Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes partner feedback on the following concept elements: Upper E Traffic Management (ETM) planning processes, transit phase of operation, data sharing, time horizons for data sharing, and cooperative integration of military operations. An additional segment of the slides consists of an overview of the UAS Traffic Management (UTM) concept and its relationship to ETM.

Upper E↗

Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes a presentation of Communication, Navigation, and Surveillance assessments as they relate to the ETM environment, a review of Industry thoughts on equitable airspace access and associated rules of the road, and an initial presentation of the separation assurance process and related negotiation aspect.

Upper E↗

Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a coopertive, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a presentation on initial work titled 'Sensitivity Study of Minimum Reserved Airspace in ETM Operations,' and a high level discussion titled 'Separation Management Service Framework for ETM.'

Upper E↗

Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a recap of the group's history and road ahead, a discussion of industry's initial position on, 'Industry principles for ETM rules of the road: Conflict identification and resolution,' and a simulation roadmap for planned work ahead.

Upper E↗

ETM: Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a discussion of industry's position on operation intent and negotiation strategies in ETM airspace, applications of that position as captured through use cases, and a simulation roadmap for NASA's planned work ahead into CY21.

Upper E↗

ETM: Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a discussion of industry's feedback regarding a specific use case, a presentation on lexicon and the definition of Common Operating Practices, and an update on modeling and simulation work.

Upper E↗

Achieving Indigenous Adoption and Sustainability

This study sought to develop a framework which would assist project implementers in their efforts to effectively indigenize technical and policy expertise in SNL's international partners. The initial assumption was that current and past projects undertaken by the Center for Global Security and Cooperation (CGSC) had produced many successful and effective tools and techniques to achieve indigenization and sustainability. As such, this study would be able leverage those tools and techniques to produce a common framework that would enhance SNL's ability to reproduce those past successes. Data was collected for this study by conducting a series of interviews and focus groups in order to elicit information about SNL's efforts and capabilities. The interviews focused on collecting data ranging from understanding definitions of sustainability and indigenization to financial considerations and various project management considerations. Initial findings showed that the problem statement originally formed in this study's hypothesis was missing elements of customer and in-country partner needs and goals which lead the interview team to adapt the original goal to determine what elements produced a success project rather than developing a framework. Overall the study found four main components that each successful project shared: the need to answer the right question, involve an institutional champion, the need to understand key stakeholders, and finally the need continually survey the project landscape.

99 GENERAL AND MISCELLANEOUS↗

Large wind-turbine projects in the United States wind energy program

The technological development of large, horizontal-axis wind turbines (100 kW-2500 kW) is surveyed with attention to prototype projects managed by NASA. Technical feasibility has been demonstrated in utility service for systems with a rated power of up to 200 kW and a rotor diameter of 125 ft (Mod-OA). Current designs of large wind turbines such as the 2500 kW Mod-2 are projected to be cost competitive for utility applications when produced in quantity, with capital costs of 600 to 700 dollars per kW (in 1977 dollars).

Thomas, R. L.↗

Upper Class E Traffic Management (ETM)

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper Class E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper Class E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a discussion of service applicability to the ETM environment and examples from UAS Traffic Management, an update on modeling and simulation work, and an announcement of an upcoming ETM workshop.

Upper E↗

ETM: Upper Class E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high-altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper Class E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper Class E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, an overview of relevant activities by NASA's Airborne Science Program, a review of the 2023 ETM Workshop, a placeholder for a presentation on an approach to an International Framework for operations, and an update on NASA's preparations for upcoming simulations.

Upper E↗

Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experiences in managing the Prometheus Project

Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

nuclear↗

Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

TSIS↗

The Chilling Effects of Administrative Burden on Efficiency Policy Uptake: Examining the Case of Federal ESAs

Utilizing policies and programs which incentivize energy efficiency or on-site renewables is difficult. The challenges and costs associated with researching these policies, interacting with their providers, and ensuring regulatory compliance can be collectively referred to as administrative burden. To better understand the impact of administrative burden on energy efficiency policies, we investigated the administrative burden associated with energy sales arrangements (ESA). ESAs are a contracting vehicle related to energy savings performance contracts where an energy services company designs and constructs a renewable energy system at a federal site, transferring ownership of those generating assets to the site after a 20-year term. We conducted a series of in-depth interviews with a variety of relevant ESA stakeholders, including federal project managers, subject matter experts, and energy service companies. We then augmented these interviews with a review of the relevant literature. This research indicated that the current level of administrative burden decreases the adoption of renewable energy through ESAs by the federal government by raising upfront costs, depressing project attempts due to complexity, and introducing delays and challenges in successfully implemented projects. This chilling effect is especially pronounced in new policy vehicles and with inexperienced implementers. Findings from the specific case of ESAs can be generalized to other types of energy policy including efficiency programs. Policy makers decrease the efficacy of initiatives through increased administrative burden, and these effects will be most pronounced in programs with novel design or targeted at unfamiliar audiences.

Newkirk, Alex↗

Sensitive Resources Assessment and Forest Analysis for The SSP-2A Parcel and Proposed Oak Ridge Enhanced Technology and Training Center (ORETTC), Oak Ridge, Tennessee

This report summarizes current knowledge of natural and cultural resources associated with potential land use changes within an 81-acre (32.8-hectare) parcel, termed SSP-2A, on the US Department of Energy’s (DOE’s) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Figure 1). A primary goal for the work presented here was to evaluate potential impacts to sensitive resources within the SSP-2A parcel that might result from land disturbance and construction of the Oak Ridge Enhanced Technology and Training Center (ORETTC). In addition to on-the-ground surveys of the ORETTC footprint and SSP-2A parcel during summer 2020 (Figure 1), this report leverages historical (pre-1995) and contemporary (1995–present) data from additional sources such as the Tennessee Department of Environment and Conservation (TDEC). The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess, manage, and research sensitive resources on the ORR. This report should facilitate more environmentally sound decisions during planning and development of the ORETTC, provide a foundation for further assessment of sensitive and cultural resources associated with the broader SSP-2A parcel (should additional actions take place), and help project managers address regulatory guidance and DOE policy on sustainable development. Those who reference this report must consider that the timing of surveys does not permit complete delineation of resources. Data deficiencies are indicated where possible. Additional surveys may be required to account for seasonal patterns of various threatened and endangered species (e.g., bats), and additional assessment will be required if activities extend beyond the ORETTC site (Figure 2).

54 ENVIRONMENTAL SCIENCES↗

Atlas/Centaur-SOHO Pre-Launch News Conference

Live coverage of a pre-launch news conference on the Atlas/Centaur SOHO mission is presented. George Diller, NASA Public Affairs, introduces the panel. Floyd Curington, NASA Launch Manager, Kennedy Space Center, presents countdown activities. Pat Symons, Launch Vehicle Manager, NASA Lewis Research Center, analyzes the time duration from liftoff to spacecraft separation. Fabrizio Felici, SOHO Mission Director European Space Agency (ESA), explains the important features of SOHO, which includes a payload of 650 kilos and 12 major instruments with multisensors. Ken Sizemore, International Solar Terrestrial Physics (ISTP) Project Manager Goddard Space Flight Center (GSFC), talks about the successful international collaboration between the ESA and NASA. Joel Tumbiolo, Launch Weather Officer United States Air Force (USAF, presented the weather forecast. SOHO was launched aboard an Atlas II rocket on November 23, 1995. The news conference ends with a brief question and answer period.

Source record↗

Wastewater Treatment at the Fernald Preserve-Past, Present, and Future - 19555

Industrial wastewater treatment at the Fernald Preserve, Ohio, Site has been ongoing since a uranium metals refinery was constructed there at the beginning of the Cold War in 1951. Initially, the primary purpose of treatment was to recover uranium for reuse. Later, when cleanup of the site was progressing in the 1990's, wastewater treatment efforts greatly expanded. Large treatment facilities were constructed to handle contaminated surface water, groundwater, remediation wastewater, and leachate from the on-site disposal facility. These new facilities were designed to reduce uranium concentration to meet the US Environmental Protection Agency (EPA) drinking water standard and not generate large quantities of contaminated waste. Anion-exchange resin was chosen as the treatment media. The centerpiece of these facilities was the Advanced Wastewater Treatment facility, which had a treatment capacity of 10,978 liters per minute (lpm) (2900 gallons per minute [gpm]). Forecasts estimated that with the exception of groundwater the site's remediation would be completed in 2006. In 2003, the US Department of Energy (DOE) Office of Environmental Management began negotiations with the EPA and Ohio Environmental Protection Agency to reduce wastewater treatment capacity at the Fernald Environmental Management Project. These negotiations resulted in the site's treatment capacity being reduced to 6814 lpm (1800 gpm) via the Converted Advanced Wastewater Treatment facility (CAWWT). By 2010, the uranium concentration in the groundwater being pumped had been reduced to the degree that only intermittent treatment for uranium removal was needed. As a result, the CAWWT was considerably oversized. Increased maintenance on the aging CAWWT equipment led the DOE Office of Legacy Management (LM) to commission an assessment of the facility, which was completed in early 2015. The condition assessment identified numerous components at or near the end of their design life. Based on the assessment's findings and the fact that the current facility's treatment capacity was substantially greater than needed, LM began looking at options for an appropriately sized treatment system to handle the site's needs until the groundwater remediation was completed (currently projected for 2039). Options were evaluated in the spring of 2015, and LM presented the recommended changes to regulators and stakeholders. Approvals for a new, smaller system with a 189 lpm (50 gpm) capacity were obtained through a series of meetings in the summer of 2015. After more detailed planning in the fall of 2015, LM initiated the project in 2016. The project comprises the following four phases: (1) Removal and disposal of used media, piping, and tanks to make room for the new system in the existing building (completed in January 2017); (2) design of the new system (completed in April 2017); (3) construction, installation, and startup of the new system (completed in May 2018); and (4) backwash basin refurbishment (yet to be completed). In the late 2030's, when groundwater remediation is projected to be completed at the site, it is anticipated that the only remaining wastewater treatment need will be for small quantities of leachate from the on-site disposal facility. Results of leachate treatment testing in 2003 indicate it may be feasible to utilize a small passive treatment system for this leachate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn↗