Search NASA⌕ Search

SEARCH · Search NASA

Results for “ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

RELAP5-3D Developmental Assessment: Comparison of Versions 4.1.3is and 4.0.3is

Figures have been generated comparing the parameters used in the developmental assessment of the RELAP5-3D code using versions 4.1.3is and 4.0.3is. The figures, which are the same as those used in Volume III of the RELAP5-3D code manual, compare calculations using the semi-implicit solution scheme with available experiment data. These figures provide a quick, visual indication of how the code predictions changed between these two code versions and can be used to identify cases in which the assessment judgment may need to be changed in Volume III of the code manual. Changes to the assessment judgments made after reviewing all of the assessment cases are also provided.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

RELAP5-3D Developmental Assessment: Comparison of Versions 4.2.1i and 4.1.3i

Figures have been generated comparing the parameters used in the developmental assessment of the RELAP5-3D code using versions 4.2.1i and 4.1.3i. The figures, which are the same as those used in Volume III of the RELAP5-3D code manual, compare calculations using the semi-implicit solution scheme with available experiment data. These figures provide a quick, visual indication of how the code predictions changed between these two code versions and can be used to identify cases in which the assessment judgment may need to be changed in Volume III of the code manual. Changes to the assessment judgments made after reviewing all of the assessment cases are also provided.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

RELAP5-3D Developmental Assessment: Comparison of Versions 4.3.4i and 4.2.1i

Figures have been generated comparing the parameters used in the developmental assessment of the RELAP5-3D code using versions 4.3.4i and 4.2.1i. The figures, which are the same as those used in Volume III of the RELAP5-3D code manual, compare calculations using the semi-implicit solution scheme with available experiment data. These figures provide a quick, visual indication of how the code predictions changed between these two code versions and can be used to identify cases in which the assessment judgment may need to be changed in Volume III of the code manual. Changes to the assessment judgments made after reviewing all of the assessment cases are also provided.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

RELAP-7 Software Verification and Validation Plan - Requirements Traceability Matrix (RTM) Part 2: Code Assessment Strategy, Procedure, and RTM Update

This document addresses two subjects involved with the RELAP-7 Software Verification and Validation Plan (SVVP): (i) the principles and plan to assure the independence of RELAP-7 assessment through the code development process, and (ii) the work performed to establish the RELAP-7 assessment plan, i.e., the assessment strategy, literature review, and identification of RELAP-7 requirements. Then, the Requirements Traceability Matrices (RTMs) proposed in previous document (INL-EXT-15-36684) are updated. These RTMs provide an efficient way to evaluate the RELAP-7 development status as well as the maturity of RELAP-7 assessment through the development process.

97 MATHEMATICS AND COMPUTING↗

Retrofit of Blown Attic Insulation in Existing HUD-Code Manufactured Homes: Needs Assessment Report

This needs assessment was conducted by the Washington State University (WSU) Energy Program and Building Science Corporation (BSC), with support from the U.S. Department of Energy's (DOE) Building Technologies Office. The primary goal of this research was to identify moisture durability, energy savings, and savings-to-investment ratio (SIR) research needs related to the retrofit of attic insulation in the DOE Weatherization Assistance Program (WAP). Specifically, manufactured homes that comply with building codes established by the U.S. Department of Housing and Urban Development (HUD) built after 1976 and sited in colder climates. This project assessed current practice of WAP insulation and/or roof venting solutions that improve attic insulation energy savings and durability. WSU and BSC conducted outreach to stakeholders via email, phone, one-on-one interviews, and group meetings designed to inquire about relevant issues that they may have observed. Needs assessment feedback was provided from stakeholders involved with attic insulation retrofits in existing HUD-code manufactured housing in the colder climates of the United States. The list of more than 50 stakeholders who provided input into this needs assessment is provided in Appendix A.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Retrofit of Blown Attic Insulation in Existing HUD-Code Manufactured Homes: Needs Assessment Report

This needs assessment was conducted by the Washington State University (WSU) Energy Program and Building Science Corporation (BSC), with support from the U.S. Department of Energy's (DOE) Building Technologies Office. The primary goal of this research was to identify moisture durability, energy savings, and savings-to-investment ratio (SIR) research needs related to the retrofit of attic insulation in the DOE Weatherization Assistance Program (WAP). Specifically, manufactured homes that comply with building codes established by the U.S. Department of Housing and Urban Development (HUD) built after 1976 and sited in colder climates. This project assessed current practice of WAP insulation and/or roof venting solutions that improve attic insulation energy savings and durability. WSU and BSC conducted outreach to stakeholders via email, phone, one-on-one interviews, and group meetings designed to inquire about relevant issues that they may have observed. Needs assessment feedback was provided from stakeholders involved with attic insulation retrofits in existing HUD-code manufactured housing in the colder climates of the United States. The list of more than 50 stakeholders who provided input into this needs assessment is provided in Appendix A.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Risk Assessment for Marine Vessel Traffic and Wind Energy Development in the Atlantic

The Bureau of Ocean Energy Management (BOEM) is initiating leasing of the seabed for offshore wind energy development on the outer continental shelf (OCS) in the Atlantic from Maine to Florida, with initial development planned for a series of Wind Energy Areas (WEAs) designated by the Department of Interior. Additional wind areas are under development and are currently considered to be Wind Call Areas (WCAs), leasing areas, and other set asides. Some of the proposed sites are located at or near the entrances to major ports, others are located at the seaward terminus of existing Traffic Separation Schemes (TSS), and many of the wind areas occupy locations along historical shipping routes. The siting of offshore wind farms has the potential to affect existing shipping along the Atlantic Coast; modifications to safe-access routes may be required. The United States Coast Guard (USCG) has the authority to ensure navigational safety in U.S. waters. The USCG has undertaken the Atlantic Coast Port Access Study (ACPARS) to assess future port access and navigation needs for the Atlantic coast, at a time when the mix of shipping routes and vessels are likely to change due to factors such as the widening of the Panama Canal and opening of the Arctic Ocean to shipping. The presence of wind turbines off the Atlantic coast has the potential to affect shipping routes and activities. In order to safely incorporate the presence of offshore wind farms into ACPARS, the USCG requires information on the following: the effects of offshore renewable energy infrastructure on potential traffic density; the impacts of offshore wind infrastructure on shipping traffic including rerouting, funneling, and obstructions to navigation; and whether changes to safe access routes for vessels are needed with the installation of offshore wind farms, including modifications to fairways or TSSs. BOEM entered into an Interagency Agreement in August 2012 with the US Department of Energy (DOE) to provide risk assessment expertise to the USCG development of ACPARS and BOEM’s OCS leasing. DOE assigned Pacific Northwest National Laboratory (PNNL) to provide an assessment of navigational safety risks (including collision, contact, grounding, and stranding). PNNL structured the project around several activities: 1) acquisition and processing of Automated Identification System (AIS) data; 2) geospatial analysis to elucidate historical shipping routes; 3) development of a data-driven numerical model to predict vessel movements in the presence of offshore wind farms; 4) enlisting expertise in navigation from an experts’ panel; 5) assessment of navigational risks from the presence of offshore wind farms; and 6) recommendations for changes to the navigation system to accommodate those changes. This report focuses on the activities carried out by PNNL, in close coordination with BOEM and USCG, from August 2012 to November 2013, and indicates the priority actions for additional enhancement to the modeling system to be carried out from December 2013 through November 2014. The body of the report briefly introduces each step of the process, and reports on notable outcomes. Detailed descriptions, computations, and figures that represent each step are included in ten technical appendices.

17 WIND ENERGY↗

Assessment Approach to Advanced Fuel Models

This document constitutes completion of the NEAMS milestone M3MS-21IN0201016, which is titled: Assessment of advanced fuel improvements. In this report we present: (1) simulations of separate effects creep tests for uranium alloy and HT-9; (2) examples of standardizing and updating metallic fuel assessments to include the latest models and key output figures of merit, which is coordinated with LANL to better evaluate advanced models; (3) examples of how the FIPD database at ANL is integrated into metallic fuel assessment cases; and finally (4) documentation of fuel-specific figures of merit and the BISON review process for assessments with best practices for preparing and reviewing finite element simulations in the appendix.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Renewable Energy Resource Assessment Information for the United States

The Renewable Energy Resource Assessment Information for the United States report summarizes the results of nearly 30 national renewable energy resource assessments performed by the U.S. national laboratories since 2012. Included are assessments for solar, wind, biomass, marine, geothermal, and hydropower energy resource technologies. Increased attention is given to the renewable energy resources available near federally recognized Tribal Nations and low-to-moderate income households, where assessed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CARILEC Resilient Energy Community CoP for Cybersecurity Workshop Series: Cybersecurity Assessment Tools [Slides]

For the last several years and in collaboration with CARILEC, USAID and NREL have been working to support cyber resilience at power sector utilities in Latin America and the Caribbean. Direct technical assistance with regional utilities has been a key component of USAID-NREL Partnership activities, and technical assistance has typically included a foundational cybersecurity assessment using NREL's Distributed Energy Resource Cybersecurity Framework (DER-CF) tool. The DER-CF allows organizations to benchmark and evaluate their cybersecurity posture across the areas of Governance, Technical Management, and Physical Security. To complement the activities of the newly created CAREC IT/OT and Cybersecurity Team, this webinar on cybersecurity assessment tools includes an overview of the DER-CF tool and a discussion with regional stakeholders and NREL experts on the DER-CF assessment process and other resources for cybersecurity assessments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Soil-to-Plant Concentration Ratios for Assessing Food Chain Pathways in Biosphere Models

This report describes work performed for the U.S. Nuclear Regulatory Commission’s project Assessment of Food Chain Pathway Parameters in Biosphere Models, which was established to assess and evaluate a number of key parameters used in the food-chain models used in performance assessments of radioactive waste disposal facilities. Section 2 of this report summarizes characteristics of samples of soils and groundwater from three geographical regions of the United States, the Southeast, Northwest, and Southwest, and analyses performed to characterize their physical and chemical properties. Because the uptake and behavior of radionuclides in plant roots, plant leaves, and animal products depends on the chemistry of the water and soil coming in contact with plants and animals, water and soil samples collected from these regions of the United States were used in experiments at Pacific Northwest National Laboratory to determine radionuclide soil-to-plant concentration ratios. Crops and forage used in the experiments were grown in the soils, and long-lived radionuclides introduced into the groundwater provide the contaminated water used to water the grown plants. The radionuclides evaluated include 99Tc, 238Pu, and 241Am. Plant varieties include alfalfa, corn, onion, and potato. The radionuclide uptake results from this research study show how regional variations in water quality and soil chemistry affect radionuclide uptake. Section 3 summarizes the procedures and results of the uptake experiments, and relates the soil-to-plant uptake factors derived. In Section 4, the results found in this study are compared with similar values found in the biosphere modeling literature; the study’s results are generally in line with current literature, but soil- and plant-specific differences are noticeable. This food-chain pathway data may be used by the NRC staff to assess dose to persons in the reference biosphere (e.g., persons who live and work in an area potentially affected by radionuclide releases) of waste disposal facilities and decommissioning sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phase I Archaeological Survey of Parcel ED-3 and Historic Assessment of the Happy Valley Worker Camp Roane County, Tennessee

Parcel ED-3 was the location of a portion of "Happy Valley," a temporary worker housing area occupied from 1943 to 1947 during the construction of the K-25 Oak Ridge Gaseous Diffusion Plant. The project was carried out under subcontract for the Department of Energy. The survey report will be used in the preparation of an Environmental Assessment under the National Environmental Policy Act (NEPA). New South Associates conducted a Phase I Archaeological Survey of Parcel ED-3 at the US Department of Energy's Oak Ridge Reservation in Roane County, Tennessee. The survey was conducted in two parts. The first survey was carried out in 2008 and covered an area measuring approximately 110 acres. The second survey took place in 2009 and focused on 72 acres west of the first survey area. The objective of the surveys was to identify any archaeological remains associated with Happy Valley and any additional sites on the property and to assess these sites for National Register eligibility. New South Associates also conducted a historic assessment to gather information on Happy Valley. This historic assessment was used in conjunction with the archaeological survey to evaluate the significance of the Happy Valley site. Archaeological remains of Happy Valley were located throughout the parcel, but no additional sites were located. The official state site number for Happy Valley is 40RE577. During the two surveys a total of 13 artifact concentrations, 14 isolated finds, and 75 structural features were located. Due to the Happy Valley's strong association with the Manhattan Project, the site is recommended eligible for the National Register of Historic Places under Criterion A.

54 ENVIRONMENTAL SCIENCES↗

INDUSTRIAL ASSESSMENT CENTER PROGRAM

Since its establishment in 1990, San Diego State University’s Industrial Assessment Center (IAC) has served close to 400 small and medium-sized manufacturing plants in Southern California. SDSU/IAC’s efforts to transfer state-of-the-art technologies to industry have increased revenues, cultivated creativity, improved efficiencies, and benefited the environment. A substantial benefit from the program has been the ongoing training of engineering faculty and students. During this funding cycle, SDSU/IAC has trained 31 students, 7 of the graduate. A total of 92 assessments and 108 assessment days were completed, resulting in 638 assessment recommendations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydropower Resource Assessment of Brazilian Streams

The Idaho National Laboratory (INL) in collaboration with the U.S. Geological Survey (USGS) with the assistance of the Empresa de Pesquisa Energetica (EPE) and the Agencia Nacional de Energia Electrica (ANEEL) has performed a comprehensive assessment of the hydropower potential of all Brazilian natural streams. The methodology by which the assessment was performed is described. The results of the assessment are presented including an estimate of the hydropower potential for all of Brazil, and the spatial distribution of hydropower potential thus providing results on a state by state basis. The assessment results have been incorporated into a geographic information system (GIS) application for the Internet called the Virtual Hydropower Prospector do Brasil. VHP do Brasil displays potential hydropower sites on a map of Brazil in the context of topography and hydrography, existing power and transportation infrastructure, populated places and political boundaries, and land use. The features of the application, which includes tools for finding and selecting potential hydropower sites and other features and displaying their attributes, is fully described.

13 HYDRO ENERGY↗

Needs for Robotic Assessments of Nuclear Disasters

Following the nuclear disaster at the Fukushima nuclear reactor plant in Japan, the need for systems which can assist in dynamic high-radiation environments such as nuclear incidents has become more apparent. The INL participated in delivering robotic technologies to Japan and has identified key components which are needed for success and obstacles to their deployment. In addition, we are proposing new work and methods to improve assessments and reactions to such events in the future. Robotics needs in disaster situations include phases such as: Assessment, Remediation, and Recovery Our particular interest is in the initial assessment activities. In assessment we need collection of environmental parameters, determination of conditions, and physical sample collection. Each phase would require key tools and efforts to develop. This includes study of necessary sensors and their deployment methods, the effects of radiation on sensors and deployment, and the development of training and execution systems.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Baseline Risk Assessment Supporting Closure at Waste Management Area C at the Hanford Site Washington

The Office of River Protection under the U.S. Department of Energy is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C under the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO). A baseline risk assessment (BRA) of current conditions is based on available characterization data and information collected at WMA C. The baseline risk assessment is being developed as a part of a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Corrective Measures Study (CMS) at WMA C that is mandatory under Comprehensive Environmental Response, Compensation, and Liability Act and RCRA corrective action. The RFI/CMS is needed to identify and evaluate the hazardous chemical and radiological contamination in the vadose zone from past releases of waste from WMA C. WMA C will be under Federal ownership and control for the foreseeable future, and managed as an industrial area with restricted access and various institutional controls. The exposure scenarios evaluated under these conditions include Model Toxics Control Act (MTCA) Method C, industrial worker, maintenance and surveillance worker, construction worker, and trespasser scenarios. The BRA evaluates several unrestricted land use scenarios (residential all-pathway, MTCA Method B, and Tribal) to provide additional information for risk management. Analytical results from 13 shallow zone (0 to 15 ft. below ground surface) sampling locations were collected to evaluate human health impacts at WMA C. In addition, soil analytical data were screened against background concentrations and ecological soil screening levels to determine if soil concentrations have the potential to adversely affect ecological receptors. Analytical data from 12 groundwater monitoring wells were evaluated between 2004 and 2013. A screening of groundwater monitoring data against background concentrations and Federal maximum concentration levels was used to determine vadose zone contamination impacts on groundwater. Waste Management Area C is the first of the Hanford tank farms to begin the closure planning process. The current baseline risk assessment will provide valuable information for making corrective actions and closure decisions for WMA C, and will also support the planning for future tank farm soil investigation and baseline risk assessments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Approaches to consider covers and liners in a low-level waste disposal facility performance assessment

On-site disposal cells are in use and being considered at several USDOE sites as the final disposition for large amounts of waste associated with cleanup of contaminated areas and facilities. These disposal cells are typically regulated by States and/or the USEPA in addition to having to comply with requirements in DOE Order 435.1, Radioactive Waste Management. The USDOE-EM Office of Site Restoration formed a working group to foster improved communication and sharing of information for personnel associated with these Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) disposal cells and work towards more consistent assumptions, as appropriate, for technical and policy considerations related to performance and risk assessments in support of a Record of Decision and Disposal Authorization Statement. One task completed by the working group addressed approaches for considering the performance of covers and liners/leachate collection systems in the context of a performance assessment (PA). A document has been prepared which provides recommendations for a general approach to address covers and liners/leachate collection systems in a PA and how to integrate assessments with defense-in-depth considerations such as design, operations and waste acceptance criteria to address uncertainties. Specific information and references are provided for details needed to address the evolution of individual components of cover and liner/leachate collection systems. This information is then synthesized into recommendations for best practices for cover and liner system design and examples of approaches to address the performance of covers and liners as part of a performance assessment of the disposal system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗