Search NASA⌕ Search

SEARCH · Search NASA

Results for “sequestration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

CO2 Sequestration Saline Aquifer Well Closure

Materials of construction to plug and abandon a well for underground storage of CO2. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=184B416C-9D9C-4D43-ACF3-4A8B9F0463D6

42 ENGINEERING↗

CO2 Sequestration Saline Aquifer Well Construction

Materials of construction and installation fuels and emissions for a well for underground storage of CO2. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=E2236C75-7954-4DE2-B785-14AD803158C8

42 ENGINEERING↗

Mask Projection Stereolithography for Manufacturing Ceramic Parts for CO 2 Capture and Sequestration

With increased CO 2 in the atmosphere and climate change becoming central in today’s political climate, it is important to make attempts to alleviate climate change. CO 2 capture is possible at the source of some of the larges CO 2 producers – industrial firms – where it can be collected via separation membranes. While current state-of-the-art technology is amine gas treatment or polymer membranes, ceramic membranes infilled with hydroxide offer a more energetically efficient solution. Stereolithography offers a unique manufacturing technique to create uniquely-shaped ceramic parts that will maximize carbon capture while maintaining low energy needs and low cost. High-loading ceramic slurries can be more difficult to manufacture using stereolithography due to high viscosity and opacity, but produce stronger pieces when sintered. The current challenge is optimizing high-load ceramic slurries for stereolithography to print pieces with large surface areas and parts on the micrometer-scale.

36 MATERIALS SCIENCE↗

Crystal Chemistry of Toxic Metal Sequestration in Rock-Forming Minerals (Final Report)

This document is a narrative describing research and publications enabled by 25 years of Department of Energy funding under grant DE-FG02-89ER14074. This narrative is intended to be readable by scientifically literate members of the public and our federal government. Technical details of this research are described fully in the publications cited at the end. If all of this work can be boiled down to a single question, it would be this: Can common minerals in soil and rock absorb and stop toxic and radioactive metals in groundwater? The simplistic answer is Yes, but the question and its many implications are far too complicated to answer with a single word. Although my colleagues and I have completed this research, the many new questions raised by the project should provide fertile soil for researchers of a new generation.

58 GEOSCIENCES↗

Using Radioiodine Speciation to Address Environmental Remediation and Waste Stream Sequestration Problems at the Fukushima Daiichi Nuclear Power Plant and a DOE Site

Iodine-129 ( 129 I), with a half-life of half-life of 16 million years, is commonly considered the single greatest risk driver in high-level and low-level nuclear repositories. This risk stems from several basic properties of 129 I, and under many geochemical conditions, it can move as an anion at nearly the rate of water through the subsurface environment. 129 I is also extremely radiologically toxic because over 90% of body burden accumulates in the thyroid, which weighs only about 14g in an adult. There is also a large worldwide inventory of radioiodine as a result of its high fission yield and this inventory is rapidly increasing as a result of nuclear energy production. Radioiodine is produced at a rate of 40 GBq (1 Ci) per gigawatt of electricity produced by nuclear power. To illustrate how the properties of 129 I magnify its risk, 129 I accounts for only 0.00002% of the radiation released from the Savannah River Site in Aiken, South Carolina, but contributes 13% of the population dose, a six orders of magnitude magnification of risk with respect to its radioactivity. The currently favored solid phase for LLW immobilization is cement, while HLW immobilization is the incorporation of waste into glass (vitrification). However, so far, the incorporation into cement and subsequent leaching of only iodide has been seriously investigated. The major problem with this approach is that it ignores the complex speciation of iodine, i.e., it ignores iodate and organo-iodine which have different chemistries. Most of the past research was devoted to the mechanism of iodide uptake in cement hydrate phases that is sorption and/or incorporation. Very few data exist on iodate and organo-iodine incorporation in cement, even though large quantities of liquid waste containing also radioiodine have already been solidified in cement Iodine-129 from low-level waste is commonly disposed of in cementitious materials. Grout, a dense cementitious fluid, mixed with a reducing slag, is often used to immobilize radionuclides. However, the reducing environment might not be conducive to immobilize iodine. For example, the silver based immobilization technologies (e.g., AgCl, Ag-impregnated granular activated carbon, Ag-mordenite) remove iodine from the aqueous phase by promoting the formation of Ag-iodide precipitates. The solubility of AgI is eight orders of magnitude lower than it is for AgIO 3 . Similarly, coprecipitation of iodine into calcium carbonate phases occurs only with IO 3 - and not with I - and org-I. If one would want to immobilize iodine more effectively, different engineering approaches would need to be used to promote binding of I - , IO 3 - , or organo-I. Using laboratory experiments with grout, slag, and silver-based adsorbents, and GC-MS and I K-edge XANES and EXAFS and C K-edge XANES spectroscopy for identifying iodine speciation, the major problems with these methods have been identified as focused too much on just one of the iodine species for immobilization, while others, especially organo-I, remained mobile. Finally, we established that most of the adsorbents that are used contain sufficient amounts of organic matter to create organo-I . It is anticipated that increased attention directed at understanding and quantifying the speciation of radioiodine, as opposed to simply total radioiodine, will lead to improved remediation results to be used for long-term radioiodine disposal in cementitious waste forms.

129-Iodine↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

Stage B Uranium Sequestration Amendment Delivery Monitoring Using Time-Lapse Electrical Resistivity Tomography

The Hanford Site 300 Area lies adjacent to the Columbia River, approximately 5 km north of Richland, Washington. Past waste disposal practices in the 300 Area resulted in vadose zone uranium contamination beneath former infiltration ponds and trenches. Stage-driven water table fluctuations and river water intrusion facilitate mobilization of uranium from contaminated sediments in regions periodically occupied by the water table (i.e., the periodically rewetted zone or PRZ), thereby raising groundwater uranium concentrations above the maximum allowable contaminant level for uranium. This report documents the ERT imaging operations and interpretation of imaging results in terms of the extent of amendment delivery (including phosphate and/or carrier fluid) within the treatment area. Based on the interpretation, amendment delivery to the LVZ and PRZ was observed to be variable between each of the three imaging clusters, as shown in Figure S.1. Amendment transport in Cluster 1 exhibited significant lateral flow in comparison to Clusters 2 and 3, resulting in a final amendment distribution throughout a large portion of the LVZ and PRZ sediment between the injection wells. Cluster 2 exhibited good amendment delivery in the LVZ only near the injection wells. In the PRZ at Cluster 2, amendment was effectively distributed through the full distance between injection wells. Cluster 3 exhibited the smallest amount of lateral flow and amendment was primarily distributed in the LVZ and PRZ very near the injection wells. Imaging results below the water table suggest that more amendment entered the groundwater in Cluster 2 and Cluster 3 than in Cluster 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep learning techniques to disentangle water use efficiency, climate change, and carbon sequestration across ecosystem scales

Focal Areas: We plan to use machine learning (ML) to disentangle the impact of climate change on plant water use efficiency (WUE) across the leaf level, structured canopy, and community ecosystem scales. Due to the complex behavior of modeling plant WUE’s connection to carbon storage (and hidden co-varying interactions) we suggest that physics-based deep learning must be utilized. The second topic we propose is, based on a better understanding of WUE response to climate change, there is a need to predict how WUE will limit or enhance the recycling of water from transpiration by vegetation back to the land surface worldwide, and thus impact water storage capacity (i.e., natural and reservoirs), using machine learning optimization techniques such as genetic algorithms.

54 ENVIRONMENTAL SCIENCES↗

Southeast Regional Carbon Sequestration Partnership (SECARB) Preparation of Discontinuation Plan

In some CO 2 injection demonstration projects, the injection is planned as a stand-along activity, that may require a final extensive phase for planning for demobilization. The first step toward demobilization is making decisions about when the project is completed in terms of achieving milestones. After this, the project may have a task of satisfying regulators and funding partners that the injected CO 2 , elevated pressure, and well construction have a reached a condition which is acceptable for abandonment. In some projects the condition for closure has been conceptualized as “plume stabilization”; other projects have proposed extracting CO 2 . When agreement on the required conditions are reached, the needed actions are completed, whether monitoring the trend toward stabilization and pressure re-equilibration or undertaking more active processes. At the time defined in the demobilization process, wells and other infrastructure are closed and remediated following processes defined by the demobilization process. At some point, closure of the project is accomplished; in some cases, activities needed for various length of time are described as post-closure care.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration Partnership (SECARB) Revised Monitoring Plan

This report summarizes the revisions made after attainment of project metrics of monitoring 1.5 million metric tons stored which occurred at 1 ½ years and after the end of the period of accelerated injection rate (February 2011) to reach project metrics. Denbury continues downdip injection because of its impact on production, but has modified the rate of injection to meet its EOR objectives. Therefore this project will not have a post-injection “closure” period. Injected CO 2 is being recycled and the flow field is substantively controlled by production. However, a period of observation of this long duration storage has value to the program in terms of showing no impact on near-surface environments and monitoring any changes in the reservoir over the long term. In addition, observations made during the first two years of injection have raised a number of significant questions that can be addressed during the next stages of research. Lastly, budget readjustment is needed, as some tasks have gone over budget and some have been completed under budget, leaving some opportunities to address remaining issues. This report provides an overview of the revisions and supplements proposed to the modeling and monitoring plan to complete the project.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration Partnership (SECARB) Collect Repeat 3-D Survey

The baseline 3-D survey of Cranfield was collected by Denbury Onshore LLC. in 2007 and data provided to the SECARB Early team at the BEG as a major cost share contribution for Phase II. The baseline 3-D survey covered the entire Cranfield Field as well into the surrounding brine-saturated water leg. This data remains extremely valuable in characterization for Phase III, and has been analyzed extensively. Bureau researchers Hongliu Zeng and Tip Meckel have analyzed the baseline 3-D to develop reservoir models. For example, Zeng enhanced seismic data to extract textures suggestive of high sinuosity aggradational point bar from the lower Tuscaloosa interval. Meckel assessed the logs and seismically imaged structure to better define the oil-water contact to assure that the DAS experiment was set in the water leg, and mapped the graben-edge fault that separates the Phase II and the Phase III areas. Additional characterization work continues by a number of students under funding from SECARB (Kordi dissertation) as well as additional efforts under BES funding though the CFSES project.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration Partnership (SECARB): Completed History Match: Subsurface Plume Development, Early Test

In this paper, we compare 4D seismic interpretations of CO 2 plume evolution with fluid flow numerical simulation results for the SECARB Early test at Cranfield, Mississippi. Historic pressure trends, oil and gas production rates and current CO 2 -EOR production data from the field were history matched and tuned model used for predictive simulations. For CO 2 -EOR operations the tuned model results showing CO 2 plume distribution and CO 2 first arrival (break-through) times in production wells were compared to the available field data. Reasonable matches were observed with breakthrough times. However 4D seismic interpretations of saturated region distributions and simulation results mismatch in some significant ways, likely showing limitations in 4D seismic interpretations for Cranfield. The tuned model then used to predict reservoir response and storage capacity in different field development scenarios. We compared hypothetical scenarios where the operator decided to transition into CO 2 injection without oil production (CO 2 -EORT) when oil production is not economical versus a scenario of continuing with CO 2 -EOR. Our results show that CO 2 -EOR can store more CO 2 and operations will last longer whereas if switched to CO 2 -EORT field has to be abandoned earlier because of out-of-area movement of the CO 2 plume. However, the amount of CO2 stored per year during the operational period is larger for CO 2 -EORT.

01 COAL, LIGNITE, AND PEAT↗