Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

A trust fund approach to accelerating deployment of CCS: options and considerations

The paper discusses one possible avenue to accelerate deployment of carbon dioxide capture and sequestration (CCS) technologies: use of a special-purpose CCS Trust Fund. A CCS Trust Fund financed, for example, through fees on coal-based or fossil fuel-based electricity generation may have a role in reducing CO{sub 2} emissions from power plants because it could: raise funds at the scale needed to support a significant number (e.g., 10 to 30) of commercial-scale CCS projects; ensure that the funds raised would be used to demonstrate CCS at commercial scale for a full range of systems applicable to U.S. power plants; establish the true costs, reliability, and operability of power plants with CCS; utilize private-sector business standards for project selection and management to ensure program cost effectiveness; and significantly reduce CCS costs within 10 to 15 years by supporting approximately 30 demonstrations, yielding substantial national economic benefits as CCS becomes widely deployed. The United States has considerable experience with trust funds. While no single existing fund illustrates all the features that might be desirable for a CCS Trust Fund, lessons from prior U.S. experience can be used to design an effective, efficient mechanism for advancing commercial-scale deployment of CCS. In particular, experience has indicated the importance of financial self-sufficiency, private-sector management standards, insulation from the annual Congressional appropriations process, and termination upon completion of objectives. Carefully crafted enabling legislation and, most likely, use of a quasi-public or private entity to manage a CCS Trust Fund will be needed to incorporate these and other desirable features. 25 refs., 1 tab., 1 app.

01 COAL, LIGNITE, AND PEAT↗

ITER design review: Tritium issues

One of the key activities on ITER during 2007 is a Design Review covering selected high priority areas of the project in which a significant number of features of the design with the potential to compromise the achievement of some objectives of ITER have been identified. These issues are being addressed by a number of focussed working groups to develop solutions for these issues which will enhance operating margins, reliability and availability, and ensure compliance with the French licensing framework. One of the working groups has been set up to investigate tritium-related issues. The principal design features which are being addressed by this group and the proposed resolutions of these issues are described in the paper. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Establishing no credible risk of inadvertent criticality for the K-25 demolition project - 14310

Demolition of the K-25 Gaseous Diffusion Plant required establishing a non-credible risk of inadvertent criticality because a Criticality Accident Alarm System (CAAS) could not be reliably maintained operable as the building was being torn down. Preparation for, and demolition of, the facility was a multi-year long effort with significant changes in approach. The most significant change was to demolish the facility with as much of the process gas equipment and piping left in the facility as possible, rather than removing all process gas equipment and piping from the facility prior to demolishing the building structure only. The contractor had to adapt their approach to accommodate these changes. The normal approach to demolition was to remove all process gas equipment and piping prior to demolition, using Nuclear Criticality Safety (NCS) controls based on the double contingency principle, while CAAS coverage was intact. Then, the building structure was demolished with no requirement for a CAAS. This was the method used to demolish the K-33 Building, for example. In the case of K-25 demolition, all equipment and piping that met the Environmental Management Waste Management Facility (EMWMF) disposal cell Waste Acceptance Criteria (WAC) was left in the building and removed as part of the building demolition process. This resulted in significant quantities of fissionable material remaining in the building and being handled during demolition. The NCS Organization worked closely with several groups during preparation activities. A Data Management organization was established to specifically identify every piece of process gas equipment and piping in the facility so that it could be accounted for and characterized. Deactivation and Decommissioning (D and D) personnel conducted internal visual inspections, by remote camera, of all process gas equipment and piping larger than 3' diameter, to reveal any large deposits that would require removal. Non-Destructive Assay (NDA) of the vast majority of equipment and piping was required to quantify the amount of fissionable material remaining. Finally, all process gas equipment and piping larger than 3'' diameter was internally filled with foam, which was credited by NCS with immobilizing the remaining fissionable material such that large migration and accumulation could not occur during demolition activities. NCS personnel worked closely with all of these groups in order to acquire the data and information needed to establish a non-credible risk of inadvertent criticality during building demolition. Good communication and a close working relationship between NCS, the various D and D/characterization personnel, and the Department of Energy (DOE) ensured the success of the modified approach to building demolition. The same successful approach is currently underway in the K-27 Building as well. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dynamically Learning Incentives for Load Control

As electrical generation becomes more distributed and volatile, and loads become more uncertain, controllability of distributed energy resources (DERs), regardless of their ownership status, will be necessary for grid reliability. Grid operators lack direct control over end-users' grid interactions, such as energy usage, but incentives can influence behavior -- for example, an end-user that receives a grid-driven incentive may adjust their consumption or expose relevant control variables in response. A key challenge in studying such incentives is the lack of data about human behavior, which usually motivates strong assumptions, such as distributional assumptions on compliance or rational utility-maximization. In this paper, we propose a general incentive mechanism in the form of a constrained optimization problem -- our approach is distinguished from prior work by modeling human behavior (e.g., reactions to an incentive) as an arbitrary unknown function. We propose feedback-based optimization algorithms to solve this problem that each leverage different amounts of information and/or measurements. We show that each converges to an asymptotically stable incentive with (near)-optimality guarantees given mild assumptions on the problem. Finally, we evaluate our proposed techniques in voltage regulation simulations on standard test beds. We test a variety of settings, including those that break assumptions required for theoretical convergence (e.g., convexity, smoothness) to capture realistic settings. In this evaluation, our proposed algorithms are able to find near-optimal incentives even when the reaction to an incentive is modeled by a theoretically difficult (yet realistic) function.

demand response↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Development of Digital Twin-Informed Predictive Maintenance for Critical Components in Advanced Reactors

Small modular reactors (SMRs) and microreactors, along with other advanced reactor (AR) technologies, are key to the future of nuclear energy. For these systems to achieve low operating costs, high reliability, and flexibility across applications, their operation and maintenance must be optimized. Digital twin (DT) technology is one of the technologies that enables real-time (or faster than real-time) monitoring and prognosis of critical components which are vital for operational efficiency, low costs, and enhanced safety of ARs, accelerating their deployment. DT technology provides dynamic virtual representation of physical assets by integrating real-time data, physics-based models, and advanced analytics, which is critical to optimizing the performance of the entire energy system throughout the life cycle. DTs empower engineers and operators to virtually explore different scenarios, configurations, and control strategies, allowing for the identification of optimal solutions that maximize reactor efficiency, safety, and economics.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Stability and support issues in the construction of large span caverns for physics

New physics experiments, proposed to study neutrinos and protons, call for the use of large underground particle detectors. In the United States, such detectors would be housed in the US Deep Underground Science and Engineering Laboratory (DUSEL), sited within the footprint of the defunct Homestake Mine, South Dakota. Although the experimental proposals differ in detail, all rely heavily upon the ability of the mined and reinforced rock mass to serve as a stable host for the detector facilities. Experimental proposals, based on the use of Water Cherenkov detector technology, specify rock caverns with excavated volumes in excess of half a million cubic meters, spans of at least 50 m, sited at depths of approximately one to 1.5 kilometers. Although perhaps sited at shallower depth, proposals based on the use of Liquid Argon (LAr) detector technology are no less challenging. LAr proposals not only call for the excavation of large span caverns, but have an additional need for the safe management of large quantities (kilo-tonnes) of cryogenic liquid, including critical provisions for the fail-safe egress of underground personnel and the reliable exhaust of Argon gas in the event of a catastrophic release. These multi-year, high value physics experiments will provide the key experimental data needed to support the research of a new generation of physicists as they probe the behavior of basic particles and the fundamental laws of nature. The rock engineer must deliver caverns that will reliably meet operational requirements and remain stable for periods conservatively estimated to be in excess of twenty years. This paper provides an overview of the DUSEL site conditions and discusses key end-user requirements and design criteria likely to dominate in determining the viability of experimental options. The paper stresses the paramount importance of collecting adequate site-specific data to inform early siting, dimensioning and layout decisions. Given the large-scale of the excavation and likely timeline to construction, the paper also strongly suggests that there are exciting opportunities for the rock mechanics and engineering community to identify and efficiently integrate research components into the design and construction process.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Combined Heating and Power Using Microturbines in a Major Urban Hotel

This paper describes the results of a cooperative effort to install and operate a Cooling, Heating and Power (CHP) System at a major hotel in San Francisco, CA. The packaged CHP System integrated four microturbines, a double-effect absorption chiller, two fuel gas boosters, and the control hardware and software to ensure that the system operated predictably, reliably, and safely. The chiller was directly energized by the recycled hot exhaust from the microturbines, and could be configured to provide either chilled or hot water. As installed, the system was capable of providing up to 227 kW of net electrical power and 142 Refrigeration Tons (RT) of chilled water at a 59oF (15oC) ambient temperature. For the year, the CHP efficiency was 54 percent. Significant lessons learned from this test and verification project are discussed as well as measured performance and economic considerations.

42 ENGINEERING↗

A framework to collect human reliability analysis data for nuclear power plants using a simplified simulator and student operators

Data scarcity in human reliability analysis (HRA) has been a major challenge in the quantification process. Many institutes have collected HRA data through experiments using full-scope simulators with actual operators. Nevertheless, there are still some limitations to relying solely on full-scope studies. This paper aims to propose how full-scope data collection studies can be supported through the Simplified Human Error Experimental Program (SHEEP). The SHEEP framework was developed by Idaho National Laboratory (INL) to collect HRA data through a simplified simulator and student operators. This paper introduces the major tasks in the SHEEP framework, with a particular focus on differences that arise due to participant type (i.e., student vs. actual operator), based on experiments using a simplified simulator (i.e., the Rancor Microworld). This paper also describes whether the data collected via this approach could support a representative full-scope data collection study (i.e., the HuREX study) based on the experimental data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Nonparametric Bayesian Framework for Short-Term Wind Power Probabilistic Forecast

To improve the energy system resilience and economic efficiency, the wind power as a renewable energy starts to be deeply integrated into smart power grids. However, the wind power forecast uncertainty brings operational challenges. In order to provide a reliable guidance on operational decisions, in this paper, we propose a short-term wind power probabilistic forecast. Specifically, to model the rich dynamic behaviors of underlying physical wind power stochastic process occurring in various meteorological conditions, we first introduce an infinite Markov switching autoregressive model. This nonparametric time series model can capture the important properties in the real world data to improve the prediction accuracy. Then, given finite historical data, the posterior distribution of flexible forecast model can correctly quantify the model estimation uncertainty. Built on it, we develop the posterior predictive distribution to rigorously quantify the overall forecasting uncertainty accounting for both inherent stochastic uncertainty and model estimation error. Furthermore, the proposed approach can provide accurate and reliable short-term wind power probabilistic forecast, which can be used to support smart power grids real-time risk management.

17 WIND ENERGY↗

Rapid Monitoring and Defense Approach for Resilience Improvement of Grid Cyber Security

Cyber-physical systems and electric utilities significantly depend on the reliability and efficiency of information and operational technology. However, false data injection attacks based on synchrophasor measurement data pose a serious threat to the safe and reliable operation of modern power systems. Here, to mitigate this problem, a rapid monitoring and defense approach is proposed to defend against cyber attacks. Initially, the Time and Frequency based Convolutional neural Network (TFCN) is proposed to detect different types of attacks. Within the TFCN, the advances are that both time and frequency domain information can be fused without extra spectrum analysis methods, and can save detection time to speed the calculation efficiency using the developed time-frequency block. Next, a comprehensive defense strategy is developed for multiple cyber attacks to ensure the stability and resilience of the power system according to the feedback detection results. The advances of this strategy are that different control strategies can be automatically selected to recover the stability to the greatest extent according to the detected attacks. To verify the effectiveness of the proposed approach, the high-speed frequency measurements collected from the wide-area monitoring system are used. The results demonstrate that the cyber attack detection performance can reach 95.57% accuracy, outperforming both traditional and some advanced neural networks. Importantly, the defense strategy is conducted and verified in a modified IEEE 39 bus system as well, which illustrates profound performance in faster stability restoration.

Comprehensive defense strategy↗

Integration of Hybrids into Wholesale Power Markets

With growing commercial activity around utility-scale hybrid storage projects in the Unites States, independent system operators (ISOs) and regional transmission organizations (RTOs) are faced with making decisions on how to represent such emerging technology resources in the market clearing software through the definition of hybrid resource participation models. System operators are facing increasing uncertainties around efficient and reliable ways to operate these resources given the ambiguity around their impacts, particularly when high levels of hybrid resources are present. This study aimed to evaluate and compare the performance implications of different hybrid resource participation models in a realistic wholesale electricity market setting with significant deployment of hybrid resources, and to provide the industry with metrics that quantify the advantages and disadvantages of different participation options using realistic electricity market simulations. The different participation models are compared in terms of the impact to reliability of the overall system, the ability of the market to access the full capabilities of hybrid resources as measured by the economic efficiency, and asset profitability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chapter Ten - Power, Buildings, and Other Critical Networks: Integrated Multisystem Operation

The electrifying transportation sector, the increasing grid interactivity of the built environment, the rapidly expanding number of devices within the Internet-of-Things, and the overall trend toward highly connected systems and interdependent networks is revolutionizing the operation of the electric power grid. While these changes are presenting grid operators with new challenges to ensure an efficient, reliable, and sustainable operation of the grid, they also enable a new suite of resources that can be utilized for assisting the grid in times of need. In this chapter, we explore how these recent changes and trends are affecting modern power systems and discuss the benefits and challenges of an increasingly electrified and interconnected world. We will observe how various critical infrastructure, that is, buildings, water and gas, transportation, and telecommunication networks are highly dependent on power network operations but, with improved coordination and control, can also provide valuable assets to the grid in times of need.

electricity markets↗

Global Experiences with HPC Operational Data Measurement, Collection and Analysis

As we move into the exascale era, supercomputers grow larger, denser, more heterogeneous, and ever more complex. Operating such machines reliably and efficiently requires deep insight into the operational parameters of the machine itself as well as its supporting infrastructure. To fulfill this need, early adopter sites have started the development and deployment of Operational Data Analytics (ODA) frameworks allowing the continuous monitoring, archiving, and analysis of near realtime performance data from the machine and infrastructure levels, providing immediately actionable information for multiple operational uses. To understand their ODA goals, requirements, and use cases, we have conducted a survey among eight early adopter sites from the US, Europe, and Japan that operate top 50 high-performance computing systems. We have assessed the technologies leveraged to build their ODA frameworks, identified use cases and other push and pull factors that drive the sites' ODA activities, and report on their operational lessons.

Ott, Michael↗

HIPPO – A Software Platform for Electricity Market Research and Development

The goal of this project is to provide Regional transmission organizations (RTOs) and independent system operators (ISOs) a market design and prototyping software, High-Performance Power-Grid Optimization (HIPPO), that they can evaluate electricity market design options, calculate market planning strategies and operational performance. With the high standards and strict reliability requirements for operating power systems, impacts of new technologies need to be fully investigated prior to any consideration for adoption. A market design and prototyping software tool which can be used to prototype electricity market design options, to calculate market planning strategies and operational performance with high precision, and to investigate the impacts for integrating future power grid technologies will be valuable to RTOs/ISOs who operate power systems, to vendors like GE and ABB who provide the market solvers, and to market participants and researchers who are actively doing market research. HIPPO is a such tool that can be used to improve the current market operations and provide capabilities for rigorous forward-looking design and prototyping of next-generation energy markets. HIPPO has a high-resolution model for the day-ahead SCUC, which was validated with MISO and GE-Grid Solutions. HIPPO is built with parallel and distributed computing capabilities and can be executed in both multi-thread and high-performance computing (HPC) settings. This capability provides fast solution speed necessary to handle the larger and more complex SCUC problems of real-world cases and the potentially growing size and complexity of future scenarios. In addition, HIPPO has a concurrent optimizer (CO) which manages multiple algorithm executions simultaneously and leverages the advantages from different algorithms. This structure provides flexibility to better benchmark competing approaches. Highly accurate market model, fast solution technologies and flexible model and algorithm control are the features which will make HIPPO an extensible platform for developing and testing multiple approaches to meet a wide range of future market needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and Operation of Power Systems with Large Amounts of Wind Power: Final Summary Report, IEA WIND Task 25, Phase Three 2012-2014

This report summarizes recent findings on wind integration from the 16 countries participating in the International Energy Agency (IEA) Wind collaboration research Task 25 in 2012-2014. Both real experience and studies are reported. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value in operational timescales (balancing related issues). The first section presents variability and uncertainty of power system-wide wind power, and the last section presents recent wind integration studies for higher shares of wind power. Appendix 1 provides a summary of ongoing research in the national projects contributing to Task 25 in 2015-2017.

17 WIND ENERGY↗

Inverter Controls for Smooth Transition Operation and Voltage Balancing of Networked Microgrids

With increasing penetrations of distributed energy resources (DERs), researchers have extensively studied the formation and networking of microgrids to improve reliability during distribution system outages. However, these operations might require DERs in the microgrids to switch between grid-following (GFL) and grid-forming (GFM) modes of operation. A smooth transition between the operation modes should be ensured to have a stable system operation and to avoid nuisance tripping. Additionally, as we network microgrids, inverter control schemes with voltage-balancing controls are needed for unbalanced distribution networks. This paper presents the design of a GFM and GFL capable inverter control scheme for reliable operation in networked microgrids with mechanisms for 1) smooth transition between the GFL and GFM modes, and 2) negative sequence voltage control for voltage balancing. Using electromagnetic transient (EMT) simulations, the control scheme is first tested on a simple two-source power system using a digital real-time simulator. Next, a real-world distribution feeder with unbalanced loading and multiple DERs is used to demonstrate stable operation during the networking of microgrids with voltage balance support.

distributed energy resources↗

The Microgrid Performance Reliability Model (MPRM) v. 1.50 Beta

The MPRM is a simulation code that is used to statistically quantify the performance and reliability of a microgrid operating in islanded mode. Performance can be expressed in terms of fuel efficiency, renewable penetration, and other operational characteristics of the grid. Reliability can be expressed in terms of frequency and magnitude of load loss on a tier-by-tier, bus-by-bus basis or on an

Eddy, John↗