Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Motivation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Long-lived vectors from electromagnetic cascades at SHiP

We simulate dark-vector, V, production from electromagnetic cascades at the recently approved SHiP experiment. The cascades (initiated by photons from π$^{0}$ → γγ) can lead to 3–4 orders of magnitude increase of the event rate relative to using primary production alone. We provide new SHiP sensitivity projections for dark photons and electrophilic gauge bosons, which are significantly improved compared to previous literature. The main gain in sensitivity occurs for long-lived dark vectors with masses below ~ 50 − 300 MeV. The dominant production mode in this parameter space is low-energy annihilation e$^{+}$e$^{−}$ → V (γ). This motivates a detailed study of backgrounds and efficiencies in the SHiP experiment for sub-GeV signals.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Alpenglow Instruments All Phase Water Probe: SBIR Phase I Final Report

Current approaches for measuring water vapor, ice water content, and liquid water content in the atmosphere have a variety of limitations. This is particularly true for ice water content measurements, which are needed in a variety of contexts including understanding the impact of clouds on global climate. The Alpenglow All-Phase Water Probe, which was motivated by limitations of current approaches to measuring water vapor, liquid water, and ice water content in the atmosphere, uses Raman scattering to derive these quantities. The use of Raman scattering signals for retrieval of water vapor mixing ratio, liquid and ice water content has been used in remote sensing applications. This project explored the use of the same approach in an in situ probe to measure all three phases of water in the atmosphere. The prototype device developed in this Phase 1 DOE SBIR proposal was used to demonstrate proof of concept for using Raman scattering to detect signals from water vapor, liquid water, and ice water. The prototype instrument consisted of the transmitting laser (355 nm, 7ns pulse), collector optics and receiver body, and data system. The receiver section body split the return signal into four channels, one for nitrogen plus channels dominated by water vapor, liquid water, and ice. Tests were conducted over a range of conditions ranging from ambient conditions in the lab (low water vapor mixing ratio, no liquid or ice water content), through a cool but saturated plume produced by an off-the-shelf humidifier (moderate water vapor mixing ratio plus some liquid water content), and hot, saturated stream containing extremely high water vapor mixing ratios with liquid water. Data from these tests, which was recorded using a Licel photon-counting data system, demonstrated the sensitivity of the system to varying water vapor mixing ratios ranging from ~5 g m -3 to > 20 g m -3 . Signals in the water vapor and ice channels were observed during the humidifier and hot vapor tests, as expected given the overlap between the ice and water vapor Raman spectra, with the relative contributions to each channel varying as expected with temperature.

58 GEOSCIENCES↗

DUNE in 10 Minutes [Slides]

The DUNE Science Collaboration is currently made up of over 1000 collaborators from 175 institutions (60% non-US) in 32 countries (35% of developing countries) plus CERN. The aim of this research program is to discover some of the greatest mysteries of the universe; origin of matter, unification of forces, black holes formation, among others. This project has a cooperative structure of consortia, working groups, task forces, boards and committees who have been working academically and administratively on the different key areas such as physics research, development of the detectors and prototypes, coordination of interfaces, and data analysis. One of the main objectives of this experiment is to motivate young people into science; leaders and members of the experiment, are very encouraging with younger members. On the other hand, this experiment goes beyond the experimental and practical outcomes in developing countries such as Colombia. This experiment is providing us with opportunities for doing science in our country, promoting progress, engaging new generations of Colombians and placing science on the political agenda.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Workshop on the Role of Design Assurance in System-Wide Safety’s Safety Demonstrator Series

This report summarizes a three-hour hybrid in-person/online workshop on June 7, 2024 on the topic of design assurance and the Safety Demonstrator Series (SDS), which was held at NASA Ames Research Center. The SDS provides an operational demonstration of, and recommendations for, requirements and standards necessary to monitor, assess, and mitigate risks to assure safety in disaster-oriented operations. Over sixty NASA personnel participated in the workshop. Four main topics were discussed: (1) assurance needs for the Safety Demonstrator Series, (2) assurance and the In-Time Aviation Safety Management System (IASMS), (3) in-time assurance: existing efforts and future opportunities, and (4) demonstrating assurance tools in the Safety Demonstrators. Key takeaways are as follows: 1. Design assurance tools can be used to assure an In-Time Aviation Safety Management System, the systems that comprise it, and other systems or missions. Assurance must consider both systems and components and include the interactions between elements in both a systems/aircraft context and a systems-of-systems/airspace context. 2. Design-time assurance activities can support the identification of monitors needed for operational assurance activities (i.e., the “monitor” function in the monitor-assess-mitigate paradigm at the heart of the IASMS concept). 3. A major opportunity for design-time assurance tools to contribute to the IASMS concept is to support rapid re-validation of systems. This will be particularly important for (1) supporting novel operations in the IASMS, where operational data may disprove design-time assumptions (motivating re-analysis of system safety) and (2) adapting technologies (e.g., AI/ML for autonomous operations) to new operational domains, where there may be new or different safety considerations not included in the initial scope of operations. 4. There are several design assurance tools under development in the System-Wide Safety project that can support assurance of Services, Functions, and Capabilities (SFCs) in the Safety Demonstrators. Transitioning these tools from one-off research projects into a functioning part of IASMS assurance will require closer integration between these tools. 5. It is not clear whether the role of design assurance tools is primarily as a part of IASMS architecture or as an external check on IASMS. The workshop consisted of four discussion topics initiated via four lightning talks by System-Wide Safety researchers. Discussions utilized Mural to engage both in-person and online participants in the hybrid format. Polls and surveys were also utilized to gather participant input. The workshop closed with a reflection activity for participants, as well as new ideas for collaboration and coordination of ongoing System-Wide Safety research.

design assurance↗

Simulating spin dynamics of supersolid states in a quantum Ising magnet

Motivated by a recent experimental study on the quantum Ising magnet K 2 Co(SeO 3 ) 2 that presented spectroscopic evidence of zero-field supersolidity (Chen et al., arXiv:2402.15869), we simulate the excitation spectrum of the corresponding microscopic XXZ model for the compound, using the recently developed excitation ansatz for infinite projected entangled-pair states. Here, we map out the ground state phase diagram and compute the dynamical spin structure factors across a range of magnetic field strengths, focusing especially on the two supersolid phases found near zero and saturation fields. Our simulated excitation spectra for the zero-field supersolid “Y” phase are in excellent agreement with the experimental data.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Negative Ion Drift TPC Development for High-Resolution Tracking (Final Technical Report)

Together with our Japanese (Kobe) and US collaborators (Hawaii and Wellesley), we proposed work on negative-ion time projection chambers (NITPC) with the recently discovered NI gas, SF 6 . The 1-year proposal requested $\$$37,699 at UNM to extend our work on studying the properties of SF 6 and to perform R&D on a novel TPC readout scheme that employs timing alone to reconstruct short tracks in 2-dimensions. The proposal was approved but the budget reduced to $\$$8K, thereby reducing the scope of the project. We chose to focus our efforts on R&D of the novel TPC readout (the “tilted GEM” readout) and used our funds for materials and supplies and machine shop time at UNM. Support for manpower, such as an engineer, graduate student and the PI were not included. Here we provide a fuller motivation for this R&D (which was not possible in the very short proposal) and describe the accomplishments over the ~1.5 year of the grant (including a NCE).

47 OTHER INSTRUMENTATION↗

Using Ada to implement the operations management system in a community of experts

An architecture is described for the Space Station Operations Management System (OMS), consisting of a distributed expert system framework implemented in Ada. The motivation for such a scheme is based on the desire to integrate the very diverse elements of the OMS while taking maximum advantage of knowledge based systems technology. Part of the foundation of an Ada based distributed expert system was accomplished in the form of a proof of concept prototype for the KNOMES project (Knowledge-based Maintenance Expert System). This prototype successfully used concurrently active experts to accomplish monitoring and diagnosis for the Remote Manipulator System. The basic concept of this software architecture is named ACTORS for Ada Cognitive Task ORganization Scheme. It is when one considers the overall problem of integrating all of the OMS elements into a cooperative system that the AI solution stands out. By utilizing a distributed knowledge based system as the framework for OMS, it is possible to integrate those components which need to share information in an intelligent manner.

Frank, M. S.↗

Aircraft Turbine Engine Control Research at NASA Glenn Research Center

This paper provides an overview of the aircraft turbine engine control research at the NASA Glenn Research Center (GRC). A brief introduction to the engine control problem is first provided with a description of the state-of-the-art control law structure. A historical aspect of engine control development since the 1940s is then provided with a special emphasis on the contributions of GRC. With the increased emphasis on aircraft safety, enhanced performance, and affordability, as well as the need to reduce the environmental impact of aircraft, there are many new challenges being faced by the designers of aircraft propulsion systems. The Controls and Dynamics Branch (CDB) at GRC is leading and participating in various projects to develop advanced propulsion controls and diagnostics technologies that will help meet the challenging goals of NASA Aeronautics Research Mission programs. The rest of the paper provides an overview of the various CDB technology development activities in aircraft engine control and diagnostics, both current and some accomplished in the recent past. The motivation for each of the research efforts, the research approach, technical challenges, and the key progress to date are summarized.

Garg, Sanjay↗

Solar Thermal Upper Stage Liquid Hydrogen Pressure Control Testing

High-energy cryogenic propellant is an essential element in future space exploration programs. Therefore, NASA and its industrial partners are committed to an advanced development/technology program that will broaden the experience base for the entire cryogenic fluid management community. Furthermore, the high cost of microgravity experiments has motivated NASA to establish government/aerospace industry teams to aggressively explore combinations of ground testing and analytical modeling to the greatest extent possible, thereby benefitting both industry and government entities. One such team consisting of ManTech SRS, Inc., Edwards Air Force Base, and Marshall Space Flight Center (MSFC) was formed to pursue a technology project designed to demonstrate technology readiness for an SRS liquid hydrogen (LH2) in-space propellant management concept. The subject testing was cooperatively performed June 21-30, 2000, through a partially reimbursable Space Act Agreement between SRS, MSFC, and the Air Force Research Laboratory. The joint statement of work used to guide the technical activity is presented in appendix A. The key elements of the SRS concept consisted of an LH2 storage and supply system that used all of the vented H2 for solar engine thrusting, accommodated pressure control without a thermodynamic vent system (TVS), and minimized or eliminated the need for a capillary liquid acquisition device (LAD). The strategy was to balance the LH2 storage tank pressure control requirements with the engine thrusting requirements to selectively provide either liquid or vapor H2 at a controlled rate to a solar thermal engine in the low-gravity environment of space operations. The overall test objective was to verify that the proposed concept could enable simultaneous control of LH2 tank pressure and feed system flow to the thruster without necessitating a TVS and a capillary LAD. The primary program objectives were designed to demonstrate technology readiness of the SRS concept at a system level as a first step toward actual flight vehicle demonstrations. More specific objectives included testing the pressure and feed control system concept hardware for functionality, operability, and performance. Valuable LH2 thermodynamic and fluid dynamics data were obtained for application to both the SRS concept and to future missions requiring space-based cryogen propellant management.

Moore, J. D.↗

CMIP5 Scientific Gaps and Recommendations for CMIP6

The Coupled Model Intercomparison Project (CMIP) is an ongoing coordinated international activity of numerical experimentation of unprecedented scope and impact on climate science. Its most recent phase, the fifth phase (CMIP5), has created nearly 2 PB of output from dozens of experiments performed by dozens of comprehensive climate models available to the climate science research community. In so doing, it has greatly advanced climate science. While CMIP5 has given answers to important science questions, with the help of a community survey we identify and motivate three broad topics here that guided the scientific framework of the next phase of CMIP, that is, CMIP6: (1) How does the Earth system respond to changes in forcing? (2) What are the origins and consequences of systematic model biases? (3) How can we assess future climate changes given internal climate variability, predictability, and uncertainties in scenarios? CMIP has demonstrated the power of idealized experiments to better understand how the climate system works. We expect that these idealized approaches will continue to contribute to CMIP6. The quantification of radiative forcings and responses was poor, and thus it requires new methods and experiments to address this gap. There are a number of systematic model biases that appear in all phases of CMIP that remain a major climate modeling challenge. In conclusion, these biases need increased attention to better understand their origins and consequences through targeted experiments. Improving understanding of the mechanisms’ underlying internal climate variability for more skillful decadal climate predictions and long-term projections remains another challenge for CMIP6.

58 GEOSCIENCES↗

Work Term Assignment Spring 2017

My tour in the Engineering Robotics directorate exceeded my expectations. I learned lessons about Creo, manufacturing and assembly, collaboration, and troubleshooting. During my first tour, last spring, I used Creo on a smaller project, but had limited experience with it before starting in the Dynamic Systems Test branch this spring. I gained valuable experience learning assembly design, sheet metal design and designing with intent for manufacturing and assembly. These skills came from working both on the hatch and the floor. I also learned to understand the intent of other designers on models I worked with. While redesigning the floor, I was modifying an existing part and worked to understand what the previous designer had done to make it fit with the new model. Through working with the machine shop and in the mock-up, I learned much more about manufacturing and assembly. I used a Dremel, rivet gun, belt sander, and countersink for the first time. Through taking multiple safety training for different machine shops, I learned new machine shop safety skills specific to each one. This semester also gave me new collaborative opportunities. I collaborated with engineers within my branch as well as with Human Factors and the building 10 machine shop. This experience helped me learn how to design for functionality and assembly, not only for what would be easiest in my designs. In addition to these experiences, I learned many lessons in troubleshooting. I was the first person in my office to use a Windows 10 computer. This caused unexpected issues with NASA services and programs, such as the Digital Data Management Server (DDMS). Because of this, I gained experience finding solutions to lockout and freeze issues as well as Creo specific settings. These will be useful skills to have in the future and will be implemented in future rotations. This co-op tour has motivated me more to finish my degree and pursue my academic goals. I intend to take a machining Career Gateway Elective in the Fall to improve my skills in building as well as designing with manufacturing intent. I am also inspired to take more mechatronics CGE courses before I graduate to learn more about the crossover between mechanical and electrical engineering. This semester, I worked on multiple projects and had the opportunity to learn from engineers of different disciplines. I became proficient in Creo 2.0, a program I had not used significantly before. I finished modifying the hatch for 3D print and made sizeable modifications to the nose floor support design. I also gained hands-on experience that will be useful in my engineering career in the future. I would consider all of these major achievements from this spring semester. Lastly, I learned to ask more questions and to search for the right people to find answers which I know will be a valuable skill in the future. This summer, I will be completing my last rotation in the Flight Operations Directorate at Ellington Air Field. After this last tour, I will be returning to school for the Fall, Spring and Summer. I will graduate in August of 2018. I am looking forward to learning more about the different jobs available to engineers. This division works directly with many different types of aircrafts and I am excited to learn more about this focus of engineering. The Aircraft Operations Division values team work greatly and I intend to improve my interpersonal skills by working with them this summer.

Sico, Mallory↗

CHASM Challenge Problem: Lagrangian Hydrodynamics

Computer simulations of many science and engineering problems require modeling the equations of hydrodynamics which describe the motion of materials relative to each other induced by various forces. Many important DoD simulation problems involve complex multi-material systems that undergo large deformations. Examples include the analysis of armor defense, penetration mechanics, blast effects, structural integrity, and conventional munitions such as shaped charges and explosively formed projectiles. Indeed, the original motivation for developing codes that solve the equations of hydrodynamics, herein referred to as “hydrocodes”, was to solve problems with defense applications. The FY2010 Requirements Analysis Report issued by the DoD High Performance Computing Modernization Program (HPCMP) Office shows that a major portion of DoD HPC activities involves hydrocodes [HPCMP2010]. The report surveyed 496 projects across the Services and various Agencies, representing 4,050 HPCMP users at more than 125 locations, including government, contractors, and academia, and grouped each project into one of ten categories.

42 ENGINEERING↗

M DWARF ACTIVITY IN THE PAN-STARRS1 MEDIUM-DEEP SURVEY: FIRST CATALOG AND ROTATION PERIODS

We report on an ongoing project to investigate activity in the M dwarf stellar population observed by the Pan-STARRS1 Medium-Deep Survey (PS1-MDS). Using a custom-built pipeline, we refine an initial sample of ∼4 million sources in PS1-MDS to a sample of 184,148 candidate cool stars using color cuts. Motivated by the well-known relationship between rotation and stellar activity, we use a multiband periodogram analysis and visual vetting to identify 270 sources that are likely rotating M dwarfs. We derive a new set of polynomials relating M dwarf PS1 colors to fundamental stellar parameters and use them to estimate the masses, distances, effective temperatures, and bolometric luminosities of our sample. We present a catalog containing these values, our measured rotation periods, and cross-matches to other surveys. Our final sample spans periods of ≲1–130 days in stars with estimated effective temperatures of ∼2700–4000 K. Twenty-two of our sources have X-ray cross-matches, and they are found to be relatively X-ray bright as would be expected from selection effects. Our data set provides evidence that Kepler -based searches have not been sensitive to very slowly rotating stars ( P {sub rot} ≳ 70 day), implying that the observed emergence of very slow rotators in studies of low-mass stars may be a systematic effect. We also see a lack of low-amplitude (<2%) variability in objects with intermediate (10–40 day) rotation periods, which, considered in conjunction with other observational results, may be a signpost of a loss of magnetic complexity associated with a phase of rapid spin-down in intermediate-age M dwarfs. This work represents just a first step in exploring stellar variability in data from the PS1-MDS and, in the farther future, Large Synoptic Survey Telescope.

79 ASTRONOMY AND ASTROPHYSICS↗

An Advanced Actuator Line Method for Wind Energy Applications and Beyond: Preprint

The actuator line method to represent rotor aerodynamics within computational fluid dynamics has been in use for over a decade. This method applies a body force to the flow field along rotating lines corresponding to the individual rotor blades and employs tabular airfoil data to compute the force distribution. The actuator line method is attractive because compared to blade-resolved simulations, the required mesh is much simpler and the computational cost is lower. This work proposes a higher fidelity variant of the actuator line method meant to fill the space between current actuator line and blade-resolved simulations. It contains modifications in two key areas. The first is that of freestream velocity vector estimation along the line, which is necessary to compute the lift and drag along the line using tabular airfoil data. Most current methods rely on point sampling in which the location of sampling is ambiguous. Here we test a velocity sampling method that uses a properly weighted integral over space, removing this ambiguity. The second area of improvement is the function used to project the one-dimensional actuator line force onto the three-dimensional fluid mesh as a body force. We propose and test a projection function that spreads the force over a region that looks something like a real blade with the hope that it will produce the blade local and near wake flow features with more accuracy and higher fidelity. Our goal is that between these two improvements, not only will the flow field predictions be enhanced, but also the spanwise loading will be made more accurate. We refer to this combination of improvements as the advanced actuator line method. We apply these improvements to two different wind turbine cases. Although there is a strong wind energy motivation in our work, there is no reason these advanced actuator line ideas cannot be used in other applications, such as helicopter rotors.

17 WIND ENERGY↗

A Comparison of Time Series Gap-Filling Methods to Impute Solar Radiation Data

Complete solar resource datasets play a critical role at every stage of solar project phases. However, measured or modeled solar resource data come with significant uncertainties and usually suffer from several issues, including but not limited to, data gaps, data quality issue, etc. In order to mitigate these issues an appropriate data imputation method should be implemented to build a complete and reliable temporal (and spatial) database. Being motivated by this, in this study we compare the performances of eight different gap filling methods extensively by creating random and artificial data gaps in (i) hourly irradiance data for one year using a few locations of the National Solar Radiation Database (NSRDB) and (ii) one-minute ground measurement dataset from Surface Radiation Budget Network (SURFRAD) stations.

clearness index↗

Investigation of Public Discourse Methods in Energy Policy Decision-Making: A Summary of What You Told Us and What We Learned

The ground is littered with projects that failed because of strong public opposition, including natural gas and coal power plants proposed in Idaho over the past several years. This joint project , of the Idaho National Laboratory, Boise State University, Idaho State University and University of Idaho has aimed to add to the tool box to reduce project risk through encouraging the public to engage in more critical thought and be more actively involved in public or social issues. Early in a project, project managers and decision-makers can talk with no one, pro and con stakeholder groups, or members of the public. Experience has shown that talking with no one outside of the project incurs high risk because opposition stakeholders have many means to stop most (if not all) energy projects. Talking with organized stakeholder groups provides some risk reduction from mutual learning, but organized groups tend not to change positions except under conditions of a negotiated settlement. Achieving a negotiated settlement may be impossible. Furthermore, opposition often arises outside pre-existing groups. Standard public polling provides some information but does not reveal underlying motivations, intensity of attitudes, etc. Improved methods are needed that probe deeper into stakeholder (organized groups and members of the public) values and beliefs (sometimes called /heuristics) to increase the potential for change of opinions and/or out-of-box solutions. The term “heuristics” refers to the mental short-cuts, underlying beliefs, and paradigms that everyone uses to filter and interpret information, to interpret what is around us, and to guide our actions and decisions. This document is the final report of a 3-year effort to test different public discourse methods in the subject area of energy policy decision-making. We analyzed 504 mail-in surveys and 80 participants in groups on the Boise State University campus for their preference, financial support, and evaluations of eight attributes for energy conservation and efficiency, fossil fuels, nuclear energy, hydropower, and renewable energy. All participants saw a 7-person diverse energy expert panel. Some participants attended deliberation sessions; some received a 35-page briefing document that included pros and cons of the different energy options.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Public Discourse in Energy Policy Decision-Making: Final Report

The ground is littered with projects that failed because of strong public opposition, including natural gas and coal power plants proposed in Idaho over the past several years. This joint project , of the Idaho National Laboratory, Boise State University, Idaho State University and University of Idaho has aimed to add to the tool box to reduce project risk through encouraging the public to engage in more critical thought and be more actively involved in public or social issues. Early in a project, project managers and decision-makers can talk with no one, pro and con stakeholder groups, or members of the public. Experience has shown that talking with no one outside of the project incurs high risk because opposition stakeholders have many means to stop most (if not all) energy projects. Talking with organized stakeholder groups provides some risk reduction from mutual learning, but organized groups tend not to change positions except under conditions of a negotiated settlement. Achieving a negotiated settlement may be impossible. Furthermore, opposition often arises outside pre-existing groups. Standard public polling provides some information but does not reveal underlying motivations, intensity of attitudes, etc. Improved methods are needed that probe deeper into stakeholder (organized groups and members of the public) values and beliefs/heuristics to increase the potential for change of opinions and/or out-of-box solutions. The term “heuristics” refers to the mental short-cuts, underlying beliefs, and paradigms that everyone uses to filter and interpret information, to interpret what is around us, and to guide our actions and decisions. This document is the final report of a 3-year effort to test different public discourse methods in the subject area of energy policy decision-making. We analyzed 504 mail-in surveys and 80 participants in groups on the Boise State University campus for their preference, financial support, and evaluations of eight attributes for energy conservation and efficiency, fossil fuels, nuclear energy, hydropower, and renewable energy. All participants saw a 7-person diverse energy expert panel. Some participants attended deliberation sessions; some received a 35-page briefing document that included pros and cons of the different energy options.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CU in space: The University of Colorado get away special payload G-285

The University of Colorado's first Get Away Special was conceived by a dozen science and engineering students in the spring of 1984. Since that time, the project has grown to include over 100 undergraduate and graduate students who have 'provided the experimental objectives, design, construction, integration, testing and management of the payload. Faculty and staff of the university and its affiliated laboratories as well as engineers from local industries have provided many useful suggestions at all stages of development. The principal motivation for developing this payload is to provide university students with the opportunity to participate in space science and engineering beginning at the ground level. At the same time, they are contributing their results from new science and technological discoveries to several disciplines. There are four separate experiments integrated into the /'single payload of G-285 which are supported by internal payload !power, thermal environment control, command land data handling [ facilities and structural subsystems. The four experiments contained in this payload are: a single spectrometer performing i two experiments- one to study night time shuttle glow phenomena in the ultraviolet and the other to observe NO2 concentrations over / equatorial latitudes in the day; a fluids management experiment ' using centrifugation for particle/liquid/vapor separation; and an experiment using Phycomyces fungi to study the gravireceptor mechanism theory. The experiments are supported by a microprocessor, data storage devices, power and thermal control subsystems. All these are located within a sealed aluminum container. The container, a refitted sounding rocket casing, has a top and bottom which bolt to the main body of the rocket section. The top section holds a five inch diameter quartz window through which light enters the spectrometer. A rotating mirror assembly and one of two battery boxes are mounted on the outside of the top section below the interface plane of the MDA. A second battery box is attached to the bottom section of the sealed container. All payload items except the battery boxes and mirror assembly are located inside the sealed rocket section to insure containment and to prevent outgassing of materials. The container will be sealed prior to launch and purged with one atmosphere of argon.

Kent Tobiska↗