registered proton-proton collisions at 900 GeV, 2.36 GeV and finally 7 TeV center of mass energy. These data samples have been used to study the detector performance in detail and are currently being used also for the first physics studies. In this document, we present some selected physics and performance results obtained with the first 7 TeV proton-proton collisions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of indirect dark matter search with neutrino telescopes

We discuss here the latest results of high energy neutrino experiments with neutrino telescopes in search for neutrino emissions from astrophysical sources where there is every likelihood that relic dark matter has been clumped and annihilates till presently, e.g. in the Sun, in the Galaxy Center and in the Dwarfs.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Confirmatory Survey of the Defense Logistics Agency, Defense National Stockpile Center, New Haven Depot, New Haven, Indiana (Final Report)

The objectives of the radiological confirmatory survey were to collect adequate radiological data for use in evaluating the radiological condition of NHD land areas, warehouses, and support buildings. The data generated from the confirmatory survey activities were used to evaluate the results of the Final Status Survey Report (FSSR) submitted by Cabrera Services (Cabrera 2009). Cabrera has stated that all radioactive materials have been removed and that remediation of the open land areas and structure surfaces was complete, and that the NHD meets the criteria for unrestricted use.

61 RADIATION PROTECTION AND DOSIMETRY↗

Photovoltaics and solar thermal conversion to electricity - Status and prospects

Photovoltaic power system technology development includes flat-plate silicon solar arrays and concentrating solar cell systems, which use silicon and other cell materials such as gallium arsenide. System designs and applications include small remote power systems ranging in size from tens of watts to tens of kilowatts, intermediate load-center applications ranging in size from tens to hundreds of kilowatts, and large central plant installations, as well as grid-connected rooftop applications. The thermal conversion program is concerned with large central power systems and small power applications.

Alper, M. E.↗

2006 Status of the Momentum eXchange Electrodynamic Re-Boost (MXER) Tether Development

The MXER Tether technology development is a high-payoff/high-risk investment area within the NASA In-Space Propulsion Technology (ISPT) Program. The ISPT program is managed by the NASA Headquarters Science Mission Directorate and implemented by the Marshall Space Flight Center in Huntsville, Alabama. The MXER concept was identified and competitively ranked within NASA's comprehensive Integrated In-Space Transportation Plan (IISTP); an agency-wide technology assessment activity. The objective of the MXER tether project within ISPT is to advance the technological maturation level for the MXER system, and its subsystems, as well as other space and terrestrial tether applications. Recent hardware efforts have focused on the manufacturability of space-survivable high-strength tether material and coatings, high-current electrodynamic tether, lightweight catch mechanism, high-accuracy propagator/predictor code, and efficient electron collection/current generation. Significant technical progress has been achieved with modest ISPT funding to the extent that MXER has evolved to a well-characterized system with greater capability as the design has been matured. Synergistic efforts in high-current electrodynamic tethers and efficient electron collection/current generation have been made possible through SBIR and STTR support. The entire development endeavor was orchestrated as a collaborative team effort across multiple individual contracts and has established a solid technology resource base, which permits a wide variety of future space cable/tether applications to be realized.

Bonometti, Joseph A.↗

Status of Solar Sail Technology Within NASA

In the early 2000s, NASA made substantial progress in the development of solar sail propulsion systems for use in robotic science and exploration of the solar system. Two different 20-m solar sail systems were produced and they successfully completed functional vacuum testing in NASA Glenn Research Center's (GRC's) Space Power Facility at Plum Brook Station, Ohio. The sails were designed and developed by ATK Space Systems and L Garde, respectively. The sail systems consist of a central structure with four deployable booms that support the sails. These sail designs are robust enough for deployment in a one-atmosphere, one-gravity environment and were scalable to much larger solar sails perhaps as large as 150 m on a side. Computation modeling and analytical simulations were also performed to assess the scalability of the technology to the large sizes required to implement the first generation of missions using solar sails. Life and space environmental effects testing of sail and component materials were also conducted. NASA terminated funding for solar sails and other advanced space propulsion technologies shortly after these ground demonstrations were completed. In order to capitalize on the $30M investment made in solar sail technology to that point, NASA Marshall Space Flight Center (MSFC) funded the NanoSail-D, a subscale solar sail system designed for possible small spacecraft applications. The NanoSail-D mission flew on board the ill-fated Falcon-1 Rocket launched August 2, 2008, and due to the failure of that rocket, never achieved orbit. The NanoSail-D flight spare will be flown in the Fall of 2010. This paper will summarize NASA's investment in solar sail technology to-date and discuss future opportunities

Johnson, Les↗

Development Status of the Fission Power System Technology Demonstration Unit

This paper summarizes the progress that has been made in the development of the Fission Power System Technology Demonstration Unit (TDU). The reactor simulator core and Annular Linear Induction Pump have been fabricated and assembled into a test loop at the NASA Marshall Space Flight Center. A 12 kWe Power Conversion Unit (PCU) is being developed consisting of two 6 kWe free-piston Stirling engines. The two 6 kWe engines have been fabricated by Sunpower Inc. and are currently being tested separately prior to integration into the PCU. The Facility Cooling System (FCS) used to reject convertor waste heat has been assembled and tested at the NASA Glenn Research Center (GRC). The structural elements, including a Buildup Assembly Platform (BAP) and Upper Truss Structure (UTS) have been fabricated, and will be used to test cold-end components in thermal vacuum prior to TDU testing. Once all components have been fully tested at the subsystem level, they will be assembled into an end-to-end system and tested in thermal vacuum at GRC.

Briggs, Maxwell H.↗

Development Status of the Fission Power System Technology Demonstration Unit

This paper summarizes the progress that has been made in the development of the Fission Power System Technology Demonstration Unit (TDU). The reactor simulator core and Annular Linear Induction Pump have been fabricated and assembled into a test loop at the NASA Marshall Space Flight Center. A 12 kWe Power Conversion Unit (PCU) is being developed consisting of two 6 kWe free-piston Stirling engines. The two 6 kWe engines have been fabricated by Sunpower Inc. and are currently being tested separately prior to integration into the PCU. The Facility Cooling System (FCS) used to reject convertor waste heat has been assembled and tested at the NASA Glenn Research Center (GRC). The structural elements, including a Buildup Assembly Platform (BAP) and Upper Truss Structure (UTS) have been fabricated, and will be used to test cold-end components in thermal vacuum prior to TDU testing. Once all components have been fully tested at the subsystem level, they will be assembled into an end-to-end system and tested in thermal vacuum at NASA GRC.

Briggs, Maxwell H.↗

AN EXTREME ANALOGUE OF ϵ AURIGAE: AN M-GIANT ECLIPSED EVERY 69 YEARS BY A LARGE OPAQUE DISK SURROUNDING A SMALL HOT SOURCE

We present TYC 2505-672-1 as a newly discovered and remarkable eclipsing system comprising an M-type red giant that undergoes a ∼3.45 year long, near-total eclipse (depth of ∼4.5 mag) with a very long period of ∼69.1 years. TYC 2505-672-1 is now the longest-period eclipsing binary system yet discovered, more than twice as long as that of the currently longest-period system, ϵ Aurigae. We show from analysis of the light curve including both our own data and historical data spanning more than 120 years and from modeling of the spectral energy distribution, both before and during eclipse, that the red giant primary is orbited by a moderately hot source ( T {sub eff} ≈ 8000 K) that is itself surrounded by an extended, opaque circumstellar disk. From the measured ratio of luminosities, the radius of the hot companion must be in the range of 0.1–0.5 R {sub ⊙} (depending on the assumed radius of the red giant primary), which is an order of magnitude smaller than that for a main sequence A star and 1–2 orders of magnitude larger than that for a white dwarf. The companion is therefore most likely a “stripped red giant” subdwarf-B type star destined to become a He white dwarf. It is, however, somewhat cooler than most sdB stars, implying a very low mass for this “pre-He-WD” star. The opaque disk surrounding this hot source may be a remnant of the stripping of its former hydrogen envelope. However, it is puzzling how this object became stripped, given that it is at present so distant (orbital semimajor axis of ∼24 au) from the current red giant primary star. Extrapolating from our calculated ephemeris, the next eclipse should begin in early UT 2080 April and end in mid UT 2083 September (eclipse center UT 2081 December 24). In the meantime, radial velocity observations would establish the masses of the components, and high-cadence UV observations could potentially reveal oscillations of the hot companion that would further constrain its evolutionary status. In any case, this system is poised to become an exemplar of a very rare class of systems, even more extreme in several respects than the well studied archetype ϵ Aurigae.

79 ASTRONOMY AND ASTROPHYSICS↗

Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations

As part of the Research Institute for Computing and Information Systems (RICIS) activity, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Max satellite simulation. This activity is carried out in the software technology laboratory utilizing the Orbital Operations Simulator (OOS). This interim report provides the status of the project and outlines the future plans.

Jani, Yashvant↗

Discrete Roughness Effects on Shuttle Orbiter at Mach 6

Discrete roughness boundary layer transition results on a Shuttle Orbiter model in the NASA Langley Research Center 20-Inch Mach 6 Air Tunnel have been reanalyzed with new boundary layer calculations to provide consistency for comparison to other published results. The experimental results were previously obtained utilizing the phosphor thermography system to monitor the status of the boundary layer via global heat transfer images of the Orbiter windward surface. The size and location of discrete roughness elements were systematically varied along the centerline of the 0.0075-scale model at an angle of attack of 40 deg and the boundary layer response recorded. Various correlative approaches were attempted, with the roughness transition correlations based on edge properties providing the most reliable results. When a consistent computational method is used to compute edge conditions, transition datasets for different configurations at several angles of attack have been shown to collapse to a well-behaved correlation.

Berry, Scott A.↗

Comparison of Methods for Determining Boundary Layer Edge Conditions for Transition Correlations

Data previously obtained for the X-33 in the NASA Langley Research Center 20-Inch Mach 6 Air Tunnel have been reanalyzed to compare methods for determining boundary layer edge conditions for use in transition correlations. The experimental results were previously obtained utilizing the phosphor thermography technique to monitor the status of the boundary layer downstream of discrete roughness elements via global heat transfer images of the X-33 windward surface. A boundary layer transition correlation was previously developed for this data set using boundary layer edge conditions calculated using an inviscid/integral boundary layer approach. An algorithm was written in the present study to extract boundary layer edge quantities from higher fidelity viscous computational fluid dynamic solutions to develop transition correlations that account for viscous effects on vehicles of arbitrary complexity. The boundary layer transition correlation developed for the X-33 from the viscous solutions are compared to the previous boundary layer transition correlations. It is shown that the boundary layer edge conditions calculated using an inviscid/integral boundary layer approach are significantly different than those extracted from viscous computational fluid dynamic solutions. The present results demonstrate the differences obtained in correlating transition data using different computational methods.

Liechty, Derek S.↗

Mars Global Reference Atmospheric Model (Mars-GRAM) Upgrades

The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering models of the Martian atmosphere is the Mars Global Reference Atmospheric Model (Mars-GRAM) developed and maintained by the NASA Marshall Space Flight Center (MSFC). The NASA Science Mission Directorate (SMD) has provided funding support to upgrade the planetary GRAMs in Fiscal Year 2018 and 2019. This poster summarizes the upgrades that have been made to Mars-GRAM, the release status of Mars-GRAM, the new GRAMs that are under development, and future Mars-GRAM upgrade plans.

Justh, H. L.↗

Status on the Recovery of Voyager Plasma Electron Observations at Jupiter

We give status report on the recovery of Voyager 1 and 2 plasma electron observations during their Jupiter flybys. The plan is to complete this analysis including new results never published before. The original summary data tapes and later datafiles were evidently permanently lost along with our past analysis results of the plasma electron observations except for that shown in previous publications. These summary data tapes included the plasma ion and electron raw datafiles, status words needed to convert data numbers to currents, SEDR data with trajectory and attitude information and magnetic field measurements. In addition to recovering the plasma electron plasma observations (electron intensities and fluid parameters of the thermal and suprathermal electron populations, respectively), the SEDR trajectory information during the out bound passes were lost but fortunately in the past the SEDR files were converted to Spice Kernals, so this unexpected problem was solved. In addition, we had to rewrite our read routines it looked like the previous read routines so the rest of the Fortran code could be used; the Fortran- code had to be modified to work with the latest compilers and computer platforms. We will report on the- status of our work- originally funded under the Planetary Data Archiving, Restoration, and Tools (PDART)program but now being funded by the Internal Scientist Funding Model (ISFM) Exosphere Ionosphere Magnetospheres Modeling (EIMM)program at NASA Goddard Space Flight Center.

E C Sittler Jr.↗

The Status of LILW Complex Disposal Facility Construction in Korea - 17123

In this paper, the experiences and directions of the construction of the LILW disposal facility in Korea are discussed. The LILW disposal facility is being constructed in Gyeongju-si, Korea. The disposal facility is officially called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (WLDC)'. It can dispose of 800,000 drums (hereafter, 'drums' means '200 liter drum equivalents' unless specified otherwise) of radioactive waste in a site of 2,060,000 m{sup 2}. The first stage of the LILW facility construction was completed in June 2014, and approved for use by Nuclear Safety and Security Commission (NSSC) in December 2014. The first stage of the LILW facility is a type of underground silo with disposal capacity of 35,200 m{sup 3} (100,000 drums). The first stage of the LILW facility consists of a construction tunnel, an operation tunnel, an access shaft and six silos, etc. Silo for final disposal is located 80∼130 m below sea level, 25 m in diameter and 50 m in height. The capacity of each silo is approximately 16,700 drums. The second stage of the LILW facility is under construction to be completed by December 2019. Site construction is currently underway. The second stage of the LILW facility is a type of near-surface disposal with disposal capacity of 32,875 m{sup 3} (125,000 drums). This stage of the LILW disposal facility consists of an underground gallery, three movable cranes and twenty vaults, etc. Vault for final disposal is located 70 m above sea level, 20 m in width, 20 m length and 10 m in height. The capacity of each vault is approximately 6,250 drums. These stages of the LILW disposal facilities are together called LILW complex disposal facility. It's the world's first LILW disposal facility with two different types of disposal facilities in one site. For efficient operation, these disposal facilities share a reception and storage building, waste water treatment system, measurement and monitoring system, etc. After construction of the first two stages is completed, LILW disposal facilities will be incrementally expanded, and as the whole LILW disposal facilities are completed, all LILW in Korea will be managed safely in WLDC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One Year Old and Growing: A Status Report on the International Space Station and Its Partners

The first elements of the International Space Station have been launched and docked together, and are performing well on-orbit. The Station is currently being operated jointly by NASA and Russian space organizations. In May 1999, the Space Shuttle was the first vehicle to dock to the International, Space Station. A crew of seven U.S. and Russian astronauts delivered 4000 pounds of supplies, made repairs to communications and battery systems, and installed external hardware during an EVA. The next module, the Russian Service Module, is due to join the orbital complex this year. This will initiate a period of rapid growth, with new modules and equipment continually added for the next five to six years, through assembly complete. The first crew is scheduled to begin permanent occupation of the International Space Station early next year. Hardware is being developed by Space Station partners and participants around the world and is largely on schedule for launch. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required. International crews are selected and in training. Coordination efforts continue with each of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved their own successes. This paper will discuss the status of the ISS partners and participants, their contributions and accomplished milestones, and upcoming events. It will also give a status report on the developments of the remainder of the ISS modules and components by each partner and participant. The ISS, the largest and most complicated peacetime project in history, is flying, and, with the help of all the ISS members, will continue to grow.

Bartoe, John-David F.↗

Design and Optimization of Photovoltaics Recycling Infrastructure

With the growing production and installation of photovoltaics (PV) around the world constrained by the limited availability of resources, end-of-life management of PV is becoming very important. A few major PV manufacturers currently are operating several PV recycling technologies at the process level. The management of the total recycling infrastructure, including reverse-logistics planning, is being started in Europe. In this paper, we overview the current status of photovoltaics recycling planning and discuss our mathematic modeling of the economic feasibility and the environmental viability of several PV recycling infrastructure scenarios in Germany; our findings suggest the optimum locations of the anticipated PV take-back centers. Short-term 5-10 year planning for PV manufacturing scraps is the focus of this article. Although we discuss the German situation, we expect the generic model will be applicable to any region, such as the whole of Europe and the United States.

14 SOLAR ENERGY↗

Test and training simulator for ground-based teleoperated in-orbit servicing

For the Post-IOC(In-Orbit Construction)-Phase of COLUMBUS it is intended to use robotic devices for the routine operations of ground-based teleoperated In-Orbit Servicing. A hardware simulator for verification of the relevant in-orbit operations technologies, the Servicing Test Facility, is necessary which mainly will support the Flight Control Center for the Manned Space-Laboratories for operational specific tasks like system simulation, training of teleoperators, parallel operation simultaneously to actual in-orbit activities and for the verification of the ground operations segment for telerobotics. The present status of definition for the facility functional and operational concept is described.

Schaefer, Bernd E.↗