Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Advanced EMU Portable Life Support System (PLSS) and Shuttle/ISS EMU Schematics, A Comparison

In order to be able to adapt to differing vehicle interfaces such as suitport and airlock, adjust to varying vehicle pressure schedules, tolerate lower quality working fluids, and adapt to differing suit architectures as dictated by a range of mission architectures, the next generation space suit requires more adaptability and robustness over that of the current Shuttle/ISS Extra-vehicular Mobility Unit (EMU). While some features have been added to facilitate interfaces to differing vehicle and suit architectures, the key performance gains have been made via incorporation of new technologies such as the variable pressure regulators, Rapid Cycle Amine swing-bed, and Suit Water Membrane Evaporator. This paper performs a comparison between the Shuttle/ISS EMU PLSS schematic and the Advanced EMU PLSS schematic complete with a discussion for each difference.

Campbell, Colin↗

Advanced EMU Portable Life Support System (PLSS) and Shuttle/ISS EMU Schematics, a Comparison

In order to be able to adapt to differing vehicle interfaces such as suitport and airlock, adjust to varying vehicle pressure schedules, tolerate lower quality working fluids, and adapt to differing suit architectures as dictated by a range of mission architectures, the next generation space suit requires more adaptability and robustness over that of the current Shuttle/ISS Extra-vehicular Mobility Unit (EMU). While some features have been added to facilitate interfaces to differing vehicle and suit architectures, the key performance gains have been made via incorporation of new technologies such as the variable pressure regulators, Rapid Cycle Amine swing-bed, and Suit Water Membrane Evaporator. This paper performs a comparison between the Shuttle/ISS EMU PLSS schematic and the Advanced EMU PLSS schematic complete with a discussion for each difference.

Campbell, Colin↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

Validation of the Mars 2020 Fault Protection Design: Navigating the Infinity of the Off-Nominal

On July 30th 2020, the Mars 2020 mission successfully launched out of Cape Canaveral, Florida, passed through the Earth’s shadow, and began its short cruise to Mars. Less than seven months later, the Perseverance rover touched down safely in Jezero Crater to begin its ambitious mission that includes looking for signs of ancient life and collecting samples for future return to Earth. Getting to the successful landing, or “Tango Delta Nominal,” could not have been achieved without also considering the off-nominal. One of the teams supporting this ambitious mission is the fault protection (FP) team. This team is tasked with assessing the various failures, or faults, that could prevent mission success and with ensuring that the autonomous behaviors built into the software and hardware can detect faults and recover the vehicle to a safe state. As part of its charter, the FP team designed a test campaign to provide confidence in the system’s robustness to off-nominal scenarios across all of Mars 2020’s mission phases. The greatest challenge associated with designing such a validation campaign was reducing the infinite number of anomalous scenarios into a finite test suite. In addition, the tests needed to be executed efficiently in order to utilize the team’s limited test venue access, but still needed to maintain a level of rigor that guaranteed confidence in the test outcomes. Given that each test scenario generated massive amounts of data, the team also developed methods for quickly ascertaining whether the autonomous fault protection behaviors maintained vehicle safety in the presence of an anomaly. This paper summarizes the processes that the Mars 2020 fault protection team employed to execute its off-nominal validation campaign. It captures both the methods of generating a suite of off-nominal tests, as well as reducing it to a subset that can be realistically executed within schedule and resource constraints. It also describes the various processes and philosophies that the team utilized to execute the tests efficiently, including creating a standardized procedure template, keeping the test cases modular so that they could be easily interchanged, and capturing common fault injections in a change-controlled database. Finally, it will describe the tools and processes for assessing the test data, focusing in particular on a tool that evaluated vehicle state using “secondary” sources of data to validate that the software had truly configured the spacecraft to the expected safe state.

Morantz, Chaz↗

Status of Triso fuel irradiations in the advanced test reactor supporting high-temperature gas-cooled reactor designs - 18468

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is irradiating up to seven experiments on low-enriched uranium tri-structural isotropic (TRISO) particle fuel. Irradiations and fuel development are being accomplished at Idaho National Laboratory s Advanced Test Reactor to support development of the next generation of reactors in the United States. The experiments are being irradiated over several years to demonstrate and qualify new TRISO-coated particle fuel for use in high-temperature gas reactors, with goals of providing irradiation performance data to support fuel process development, qualifying fuel for normal operating conditions, supporting development and validation of fuel performance and fission product transport models and codes, and providing irradiated fuel and materials for post-irradiation examination and safety testing. The experiments are irradiated in an inert sweep gas atmosphere, with individual online temperature monitoring and control of each capsule and online fission product monitoring of effluent to track individual capsule fuel performance. The first experiment (AGR-1) started irradiation in December 2006 and was completed in November 2009. The second experiment (AGR-2) started irradiation in June 2010 and completed in October 2013. The third and fourth experiments have been combined into a single experiment (AGR-3/4), which started its irradiation in December 2011 and completed in April 2014. Because the purpose of this experiment was to provide data on fission product migration and retention in the next generation reactor, the design of this experiment was significantly different from the first two experiments. The final experiment (AGR-5/6/7) is scheduled to begin irradiation in early summer 2017. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Southern Sky Survey with Fermi LAT and ASKAP

We present the prospects for a future joint gamma-ray and radio survey of southern hemisphere sources using the Fermi Large Area Telescope (LAT) and the upcoming Australian Square Kilometre Array Pathfinder (ASKAP) radio telescope. ASKAP is a next generation radio telescope designed to perform surveys at GHz frequencies at a much higher survey speed than previous radio telescopes, and is scheduled to start engineering observations in 2011. The survey capabilities of both Fermi LAT and ASKAP are described, and the planned science surveys for ASKAP are summarized. We give some expected details of the Variable and Slow Transient (VAST) survey using ASKAP, which will search for transients on timescales from 5 seconds to years. Some observational properties of faint and transient sources seen at gamma-ray and radio wavelengths are summarized, and prospects and strategies for using ASKAP survey data for LAT source counterpart identification are summarized.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Intelligent Planning and Scheduling for Controlled Life Support Systems

Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.

Leon, V. Jorge↗

New Generator Technology

New generator technology project is driven by the need to be able to remotely deploy generator technology where it is needed, when it is needed. Both the military and aid programs that provide assistance after disasters could use the ability to deploy energy generation that fits the needs of the situation. Currently, pre-specified generators are deployed, sometime more than half way around the world to provide electricity. Through our Phase-I to Phase III DARPA grant, we will provide a mechanism where a 3d print station and raw materials could be shipped to a deployment site and remotely deployed personnel. These remote personnel can collaborate with engineers at a home location where 3d print plans can be optimized for the remote purpose. The plans can then be sent electronically to the remote location for printing, much like NASA sent the plans for a socket wrench to the International Space Station for printing in . If multiple generators need to be deployed at different remote locations, within miles of each other the printer rig can be moved to print the generators where they are needed. 3d printing is growing in the field of manufacturing. 3d printing has matured to the point where many types of materials are now available for many types of manufacturing. Both magnetic and electrically conductive material materials have recently been developed which can now lead to 3d printing of engines and generators. Our project will provide a successful printer rig that can be remotely deployed, to print a generator design in the field as well as provide a process for deploying the printed generator as well. This Systems Engineering Management Plan(SEMP) will provide the planning required for a Phase I DARPA grant that may also include goals for Phase II and Phase II grants. The SEMP provides a proposed project schedule, references, system engineering processes, specialty engineering system deployment and product support sections. Each section will state how our company will provide the necessary services to make this project succeed.

3D printing, manufacturing, generator technology, ↗

Development and Application of A Membrane-Based Thermodenuder for Measurement of Volatile Particles Emitted by A Jet Turbine Engine

Measurement of volatile particles emitted by modern jet engines is a daunting task. Besides the complexity in sampling jet aircraft exhaust, the main difficulty lies at how to faithfully capture the phase-partition dynamics of volatile particles as they travel downstream from the engine exhaust nozzle. As a result, the physico-chemical properties of the exhaust are also transformed. We have developed a sampling instrument that aims at enabling study of the phase-partition dynamics. The objective of this research project was to design and evaluate a new thermodenuder for performing phase separation of the engine-emitted volatile particles. The backbone of the new thermodenuder is a thin metallic membrane. The membrane enables extraction of molecules that can be thermally desorbed from the condensed particulate phases and collected for subsequent chemical analysis. Toward realization of the technique in the future field aircraft emissions measurement we tested this new thermo-denuding device using laboratory-generated particles that were made of non-volatile or semi-volatile chemicals. The particle penetration efficiency, a measure of the device performance, of this thermodenuder was found to be better than 99%. Results obtained from the tests executed at a number of operating temperature conditions show reasonably good thermal separation. We have scheduled to apply this new device to characterize emissions from a T63 turboshaft engine in the spring of 2010 and are expecting to show the engine results at the conference. The test results based on the laboratory-generated particles were encouraging for the intended application. With excellent particle transmission efficiency and an ability to simultaneously measure the composition in the gas and particle phases of the engine particles, we believe the new technology will make a great contribution to measurement research of engine emissions.

47 OTHER INSTRUMENTATION↗

Heavy Water Components Test Reactor Decommissioning - Major Component Removal

The Heavy Water Components Test Reactor (HWCTR) facility (Figure 1) was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR facility is on high, well-drained ground, about 30 meters above the water table. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. It was not a defense-related facility like the materials production reactors at SRS. The reactor was moderated with heavy water and was rated at 50 megawatts thermal power. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In 1965, fuel assemblies were removed, systems that contained heavy water were drained, fluid piping systems were drained, deenergized and disconnected and the spent fuel basin was drained and dried. The doors of the reactor facility were shut and it wasn't until 10 years later that decommissioning plans were considered and ultimately postponed due to budget constraints. In the early 1990s, DOE began planning to decommission HWCTR again. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. The $1.6 billion allocation from the American Recovery and Reinvestment Act to SRS for site clean up at SRS has opened the doors to the HWCTR again - this time for final decommissioning. During the lifetime of HWCTR, 36 different fuel assemblies were tested in the facility. Ten of these experienced cladding failures as operational capabilities of the different designs were being established. In addition, numerous spills of heavy water occurred within the facility. Currently, radiation and radioactive contamination levels are low within HWCTR with most of the radioactivity contained within the reactor vessel. There are no known insults to the environment, however with the increasing deterioration of the facility, the possibility exists that contamination could spread outside the facility if it is not decommissioned. An interior panoramic view of the ground floor elevation taken in August 2009 is shown in Figure 2. The foreground shows the transfer coffin followed by the reactor vessel and control rod drive platform in the center. Behind the reactor vessel is the fuel pool. Above the ground level are the polar crane and the emergency deluge tank at the top of the dome. Note the considerable rust and degradation of the components and the interior of the containment building. Alternative studies have concluded that the most environmentally safe, cost effective option for final decommissioning is to remove the reactor vessel, steam generators, and all equipment above grade including the dome. Characterization studies along with transport models have concluded that the remaining below grade equipment that is left in place including the transfer coffin will not contribute any significant contamination to the environment in the future. The below grade space will be grouted in place. A concrete cover will be placed over the remaining footprint and the groundwater will be monitored for an indefinite period to ensure compliance with environmental regulations. The schedule for completion of decommissioning is late FY2011. This paper describes the concepts planned in order to remove the major components including the dome, the reactor vessel (RV), the two steam generators (SG), and relocating the transfer coffin (TC).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Interconnection-wide hour-ahead scheduling in the presence of intermittent renewables and demand response: A surplus maximizing approach

This study describes a new approach for solving the multi-area electricity resource allocation problem when considering both intermittent renewables and demand response. The method determines the hourly inter-area export/import set that maximizes the interconnection (global) surplus satisfying transmission, generation and load constraints. The optimal inter-area transfer set effectively makes the electricity price uniform over the interconnection apart from constrained areas, which overall increases the consumer surplus more than it decreases the producer surplus. The method is computationally efficient and suitable for use in simulations that depend on optimal scheduling models. The method is demonstrated on a system that represents North America Western Interconnection for the planning year of 2024. Simulation results indicate that effective use of interties reduces the system operation cost substantially. Excluding demand response, both the unconstrained and the constrained scheduling solutions decrease the global production cost (and equivalently increase the global economic surplus) by 12.30B and 10.67B per year, respectively, when compared to the standalone case in which each control area relies only on its local supply resources. This cost saving is equal to 25% and 22% of the annual production cost. Including 5% demand response, the constrained solution decreases the annual production cost by 10.70B, while increases the annual surplus by 9.32B in comparison to the standalone case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Initial Study of Airport Arrival Heinz Capacity Benefits Due to Improved Scheduling Accuracy

The long-term growth rate in air-traffic demand leads to future air-traffic densities that are unmanageable by today's air-traffic control system. I n order to accommodate such growth, new technology and operational methods will be needed in the next generation air-traffic control system. One proposal for such a system is the Automated Airspace Concept (AAC). One of the precepts of AAC is to direct aircraft using trajectories that are sent via an air-ground data link. This greatly improves the accuracy in directing aircraft to specific waypoints at specific times. Studies of the Center-TRACON Automation System (CTAS) have shown that increased scheduling accuracy enables increased arrival capacity at CTAS equipped airports.

Meyn, Larry↗

A Methodology for Quantifying Reliability Benefits From Improved Solar Power Forecasting in Multi-Timescale Power System Operations

Solar power forecasting improvements are mainly evaluated by statistical and economic metrics, and the practical reliability benefits of these forecasting enhancements have not yet been well quantified. This paper aims to quantify reliability benefits from solar power forecasting improvements. To systematically analyze the relationship between solar power forecasting improvements and reliability performance in power system operations, an expected synthetic reliability (ESR) metric is proposed to integrate state-of-the-art independent reliability metrics. The absolute value and standard deviation of area control errors (ACE), and the North American Electric Reliability Corporation Control Performance Standard 2 (CPS2) score are calculated through the multi-timescale scheduling simulation, including the day-ahead unit commitment (DU), real-time unit commitment (RU), real-time economic dispatch (RE), automatic generation control (AGC) sub-models. The absolute area control error in energy (AACEE), CPS2 violations, CPS2 score, and standard deviation of the raw ACE are all calculated and combined as the ESR metric. Numerical simulations show that the reliability benefits of multi-timescale power system operations are significantly increased due to the improved solar power forecasts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2013 Cost of Wind Energy Review

This report uses representative project types to estimate the levelized cost of wind energy (LCOE) in the United States for 2013. Scheduled to be published on an annual basis, it relies on both market and modeled data to maintain a current understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed from this analysis are used to inform wind technology cost projections, goals, and improvement opportunities.

17 WIND ENERGY↗

Laser geodynamic satellite/thermal/optical vibrational analyses and testing. Volume 2: Technical report, book 3

The overall plan for accomplishing the various tests required to achieve the program objectives and tasks of the LAGEOS thermal/optical/vibration analysis and test program is described. The requirements for each test are identified for the purpose of program review for the design and fabrication of the required test article and test fixtures, for the allocation of test facilities, equipment and expendables, and for the generation of the detail test procedures by which the specified data will be obtained at specified test conditions. The current internal test program schedules, by which the various individual preparatory subtasks are to be accomplished to ensure that the individual test will be conducted within the time period required to meet program objectives are included.

Source record↗

Feasibility study for the implementation of NASTRAN on the ILLIAC 4 parallel processor

The ILLIAC IV, a fourth generation multiprocessor using parallel processing hardware concepts, is operational at Moffett Field, California. Its capability to excel at matrix manipulation, makes the ILLIAC well suited for performing structural analyses using the finite element displacement method. The feasibility of modifying the NASTRAN (NASA structural analysis) computer program to make effective use of the ILLIAC IV was investigated. The characteristics are summarized of the ILLIAC and the ARPANET, a telecommunications network which spans the continent making the ILLIAC accessible to nearly all major industrial centers in the United States. Two distinct approaches are studied: retaining NASTRAN as it now operates on many of the host computers of the ARPANET to process the input and output while using the ILLIAC only for the major computational tasks, and installing NASTRAN to operate entirely in the ILLIAC environment. Though both alternatives offer similar and significant increases in computational speed over modern third generation processors, the full installation of NASTRAN on the ILLIAC is recommended. Specifications are presented for performing that task with manpower estimates and schedules to correspond.

Field, E. I.↗

IGOS improvements for Seasat

Modifications to Battelle's Interactive Graphics Orbit Selection (IGOS) computer program to assist in the planning and evaluation of the Seasat-A Scatterometer System (SASS) flight program were studied. To meet the planning needs of the LaRC Seasat-A Scatterometer team, the following features/modifications were implemented in IGOS: (1) display and specification of time increments in orbital passes represented by the cross-hatching of ground swaths; (2) addition of pass number annotations on the horizontal axis of the STPLNG and STPTOD plots; (3) modification of the sensor model to include more than two swaths associated with a single sensor to approximate the SASS cell pattern; (4) inclusion of down range and cross-track swath geometry to display the characteristic skewed SASS pattern; (5) addition of a swath schedule to allow the display of the SASS mode changes and to calibrate gaps; and (6) development of a set of commands to generate the detailed swath data from sensor characteristics and orbit/earth motion.

Warmke, J. M.↗