Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Orbit Stability of OSIRIS-REx in the Vicinity of Bennu Using a High-Fidelity Solar Radiation Model

The OSIRIS-REx mission (Origins Spectral Interpretation Resource Identification Security Regolith EXPlorer) is an asteroid sample return mission to Bennu (RQ36) that is scheduled to launch in 2016. The planned science operations precluding the small retrieval involve operations in terminator orbits (orbit plane is perpendicular to the sun). Over longer durations the solar radiation pressure (SRP) perturbs the orbit causing it to precess. Our work involves: modeling high fidelity SRP model to capture the perturbations during attitude changes; design a stable orbit from the high fidelity models to analyze the stability over time.

Williams, Trevor↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

Communication Characterization and Optimization of Applications Using Topology-Aware Task Mapping on Large Supercomputers

On large supercomputers, the job scheduling systems may assign a non-contiguous node allocation for user applications depending on available resources. With parallel applications using MPI (Message Passing Interface), the default process ordering does not take into account the actual physical node layout available to the application. This contributes to non-locality in terms of physical network topology and impacts communication performance of the application. In order to mitigate such performance penalties, this work describes techniques to identify suitable task mapping that takes the layout of the allocated nodes as well as the application's communication behavior into account. During the first phase of this research, we instrumented and collected performance data to characterize communication behavior of critical US DOE (United States - Department of Energy) applications using an augmented version of the mpiP tool. Subsequently, we developed several reordering methods (spectral bisection, neighbor join tree etc.) to combine node layout and application communication data for optimized task placement. We developed a tool called mpiAproxy to facilitate detailed evaluation of the various reordering algorithms without requiring full application executions. This work presents a comprehensive performance evaluation (14,000 experiments) of the various task mapping techniques in lowering communication costs on Titan, the leadership class supercomputer at Oak Ridge National Laboratory.

Sreepathi, Sarat↗

2022 FORCE Development Status Update

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Framework for Optimization of Resources and Economics (FORCE) is a tool suite developed at Idaho National Laboratory and is dedicated to making robust analyses of IESs easier for analysts and researchers. The report summarizes the improvements and updates to FORCE during the most recent development cycle. Particularly, we demonstrate improvements to user accessibility, stochastic time-series analysis, and vertical integration with the software tools provided in FORCE.

97 MATHEMATICS AND COMPUTING↗

Personnel Qualification and Certification Program in Pressure Decay Leak Testing on the RT-100 Type (B) Cask - 17229

The requirements for qualifications and certification of leak test personnel on Type (B) shipping casks have been more clearly defined with the recent release of ANSI N14.5-2014, Leak Tests on Radioactive Packages for Shipment. The latest version creates a standardized approach for qualifying and certifying personnel to conduct pre-shipment leakage tests on Type (B) packages. The U.S Nuclear Regulatory Commission (NRC) is currently updating the Regulatory Guide R.G 7.4, Leakage Tests on Packages for shipment of Radioactive Material, to endorse ANSI N14.5-2014. According to ANSI N14.5-2014, leakage testing shall be performed in accordance with written procedures by qualified and certified personnel in accordance with the requirements of ASNT SNT-TC-1A-2006, Recommended Practice for Personnel Qualification and Certification in Nondestructive Testing. This is a significant modification to the old standard, ANSI N14.5-1997, which simply states that pressure leak testing shall be conducted by trained and certified personnel without reference to any specific certification standards or regulations. SNT-TC-1A published by the American Society for Nondestructive Testing (ASNT) has several advantages to employers; namely, it allows for a Limited NDT Level II certification program. Limited certifications are especially valuable for personnel who possess limited experience and wish to become a certified Limited NDT Level II in a specific technique on a specific cask using a specific procedure and equipment. Robatel Technologies recently developed a comprehensive qualification and training program based on the recommendations of SNT-TC-1A for Exelon Corporation to certify their employees to a Limited NDT Level II in Pressure Decay Leak Testing on the RT-100 Cask. The project scope included the development of a training and qualification program (Written practice), writing a pressure decay leak test procedure, the design of a pressure decay leak test manifold, and the delivery of classroom training. The written practice outlines the requirements to ensure that personnel participating in the program have the necessary qualification, experience, and training to become certified in the leak test method. The program will give Exelon the liberty to conduct their own leak testing on the RT- 100 without the need to rely on outside resources for leak testing. When fully implemented, the program is expected to improve productivity and eliminate schedule delays, along with substantial economic benefits. Following the appropriate standards and industry best practices, the project was successfully completed and scheduled to be fully implemented by Exelon's Nuclear Stations by the end of 2016. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Cost Savings Resulting From Classified Component Disposal at the Nevada National Security Site (NNSS) - 16440

This paper discusses the Nevada National Security Site (NNSS) capability to dispose of both radioactive and non-radioactive classified components and the tremendous cost-avoidance in storage, sanitization and/or demilitarization (Demil), and disposal that have been experienced by generators. One generator, The U.S. Air Force Materiel Command (AFMC), 414. Supply Chain Management Squadron out of Hill Air Force Base (HAFB) experienced total cost-avoidance in the last two years of $218 million on an investment of $1.9 million for disposal at the NNSS. They also accelerated the planned component disposition schedule by 7 years. In 2012, the NNSS added the capability of meeting a key national resource for the safe, secure disposal of classified components that have been declared excess to national security requirements. Since that time the program has continued to grow and expand. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Preventative Radiological/Nuclear Detector Archetypes to Validate Repurpose to the Consequence Management Mission

In the event of a radiological or nuclear emergency involving a large-scale release of radioactive material, local responders would be the primary means to perform radiation measurements to assess impacts and issue protective action recommendations for the responders and the public. Over the first 24-36 hours, Federal responders and resources will deploy to augment the local efforts, and if necessary, provide extensive radiation monitoring and assessment capabilities coordinated by the Department of Energy-led Federal Radiological Monitoring and Assessment Center and Federal Emergency Management Agency-led Multiagency Coordination Group. Unless Federal resources happen to be deployed at the moment an incident occurs, such as a preventative radiological/nuclear detection mission for a scheduled special event, the local response to an incident will commence and persist for many hours with no on-scene Federal support. For a catastrophic incident, such as a nuclear detonation or severe reactor accident, the local jurisdictions may not have a full range of adequate supplies of health physics instruments and personnel dosimetry. Therefore early in a crisis, the local responders will inevitably conduct their operations with the radiation detection and dosimetry capabilities that they have available until additional resources and support are requested and arrive. Most of the radiation detection instruments currently fielded at the local level are carried by law enforcement personnel and are designed for interdiction missions - referred to here as preventative radiological/nuclear detection (PRND) instruments. This study investigated how this PRND equipment can be repurposed in consequence management (CM) missions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Simulating a Low-Weight Encoding of the Fermi-Hubbard Model Feedback and Support with QAOA

Recent work [1] has proposed a compact fermion-to-qubit mapping for the Fermi-Hubbard model (FHM), potentially lowering the overhead needed to simulate such a system on quantum hardware. In prior work [2], we numerically investigated how well a quantum annealer could prepare ground states of the FHM encoded using the resource-efficient mapping. In order to compare these results to gate-model systems, we turn to a QAOA-style approach and replace the annealing schedule with both Trotterizations thereof and also more general Hamiltonian-variational ansatze based on the terms of the mapped FH Hamiltonian. We investigate the achievable ground state fidelities of these gate sequences, consider various optimizations of the ansatze structure, and offer resource estimations of the optimized QAOA protocols for near-term hardware.

quantum computing↗

Water Quality Projects Summary for the Mid-Columbia and Cumberland River Systems

Scheduling and operational control of hydropower systems is accompanied with a keen awareness of the management of water use, environmental effects, and policy, especially within the context of strict water rights policy and generation maximization. This is a multi-objective problem for many hydropower systems, including the Cumberland and Mid-Columbia river systems. Though each of these two systems have distinct operational philosophies, hydrologic characteristics, and system dynamics, they both share a responsibility to effectively manage hydropower and the environment, which requires state-of-the art improvements in the approaches and applications for water quality modeling. The Department of Energy and Oak Ridge National Laboratory have developed tools for total dissolved gas (TDG) prediction on the Mid-Columbia River and a decision-support system used for hydropower generation and environmental optimization on the Cumberland River. In conjunction with IIHR - Hydroscience & Engineering, The University of Iowa and University of Colorado s Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), ORNL has managed the development of a TDG predictive methodology at seven dams along the Mid-Columbia River and has enabled the ability to utilize this methodology for optimization of operations at these projects with the commercially available software package Riverware. ORNL has also managed the collaboration with Vanderbilt University and Lipscomb University to develop a state-of-the art method for reducing high-fidelity water quality modeling results into surrogate models which can be used effectively within the context of optimization efforts to maximize generation for a reservoir system based on environmental and policy constraints. The novel contribution of these efforts is the ability to predict water quality conditions with simplified methodologies at the same level of accuracy as more complex and resource intensive computing methods. These efforts were designed to incorporate well into existing hydropower and reservoir system scheduling models, with runtimes that are comparable to existing software tools. In addition, the transferability of these tools to assess other systems is enhanced due the use of simplistic and easily attainable values for inputs, straight-forward calibration of predictive equation coefficients, and standardized comparison of traditionally familiar outputs.

54 ENVIRONMENTAL SCIENCES↗

An algorithm for the space shuttle scheduling problem

The problem of determining launch times for a set of missions is considered. Launch times must satisfy early start time and resource constraints. The investigation reported is concerned with the minimization of the number of missions which are launched after specified late start times. An algorithm is presented which, under certain restrictive assumptions, provides an optimal solution. If the restrictive assumptions are not satisfied, the algorithm may be used to obtain a lower bound on the number of missions flown late.

Fisher, M. L.↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Resilient Microgrid Scheduling Considering Multi-Level Load Priorities

In this paper, we propose a novel resilient microgrid scheduling model considering the multi-level load priorities. The resiliency of the microgrid is guaranteed by quickly adjusting the output of committed local resources and shedding the loads with low priorities when the power supply from the main grid is interrupted. Considering the uncertainty of renewable energy resources and loads as well as exchanged power at PCC, the probability of successful islanding (PSI) is used to quantify the resiliency of electricity supply for various loads with different priorities. Then, the multi-level priorities are enforced through chance constrains. Results of numerical simulation validate the proposed resilient scheduling model. In addition, the impacts of resiliency requirement of loads with high priority on the resiliency of loads with low priority are analyzed as well.

Liu, Guodong↗

Robust Scheduling of Microgrids With Resiliency Constraints

This paper proposes a novel microgrid scheduling model considering the resiliency requirements. The resiliency of the microgrid is guaranteed by quickly adjusting the output of committed local resources to supply the local demands continuously when the supply of power from the main grid is interrupted. To capture the prevailing uncertainties in renewable generation and demand, a two-stage robust optimization model is formulated to minimize the total operating cost under the worst realization of the modeled uncertainties. The column and constraint generation (CCG) method is used to solve the problem in an iterative manner. The solution of the proposed robust scheduling model guarantees the resiliency of the microgrid by supporting a quick islanding without consumer interruption and ensures the robustness against uncertainties in renewable generation and demand.

Liu, Guodong↗

Comprehensive Lifecycle Planning and Management System For Addressing Water Issues Associated With Shale Gas Development In New York, Pennsylvania, And West Virginia

The objective of this project is to develop a modeling system to allow operators and regulators to plan all aspects of water management activities associated with shale gas development in the target project area of New York, Pennsylvania, and West Virginia (target area ), including water supply, transport, storage, use, recycling, and disposal and which can be used for planning, managing, forecasting, permit tracking, and compliance monitoring. The proposed project is a breakthrough approach to represent the entire shale gas water lifecycle in one comprehensive system with the capability to analyze impacts and options for operational efficiency and regulatory tracking and compliance, and to plan for future water use and disposition. It will address all of the major water-related issues of concern associated with shale gas development in the target area, including water withdrawal, transport, storage, use, treatment, recycling, and disposal. It will analyze the costs, water use, and wastes associated with the available options, and incorporate constraints presented by permit requirements, agreements, local and state regulations, equipment and material availability, etc. By using the system to examine the water lifecycle from withdrawals through disposal, users will be able to perform scenario analysis to answer "what if" questions for various situations. The system will include regulatory requirements of the appropriate state and regional agencies and facilitate reporting and permit applications and tracking. These features will allow operators to plan for more cost effective resource production. Regulators will be able to analyze impacts of development over an entire area. Regulators can then make informed decisions about the protections and practices that should be required as development proceeds. This modeling system will have myriad benefits for industry, government, and the public. For industry, it will allow planning all water management operations for a project or an area as one entity to optimize water use and minimize costs subject to regulatory and other constraints. It will facilitate analysis of options and tradeoffs, and will also simplify permitting and reporting to regulatory agencies. The system will help regulators study cumulative impacts of development, conserve water resources, and manage disposal options across a region. It will also allow them to track permits and monitor compliance. The public will benefit from water conservation, improved environmental performance as better system wide decisions are made, and greater supply of natural gas, with attendant lower prices, as costs are reduced and development is assisted through better planning and scheduling. Altogether, better economics and fewer barriers will facilitate recovery of the more than 300 trillion cubic feet of estimated recoverable natural gas resource in the Marcellus Shale in a manner that protects the environment.

03 NATURAL GAS↗

A simple protocol for coordinating planning agents

This paper introduces a simple decentralized protocol that enables seperate planners to coordinate shared tasks and resolve conflicts over shared and private resources.

multiple agents coordination planning scheduling M↗

Utility maximizing dynamic resource management in an oversubscribed energy-constrained heterogeneous computing system

The need for greater performance in high performance computing systems combined with rising costs of electricity to power these systems motivates the need for energy-efficient resource management. Driven by the requirements of the Extreme Scale Systems Center at Oak Ridge National Laboratory, our study addresses the problem of scheduling dynamically-arriving tasks to machines in an oversubscribed and energy-constrained heterogeneous distributed computing environment. Our goal is to maximize total “utility” earned by the system, where the utility of a task is defined by a monotonically-decreasing function that represents the value of completing that task at different times. To address this problem, we design four energy-aware resource allocation heuristics and compare their performance to heuristics from the literature. For our given energy-constrained environment, we also design an energy filtering technique that helps some heuristics regulate their energy consumption by allowing tasks to only consume up to an estimated fair-share of energy. Extensive sensitivity analyses of the heuristics in environments with different levels of heterogeneity show that heuristics with the ability to balance both energy consumption and utility exhibit the best performance because they save energy for use by future tasks.

97 MATHEMATICS AND COMPUTING↗

Planning and scheduling research at NASA Ames Research Center

Planning and scheduling is the area of artificial intelligence research that focuses on the determination of a series of operations to achieve some set of (possibly) interacting goals and the placement of those operations in a timeline that allows them to be accomplished given available resources. Work in this area at the NASA Ames Research Center ranging from basic research in constrain-based reasoning and machine learning, to the development of efficient scheduling tools, to the application of such tools to complex agency problems is described.

Friedland, Peter↗

Coordinated Science Campaign Scheduling for Sensor Webs

Future Earth observing missions will study different aspects and interacting pieces of the Earth's eco-system. Scientists are designing increasingly complex, interdisciplinary campaigns to exploit the diverse capabilities of multiple Earth sensing assets. In addition, spacecraft platforms are being configured into clusters, trains, or other distributed organizations in order to improve either the quality or the coverage of observations. These simultaneous advances in the design of science campaigns and in the missions that will provide the sensing resources to support them offer new challenges in the coordination of data and operations that are not addressed by current practice. For example, the scheduling of scientific observations for satellites in low Earth orbit is currently conducted independently by each mission operations center. An absence of an information infrastructure to enable the scheduling of coordinated observations involving multiple sensors makes it difficult to execute campaigns involving multiple assets. This paper proposes a software architecture and describes a prototype system called DESOPS (Distributed Earth Science Observation Planning and Scheduling) that will address this deficiency.

Edgington, Will↗