Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch pad”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

856 records · Page 48

Improving the Science Observing Efficiency of the Chandra X-Ray Observatory via the Chandra Radiation Model

The Chandra X-ray Observatory (CXO), NASA's latest "Great Observatory", was launched on July 23, 1999 and reached its final orbit on August 7, 1999. The CXO is in a highly elliptical orbit, approximately 140,000 km x 10,000 km, and has a period of approximately 63.5 hours (N 2.65 days). It transits the Earth's Van Allen belts once per orbit during which no science observations can be performed due to the high radiation environment. The Chandra X-ray Observatory Center currently uses the National Space Science Data Center's "near Earth" AP-8/AE-8 radiation belt model to predict the start and end times of passage through the radiation belts. Our earlier analysis demonstrated that our implementation of the AP-8/AE-8 model (a simple dipole model of the Earth's magnetic field) does not always give sufficiently accurate predictions of the start and end times of transit of the Van Allen belts. This led to a change in our operating procedure whereby we "padded" the start and end times of transit by 10 kiloseconds (ks) so that ACIS, the primary science instrument on-board Chandra, would not be exposed to the "fringes" of the Van Allen belts on ingress and egress for any given transit. This additional 20 ks per orbit during which Chandra is unable to perform science observations sums to approximately 3 Ms of "lost" science time per year and therefore reduces the science observing efficiency of the Observatory. To address the need for a higher fidelity radiation model appropriate for the Chandra orbit, the Chandra Radiation Model (CRM) was developed. The CRM is an ion model for the outer magnetosphere and is based on data from the EPIC/ICS instrument on-board the Geotail satellite as well as data from the CEPPAD/IPS instrument on-board the Polar satellite. With the production and Implementation of the CRM, we present the results of a study designed to investigate the science observing time that may be recovered by using the CRM as a function of the additional low-energy proton exposure to ACIS.

Virani, Shanil↗

ECS Artemis II Upgrades

The National Aeronautics and Space Administration (NASA) actively works to further the expectations of space exploration and research. NASA has been able to develop innovative technology and methods that has allowed for continued discovery and innovation. NASA is in the midst of work for the Artemis mission, which is to return to the moon in an effort to prepare for future Mars exploration. After the successful launch of Artemis I last November, our sights have shifted to Artemis II, which is set to launch next year and bring humans into the lunar orbit for the first time in over fifty years. Artemis II will be the first crewed mission for the program and will represent another step forward in our mission to advance our knowledge of the universe around us. From there, the Artemis program will move onto building a permanent site on the moon that will allow us to eventually reach Mars. During my time at NASA, I was able to work with the NE-XF Branch, also known as the Environmental and Life Support Systems Branch. I specifically worked with the Environmental Control Systems (ECS) team. During my time here, construction on the system in the Vehicle Assembly Building (VAB) and at Launchpad 39B have been progressing at full force. ECS is used to provide processed and purged air at specific temperatures, pressures, and humidity’s to fulfill requirements necessary to support Orion and the SLS. While the Pad has been undergoing upgrades from the original Artemis I configuration, the VAB has a completely new ECS very similar to it. While both systems have been undergoing upgrades, we have been able to transition into testing the systems as we prepare for stacking in the VAB early next year. My role has allowed me to learn about how the systems work and function through walkdowns and visits out to both the Pad and the VAB. I’ve been able to see firsthand how the system operates and have learned how the system affects the vehicle. I’ve been able to shadow my mentor, my coworkers, and COMET operators to oversee the construction efforts of the system along with the testing of the software and the system itself. I even was able to aid in testing at the console myself at Pad 39B. Additionally, I am also revising and reviewing displays for Artemis IV that will be used to remotely control parts of the system. Eventually these displays will be used to support the future of Artemis.

Monique Toon↗

Lightning Protection System

A new Lightning Protection System (LPS) was designed and built at Launch Complex 39B (LC-39B), at the Kennedy Space Center (KSC), Florida, in 2009, for NASA’s Space Launch System (SLS) program. A comprehensive lightning monitoring system was additionally designed and the LC-39B lightning instrumentation started incremental deployment early 2011. By March 2011, the LC-39B lightning monitoring system was activated with short outages during construction and renovations of the LC-39B. Since 2011, the LC-39B LPS has been directly struck at least once per year. The earliest and latest in a year that the LPS has been directly struck by lightning has been January 7th and October 1st (both 2017), respectively. During the summer of 2018, the Mobile Launcher 1 (ML-1) lightning monitoring system was deployed and partially active during ML-1 construction/testing. Since 2018, the ML-1 has been parked at the LC-39B for different durations of time for integrated testing. Early August 2019 (6th and 9th ) multiple lightning strikes terminated directly on the LPS at three different locations in addition to a nearby strike within the Pad perimeter and multiple nearby strikes outside the Pad Perimeter, triggering both, the LC-39B and the ML-1 lightning monitoring systems. This has been the first time direct lightning strikes have terminated on the LPS or within the LC-39B perimeter while the ML-1 has been at the LC-39B. This paper summarizes direct and close nearby lightning strikes to LC-39B from 2011 until the summer of 2019.

Angel G Mata↗

NESC Peer-Review of the Flight Rationale for Expected Debris Report

Since the loss of Columbia on February 1, 2003, the Space Shuttle Program (SSP) has significantly improved the understanding of launch and ascent debris, implemented hardware modifications to reduce debris, and conducted tests and analyses to understand the risks associated with expected debris. The STS-114 flight rationale for expected debris relies on a combination of all three of these factors. A number of design improvements have been implemented to reduce debris at the source. The External Tank (ET) thermal protection system (TPS) foam has been redesigned and/or process improvements have been implemented in the following locations: the bipod closeout, the first ten feet of the liquid hydrogen (LH2) tank protuberance air load (PAL) ramp, and the LH2 tank-to-intertank flange closeout. In addition, the forward bipod ramp has been eliminated and heaters have been installed on the bipod fittings and the liquid oxygen (LO2) feedline forward bellows to prevent ice formation. The Solid Rocket Booster (SRB) bolt catcher has been redesigned. The Orbiter reaction control system (RCS) thruster cover "butcher paper" has been replaced with a material that sheds at a low velocity. Finally, the pad area has been cleaned to reduce debris during lift-off.

Harris, Charles E.↗

SUBSA and PFMI Transparent Furnace Systems Currently in use in the International Space Station Microgravity Science Glovebox

The Solidification Using a Baffle in Sealed Ampoules (SUBSA) and Pore Formation and Mobility Investigation (PFMI) furnaces were developed for operation in the International Space Station (ISS) Microgravity Science Glovebox (MSG). Both furnaces were launched to the ISS on STS-111, June 4, 2002, and are currently in use on orbit. The SUBSA furnace provides a maximum temperature of 850 C and can accommodate a metal sample as large as 30 cm long and 12mm in diameter. SUBSA utilizes a gradient freeze process with a minimum cooldown rate of 0.5C per min, and a stability of +/- 0.15C. An 8 cm long transparent gradient zone coupled with a Cohu 3812 camera and quartz ampoule allows for observation and video recording of the solidification process. PFMI is a Bridgman type furnace that operates at a maximum temperature of 130C and can accommodate a sample 23cm long and 10mm in diameter. Two Cohu 3812 cameras mounted 90 deg apart move on a separate translation system which allows for viewing of the sample in the transparent hot zone and gradient zone independent of the furnace translation rate and direction. Translation rates for both the cameras and furnace can be specified from 0.5micrometers/sec to 100 micrometers/sec with a stability of +/-5%. The two furnaces share a Process Control Module (PCM) which controls the furnace hardware, a Data Acquisition Pad (DaqPad) which provides signal condition of thermal couple data, and two Cohu 3812 cameras. The hardware and software allow for real time monitoring and commanding of critical process control parameters. This paper will provide a detailed explanation of the SUBSA and PFMI systems along with performance data and some preliminary results from completed on-orbit processing runs.

Spivey, Reggie A.↗

Fusion of Test and Analysis: Artemis I Booster to Mobile Launcher Interface Validation

NASA is in the midst of bold and exciting next steps in human exploration and spaceflight. The designs of the new Space Launch System (SLS), the Orion spacecraft and the Exploration Ground Systems (EGS) for vehicle processing and launch are essentially complete and there has been significant progress in manufacturing and assembly of specific hardware for the Artemis I and Artemis II missions. Equally as important, the program level and integrated system level testing and analyses are also well underway to support integrated verification, validation, and Certificate of Flight Readiness (CoFR) for Artemis I. Testing and analysis are key to addressing technical challenges faced by the Artemis missions. Building block approaches are required that provide the right balance between component, element, and/or system level testing that satisfies verification and validation objectives where uncertainties are quantified and minimized. Artemis I is a system of systems that requires a fusion of test and analysis that adeptly characterizes critical interfaces between major program elements. An example of this fusion involves characterizing the interface between the SLS booster and the Mobile Launcher (ML) Vertical Support Post (VSP) interfaces. Proper characterization of this interface represents a number of challenges beginning with the fact that it is a mating of ground support structure in the form of a civil structure to flight hardware. Both sides of the interface are built to different construction standards, but are governed by interface requirements to ensure compatibility when mated. From past program experience, the flexibility at the booster to ML interface is critical in developing accurate prelaunch stacking and cryogenic preloads, squat loads, and pad separation release of preloads and squat loads. This same premise holds for Artemis I. To characterize the asymmetric characteristics at this interface, careful consideration of static forces due to gravity loading with the commensurate effects due to leveling during booster stacking (i.e., spacing and shimming) and nonlinear geometric forces are necessary for inclusion in pre-test assessments. This paper will look at these issues for the upcoming Booster Pull Test in which two boosters will be installed on the ML and one of these boosters will undergo static lateral loading followed afterwards with dynamic excitation into resonance and free-decay. This paper evaluates the booster to ML interface characteristics by characterizing the interface flexibility between the booster aft skirt and the ML VSP interfaces. Furthermore, this paper methodically evaluates the effect of the following on the test outcome: gravitational effects on the booster and ML, the effects of VSP leveling, spacing, and shimming under gravitational loading during booster stacking, the effect of geometric nonlinear follower force due to cg offset as booster is laterally displaced, and the system coupling between the booster under test, ML, and the second booster. Simulated results for a static load pull and dynamic excitation provide insight into the differences in measurement responses when boundary conditions and geometric conditions are included and not included.

Joel W Sills Jr.↗

6DOF Testing of the SLS Inertial Navigation Unit

The Navigation System on the NASA Space Launch System (SLS) Block 1 vehicle performs initial alignment of the Inertial Navigation System (INS) navigation frame through gyrocompass alignment (GCA). Because the navigation architecture for the SLS Block 1 vehicle is a purely inertial system, the accuracy of the achieved orbit relative to mission requirements is very sensitive to initial alignment accuracy. The assessment of this sensitivity and many others via simulation is a part of the SLS Model-Based Design and Model-Based Requirements approach. As a part of the aforementioned, 6DOF Monte Carlo simulation is used in large part to develop and demonstrate verification of program requirements. To facilitate this and the GN&C flight software design process, an SLS-Program-controlled Design Math Model (DMM) of the SLS INS was developed by the SLS Navigation Team. The SLS INS model implements all of the key functions of the hardware-namely, GCA, inertial navigation, and FDIR (Fault Detection, Isolation, and Recovery)-in support of SLS GN&C design requirements verification. Despite the strong sensitivity to initial alignment, GCA accuracy requirements were not verified by test due to program cost and schedule constraints. Instead, the system relies upon assessments performed using the SLS INS model. In order to verify SLS program requirements by analysis, the SLS INS model is verified and validated against flight hardware. In lieu of direct testing of GCA accuracy in support of requirement verification, the SLS Navigation Team proposed and conducted an engineering test to, among other things, validate the GCA performance and overall behavior of the SLS INS model through comparison with test data. This paper will detail dynamic hardware testing of the SLS INS, conducted by the SLS Navigation Team at Marshall Space Flight Center's 6DOF Table Facility, in support of GCA performance characterization and INS model validation. A 6-DOF motion platform was used to produce 6DOF pad twist and sway dynamics while a simulated SLS flight computer communicated with the INS. Tests conducted include an evaluation of GCA algorithm robustness to increasingly dynamic pad environments, an examination of GCA algorithm stability and accuracy over long durations, and a long-duration static test to gather enough data for Allan Variance analysis. Test setup, execution, and data analysis will be discussed, including analysis performed in support of SLS INS model validation.

Geohagan, Kevin↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek A Whitman↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek Whitman↗

Sample Curation in Support of the OSIRIS-REx Asteroid Sample Return Mission

The OSIRIS-REx asteroid sample return mission launched to asteroid Bennu Sept. 8, 2016. The spacecraft will arrive at Bennu in late 2019, orbit and map the asteroid, and perform a touch and go (TAG) sampling maneuver in July 2020. After sample is stowed and confirmed the spacecraft will return to Earth, and the sample return capsule (SRC) will land in Utah in September 2023. Samples will be recovered from Utah [2] and then transported and stored in a new sample cleanroom at NASA Johnson Space Center in Houston [3]. The materials curated for the mission are described here. a) Materials Archive and Witness Plate Collection: The SRC and TAGSAM were built between March 2014 and Summer of 2015, and instruments (OTES,OVIRS, OLA, OCAMS, REXIS) were integrated from Summer 2015 until May 2016. A total of 395 items were received for the materials archive at NASA-JSC, with archiving finishing ~30 days after launch (with the final archived items being related to launch operations)[4]. The materials fall into several general categories including metals (stainless steel, aluminum, titanium alloys, brass and BeCu alloy), epoxies, paints, polymers, lubricants, non-volatile-residue samples (NVR), sapphire, and various miscellaneous materials. All through the ATLO process (from March 2015 until late August 2016) contamination knowledge witness plates (Si wafer and Al foil) were deployed in the various cleanrooms in Denver and KSC to provide an additional record of particle counts and volatiles that is archived for current and future scientific studies. These plates were deployed in roughly monthly increments with each unit containing 4 Si wafers and 4 Al foils. We archived 128 individual witness plates (64 Si wafers and 64 Al foils); one of each witness plate (Si and Al) was analyzed immediately by the science team after archiving, while the remaining 3 of each are archived indefinitely. Information about each material archived is stored in an extensive database at NASA-JSC, and key summary information for each will be presented in an online catalog. b) Bulk Asteroid sample: The Touch and Go Sampling Mechanism (TAGSAM) head will contain up to 1.5 kg of asteroid material. Upon return to Earth, the TAGSAM head with the sample canister will be subjected to a nitrogen purge and then opened in a nitrogen cabinet in Houston. Once the TAGSAM head is removed from the canister, it will be dis-assembled slowly and carefully under nitrogen until the sample can be removed for processing in a dedicated nitrogen glovebox. Bennu surface samples are expected to be sub-cm sized, based on thermal infrared and radar polarization ratio measurements [1]. The upper limit on material collected by the TAGSAM head is ~2 cm. Therefore, we will be prepared to handle, subdivide, and characterize materials of a wide grain size (from ~10 m to 2 cm), and for both organic (UV fluorescence) and inorganic (SEM, FTIR, optical) properties. Representative portions of the bulk sample will be prepared for JAXA (0.5 %; see also [5]) and Canadian Space Agency (4%), with the remaining divided between the science team (<25%) and archived for future studies (NASA) (>75%). c) Contact Pad samples: The base of the TAGSAM head contains 24 contact pads that are designed to trap the upper surface layer of material and thus offer an opportunity to study asteroid samples that have resided at the very top surface of the regolith. Asteroid material is trapped on the pads in spring steel Velcro hooks, and material will have to be removed from these pads by curation specialists in the lab. d) Hardware: Some canister and SRC hardware items will contain information that will be important to understanding the collected samples, including the canister gas filter, temperature strips, flight witness plates, and the TAGSAM and canister parts that might have adhering dust grains. Some challenges remaining for both bulk sample and contact pad samples include: i) working with intermediate size range (200 to 500 micron) samples - a size range NASA has not previously worked in such detail; ii) techniques for removal of contact pad material from the spring steel hooks, iii) static electrical effects of dust sized particles during sample handling and curation is likely to be significant, and iv) the TAGSAM head and associated canister hardware will undoubtedly be coated with fine adhering dust grains from Bennu. In the case of collection of a large bulk sample mass, the adhering dust grains may be of lower priority. If a small sample mass is returned, the adhering dust may attain a higher priority, so recovery of adhering dust grains is an additional challenge to consider. In the year leading up to sample return we plan a variety of sample handling rehearsals that will enables the curation team to be prepared for many new aspects posed by this sample suite.

Righter, Kevin↗