Search NASA⌕ Search

SEARCH · Search NASA

Results for “load Balancing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

A New Flow-Through Wind Tunnel Balance for Retropropulsion Testing

Supersonic retropropulsion is believed to be an enabling technology for large-scale human Mars lander vehicle concepts. Ground testing of such vehicles requires the development of new flow-through wind tunnel balances because no suitable balances exist. A new flow-through balance is designed that employs membranes in place of bellows, which have historically been used, and that passes the flow through load bearing parts of the balance. Flow through the balance is optimized via the addition of flow guides, which are manufactured as separate parts, and attached to the balance. Calibration of this new flow-through balance demonstrates that it can suitably characterize the load and pressure ranges it was designed for, which provides aero researchers a new tool to directly measure supersonic retropropulsion performance of powered descent vehicles.

Flow through balance↗

A New Flow-Through Balance for Retropropulsion Testing

Supersonic retropropulsion is believed to be an enabling technology for large-scale human Mars lander vehicle concepts. Ground testing of such vehicles requires the development of new flow-through wind tunnel balances because no suitable balances exist. A new flow-through balance is designed that employs membranes in place of bellows, which have historically been used, and that passes the flow through load bearing parts of the balance. Flow through the balance is optimized via the addition of flow guides, which are manufactured as separate parts, and attached to the balance. Calibration of this new flow-through balance demonstrates that it can suitably characterize the load and pressure ranges it was designed for, which provides aero researchers a new tool to directly measure supersonic retropropulsion performance of powered descent vehicles.

Flow through balance↗

Single-Vector Calibration of Wind-Tunnel Force Balances

An improved method of calibrating a wind-tunnel force balance involves the use of a unique load application system integrated with formal experimental design methodology. The Single-Vector Force Balance Calibration System (SVS) overcomes the productivity and accuracy limitations of prior calibration methods. A force balance is a complex structural spring element instrumented with strain gauges for measuring three orthogonal components of aerodynamic force (normal, axial, and side force) and three orthogonal components of aerodynamic torque (rolling, pitching, and yawing moments). Force balances remain as the state-of-the-art instrument that provide these measurements on a scale model of an aircraft during wind tunnel testing. Ideally, each electrical channel of the balance would respond only to its respective component of load, and it would have no response to other components of load. This is not entirely possible even though balance designs are optimized to minimize these undesirable interaction effects. Ultimately, a calibration experiment is performed to obtain the necessary data to generate a mathematical model and determine the force measurement accuracy. In order to set the independent variables of applied load for the calibration 24 NASA Tech Briefs, October 2003 experiment, a high-precision mechanical system is required. Manual deadweight systems have been in use at Langley Research Center (LaRC) since the 1940s. These simple methodologies produce high confidence results, but the process is mechanically complex and labor-intensive, requiring three to four weeks to complete. Over the past decade, automated balance calibration systems have been developed. In general, these systems were designed to automate the tedious manual calibration process resulting in an even more complex system which deteriorates load application quality. The current calibration approach relies on a one-factor-at-a-time (OFAT) methodology, where each independent variable is incremented individually throughout its full-scale range, while all other variables are held at a constant magnitude. This OFAT approach has been widely accepted because of its inherent simplicity and intuitive appeal to the balance engineer. LaRC has been conducting research in a "modern design of experiments" (MDOE) approach to force balance calibration. Formal experimental design techniques provide an integrated view to the entire calibration process covering all three major aspects of an experiment; the design of the experiment, the execution of the experiment, and the statistical analyses of the data. In order to overcome the weaknesses in the available mechanical systems and to apply formal experimental techniques, a new mechanical system was required. The SVS enables the complete calibration of a six-component force balance with a series of single force vectors.

Parker, P. A.↗

Virtual Self-Excited Induction Generator-Based Grid-Forming Inverter Control for Robust Voltage Regulation Under Nonideal Loading

This paper presents a generator-inspired control methodology for grid-forming (GFM) inverters that deliberately emulates a self-excited induction generator so that the inverter can hold its voltage and frequency under difficult loading and severe terminal disturbances across wide voltage and frequency ranges. The design integrates a Lyapunov energy function-based inner loop to provide high bandwidth and strong disturbance rejection, and it complements this with a passivity-based argument that furnishes a coherent large-signal stability guarantee beyond small-signal limits. Analytical insights are developed via the Krylov-Bogoliubov-Mitropolsky averaging method, which reveals an intrinsic resistive droop characteristic; these closed-form relations both explain the observed dynamics and yield simple, decentralized tuning rules. The methodology is validated on a controller-hardware-in-the-loop platform and exercised in real time across balanced, unbalanced, and nonlinear loads, as well as during parallel operation. Across these scenarios, the inverter maintains balanced three-phase voltages, limits harmonic content, settles quickly with well-damped transients, and remains resilient when multiple units operate in parallel. The contributions are a self-excited-machine-inspired GFM controller with enhanced dynamic performance and robustness, a single stability rationale grounded in passivity, closed-form expressions that guide tuning, and comprehensive hardware-in-the-loop validations demonstrating effectiveness and superiority under challenging operating conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Temperature (1000 F) Magnetic Thrust Bearing Test Rig Completed and Operational

Large axial loads are induced on the rolling element bearings of a gas turbine. To extend bearing life, designers use pneumatic balance pistons to reduce the axial load on the bearings. A magnetic thrust bearing could replace the balance pistons to further reduce the axial load. To investigate this option, the U.S. Army Research Laboratory, the NASA Glenn Research Center, and Texas A&M University designed and fabricated a 7-in.- diameter magnetic thrust bearing to operate at 1000 F and 30,000 rpm, with a 1000-lb load capacity. This research was funded through a NASA Space Technology Transfer Act with Allison Advance Development Company under the Ultra-Efficient Engine Technology (UEET) Intelligent Propulsion Systems Foundation Technology project.

Montague, Gerald T.↗

Multiscale Effects Masked the Impact of the COVID-19 Pandemic on Electricity Demand in the United States

Shelter-in-place orders and business closures related to COVID-19 changed the hourly profile of electricity demand and created an unprecedented source of uncertainty for the grid. The potential for continued shifts in electricity profiles has implications for electricity sector investment and operating decisions that maintain reserve margins and provide grid reliability. This study reveals that understanding this uncertainty requires an understanding of the underlying drivers at the customer-class scale. This paper utilizes three datasets to compare the impacts of COVID-19 on electricity consumption across a range of spatiotemporal and customer scales. At the utility/customer-class scale, COVID-19-induced shutdowns in the spring of 2020 shifted weekday residential load profiles to resemble weekend profiles from previous years. Total commercial loads declined, but the commercial diurnal load profile was unchanged. With only total loads available at the balancing authority scale, the apparent impact of COVID-19 was smaller during the summer due in part to phased re-opening and spatial variability in re-opening, but there were still clear variations once total loads were broken down zonally. Monthly data at the state scale showed an increase in state-level residential electricity sales, a decrease in commercial sales, and a small net decrease in total sales in most states from April-August 2020. Analyses that focus on total load or a single scale may miss important changes that become apparent when the load is broken down regionally or by customer class.

COVID-19, electricity demand, multiscale, Commonwe↗

NV Energy Large-Scale Photovoltaic Integration Study: Intra-Hour Dispatch and AGC Simulation

The uncertainty and variability with photovoltaic (PV) generation make it very challenging to balance power system generation and load, especially under high penetration cases. Higher reserve requirements and more cycling of conventional generators are generally anticipated for large-scale PV integration. However, whether the existing generation fleet is flexible enough to handle the variations and how well the system can maintain its control performance are difficult to predict. The goal of this project is to develop a software program that can perform intra-hour dispatch and automatic generation control (AGC) simulation, by which the balancing operations of a system can be simulated to answer the questions posed above. The simulator, named Electric System Intra-Hour Operation Simulator (ESIOS), uses the NV Energy southern system as a study case, and models the system’s generator configurations, AGC functions, and operator actions to balance system generation and load. Actual dispatch of AGC generators and control performance under various PV penetration levels can be predicted by running ESIOS. With data about the load, generation, and generator characteristics, ESIOS can perform similar simulations and assess variable generation integration impacts for other systems as well. This report describes the design of the simulator and presents the study results showing the PV impacts on NV Energy real-time operations.

Energy↗

Features for a Modern Strain-Gage Balance Data Analysis Software Tool

Required, recommended, and optional features are discussed that benefit preparation and evaluation of the load prediction equations in a strain-gage balance data analysis tool. First, milestones in the evolution of load prediction methods are reviewed so that suggested features can be put into a historical context. Afterwards, independent and dependent variable choices for the balance data analysis are discussed. Then, it is illustrated how three different metrics may be used for the identification of the root cause of an unwanted divergence of the load iterations that may be observed during an iterative load prediction. Finally, a list of features is provided to guide software development efforts.

wind tunnel test↗

Analytical study of pressure balancing in gas film seals

The load factor is investigated for subsonic and choked flow conditions, laminar and turbulent flows, and various seal entrance conditions. Both parallel sealing surfaces and surfaces with small linear deformation were investigated. The load factor for subsonic flow depends strongly on pressure ratio; under choked flow conditions, however the load factor is found to depend more strongly on film thickness and flow entrance conditions rather than pressure ratio. The importance of generating hydrodynamic forces to keep the seal balanced under severe and multipoint operation is also discussed.

Zuk, J.↗

Improved load distribution in parallel sparse Cholesky factorization

Compared to the customary column-oriented approaches, block-oriented, distributed-memory sparse Cholesky factorization benefits from an asymptotic reduction in interprocessor communication volume and an asymptotic increase in the amount of concurrency that is exposed in the problem. Unfortunately, block-oriented approaches (specifically, the block fan-out method) have suffered from poor balance of the computational load. As a result, achieved performance can be quite low. This paper investigates the reasons for this load imbalance and proposes simple block mapping heuristics that dramatically improve it. The result is a roughly 20% increase in realized parallel factorization performance, as demonstrated by performance results from an Intel Paragon system. We have achieved performance of nearly 3.2 billion floating point operations per second with this technique on a 196-node Paragon system.

Rothberg, Edward↗

Government/Industry Workshop on Payload Loads Technology

A fully operational space shuttle is discussed which will offer science the opportunity to explore near earth orbit and finally interplanetary space on nearly a limitless basis. This multiplicity of payload/experiment combinations and frequency of launches places many burdens on dynamicists to predict launch and landing environments accurately and efficiently. Two major problems are apparent in the attempt to design for the diverse environments: (1) balancing the design criteria (loads, etc.) between launch and orbit operations, and (2) developing analytical techniques that are reliable, accurate, efficient, and low cost to meet the challenge of multiple launches and payloads. This paper deals with the key issues inherent in these problems, the key trades required, the basic approaches needed, and a summary of the state-of-the-art techniques.

Source record↗

Evaluation of Regression Models of Balance Calibration Data Using an Empirical Criterion

An empirical criterion for assessing the significance of individual terms of regression models of wind tunnel strain gage balance outputs is evaluated. The criterion is based on the percent contribution of a regression model term. It considers a term to be significant if its percent contribution exceeds the empirical threshold of 0.05%. The criterion has the advantage that it can easily be computed using the regression coefficients of the gage outputs and the load capacities of the balance. First, a definition of the empirical criterion is provided. Then, it is compared with an alternate statistical criterion that is widely used in regression analysis. Finally, calibration data sets from a variety of balances are used to illustrate the connection between the empirical and the statistical criterion. A review of these results indicated that the empirical criterion seems to be suitable for a crude assessment of the significance of a regression model term as the boundary between a significant and an insignificant term cannot be defined very well. Therefore, regression model term reduction should only be performed by using the more universally applicable statistical criterion.

Ulbrich, Norbert↗

Automated load management for spacecraft power systems

An account is given of the results of a study undertaken by NASA's Marshall Space Flight Center to design and implement the load management techniques for autonomous spacecraft power systems, such as the Autonomously Managed Power System Test Facility. Attention is given to four load-management criteria, which encompass power bus balancing on multichannel power systems, energy balancing in such systems, power quality matching of loads to buses, and contingency load shedding/adding. Full implementation of these criteria calls for the addition of a second power channel.

Lollar, Louis F.↗

Automatic force balance calibration system

A system for automatically calibrating force balances is provided. The invention uses a reference balance aligned with the balance being calibrated to provide superior accuracy while minimizing the time required to complete the calibration. The reference balance and the test balance are rigidly attached together with closely aligned moment centers. Loads placed on the system equally effect each balance, and the differences in the readings of the two balances can be used to generate the calibration matrix for the test balance. Since the accuracy of the test calibration is determined by the accuracy of the reference balance and current technology allows for reference balances to be calibrated to within +/-0.05% the entire system has an accuracy of +/-0.2%. The entire apparatus is relatively small and can be mounted on a movable base for easy transport between test locations. The system can also accept a wide variety of reference balances, thus allowing calibration under diverse load and size requirements.

Ferris, Alice T.↗

Automatic force balance calibration system

A system for automatically calibrating force balances is provided. The invention uses a reference balance aligned with the balance being calibrated to provide superior accuracy while minimizing the time required to complete the calibration. The reference balance and the test balance are rigidly attached together with closely aligned moment centers. Loads placed on the system equally effect each balance, and the differences in the readings of the two balances can be used to generate the calibration matrix for the test balance. Since the accuracy of the test calibration is determined by the accuracy of the reference balance and current technology allows for reference balances to be calibrated to within .+-.0.05%, the entire system has an accuracy of a .+-.0.2%. The entire apparatus is relatively small and can be mounted on a movable base for easy transport between test locations. The system can also accept a wide variety of reference balances, thus allowing calibration under diverse load and size requirements.

Ferris, Alice T.↗

District Energy Corporation SW 40th Street Thermal Energy Plant

The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot print and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.

15 GEOTHERMAL ENERGY↗

Large Load Impacts to Distribution System Hosting Capacity

This work examined the impact of large loads on utility distribution system models using the Sandia-developed open-source software DREAMS. It was shown that hosting capacity varies with location and changes after any asset is added to, or removed from, a system. Despite the tested models having similar rated voltages and other characteristics, their thermal and voltage constrained hosting capacity varied over 2 MW. The addition of a 3-phase balanced constant power large load with power factor of 1.0 exhibited non-linear reductions to all voltage constrained hosting capacities. The reductions to thermal constrained hosting capacity from a load with similar characteristics was more linear, related to the size of the added load, and did not impact all model buses. Co-located capacitors were shown to accommodate demand that was beyond the baseline voltage constrained hosting capacity limits, however, the costs and benefits from this approach were found to not be 1:1 and required additional available thermal capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying Challenging Operating Hours for Solar Intergration in the NV Energy System

Abstract-- In this paper, the ability of the Nevada (NV) Energy generation fleet to meet its system balancing requirements under different solar energy penetration scenarios is studied. System balancing requirements include capacity, ramp rate, and ramp duration requirements for load following and regulation. If, during some operating hours, system capability is insufficient to meet these requirements, there is certain probability that the balancing authority’s control and reliability performance can be compromised. These operating hours are considered as “challenging” hours. Five different solar energy integration scenarios have been studied. Simulations have shown that the NV Energy system will be potentially able to accommodate up to 942 MW of solar photovoltaic (PV) generation. However, the existing generation scheduling procedure should be adjusted to make it happen. Fast-responsive peaker units need to be used more frequently to meet the increasing ramping requirements. Thus, the NV Energy system operational cost can increase. Index Terms—Solar Generation, Renewables Integration, Balancing Process, Load Following, Regulation.

capacity↗