Search NASA⌕ Search

SEARCH · Search NASA

Results for “program areas”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Evaluation of Storage for Transportation Equipment, Unfueled Convertors, and Fueled Convertors at the INL for the Radioisotope Power Systems Program

This report contains an evaluation of the storage conditions required for several key components and/or systems of the Radioisotope Power Systems (RPS) Program at the Idaho National Laboratory (INL). These components/systems (transportation equipment, i.e., type ‘B’ shipping casks and the radioisotope thermo-electric generator transportation systems (RTGTS), the unfueled convertors, i.e., multi-hundred watt (MHW) and general purpose heat source (GPHS) RTGs, and fueled convertors of several types) are currently stored in several facilities at the Materials and Fuels Complex (MFC) site. For various reasons related to competing missions, inherent growth of the RPS mission at the INL and enhanced efficiency, it is necessary to evaluate their current storage situation and recommend the approach that should be pursued going forward for storage of these vital RPS components and systems. The reasons that drive this evaluation include, but are not limited to the following: 1) conflict with other missions at the INL of higher priority, 2) increasing demands from the INL RPS Program that exceed the physical capacity of the current storage areas and 3) the ability to enhance our current capability to care for our equipment, decrease maintenance costs and increase the readiness posture of the systems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Automated Process Planning for Embossing and Functionally Grading Materials via Site-Specific Control in Large-Format Metal-Based Additive Manufacturing

The potential for site-specific, process-parameter control is an attribute of additive manufacturing (AM) that makes it highly attractive as a manufacturing process. The research interest in the functionally grading material properties of numerous AM processes has been high for years. However, one of the issues that slows developmental progress in this area is process planning. It is not uncommon for manual programming methods and bespoke solutions to be utilized for site-specific control efforts. This article presents the development of slicing software that contains a fully automated process planning approach for enabling through-thickness, process-parameter control for a range of AM processes. The technique includes the use of parent and child geometries for controlling the locations of site-specific parameters, which are overlayed onto unmodified toolpaths, i.e., a vector-based planning approach is used in which additional information, such as melt pool size for large-scale metal AM processes, is assigned to the vectors. This technique has the potential for macro- and micro-structural modifications to printed objects. A proof-of-principle experiment is highlighted in which this technique was used to generate dynamic bead geometries that were deposited to induce a novel surface embossing effect, and additional software examples are presented that highlight software support for more complex objects.

36 MATERIALS SCIENCE↗

The COSMOS2015 Catalog: Exploring the 1 < z < 6 universe with half a million galaxies

We present the COSMOS2015{sup 24} catalog, which contains precise photometric redshifts and stellar masses for more than half a million objects over the 2deg{sup 2} COSMOS field. Including new YJHK{sub s} images from the UltraVISTA-DR2 survey, Y-band images from Subaru/Hyper-Suprime-Cam, and infrared data from the Spitzer Large Area Survey with the Hyper-Suprime-Cam Spitzer legacy program, this near-infrared-selected catalog is highly optimized for the study of galaxy evolution and environments in the early universe. To maximize catalog completeness for bluer objects and at higher redshifts, objects have been detected on a χ {sup 2} sum of the YJHK{sub s} and z {sup ++} images. The catalog contains ∼6×10{sup 5} objects in the 1.5 deg{sup 2} UltraVISTA-DR2 region and ∼1.5×10{sup 5} objects are detected in the “ultra-deep stripes” (0.62 deg{sup 2}) at K{sub s}⩽24.7 (3σ, 3″, AB magnitude). Through a comparison with the zCOSMOS-bright spectroscopic redshifts, we measure a photometric redshift precision of σ{sub Δz/(1+z{sub s)}} = 0.007 and a catastrophic failure fraction of η = 0.5%. At 3<z<6, using the unique database of spectroscopic redshifts in COSMOS, we find σ{sub Δz/(1+z{sub s)}} = 0.021 and η = 13.2%. The deepest regions reach a 90% completeness limit of 10{sup 10}M{sub ⊙} to z = 4. Detailed comparisons of the color distributions, number counts, and clustering show excellent agreement with the literature in the same mass ranges. COSMOS2015 represents a unique, publicly available, valuable resource with which to investigate the evolution of galaxies within their environment back to the earliest stages of the history of the universe. The COSMOS2015 catalog is distributed via anonymous ftp and through the usual astronomical archive systems (CDS, ESO Phase 3, IRSA).

79 ASTRONOMY AND ASTROPHYSICS↗

Impact of Biodiesel on the Oxidation Kinetics and Morphology of Diesel Particulate

We compare the oxidation characteristics of four different diesel particulates generated with a modern light-duty engine. The four particulates represent engine fueling with conventional ultra-low sulfur diesel (ULSD), biodiesel, and two intermediate blends of these fuels. The comparisons discussed here are based on complementary measurements implemented in a laboratory micro-reactor, including temperature programmed desorption and oxidation, pulsed isothermal oxidation, and BET surface area. From these measurements we have derived models that are consistent with the observed oxidation reactivity differences. When accessible surface area effects are properly accounted for, the oxidation kinetics of the fixed carbon components were found to consistently exhibit an Arrhenius activation energy of 113 6 kJ/mol. Release of volatile carbon from the as-collected particulate appears to follow a temperaturedependent rate law.

09 BIOMASS FUELS↗

National Consortium Supports cities in Evaluating LED Street Lights (Solid-State Lighting Factsheet)

To leverage the efforts of multiple cities pursuing evaluations of LED street lighting products, the U.S. Department of Energy (DOE) supports the Municipal Solid-State Street Lighting Consortium. The Consortium collects, analyzes, and shares technical information and experiences related to LED street and area lighting demonstrations. This factsheet provides an overview of the program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Taking Closure to the Next Level - 13030

The River Corridor Closure Project (RCCP) is the Hanford Site's first closure project and when it is complete, in 2015, it will have cleaned up 220 mi{sup 2} of contaminated land adjacent to the Columbia River. Washington Closure Hanford (WCH) was selected by the DOE to manage the removal and cleanup of Hanford's nuclear legacy along the River Corridor. Work began in 2005 and is now more than 85% complete with more than 2 years left in the contract. A Closure Team was commissioned in December 2009 and has since issued a closure strategy and a disciplined three-phase approach to transition land parcels to DOE, Richland Operations Office (DOE-RL) as cleanup is completed. This process supports DOE-RL objectives for progressive footprint reduction based on the division of the River Corridor into geographical land parcels. It also allows for incremental area-by-area transition and turnover to the Long-Term Stewardship program. Several important milestones stand between now and the successful end of the RCCP. They include overall funding impacts, working with DOE-RL on new scope additions, meeting regulatory milestones, and maintaining a strong safety performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Monitoring Optimization of Post Closure Waste Sites at SRS - 13184

Groundwater monitoring at the Savannah River Site (SRS) is required at dozens of waste sites and includes sampling at over 1,000 monitoring wells. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost that represents an increasing proportion of the environmental management budget as surface waste units are closed. Therefore, a comprehensive evaluation of the monitoring program for eighteen regulated waste units was conducted to identify areas where monitoring could be optimized. The units evaluated varied considerably in the scope of monitoring; ranging from two wells to hundreds of wells. In order to systematically evaluate such disparate monitoring networks, SRS developed a decision-logic analysis using flow sheets to address potential areas of optimization. Five areas were identified for evaluation, including: (1) Comparison of current monitoring to regulatory requirements, (2) Spatial distribution, (3) Temporal sampling, (4) Analyte requirements, and (5) Reporting frequency and content. Optimization recommendations were made for fifteen of the eighteen groundwater units. The spatial evaluation resulted in recommendations to suspend sampling in 79 wells and add sampling at 16 wells. The temporal evaluation resulted in recommendations to reduce the number of well visits per year by 504. Analyte reductions were recommended at three groundwater units, with increases at three other units. Reporting frequency reductions were recommended for five units. Approximately $700,000 (direct dollars) of potential annualized cost savings were identified for these groundwater units, provided all recommendations are approved. The largest area of savings was associated with reducing the reporting frequency. The optimization approach has been presented to the EPA and South Carolina Department of Environmental Control (SCHDEC), with unit-specific recommendations approved for all five units presented. This approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Backyards and Bedrooms: Challenges and Successes in Gaining Access to Homes for Radiological Testing - 18204

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale properties - primarily residential - in the Municipality of Port Hope for the presence or absence of historic low-level radioactive waste. The Property Radiological Survey began in 2012 and is being conducted in five campaigns with between 450 and 1,250 properties in each campaign. The survey begins with radon monitoring, followed by interior and exterior gamma radiation tests, and concludes with exterior borehole drilling/soil sampling. The full suite of tests take approximately 18 - 24 months to complete at each property. This paper will describe the communications strategy implemented to obtain consent from thousands of property owners for CNL's contractor to conduct radiological testing in private living spaces such as bathrooms, bedrooms and closets, as well as front yards, backyards and outbuildings. This strategy incorporates tactics used to secure consent from residents who are reluctant to participate in the survey for reasons including privacy issues, family situations, life events and misapprehensions about the survey and/or the PHAI in general. The paper will include information about how residents' concerns are addressed, the stepped approach to securing access from owners who do not respond to repeated attempts at contact, and the importance of close coordination with the contractor to ensure that all components of the investigations are aligned so that work is conducted in a safe, timely and systematic manner. The authors will also describe the process for keeping the regulator and the municipality informed of survey outreach efforts, challenges and successes, and will outline the process for notifying the approximately 800 owners of properties on which historic low-level radioactive waste is expected to be identified and transitioning those owners from the survey to the remediation phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative Project Update - 19146

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. With funding of $1.28 billion CAD it is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Granby Project will relocate approximately 450,000 cubic metres of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new engineered aboveground mound being built about a kilometre north of the current site. This paper will provide an update on both projects with an emphasis on successes to date and challenges yet be faced. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing 5,000 Properties to Determine which Require Radiological Remediation - 19152

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (hLLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. Conducting work safely, while delivering the PHAI on time and within budget, is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.7 million cubic metres of hLLRW from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale sites (SSS) - primarily residential - in the Municipality of Port Hope for the presence or absence of hLLRW. This paper provides an overview of the characterization, delineation and design for remediation of historic LLRW for the SSS, a grouping of sites within the municipality comprised of residential properties, municipal properties including municipal road allowances, private road allowances and temporary storage sites. Comprising over 4,800 parcels of land, a robust remedial process was designed to identify, characterize, delineate and remediate interior and exterior hLLRW contamination found in soils and building materials. The process adheres to the framework of the Port Hope Project Waste Nuclear Substance Licence (License) and its associated governance frameworks and regulatory requirements [1]. The overall goal is for CNL to be able to issue the owner of each parcel of land a Compliance Letter stating that the site meets the PHAI Clean-up Criteria, either after completion of characterization (if no hLLRW is identified) or after completion of remediation and verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Opportunities for Basic Efficiency Measures in Low-Income Homes: A Southeast Alaska Case Study

Juneau, Alaska, is the state's capital city and aims to reach 80% renewable energy for the space heating and transportation sectors by 2045. This goal highlights a need to electrify both sectors to take advantage of the inexpensive hydropower available from the local electric utility, Alaska Electric Light and Power. To that end, researchers examined the feasibility of deploying storm windows via a case study of installing storm windows in two local low-income homes. Newer models of storm windows provide an extra layer of insulation over existing windows while preserving operability and views. They can also improve comfort and reduce noise. In addition to conducting pre- and post-installation air leakage tests, energy monitoring, and occupant interviews, researchers worked with the regional housing authority and a local builder to install the storm windows and replace inoperable windows in the two houses in 2021. The team encountered several challenges, including a lack of egress windows, energy data from a wide variety of heating systems, extremely leaky homes, and installation issues, such as windows that were not square. These results point to several barriers to the widespread deployment of window upgrades in the area and open the door to opportunities to design deployment programs that improve safety and efficiency.

cold climate↗

AVESTAR Center for Operational Excellence of Electricity Generation Plants

To address industry challenges in attaining operational excellence for electricity generation plants, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTARTM). This presentation will highlight the AVESTARTM Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission electricity generation plants. The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTSs) and 3D virtual immersive training systems (ITSs) into an integrated energy plant and control room environment. AVESTAR’s initial offering combines--for the first time--a “gasification with CO2 capture” process simulator with a “combined-cycle” power simulator together in a single OTS/ITS solution for an integrated gasification combined cycle (IGCC) power plant with carbon dioxide (CO2) capture. IGCC systems are an attractive technology option for power generation, especially when capturing and storing CO2 is necessary to satisfy emission targets. The AVESTAR training program offers a variety of courses that merge classroom learning, simulator-based OTS learning in a control-room operations environment, and immersive learning in the interactive 3D virtual plant environment or ITS. All of the courses introduce trainees to base-load plant operation, control, startups, and shutdowns. Advanced courses require participants to become familiar with coordinated control, fuel switching, power-demand load shedding, and load following, as well as to problem solve equipment and process malfunctions. Designed to ensure work force development, training is offered for control room and plant field operators, as well as engineers and managers. Such comprehensive simulator-based instruction allows for realistic training without compromising worker, equipment, and environmental safety. It also better prepares operators and engineers to manage the plant closer to economic constraints while minimizing or avoiding the impact of any potentially harmful, wasteful, or inefficient events. The AVESTAR Center is also used to augment graduate and undergraduate engineering education in the areas of process simulation, dynamics, control, and safety. Students and researchers gain hands-on simulator-based training experience and learn how the commercial-scale power plants respond dynamically to changes in manipulated inputs, such as coal feed flow rate and power demand. Students also analyze how the regulatory control system impacts power plant performance and stability. In addition, students practice start-up, shutdown, and malfunction scenarios. The 3D virtual ITSs are used for plant familiarization, walk-through, equipment animations, and safety scenarios. To further leverage the AVESTAR facilities and simulators, NETL and its university partners are pursuing an innovative and collaborative R&D program. In the area of process control, AVESTAR researchers are developing enhanced strategies for regulatory control and coordinated plant-wide control, including gasifier and gas turbine lead, as well as advanced process control using model predictive control (MPC) techniques. Other AVESTAR R&D focus areas include high-fidelity equipment modeling using partial differential equations, dynamic reduced order modeling, optimal sensor placement, 3D virtual plant simulation, and modern grid. NETL and its partners plan to continue building the AVESTAR portfolio of dynamic simulators, immersive training systems, and advanced research capabilities to satisfy industry’s growing need for training and experience with the operation and control of clean energy plants. Future dynamic simulators under development include natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants with post-combustion CO2 capture. These dynamic simulators are targeted for use in establishing a Virtual Carbon Capture Center (VCCC), similar in concept to the DOE’s National Carbon Capture Center for slipstream testing. The VCCC will enable developers of CO2 capture technologies to integrate, test, and optimize the operation of their dynamic capture models within the context of baseline power plant dynamic models. The objective is to provide hands-on, simulator-based “learn-by-operating” test platforms to accelerate the scale-up and deployment of CO2 capture technologies. Future AVESTAR plans also include pursuing R&D on the dynamics, operation, and control of integrated electricity generation and storage systems for the modern grid era. Special emphasis will be given to combining load-following energy plants with renewable and distributed generating supplies and fast-ramping energy storage systems to provide near constant baseload power.

97 MATHEMATICS AND COMPUTING↗

Recovery Act - LADWP Smart Grid Regional Demonstration Program Final Technical Report

LADWP collaborated with its project partners to carry out this demonstration in the designated areas to include two university campuses – the University of California, Los Angeles (UCLA) and the University of Southern California (USC) – surrounding neighborhoods, City of Los Angeles facilities, and LADWP power system test labs. The last project partner, Jet Propulsion Laboratory (JPL) was responsible for the cyber security aspects of the project. The program’s use cases provided insightful information to understand triggers for customers, distributors, and generators to adapt their behavior which aid in reducing system demands and costs, increasing energy efficiency, and increasing grid reliability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY22 Grid Modernization & Energy Storage Program: Accomplishments & Impacts

Sandia’s Grid Modernization and Energy Storage program works to advance a national vision of a secure, resilient, and sustainable electric system for all users. Our achievements reflect a strategic approach combining technology development; modeling, simulation, and data analytics; and partnered demonstrations and outreach to further the adoption of advanced grid and storage technologies. Our FY22 efforts leverage the strengths of our partnerships—spanning Sandia’s core science and technology competencies as well as external technology leaders—to develop the solutions today which enable the grid of tomorrow. Much of the material in this report comes from the separate 2022 Accomplishments Report compiled by our Energy Storage subprogram team, a cornerstone of our grid research and achievements. The Grid Energy Storage Program at Sandia is focused on making energy storage cost-effective through research and development (R&D) in new battery technologies, advanced power electronics and power conversion systems, improved safety and reliability for energy storage systems, analytical tools for the valuation of energy storage, and the validation of new energy storage technologies through demonstration projects. During the 2022 fiscal year, Sandia executed R&D work supported by the U.S. Department of Energy’s (DOE) Office of Electricity – Energy Storage Program under the leadership of Dr. Imre Gyuk. This report indicates key areas of research and engagement and summarizes the impact of Sandia’s contributions through notable accomplishments, journal publications, patents, and technical conferences and presentations. It is provided with the hope that readers discover ways we can further team to create our modern grid and apply the outcomes of our efforts. The bulk of work described herein is funded by the DOE Office of Electricity and key programs within the DOE Office of Energy Efficiency and Renewable Energy. As we indicated in our report from last year, the contributors to our successes are too numerous to name here, though our team wishes to express our deep gratitude to the numerous program and project sponsors at the US Department of Energy, who often function equally as technical collaborators; our many partners in industry, academia, utilities, and other national labs; and fellow researchers and business partners at Sandia whose leadership and creativity have enabled the accomplishments described herein.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Environment, Safety and Health Self-Assessment Report Fiscal Year 2010

The Lawrence Berkeley National Laboratory (LBNL) Environment, Safety, and Health (ES&H) Self-Assessment Program was established to ensure that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The ES&H Self-Assessment Program, managed by the Office of Contractor Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The primary objective of the program is to ensure that work is conducted safely and with minimal negative impact to workers, the public, and the environment. Self-assessment follows the five core functions and guiding principles of ISM. Self-assessment is the mechanism used to promote the continuous improvement of the Laboratory's ES&H programs. The process is described in the Environment, Safety, and Health Assurance Plan (PUB-5344) and is composed of three types of self-assessments: Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review. The Division ES&H Self-Assessment Manual (PUB-3105) provides the framework by which divisions conduct formal ES&H self-assessments to systematically identify program deficiencies. Issue-specific assessments are designed and implemented by the divisions and focus on areas of interest to division management. They may be conducted by teams and involve advance planning to ensure that appropriate resources are available. The ES&H Technical Assurance Program Manual (PUB-913E) provides the framework for systematic reviews of ES&H programs and processes. The ES&H Technical Assurance Program Assessment is designed to evaluate whether ES&H programs and processes are compliant with guiding regulations, are effective, and are properly implemented by LBNL divisions. The Division ES&H Peer Review Manual provides the framework by which division ISM systems are evaluated and improved. Peer Reviews are conducted by teams under the direction of senior division management and focus on higher-level management issues. Peer Review teams are selected on the basis of members knowledge and experience in the issues of interest to the division director. LBNL periodically requests in-depth independent assessments of selected ES&H programs. Such assessments augment LBNL's established assessment processes and provide an objective view of ES&H program effectiveness. Institutional Findings, Observations, and Noteworthy Practices identified during independent assessments are specifically intended to help LBNL identify opportunities for program improvement. This report includes the results of the Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review, respectively.

99 GENERAL AND MISCELLANEOUS↗